CN106087671A - A kind of concreting template - Google Patents

A kind of concreting template Download PDF

Info

Publication number
CN106087671A
CN106087671A CN201610631940.XA CN201610631940A CN106087671A CN 106087671 A CN106087671 A CN 106087671A CN 201610631940 A CN201610631940 A CN 201610631940A CN 106087671 A CN106087671 A CN 106087671A
Authority
CN
China
Prior art keywords
panel
floor
concreting
template
connecting rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610631940.XA
Other languages
Chinese (zh)
Other versions
CN106087671B (en
Inventor
周永明
王新民
赵兵
刘燕明
徐德新
李浩宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 17th Bureau Group Municipal Construction Co ltd
Third Engineering Co Ltd of China Railway 17th Bureau Group Co Ltd
Original Assignee
Third Engineering Co Ltd of China Railway 17th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Engineering Co Ltd of China Railway 17th Bureau Group Co Ltd filed Critical Third Engineering Co Ltd of China Railway 17th Bureau Group Co Ltd
Priority to CN201610631940.XA priority Critical patent/CN106087671B/en
Publication of CN106087671A publication Critical patent/CN106087671A/en
Application granted granted Critical
Publication of CN106087671B publication Critical patent/CN106087671B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E01B29/005Making of concrete parts of the track in situ

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The invention discloses a kind of concreting template, relate to technical field of concrete construction, including vertically disposed panel, the attachment means that described panel is arranged by concreting side dorsad is connected on engineering foundation basal plane.Utilize the attachment means that concreting side is arranged dorsad, panel is connected with engineering foundation basal plane, utilize and bottom vertically disposed panel, reduce the contact area with engineering foundation basal plane, it is easy to observation and the closure of spillage point bottom panel, stop " rotten " phenomenon, it is ensured that the construction quality of reinforced concrete footing.The present invention has simple in construction, easy to operate advantage, reduce further the labor intensity of operator, and then improves construction speed.

Description

A kind of concreting template
Technical field
The present invention relates to technical field of concrete construction, particularly relate to a kind of concreting template.
Background technology
CRTS III type non-fragment orbit, is the unit plate type non-fragment orbit new structure of China's independent development, from top to bottom by Rail and fastener, precast track plate, self-compacting concrete structure filling layer, sealing coat, armored concrete with limited impression Base forms, as shown in Figure 5.
Wherein, base is in the CRTS III ballastless track bed structure of plate-type and engineering foundation structure (roadbed, tunnel under line Road, bridge etc.) between transition structure layer, be the cast-in-situ steel reinforced concrete pedestal of non-fragment orbit.Reinforced concrete footing uses Longitudinal sectional type design, length and width are all higher than track plates planar dimension.
At present, longitudinal sectional type base is in work progress, and vertical framework many employings cross section of both sides is " [" shape Template, owing under line, engineering foundation elevation exists certain error, often after formwork erection, the easy spillage in bottom, cause concrete inferior strong, rotten Roots etc., scene also needs to spend manually to clear up in a large number.Because " being one fixed width with engineering foundation basal plane bottom [" shape template Face contacts, and presence bit sets low and is difficult to observe, and blocks the most difficult simultaneously, causes structural concrete to lack when blocking in inner side, and Bad operation is affected by inner side reinforcing bar;When side seal blocks up outside, plugging material consumption is big, after finding after form removal that part of cement slurry spills Being full of the space (rotten) between the interior outside of template, below template, plugging effect is poor.
Summary of the invention
The technical problem to be solved is to provide a kind of simple in construction, easy to operate concreting mould Plate, can improve the construction quality of reinforced concrete footing.
For solving above-mentioned technical problem, the technical solution used in the present invention is:
A kind of concreting template, including vertically disposed panel, described panel is set by concreting side dorsad The attachment means put is connected on engineering foundation basal plane.
Preferably, described upper panel side is provided with horizontal floor, and horizontal ribs backboard is arranged to concreting side, institute State attachment means to be arranged between horizontal floor and engineering foundation basal plane.
Preferably, described attachment means includes upper connecting rod and the earth anchor being arranged on engineering foundation basal plane, described upper connecting rod One end is connected with horizontal floor, the other end is connected with earth anchor;Described upper connecting rod and earth anchor are two or more, the upper connecting rod at two ends and Earth anchor is separately positioned on outside panel two ends.
Preferably, being additionally provided with stringer plate below described horizontal floor, described stringer plate passes through lower link It is connected with earth anchor.
Preferably, described panel is interval with vertical floor, and vertical floor concreting side dorsad is arranged.
Preferably, described panel is segmentation structure, and two sections of adjacent panels are connected by bindiny mechanism, and every section of panel is equal It is connected with engineering foundation basal plane by attachment means bar.
Preferably, described bindiny mechanism includes vertically connecting floor and connecting bolt is secondary, and described vertical connection floor is arranged At the connection end of every section of panel, the vertical floor that connects is provided with plural bolt through-hole, the bolt that described connecting bolt is secondary Run through bolt through-hole and nut screw connection.
Preferably, described upper connecting rod and lower link are adjustable structure, all include the stagewise body of rod and trocar sheath, two points The segmentation body of rod is coordinated with trocar sheath by screw thread.
Preferably, described upper connecting rod and lower link upper end are equipped with drag hook, by drag hook respectively with horizontal floor and level Link below deep floor is connected;Described upper connecting rod and lower link lower end are equipped with draw ring, are connected with earth anchor by draw ring.
Preferably, described horizontal floor and stringer plate are equipped with the jack of vertical direction, and horizontal floor and water Jack on flat deep floor is the most corresponding.
Use and have the beneficial effects that produced by technique scheme: utilize the connection that concreting side is arranged dorsad Device, is connected panel with engineering foundation basal plane, utilizes and reduces and the contacting of engineering foundation basal plane bottom vertically disposed panel Area, it is simple to the observation of spillage point and closure bottom panel, stops " rotten " phenomenon, it is ensured that the construction of reinforced concrete footing Quality.The present invention has simple in construction, easy to operate advantage, reduce further the labor intensity of operator, Jin Erti High construction speed.
Accompanying drawing explanation
Fig. 1 is the cross-sectional view of the embodiment of the present invention;
Fig. 2 is the A direction view of panel in Fig. 1;
Fig. 3 is upper connecting rod or the structural representation of lower link in Fig. 1;
Fig. 4 is the application state figure of the present invention;
Fig. 5 is the section structure schematic diagram of CRTS III type non-fragment orbit;
In figure: 1-panel, the horizontal floor of 2-, the vertical floor of 3-, 4-jack, 5-upper connecting rod, 6-lower link, 7-earth anchor, 8-engineering Basis, 9-base, 10-stringer plate, 11-trocar sheath, 12-drag hook, 13-link, 14-draw ring, 15-rail and fastener, 16-precast track plate, 17-self-compacting concrete structure filling layer, 18-sealing coat, 19-limited impression.
Detailed description of the invention
The present invention is further detailed explanation with detailed description of the invention below in conjunction with the accompanying drawings.
A kind of concreting template as shown in Figure 1, including vertically disposed panel 1, described panel 1 is by connecting Device is connected on engineering foundation 8 basal plane, and attachment means concreting side dorsad is arranged.
As shown in Figure 4, when the present invention applies in reinforced concrