CN106906726A - A kind of cement concrete pavement steel form - Google Patents

A kind of cement concrete pavement steel form Download PDF

Info

Publication number
CN106906726A
CN106906726A CN201710146411.5A CN201710146411A CN106906726A CN 106906726 A CN106906726 A CN 106906726A CN 201710146411 A CN201710146411 A CN 201710146411A CN 106906726 A CN106906726 A CN 106906726A
Authority
CN
China
Prior art keywords
plate
mud guard
steel plate
main brace
baffler
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710146411.5A
Other languages
Chinese (zh)
Other versions
CN106906726B (en
Inventor
王本勋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Zhongji Weiye Construction Engineering Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710146411.5A priority Critical patent/CN106906726B/en
Publication of CN106906726A publication Critical patent/CN106906726A/en
Application granted granted Critical
Publication of CN106906726B publication Critical patent/CN106906726B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/50Removable forms or shutterings for road-building purposes; Devices or arrangements for forming individual paving elements, e.g. kerbs, in situ
    • E01C19/502Removable forms or shutterings, e.g. side forms; Removable supporting or anchoring means therefor, e.g. stakes

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

The present invention relates to road administration field, specifically a kind of cement concrete pavement steel form, during it is primarily adapted for use in rugged sandstone soil mixing road surfacing concrete;Whether the present invention is the main brace steel plate of spill including section, the mud guard on main brace steel plate and with concrete directly contact, the baffler being used to stretch into sandstone soil installed in mud guard lower end, be used to clear up the brush device for cleaning of debris and the measurement apparatus in the same plane for measuring polylith main brace steel plate on mud guard installed in main brace steel plate rear end.The work compound that the present invention passes through main brace steel plate, mud guard, baffler, brush device for cleaning and measurement apparatus, reduce the probability of spillage between adjacent mud guard, reduce the spillage probability of main brace steel plate lower end, eliminate the time that workmen clears up mud guard debris, and each section of mud guard upper surface is in same plane, ensure the flatness of concrete road surface.

Description

A kind of cement concrete pavement steel form
Technical field
The present invention relates to road administration field, specifically a kind of cement concrete pavement steel form.
Background technology
Cement concrete pavement is a kind of rigid high class pavement, and it is by cement, water, coarse aggregate, fine aggregate and additive by certain Level mixes and stirs into the road surface of cement concrete mixture making, with intensity it is high, bearing capacity is strong, good stability, antiskid etc. Advantage.So, China all pays much attention to cement concrete pavement making, and the build construction technology of road pavement has carried out continuous research, Cement concrete pavement is set to have obtained developing faster.In cement concrete pavement paving process, it is one highly important to install template Step, it is necessary to measure unwrapping wire to job site before installation form, then squeezes into crooked chisel by unwrapping wire position in basic unit both sides again It is fixed.Also needed to after the completion of model sheetinstallat in the uniform brushing a thin layer oil of formwork sides or pitch, so as to form removal wooden model or punching block, Punching block is used as far as possible, and length 3m~4m is highly equal with concrete surface laminate thickness.
It is existing that steel form process is installed to sandstone soil ground, there is a problem of certain, mainly include spillage problem, right The process problem for cleaning problem and out-of-flatness template with water of template;(1) spillage problem:Because sandstone soil ground is very uneven It is whole, so as to bring certain difficulty to the work of installing of steel form, in the prior art, adjacent two block concretes rack template it Between connected mode be to put together two pieces of rack templates side by side, two pieces of rack template junctions are with one piece of flat square iron plate And a horizontal reinforcement is positioned, the connected mode has carried out spacing to two pieces of left and right directions of rack template, then aids in Two pieces of rack templates are fastened on road surface respectively using vertical reinforcing bar, multi-process handling for the above method, and two pieces of rack templates Between cannot often accomplish to be brought into close contact so that there is the space of one fixed width, Jin Erzao in two pieces of rack template junctions Into spillage, while have impact on concrete side walls finish, unnecessary waste is also created;Simultaneously as main brace steel plate Bottom bracing plate bottom surface is planar structure, but sandstone soil is irregular shape, so that main brace steel plate is placed on when on sandstone soil, bottom Numerous spaces are certainly existed between fagging and sandstone soil surface, if these spaces are not processed, in fill concrete, Numerous concrete easily flow out from above-mentioned space, cause spillage, existing according to existing concrete road surface site operation experience There is workmen when these spaces are processed, mainly by manually being scooped up sandstone soil elsewhere with spade, will shovel Sandstone soil after rising is filled into above-mentioned space, and above-mentioned space is mended, and the form of construction work increased the workload of workman, And reduce efficiency of construction;(2) template cleans problem with water:Existing steel form after use, with concrete road surface sidewall contact One side can speckle with the debris such as concrete, if these debris not disposed, next time using the steel form when, the punching block Plate can then cause concrete road surface sidewall roughness, influence road quality, and existing common method is manually to clean with water, cumbersome, Labor intensive;(3) process problem of out-of-flatness template:In the prior art, in concrete road process of deployment, concrete road surface Upper surface be often to be flushed with concrete support template upper surface so that, if the upper surface of different concrete rack template is simultaneously It is not on same plane, then easily causes the injustice of concrete road surface, existing model sheetinstallat process, it is necessary to corrects mould repeatedly Whether the discrepancy in elevation and the template inner side of plate joint have dislocation and situations such as out-of-flatness, and the discrepancy in elevation is more than 3mm or has dislocation and out-of-flatness Template should remove and reinstall, it is cumbersome.In consideration of it, the invention provides a kind of new cement concrete pavement steel form, It has the characteristics that:
(1) a kind of cement concrete pavement steel form of the present invention, it passes through main brace steel plate, mud guard, baffler, cleans with water The work compound of device and measurement apparatus, reduces the probability of spillage between adjacent mud guard, reduces the leakage of main brace steel plate lower end Slurry probability, eliminates workmen and clears up the time of mud guard debris, and each section of mud guard upper surface is in same plane, The flatness of concrete road surface is ensured;
(2) a kind of cement concrete pavement steel form of the present invention, its mud guard Cross section Design is " work " font;Work as needs Dismounting main brace steel plate when, for mud guard, only need to by mud guard in main brace steel plate front and rear tuning, i.e., can will the present invention it is whole Body set up be ready for directly being used on the road of fill concrete to other, cut staff clear up mud guard when Between, improve engineering efficiency;
(3) a kind of cement concrete pavement steel form of the present invention, the design of its mud guard upper limit position block so that the present invention Operationally, only the convex region block of one piece of mud guard need to completely be snapped in another piece of recessed area seam of mud guard, then makes convex region block complete Embedded recessed area seam, you can realize being fitted close between adjacent two pieces of mud guards, more facilitate for conventional art, this hair Spillage amount is greatly reduced between bright adjacent two pieces of mud guards;
(4) a kind of cement concrete pavement steel form of the present invention, the design of its baffler, it is equivalent in planar structure Bottom bracing plate outer end added an obstacle for pyramidal structure, the space between bottom bracing plate and sandstone soil ground is isolated in resistance Dividing plate inner side, can effectively prevent spillage between the bottom bracing plate of the main brace steel plate in fill concrete and sandstone soil road surface.
The content of the invention
In order to make up the deficiencies in the prior art, a kind of heretofore described cement concrete pavement steel form, it is mainly applicable During to rugged sandstone soil mixing road surfacing concrete, spillage between adjacent mud guard can be reduced Probability, reduces the spillage probability of main brace steel plate lower end, saves workmen and clears up the time of mud guard debris, and makes each section of gear mud Plate upper surface can be in same plane, ensure the flatness of concrete road surface.
The technical solution adopted for the present invention to solve the technical problems is:A kind of cement concrete pavement steel form, it is mainly fitted During to rugged sandstone soil mixing road surfacing concrete;The present invention is the main brace of spill including section Steel plate, the mud guard on main brace steel plate and with concrete directly contact, installed in mud guard lower end be used for stretch into sandstone Baffler in soil, it is used to clear up on mud guard the brush device for cleaning of debris and many for measuring installed in main brace steel plate rear end Block main brace steel plate measurement apparatus whether in the same plane.
Described main brace steel plate includes the side stay plate of arrangement vertically, and level is connected in the bottom bracing plate of side stay plate bottom, level The top bracing plate| at the top of side stay plate is connected in, the skateboards slot for being available for mud guard to insert, slide plate are provided through on described side stay plate Groove includes the area's groove and horizontally disposed 2nd area groove that are vertically arranged, and the skateboards slot cross sectional shape that the area's grooves of an area Cao Yu bis- are constituted is T-shape;Described top bracing plate| rear and front end is symmetrically arranged with a pair measuring flumes for installing measurement apparatus.During work, main brace Steel plate is placed on sandstone soil road surface, and bottom bracing plate is contacted with sandstone soil road level, and side stay plate outer surface is vertically oriented to Will fill concrete side, main brace steel plate is securely fastened on road surface then through reinforcing bar, reinforcing bar is by main brace steel plate The method on road surface is fastened on for prior art, is not set forth in detail herein;During work, the road two of laying concrete is being needed Side is symmetrically installed above-mentioned main brace steel plate, and the effect of main brace steel plate is for being positioned to mud guard, enabling mud guard firm Shaped with to concrete road surface side wall positioned at construction road both sides.
Mud guard includes baffle plate, No. two baffle plates and the connecting plate being connected between a baffle plate and No. two baffle plates, one The mud guard cross sectional shape that number baffle plate, No. two baffle plates and connecting plate are constituted is " work " font;A number baffle plate can divide with No. two baffle plates Qian Ru not be in skateboards slot and area's groove of fitting completely, connecting plate can be embedded in that skateboards slot is interior and two area's grooves of fitting completely;And baffle plate, The equal length of No. two baffle plates and connecting plate and more than the length of skateboards slot, the design is caused when mud guard is on main brace steel plate Afterwards, there is the part stretched out mud guard rear and front end, consequently facilitating the accurate connection between follow-up adjacent two pieces of mud guards;Institute The baffle plate and No. two baffle plate lower ends stated also extend through the baffle-wall groove for being provided with and being available for baffler to insert, the cross sectional shape of baffle-wall groove It is T-shape;Under original state, mud guard is arranged on main brace steel plate, and a baffle plate lateral surface direction will fill concrete Side, in two area's grooves of connecting plate insertion main brace steel plate, in area's grooves of No. two baffle plates insertion main brace steel plate, fill concrete When, concrete road surface highest face flushes with mud guard highest face, and concrete road surface side wall is brought into close contact a baffle plate lateral surface, So as to realize sizing of the mud guard to concrete road surface side wall;After the concrete road surface maintenance a period of time for laying, open Begin dismounting main brace steel plate, now, for mud guard, only mud guard need to be carried out into front and rear tuning, makes No. two baffle plate lateral surface courts To the side of fill concrete, in area's groove of baffle plate insertion main brace steel plate, now No. two baffle surfaces are clean, so that After obtaining of the invention being disassembled, i.e., can set up other and be ready for directly being used on the road of fill concrete, cut Staff clears up the time of mud guard, improves engineering efficiency.
Specifically, as one kind of the invention preferred embodiment, described mud guard also includes limited block, a gear Concave shaped space between plate and No. two baffle plates is referred to as recessed area seam;Described limited block weldering is connected in the seam of the recessed area of mud guard rear end, And each limited block extends outward the convex region block of cube structure from the seam of recessed area, described convex region block can be with adjacent mud guard Recessed area seam agree with completely.The present invention operationally, wants precisely cooperation between adjacent two pieces of mud guards, reduce space, only needs The convex region block of one piece of mud guard is snapped in into another piece of recessed area seam of mud guard completely, the structure design is to adjacent two blocks gear mud Carried out on the left and right directions and above-below direction of plate it is spacing, then make convex region block be completely embedded into recessed area stitch, i.e., to fore-and-aft direction again It is defined, so as to be fitted close between adjacent two pieces of mud guards can be made, more facilitates for conventional art, this hair Spillage amount is greatly reduced between bright adjacent two pieces of mud guards.
The cross sectional shape of the baffler be triangular structure of right angle, and baffler minimum corner be located at baffler under End, baffler upper end is provided with the slide rail that cross sectional shape is T-shape, and described slide rail is slidably embedded in the baffle-wall groove of mud guard It is interior.The effect for designing baffler is prevented in fill concrete, is deposited between the bottom bracing plate of main brace steel plate and sandstone soil road surface In spillage;Because the bottom bracing plate bottom surface of main brace steel plate is planar structure, but sandstone soil is irregular shape, so that main brace steel plate It is placed on when on sandstone soil, numerous spaces is certainly existed between bottom bracing plate and sandstone soil surface, if these spaces is not carried out Treatment, then in fill concrete, numerous concrete easily flow out from above-mentioned space, cause spillage, bring unnecessary waste, According to existing concrete road surface site operation experience, existing workmen mainly passes through when these spaces are processed Sandstone soil elsewhere is scooped up with spade manually, the sandstone soil after scooping up is filled into above-mentioned space, will be upper State space to mend, the form of construction work increased the workload of workman, and reduce efficiency of construction;In consideration of it, the invention provides A kind of baffler, it has added an obstacle for pyramidal structure equivalent to the bottom bracing plate outer end in planar structure, by bottom bracing plate with Space between sandstone soil ground is isolated in baffler inner side, so that in fill concrete, concrete is because of baffler Inhibition, in will not draining to above-mentioned space, it is to avoid the possibility of spillage;Meanwhile, the baffler cross sectional shape is designed as directly Angle triangular structure, and the minimum corner of baffler is located at baffler lower end, its purpose is provided to reduction baffler and penetrates sand Resistance when in stone soil;When preparing to be arranged on main brace steel plate and mud guard on sandstone soil road surface, in order to by main brace steel Plate completely cuts off with the space on sandstone soil road surface with construction area, and the slide rail of baffler only need to be manually pushed to the baffle-wall of mud guard In groove, then main brace steel plate, mud guard and baffler are integrally embedded in sandstone soil;Baffler is slidably inserted gear In mud plate, the purpose is to cause that the present invention also adapts to the construction on other road surfaces outside out-of-flatness sandstone soil, if will intercept Plate is connected on mud guard, then the overall lower end of the present invention is pyramidal structure, so that the present invention is difficult to be applied to smooth-riding surface Lay the process of concrete;It is of the invention then be applicable to after baffler is dismantled and baffler of the invention can be dismantled The process of concrete is laid to smooth-riding surface, so that applicable surface of the invention is wider.
Specifically, as one kind of the invention preferred embodiment, when in baffler insertion mud guard, baffler Straight sidewalls are generally aligned in the same plane interior towards mud guard outside with mud guard outside side wall;If the inclined plane direction of baffler Mud guard outside, then when the concrete of filling is flowed at baffler, the concrete at baffler can form a sloped sidewall, So as to cause concrete road trackside wall out-of-flatness, and also add the consumption of concrete;The straight sidewalls of baffler of the present invention Towards mud guard outside, and in being generally aligned in the same plane with mud guard outside side wall, so that being contacted with mud guard and baffler Concrete road surface side-walls on same vertical plane, making concrete road surface side wall fully smooth.
Specifically, as one kind of the invention preferred embodiment, described mud guard upper-lower height is 30cm;It is described Baffler straight sidewalls upper-lower height be 10-15cm.It can be seen from national standard according to soil cement road surface construction, in Traffic volume level On the city expressway such as heavy traffic, very heavy traffic, city thoroughfare and freight backbone road, to lay difference successively from the bottom up Bed course, wherein, above-mentioned each road the superiors are Common Concrete Pavement, and the thickness of concrete layer is generally 22-24cm, most thick It is 28cm, 28cm concrete layers are generally present on very heavy traffic grade road surface;Under concrete layer for lime-fly ash aggregate base or Basic unit on cement stabilized macadam, its thickness is generally 15-18cm;Mud guard upper-lower height of the invention is designed as 30cm so that When the present invention is operated in the concrete layer work progress on above-mentioned road surface, after mud guard is placed on sandstone soil, gear Mud plate bottom can be located on lime-fly ash aggregate base or cement stabilized macadam at substrate side walls, meanwhile, baffler straight sidewalls Upper-lower height is 10-15cm so that baffler bottom is at basic unit on lime-fly ash aggregate base or cement stabilized macadam Side wall lower ends, and then workmen is on to lime-fly ash aggregate base or cement stabilized macadam in basic unit during fill concrete, coagulation Soil is difficult the intersection outflow from lime-fly ash aggregate base (basic unit on cement stabilized macadam) and mud guard and baffler, further subtracts The small probability of spillage.
Described brush device for cleaning quantity is two, and two brush device for cleaning are separately mounted to main brace steel plate rear and front end and positioned at gear Mud plate right;Each brush device for cleaning includes reservation, moves seat, brush holder support, hairbrush and pushes screw rod;Described reservation weldering is connected in main brace steel On the bottom bracing plate of plate, shifting seat is interchangeable on the top bracing plate| of main brace steel plate by screw, and the design enables to move seat Disassembled from main brace steel plate, so that can be replaced through the brush holder support and hairbrush for moving seat, prevent hairbrush long-term not more Change and influence to clean with water effect, reservation is provided with shifting seat side wall and is available for pushing the screw that screw rod is passed through, and reservation is gone back with seat middle part is moved The bar groove for being available for brush holder support to be embedded in is provided with, the space for being available for brush holder support side-to-side movement is reserved with bar groove;Described brush holder support is flat Square plate, brush holder support is embedded in reservation and moves in the bar groove of seat vertically;Described hairbrush is uniformly connected on brush holder support, and hairbrush is iron Material matter, hairbrush is the design of irony material so that hairbrush is nonabradable meanwhile, it is capable to sufficiently brush miscellaneous on mud guard Thing;Described push screw rod extends through reservation and the screw moved on seat and is in contact with brush holder support right side, brush holder support left side with The spring for resetting also is fixed between reservation and shifting seat.During work, screw rod can be pushed by manual adjustment, make push spiral shell Bar is moved left and right in reservation with shifting seat, so that it is for adjusting hairbrush pair to drive brush holder support or so translation, brush holder support or so translation The active force of mud guard, so that adjust brush device for cleaning cleans effect with water.Under original state, a baffle plate lateral surface and concrete road Face contacts, and in No. two area's grooves of baffle plate insertion main brace steel plate, after the concrete road surface maintenance a period of time for laying, opens Begin dismounting main brace steel plate, now, mud guard manually is carried out into front and rear tuning, makes No. two baffle plate lateral surfaces towards fill concrete Side, in area's groove of baffle plate insertion main brace steel plate, before a baffle plate is embedded in area's groove, also deposits on a baffle plate There are the debris such as concrete, if these debris not disposed, when next time is using a baffle plate, a baffle plate can then be caused Concrete road surface sidewall roughness, influences road quality, and existing common method is manually to clean with water, cumbersome, labor intensive, and The design of brush device for cleaning of the present invention a so that when baffle plate of the invention is embedded in area's groove, the one of debris are speckled with a baffle plate Face can touch the irony hairbrush of brush device for cleaning, then artificial to continue to be pushed to a baffle plate in one area's groove, in a gear During plate is moved, hairbrush persistently cleans a baffle sidewall with water, after a baffle plate is pushed into area's groove completely, a baffle plate The debris of side wall are then cleaned out by hairbrush, thus when it is next artificial mud guard is carried out into front and rear tuning again after, baffle plate also without Directly used by need to being cleared up again, if feeling not clean with water totally, hair can also be adjusted by adjusting push screw rod Brush to the active force of mud guard, so as to adjust the effect of cleaning with water of brush device for cleaning, it is clear that the design of brush device for cleaning has cut staff The time of mud guard is managed, engineering efficiency is improve.
Described measurement apparatus include button rope plate, fixture block, elastic threads, infrared distance sensor, microcontroller and acousto-optic report Alert device;Described button rope plate quantity is two, and a button rope plate is slidably embedded in certain main brace steel plate rear end in two button rope plates Measuring flume in, another button rope plate is slidably embedded in the measuring flume of other main brace steel plate front ends, and each button rope plate upper end is equal It is provided with groove;Described elastic threads rear and front end is fixed with fixture block, and elastic threads rear and front end is embedded in two by fixture block In the groove of button rope plate;Described infrared distance sensor is arranged on main brace steel plate upper surface rear and front end, and infrared distance measurement is passed Sensor is located at immediately below elastic threads;Described microcontroller is installed on main brace steel plate with audible-visual annunciator, and microcontroller is used In the automatic job for controlling infrared distance sensor of the present invention and audible-visual annunciator, the present invention is also equipped with power supply with to infrared survey It is powered away from sensor, microcontroller and audible-visual annunciator.In the prior art, in concrete road process of deployment, coagulation The upper surface of soil surface is often to be flushed with concrete support template upper surface, so that, if different concrete rack templates is upper End face is not on same plane, then easily cause the injustice of concrete road surface, and measurement apparatus of the invention its effects is exactly Solve this inequal situation in concrete support template upper surface;During work, each mud guard of the invention is mutually arranged on one Rise, when needing to be monitored the upper surface of certain section of each mud guard on road, then choose suitable elastic threads, by a button rope plate In the measuring flume of the main brace steel plate of embedded this section of way mud guard one end, another button rope plate is embedded in this section of way mud guard other end Main brace steel plate measuring flume in, then again by the fixture block at the elastic threads two ends of selection be respectively embedded into two button rope plate grooves It is interior, so that elastic threads are tightened in each mud guard top of the Duan Lu, now, the infrared distance sensor on each main brace steel plate The distance between elastic threads and main brace steel plate upper surface size is detected, when ultimate range in each distance values and minimum range phase When difference exceedes limit value, the audible-visual annunciator on mud guard at ultimate range and minimum range then sends alarm, is easy to construction Personnel adjust the position of main brace steel plate in time, so that each mud guard upper surface being arranged in the present invention on main brace steel plate is use up It is possible in same plane.
Beneficial effect:
(1) a kind of cement concrete pavement steel form of the present invention, it passes through main brace steel plate, mud guard, baffler, cleans with water The work compound of device and measurement apparatus, reduces the probability of spillage between adjacent mud guard, reduces the leakage of main brace steel plate lower end Slurry probability, eliminates workmen and clears up the time of mud guard debris, and each section of mud guard upper surface is in same plane, The flatness of concrete road surface is ensured;
(2) a kind of cement concrete pavement steel form of the present invention, its mud guard Cross section Design is " work " font;Work as needs Dismounting main brace steel plate when, for mud guard, only need to by mud guard in main brace steel plate front and rear tuning, i.e., can will the present invention it is whole Body set up be ready for directly being used on the road of fill concrete to other, cut staff clear up mud guard when Between, improve engineering efficiency;
(3) a kind of cement concrete pavement steel form of the present invention, the design of its mud guard upper limit position block so that the present invention Operationally, only the convex region block of one piece of mud guard need to completely be snapped in another piece of recessed area seam of mud guard, then makes convex region block complete Embedded recessed area seam, you can realize being fitted close between adjacent two pieces of mud guards, more facilitate for conventional art, this hair Spillage amount is greatly reduced between bright adjacent two pieces of mud guards;
(4) a kind of cement concrete pavement steel form of the present invention, the design of its baffler, it is equivalent in planar structure Bottom bracing plate outer end added an obstacle for pyramidal structure, the space between bottom bracing plate and sandstone soil ground is isolated in resistance Dividing plate inner side, can effectively prevent spillage between the bottom bracing plate of the main brace steel plate in fill concrete and sandstone soil road surface.
Brief description of the drawings
The present invention is further described with implementation method below in conjunction with the accompanying drawings.
Schematic diagram when Fig. 1 is present invention work;
Fig. 2 is overall structure figure of the invention;
Fig. 3 is the structure chart of main brace steel plate of the present invention;
Fig. 4 is the cutaway view of the side view of Fig. 3;
Fig. 5 is the structure chart of mud guard of the invention;
Fig. 6 is another viewing angle constructions figure of Fig. 5;
Fig. 7 is the structure chart of baffler of the present invention;
Fig. 8 is the structure chart at brush device for cleaning of the present invention;
In figure:Main brace steel plate 1, mud guard 2, baffler 3, brush device for cleaning 4, measurement apparatus 5, side stay plate 11, bottom bracing plate 12, Top bracing plate| 13, skateboards slot 111, area's groove 1111, two area's grooves 1112, the baffle plate 22, connecting plate of baffle plate 21, two of measuring flume 131, 23rd, limited block 24, recessed area seam 25, baffle-wall groove 211, convex region block 241, slide rail 31, reservation 41, move seat 42, brush holder support 43, hairbrush 44, Push screw rod 45, bar groove 411, button rope plate 51, fixture block 52, elastic threads 53, infrared distance sensor 54, groove 511.
Specific embodiment
In order that technological means, creation characteristic, reached purpose and effect that the present invention is realized are easy to understand, tie below Implementation method is closed, the present invention is expanded on further.
As depicted in figs. 1 and 2, a kind of cement concrete pavement steel form of the present invention, it is primarily adapted for use in height not During flat sandstone soil mixing road surfacing concrete;The present invention includes the main brace steel plate 1 that section is spill, is arranged on Mud guard 2 on main brace steel plate 1 and with concrete directly contact, it is used to stretching into installed in the lower end of mud guard 2 in sandstone soil Baffler 3, it is used to clear up the brush device for cleaning 4 of debris on mud guard 2 installed in the rear end of main brace steel plate 1 and for measuring polylith master Support steel plate 1 measurement apparatus 5 whether in the same plane.
As shown in Figure 1, Figure 2, Figure 3 and Figure 4, a kind of cement concrete pavement steel form of the present invention, described main brace steel Plate 1 includes the side stay plate 11 of arrangement vertically, and level is connected in the bottom bracing plate 12 of the bottom of side stay plate 11, and level is connected in side stay plate 11 The top bracing plate| 13 at top, is provided through the skateboards slot 111 for being available for mud guard 2 to insert, skateboards slot 111 on described side stay plate 11 Including the area's groove 1111 and horizontally disposed 2nd area groove 1112 that are vertically arranged, the cunning that area's groove 1111 and two area's groove 1112 are constituted The cross sectional shape of board slot 111 is T-shape;The described rear and front end of top bracing plate| 13 is symmetrically arranged with a pair for installing measurement apparatus 5 Measuring flume 131.During work, main brace steel plate 1 is placed on sandstone soil road surface, and bottom bracing plate 12 and sandstone soil road level Contact, the outer surface of side stay plate 11 be vertically oriented to will fill concrete side, then through reinforcing bar by main brace steel plate 1 firmly It is fastened on road surface, the method that be fastened on for main brace steel plate 1 on road surface by reinforcing bar is prior art, is not set forth in detail herein;Work When making, above-mentioned main brace steel plate 1 is symmetrically installed in the both sides of the road for needing to lay concrete, the effect of main brace steel plate 1 is for right Mud guard 2 is positioned, and mud guard 2 is firmly determined with to concrete road surface side wall positioned at construction road both sides Type.
As shown in Fig. 1, Fig. 5 and Fig. 6, a kind of cement concrete pavement steel form of the present invention, mud guard 2 includes a gear 21, No. two baffle plates 22 of plate and the connecting plate 23 being connected between a baffle plate 21 and No. two baffle plates 22,21, No. two gears of a baffle plate Plate 22 is " work " font with the cross sectional shape of mud guard 2 that connecting plate 23 is constituted;A number baffle plate 21 can be embedding respectively with No. two baffle plates 22 Enter in skateboards slot 111 and area's groove 1111 of fitting completely, connecting plate 23 can be embedded in skateboards slot 111 and two area's grooves of fitting completely 1112;And the equal length of 21, No. two baffle plates 22 of a baffle plate and connecting plate 23 and it is more than the length of skateboards slot 111, the design makes After proper mud guard 2 is arranged on main brace steel plate 1, there is the part stretched out the rear and front end of mud guard 2, consequently facilitating follow-up phase Accurate connection between adjacent two pieces of mud guards 2;A described baffle plate 21 is also extended through to be provided with and is available for No. two lower ends of baffle plate 22 The baffle-wall groove 211 of the insertion of baffler 3, the cross sectional shape of baffle-wall groove 211 is T-shape;Under original state, mud guard 2 is arranged on master On support steel plate 1, and lateral surface of baffle plate 21 towards will fill concrete side, the two of the insertion main brace of connecting plate 23 steel plate 1 In area's groove 1112, in No. two area's grooves 1111 of the insertion main brace of baffle plate 22 steel plate 1, during fill concrete, concrete road surface highest Face flushes with the highest face of mud guard 2, and concrete road surface side wall is brought into close contact a lateral surface of baffle plate 21, so as to realize mud guard 2 pairs of sizings of concrete road surface side wall;After the concrete road surface maintenance a period of time for laying, start to dismantle main brace steel plate 1, now, for mud guard 2, only mud guard 2 need to be carried out front and rear tuning, make No. two lateral surfaces of baffle plate 22 towards filling coagulation The side of soil, in area's groove 1111 of the insertion main brace of baffle plate 21 steel plate 1, now No. two surfaces of baffle plate 22 are clean, so that After obtaining of the invention being disassembled, i.e., can set up other and be ready for directly being used on the road of fill concrete, cut Staff clears up the time of mud guard 2, improves engineering efficiency.
As shown in Fig. 1, Fig. 5 and Fig. 6, a kind of cement concrete pavement steel form of the present invention, specifically, as the present invention It is a kind of preferred embodiment, described mud guard 2 also includes limited block 24, between a baffle plate 21 and No. two baffle plates 22 Concave shaped space is referred to as recessed area seam 25;The described weldering of limited block 24 is connected in the recessed area of the rear end of mud guard 2 seam 25, and each limited block 24 The convex region block 241 of cube structure is extended outward from recessed area seam 25, described convex region block 241 can be with adjacent mud guard 2 Recessed area seam 25 agree with completely.The present invention operationally, wants precisely cooperation between adjacent two pieces of mud guards 2, reduce space, only The convex region block 241 of one piece of mud guard 2 need to completely be snapped in another piece of recessed area seam 25 of mud guard 2, the structure design is to phase Carry out spacing on adjacent two pieces of left and right directions and above-below direction of mud guard 2, then made convex region block 241 be completely embedded into recessed area to stitch 25, i.e., fore-and-aft direction is defined again, so that be fitted close between adjacent two pieces of mud guards 2 can be made, relative to traditional skill More facilitate for art, spillage amount is greatly reduced between adjacent two pieces of mud guards 2 of the invention.
As shown in Figure 1, Figure 2 and Figure 7, a kind of cement concrete pavement steel form of the present invention, the section of the baffler 3 Triangular structure of right angle is shaped as, and the minimum corner of baffler 3 is located at the lower end of baffler 3, the upper end of baffler 3 is provided with section The slide rail 31 of T-shape is shaped as, in the baffle-wall groove 211 of the slidable embedded mud guard 2 of described slide rail 31.Design baffler 3 Effect be to prevent in fill concrete, there is spillage between the bottom bracing plate 12 of main brace steel plate 1 and sandstone soil road surface;Due to The bottom surface of bottom bracing plate 12 of main brace steel plate 1 is planar structure, but sandstone soil is irregular shape, so that main brace steel plate 1 is placed on When on sandstone soil, numerous spaces are certainly existed between bottom bracing plate 12 and sandstone soil surface, if these spaces are not processed, Then in fill concrete, numerous concrete easily flow out from above-mentioned space, cause spillage, bring unnecessary waste, according to Existing concrete road surface site operation experience, existing workmen process these spaces when, mainly by artificial Sandstone soil elsewhere is scooped up with spade, the sandstone soil after scooping up is filled into above-mentioned space, by above-mentioned sky Gap is mended, and the form of construction work increased the workload of workman, and reduce efficiency of construction;In consideration of it, the invention provides one kind Baffler 3, it has added an obstacle for pyramidal structure equivalent to the bottom bracing plate outer end in planar structure, by bottom bracing plate 12 and sand Space between stone soil ground is isolated in the inner side of baffler 3, so that in fill concrete, concrete is because of baffler 3 Inhibition, in will not draining to above-mentioned space, it is to avoid the possibility of spillage;Meanwhile, the cross sectional shape of baffler 3 is designed as directly Angle triangular structure, and the minimum corner of baffler 3 is located at the lower end of baffler 3, its purpose is provided to reduction baffler 3 and penetrates Resistance when in sandstone soil;When preparing to be arranged on main brace steel plate 1 and mud guard 2 on sandstone soil road surface, in order to will be main Support steel plate 1 completely cuts off with the space on sandstone soil road surface with construction area, only the slide rail 31 of baffler 3 manually need to be pushed into gear mud In the baffle-wall groove 211 of plate 2, then by main brace steel plate 1, the embedded sandstone soil overall with baffler 3 of mud guard 2;To intercept Plate 3 is slidably inserted in mud guard 2, the purpose is to cause that the present invention also adapts to other roads outside out-of-flatness sandstone soil The construction in face, if baffler 3 is connected on mud guard 2, the overall lower end of the present invention is pyramidal structure, so that the present invention is difficult With the process suitable for laying concrete to smooth-riding surface;And baffler 3 of the invention can be dismantled, baffler 3 is dismantled Later, process that is of the invention then being applicable to lay smooth-riding surface concrete, so that applicable surface of the invention is wider.
Specifically, as one kind of the invention preferred embodiment, when in the insertion mud guard 2 of baffler 3, baffler 3 straight sidewalls are generally aligned in the same plane interior towards the outside of mud guard 2 with the outside side wall of mud guard 2;If the inclination of baffler 3 Facing to the outside of mud guard 2, then when the concrete of filling is flowed at baffler 3, the concrete at baffler 3 can form one Sloped sidewall, so as to cause concrete road trackside wall out-of-flatness, and also add the consumption of concrete;Baffler of the present invention 3 Straight sidewalls towards the outside of mud guard 2, and in being generally aligned in the same plane with the outside side wall of mud guard 2 so that with mud guard 2 and The concrete road surface side-walls that baffler 3 is contacted are on same vertical plane, making concrete road surface side wall fully smooth.
Specifically, as one kind of the invention preferred embodiment, the described upper-lower height of mud guard 2 is 30cm;Institute The straight sidewalls upper-lower height of baffler 3 stated is 10-15cm.It can be seen from national standard according to soil cement road surface construction, in traffic Grade is on city expressway, city thoroughfare and the freight backbone roads such as heavy traffic, very heavy traffic, to lay successively from the bottom up Different bed courses, wherein, above-mentioned each road the superiors are Common Concrete Pavement, and the thickness of concrete layer is generally 22-24cm, Most thickness is 28cm, and 28cm concrete layers are generally present on very heavy traffic grade road surface;It is two-ash broken stones base under concrete layer Basic unit on layer or cement stabilized macadam, its thickness is generally 15-18cm;Mud guard upper-lower height of the invention is designed as 30cm, During so that the present invention being operated in the concrete layer work progress on above-mentioned road surface, mud guard 2 is placed on sandstone soil it Afterwards, the bottom of mud guard 2 can be located on lime-fly ash aggregate base or cement stabilized macadam at substrate side walls, meanwhile, baffler 3 is straight Avris wall upper-lower height is 10-15cm so that the bottom of baffler 3 is on lime-fly ash aggregate base or cement stabilized macadam The side wall lower ends of basic unit, and then workmen's fill concrete in basic unit on to lime-fly ash aggregate base or cement stabilized macadam When, concrete is difficult the intersection stream from lime-fly ash aggregate base (basic unit on cement stabilized macadam) and mud guard 2 and baffler 3 Go out, further reduce the probability of spillage.
As illustrated in figures 1 and 8, a kind of cement concrete pavement steel form of the present invention, the described quantity of brush device for cleaning 4 is Two, two brush device for cleaning 4 are separately mounted to the rear and front end of main brace steel plate 1 and positioned at the right of mud guard 2;Each brush device for cleaning 4 is wrapped Reservation 41 is included, seat 42, brush holder support 43, hairbrush 44 is moved and pushes screw rod 45;The bottom bracing plate for being connected in main brace steel plate 1 is welded in described reservation 41 On 12, move seat 42 by the interchangeable top bracing plate| 13 installed in main brace steel plate 1 of screw, the design enable to move seat 42 from Disassembled on main brace steel plate 1, so that can be replaced through the brush holder support 43 and hairbrush 44 for moving seat 42, prevent hairbrush 44 from growing Phase is changed without and influences to clean with water effect, and reservation 41 is provided with the shifting side wall of seat 42 and is available for pushing the screw that screw rod 45 is passed through, reservation 41 are additionally provided with the bar groove 411 for being available for brush holder support 43 to be embedded in the middle part of shifting seat 42, are reserved with bar groove 411 and are available for brush holder support 43 or so to transport Dynamic space;Described brush holder support 43 is flat square steel plate, and brush holder support 43 is vertically in the bar groove 411 of embedded reservation 41 and shifting seat 42; Described hairbrush 44 is uniformly connected on brush holder support 43, and hairbrush 44 is irony material, and hairbrush 44 is caused for the design of irony material Hairbrush 44 is nonabradable meanwhile, it is capable to sufficiently brush the debris on mud guard 2;Described push screw rod 45 extends through fixed Seat 41 is in contact with the screw moved on seat 42 and with the right side of brush holder support 43, between the left side of brush holder support 43 and reservation 41 and shifting seat 42 also It is fixed with the spring for resetting.During work, can by manual adjustment push screw rod 45, make push screw rod 45 reservation 41 with Move and moved left and right in seat 42, so as to drive the translation of brush holder support 43 or so, the translation of brush holder support 43 or so is for adjusting 44 pairs of gears of hairbrush The active force of mud plate 2, so that adjust brush device for cleaning 4 cleans effect with water.Under original state, a lateral surface of baffle plate 21 and concrete Road surface contacts, in No. two area's grooves 1111 of the insertion main brace of baffle plate 22 steel plate 1, when the concrete road surface for laying maintains one section Between after, start dismounting main brace steel plate 1, now, mud guard 2 is manually carried out into front and rear tuning, make No. two lateral surface courts of baffle plate 22 To the side of fill concrete, in area's groove 1111 of the insertion main brace of baffle plate 21 steel plate 1, an area is embedded in a baffle plate 21 Before groove 1111, also there are the debris such as concrete on a baffle plate 21, if these debris not disposed, make in next time During with a baffle plate 21, a baffle plate 21 can then cause concrete road surface sidewall roughness, influence road quality, existing conventional side Method is manually to clean with water, cumbersome, labor intensive, and the design of brush device for cleaning of the present invention 4 so that a baffle plate 21 of the invention During embedded area's groove 1111, the one side of debris is speckled with a baffle plate 21 can touch the irony hairbrush 44 of brush device for cleaning 4, connect Artificial continuation a number baffle plate 21 is pushed in area's groove 1111, during a baffle plate 21 is moved, hairbrush 44 continues Clean a side wall of baffle plate 21 with water, after a baffle plate 21 is pushed into area's groove 1111 completely, a debris for the side wall of baffle plate 21 are then Cleaned out by hairbrush 44, thus when it is next artificial mud guard 2 is carried out into front and rear tuning again after, a baffle plate 21 without carrying out again Cleaning can be used directly, if feeling not clean with water totally, can also adjust hairbrush 44 pairs by adjusting push screw rod 45 The active force of mud guard 2, so as to adjust the effect of cleaning with water of brush device for cleaning 4, the design of brush device for cleaning 4 has cut staff's cleaning The time of mud guard 21, improve engineering efficiency.
As shown in Figure 2 and Figure 4, a kind of cement concrete pavement steel form of the present invention, described measurement apparatus 5 include button Rope plate 51, fixture block 52, elastic threads 53, infrared distance sensor 54, microcontroller and audible-visual annunciator;Described button rope plate 51 is counted It is two to measure, and a button rope plate 51 is slidably embedded in the measuring flume 131 of certain rear end of main brace steel plate 1 in two button rope plates 51, Another button rope plate 51 is slidably embedded in the measuring flume 131 of other front ends of main brace steel plate 1, and each button rope plate 51 upper end is respectively provided with There is groove 511;The described rear and front end of elastic threads 53 is fixed with fixture block 52, and the rear and front end of elastic threads 53 is embedding by fixture block 52 Enter in two grooves 511 of button rope plate 51;Described infrared distance sensor 54 is arranged on two before and after the upper surface of main brace steel plate 1 End, and infrared distance sensor 54 is located at the underface of elastic threads 53;Described microcontroller is installed in master with audible-visual annunciator On support steel plate 1, microcontroller is used to control the automatic job of infrared distance sensor of the present invention 54 and audible-visual annunciator, the present invention Power supply is also equipped with to be powered with to infrared distance sensor 54, microcontroller and audible-visual annunciator.In the prior art, mixed In solidifying soil pavement-laying processes, the upper surface of concrete road surface is often to be flushed with concrete support template upper surface, so that, if The upper surface of different concrete rack templates is not on same plane, then easily cause the injustice of concrete road surface, this hair Bright measurement apparatus its effects is exactly to solve this inequal situation in concrete support template upper surface;During work, the present invention Each mud guard 2 be mutually installed together, when needing to be monitored the upper surface of certain section of each mud guard 2 on road, then choose Suitable elastic threads 53, a button rope plate 51 is embedded in this section of measuring flume 131 of the main brace steel plate 1 of the one end of way mud guard 2, will Another button rope plate 51 is embedded in this section of measuring flume 131 of the main brace steel plate 1 of the other end of way mud guard 2, then again by selection The fixture block 52 at the two ends of elastic threads 53 is respectively embedded into two grooves 151 of button rope plate 51, so that elastic threads 53 are tightened in this The top of each mud guard 2 of Duan Lu, now, the infrared distance sensor 54 on each main brace steel plate 1 detects elastic threads 53 and main brace The distance between the upper surface of steel plate 1 size, when ultimate range differs by more than limit value with minimum range in each distance values, most The audible-visual annunciator on mud guard 2 at big distance and minimum range then sends alarm, is easy to workmen to adjust main brace in time The position of steel plate 1, so that the upper surface of each mud guard 2 being arranged in the present invention on main brace steel plate 1 is as far as possible in same One plane.
During work, main brace steel plate 1 is symmetrically installed in the both sides of the road for needing to lay concrete, first puts main brace steel plate 1 Put on sandstone soil road surface, bottom bracing plate 12 is contacted with sandstone soil road level, the outer surface of side stay plate 11 is vertically oriented to will , be securely fastened to main brace steel plate 1 on road surface then through reinforcing bar by the side of fill concrete.
Then, mud guard 2 is arranged on main brace steel plate 1, and lateral surface of baffle plate 21 is towards will fill concrete Side, in two area's grooves 1112 of the insertion main brace of connecting plate 23 steel plate 1, in No. two area's grooves 1111 of the insertion main brace of baffle plate 22 steel plate 1, During fill concrete, concrete road surface highest face flushes with the highest face of mud guard 2, and concrete road surface side wall is brought into close contact No. one The lateral surface of baffle plate 21, so as to realize sizing of the mud guard 2 to concrete road surface side wall;Operationally, adjacent two pieces are kept off the present invention Precisely cooperation is wanted between mud plate 2, reduces space, only the convex region block 241 of one piece of mud guard 2 need to completely be snapped in another block of gear mud The recessed area seam 25 of plate 2.
If preparing to completely cut off the space on main brace steel plate 1 and sandstone soil road surface with construction area, concrete from main brace is prevented Steel plate 1 is spilt with the gap on sandstone soil road surface, and the slide rail 31 of baffler 3 only need to be manually pushed to the baffle-wall of mud guard 2 In groove 211, then by main brace steel plate 1, the embedded sandstone soil overall with baffler 3 of mud guard 2.
After the concrete road surface maintenance a period of time for laying, start dismounting main brace steel plate 1, now, to mud guard 2 For, only mud guard 2 need to be carried out front and rear tuning, make No. two lateral surfaces of baffle plate 22 towards the side of fill concrete, a gear In one area's groove 1111 of the insertion main brace of plate 21 steel plate 1, now No. two surfaces of baffle plate 22 are clean, so that the present invention was disassembled Afterwards, i.e., other can be set up to be ready for directly being used on the road of fill concrete, has cut staff's cleaning gear The time of mud plate 2, improve engineering efficiency;Meanwhile, when a baffle plate 21 is embedded in area's groove 1111, speckled with a baffle plate 21 The one side of debris can touch the irony hairbrush 44 of brush device for cleaning 4, then artificial to continue for a baffle plate 21 to be pushed to an area In groove 1111, during a baffle plate 21 is moved, hairbrush 44 persistently cleans a side wall of baffle plate 21 with water, when a baffle plate 21 is complete Push into after area's groove 1111 entirely, the debris of a side wall of baffle plate 21 are then cleaned out by hairbrush 44, so as to again will when next time is artificial After mud guard 2 carries out front and rear tuning, a baffle plate 21 without being cleared up again by directly used, if feeling not clean with water Totally, active force of the hairbrush 44 to mud guard 2 can also be adjusted by adjusting push screw rod 45, so as to adjust brush device for cleaning 4 Clean effect with water, from regardless of whether with a baffle plate 21 or No. two baffle plates 22, staff is without to a baffle plate 21 and two Number baffle plate 22 is cleared up, and improves engineering efficiency.
Meanwhile, when needing to be monitored the upper surface of certain section of each mud guard 2 on road, then choose suitable elastic threads 53, a button rope plate 51 is embedded in this section of measuring flume 131 of the main brace steel plate 1 of the one end of way mud guard 2, by another button rope plate In 51 this section of measuring flumes 131 of the main brace steel plate 1 of the other end of way mud guard 2 of insertion, the two ends of elastic threads 53 that will then choose again Fixture block 52 be respectively embedded into two button rope plate 51 grooves 151 in so that elastic threads 53 are tightened in each gear mud of the Duan Lu The top of plate 2, now, the infrared distance sensor 54 on each main brace steel plate 1 detect elastic threads 53 and the upper surface of main brace steel plate 1 it Between apart from size, when ultimate range differs by more than limit value with minimum range in each distance values, ultimate range with it is minimum The audible-visual annunciator on mud guard 2 at distance then sends alarm, is easy to workmen to adjust the position of main brace steel plate 1 in time, So that the upper surface of each mud guard 2 being arranged in the present invention on main brace steel plate 1 is in same plane as far as possible.
The work compound that the present invention passes through main brace steel plate 1, mud guard 2, baffler 3, brush device for cleaning 4 and measurement apparatus 5, no It is divisible, reduce the probability of spillage between adjacent mud guard 2, the spillage probability of the lower end of main brace steel plate 1 is reduced, eliminate construction Personnel clear up the time of the debris of mud guard 2, and each section of upper surface of mud guard 2 is in same plane, have ensured concrete road The flatness in face.
The basic principles, principal features and advantages of the present invention have been shown and described above.The technical staff of the industry should Understand, the present invention is not limited to the above embodiments, the description in above-described embodiment and specification is to illustrate of the invention Principle, without departing from the spirit and scope of the present invention, various changes and modifications of the present invention are possible, and these change and change Enter all fall within the protetion scope of the claimed invention.The claimed scope of the invention is by appending claims and its equivalent Define.

Claims (9)

1. a kind of cement concrete pavement steel form, it is primarily adapted for use in rugged sandstone soil mixing road surfacing concrete During;It is characterized in that:Including section for spill main brace steel plate (1), on main brace steel plate (1) and and concrete The mud guard (2) of directly contact, be used to stretching into baffler (3) in sandstone soil installed in mud guard (2) lower end, installed in master Support steel plate (1) rear end is used to clear up the brush device for cleaning (4) of debris on mud guard (2) and for measuring polylith main brace steel plate (1) Whether measurement apparatus (5) in the same plane.
2. a kind of cement concrete pavement steel form according to claim 1, it is characterised in that:Described main brace steel plate (1) bag The side stay plate (11) of vertical arrangement is included, level is connected in the bottom bracing plate (12) of side stay plate (11) bottom, and level is connected in side stay plate (11) top bracing plate| (13) at the top of, is provided through the skateboards slot for being available for mud guard (2) to insert on described side stay plate (11) (111), skateboards slot (111) includes the area's groove (1111) being vertically arranged and horizontally disposed 2nd area groove (1112), area's groove (1111) skateboards slot (111) cross sectional shape constituted with two area's grooves (1112) is T-shape;Described top bracing plate| (13) rear and front end It is symmetrically arranged with a pair measuring flumes (131) for installing measurement apparatus (5).
3. a kind of cement concrete pavement steel form according to claim 1 and 2, it is characterised in that:Mud guard (2) includes No. one Baffle plate (21), No. two baffle plates (22) and the connecting plate (23) being connected between a baffle plate (21) and No. two baffle plates (22), No. one Baffle plate (21), No. two baffle plates (22) and mud guard (2) cross sectional shape that connecting plate (23) is constituted are " work " font;A number baffle plate (21) Can be respectively embedded into skateboards slot (111) with No. two baffle plates (22) and area's groove (1111) of fitting completely, connecting plate (23) can be embedded in In skateboards slot (111) and two area's grooves (1112) of fitting completely;And a length for baffle plate (21), No. two baffle plates (22) and connecting plate (23) Degree is equal and more than the length of skateboards slot (111);A described baffle plate (21) also extends through setting with No. two baffle plate (22) lower ends There is the baffle-wall groove (211) for being available for baffler (3) to insert, the cross sectional shape of baffle-wall groove (211) is T-shape.
4. a kind of cement concrete pavement steel form according to claim 3, it is characterised in that:Described mud guard (2) is also wrapped Limited block (24) is included, the concave shaped space between a baffle plate (21) and No. two baffle plates (22) is referred to as recessed area seam (25);Described limit Position block (24) weldering is connected in the recessed area of mud guard (2) rear end seam (25), and each limited block (24) is outside from recessed area seam (25) Extend the convex region block (241) of cube structure, described convex region block (241) can stitch (25) with the recessed area of adjacent mud guard (2) Agree with completely.
5. a kind of cement concrete pavement steel form according to claim 1, it is characterised in that:The section of the baffler (3) Triangular structure of right angle is shaped as, and the minimum corner of baffler (3) is located at baffler (3) lower end, baffler (3) upper end is set There is the slide rail (31) that cross sectional shape is T-shape, described slide rail (31) is slidably embedded in the baffle-wall groove (211) of mud guard (2) It is interior.
6. a kind of cement concrete pavement steel form according to claim 1, it is characterised in that:When the embedded gear mud of baffler (3) When plate (2) is interior, the straight sidewalls of baffler (3) are located at same towards mud guard (2) outside with mud guard (2) outside side wall In plane.
7. a kind of cement concrete pavement steel form according to claim 1 and 2, it is characterised in that:Described brush device for cleaning (4) Quantity is two, and two brush device for cleaning (4) are separately mounted to main brace steel plate (1) rear and front end and positioned at mud guard (2) right;It is each clear Brush device (4) includes reservation (41), moves seat (42), brush holder support (43), hairbrush (44) and pushes screw rod (45);Described reservation (41) weldering is connected on the bottom bracing plate (12) of main brace steel plate (1), moves seat (42) interchangeable installed in main brace steel plate (1) by screw Top bracing plate| (13) on, reservation (41) is available for pushing screw rod (45) screw for passing through, reservation with moving seat (42) side wall and be provided with (41) the bar groove (411) for being available for brush holder support (43) embedded is additionally provided with shifting seat (42) middle part, is reserved with bar groove (411) and is available for brush The space of bar (43) side-to-side movement;Described brush holder support (43) is flat square steel plate, brush holder support (43) be embedded in vertically reservation (41) with Move in the bar groove (411) of seat (42);Described hairbrush (44) is uniformly connected on brush holder support (43), and hairbrush (44) is irony material Matter;Described push screw rod (45) extends through reservation (41) and connects with the screw moved on seat (42) and with brush holder support (43) right side Touch, the spring for resetting also is fixed between brush holder support (43) left side and reservation (41) and shifting seat (42).
8. a kind of cement concrete pavement steel form according to claim 1 and 2, it is characterised in that:Described measurement apparatus (5) Including button rope plate (51), fixture block (52), elastic threads (53), infrared distance sensor (54), microcontroller and audible-visual annunciator;Institute Button rope plate (51) quantity stated is two, and button rope plate (51) is slidably embedded in certain main brace steel plate in two buttons rope plate (51) (1) in the measuring flume (131) of rear end, another button rope plate (51) is slidably embedded in the measurement of other main brace steel plate (1) front ends In groove (131), each button rope plate (51) upper end is provided with groove (511);Described elastic threads (53) rear and front end is fixed with In fixture block (52), and groove (511) of elastic threads (53) rear and front end by embedded two buttons rope plate (51) of fixture block (52);It is described Infrared distance sensor (54) be located at installed in main brace steel plate (1) upper surface rear and front end, and infrared distance sensor (54) Immediately below elastic threads (53);Described microcontroller is installed on main brace steel plate (1) with audible-visual annunciator.
9. a kind of cement concrete pavement steel form according to claim 1, it is characterised in that:Described mud guard (2) is up and down Highly it is 30cm;Described baffler (3) straight sidewalls upper-lower height is 10-15cm.
CN201710146411.5A 2017-03-13 2017-03-13 A kind of cement concrete pavement steel form Active CN106906726B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710146411.5A CN106906726B (en) 2017-03-13 2017-03-13 A kind of cement concrete pavement steel form

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710146411.5A CN106906726B (en) 2017-03-13 2017-03-13 A kind of cement concrete pavement steel form

Publications (2)

Publication Number Publication Date
CN106906726A true CN106906726A (en) 2017-06-30
CN106906726B CN106906726B (en) 2018-12-18

Family

ID=59186402

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710146411.5A Active CN106906726B (en) 2017-03-13 2017-03-13 A kind of cement concrete pavement steel form

Country Status (1)

Country Link
CN (1) CN106906726B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112127228A (en) * 2020-09-16 2020-12-25 衡阳市金铭环境科技有限公司 Slab-shaped member with pile, pouring construction method for concrete layer of highway and highway
CN112663451A (en) * 2020-12-20 2021-04-16 魏秀芹 Road and bridge construction cement concrete integral type pouring steel formwork
CN114089007A (en) * 2021-11-16 2022-02-25 鄢秀 Intelligent electric meter
CN114808822A (en) * 2022-06-09 2022-07-29 中交第二公路工程局有限公司 Road surface treatment equipment for highway construction

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1269857A (en) * 1997-09-05 2000-10-11 小迈克尔·E·沙特泽 Flexible concrete form
US6705582B2 (en) * 2001-08-29 2004-03-16 John Osborn Concrete form & stake assembly and method of making same
CN202899001U (en) * 2012-11-09 2013-04-24 河南省公路工程局集团有限公司 Universal template for highway semi-rigid base construction
CN203021899U (en) * 2013-01-15 2013-06-26 中冶天工上海十三冶建设有限公司 Quick-assembling template device for concrete ground construction
CN106087671A (en) * 2016-08-04 2016-11-09 中铁十七局集团第三工程有限公司 A kind of concreting template

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1269857A (en) * 1997-09-05 2000-10-11 小迈克尔·E·沙特泽 Flexible concrete form
US6705582B2 (en) * 2001-08-29 2004-03-16 John Osborn Concrete form & stake assembly and method of making same
CN202899001U (en) * 2012-11-09 2013-04-24 河南省公路工程局集团有限公司 Universal template for highway semi-rigid base construction
CN203021899U (en) * 2013-01-15 2013-06-26 中冶天工上海十三冶建设有限公司 Quick-assembling template device for concrete ground construction
CN106087671A (en) * 2016-08-04 2016-11-09 中铁十七局集团第三工程有限公司 A kind of concreting template

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112127228A (en) * 2020-09-16 2020-12-25 衡阳市金铭环境科技有限公司 Slab-shaped member with pile, pouring construction method for concrete layer of highway and highway
CN112127228B (en) * 2020-09-16 2022-04-08 衡阳市金铭环境科技有限公司 Slab-shaped member with pile, pouring construction method for concrete layer of highway and highway
CN112663451A (en) * 2020-12-20 2021-04-16 魏秀芹 Road and bridge construction cement concrete integral type pouring steel formwork
CN114089007A (en) * 2021-11-16 2022-02-25 鄢秀 Intelligent electric meter
CN114808822A (en) * 2022-06-09 2022-07-29 中交第二公路工程局有限公司 Road surface treatment equipment for highway construction

Also Published As

Publication number Publication date
CN106906726B (en) 2018-12-18

Similar Documents

Publication Publication Date Title
CN106906726A (en) A kind of cement concrete pavement steel form
CN101906768B (en) Panel construction method of concrete faced rock-fill dam
CN106894308A (en) A kind of crack resistance construction of cement stable macadam base method
EP1778932A4 (en) Concrete sideform system
CN111576127A (en) Splicing structure for new and old road surfaces of highway engineering and construction method thereof
CN109457728B (en) Rapid construction method for section steel concrete comprehensive pipe gallery
CN109338842A (en) Colorful water-permeable road surface and construction method
CN110284395A (en) Cut dirty permeable pavement method and device
CN111485594A (en) Municipal road engineering pavement construction technology
CN110656783A (en) High-precision portable horizontal laying device for masonry mortar
CN112064446A (en) Curb mechanical operation construction method
CN210856865U (en) Roadbed flattening device for highway construction
CN109881547B (en) Uneven settlement control structure of roadbed of airport pavement passing under high-speed railway tunnel and construction process
CN102071614B (en) Stone block road construction method and guiding rule for same
CN110905529A (en) Construction method of loess tunnel penetrating through landslide mass
CN212983503U (en) New and old road surface mosaic structure of highway engineering
CN205077449U (en) Design mould is used in rapid trough construction
CN203834313U (en) Impound strap for highway pavement
CN209907168U (en) Road and bridge curb ramming device
CN108571009B (en) Construction method for side wall of full-cover excavation top-down subway station
CN112813930A (en) Construction method for constructing overflow weir surface based on overflow weir body and combined template and overflow weir
CN112176944A (en) Construction method of hydrophilic platform revetment structure
CN219045072U (en) Concrete pouring road
CN215329219U (en) Pavement flatness control device for pedestrian permeable bricks
CN204676387U (en) A kind of cement concrete pavement becomes base layer structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20181101

Address after: 350400 Feng Lou village to Feng 205, Zhong Lou, Pingtan County, Fuzhou, Fujian.

Applicant after: Lin Yunqing

Address before: 274000 Wang Qiao village, Wang Qiao Township, Huangzhen Township, Mudan District, Heze, Shandong 337

Applicant before: Wang Benxun

GR01 Patent grant
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20170630

Assignee: Shaanxi Zhongji Weiye Construction Engineering Co., Ltd

Assignor: Lin Yunqing

Contract record no.: X2019610000004

Denomination of invention: Steel form for cement concrete pavements

Granted publication date: 20181218

License type: Exclusive License

Record date: 20191202

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220527

Address after: 710000 room 2303, building 2, Moore center, No. 34, Fenghui South Road, high tech Zone, Xi'an City, Shaanxi Province

Patentee after: Shaanxi Zhongji Weiye Construction Engineering Co.,Ltd.

Address before: 350400 Feng Lou village to Feng 205, Zhong Lou, Pingtan County, Fuzhou, Fujian.

Patentee before: Lin Yunqing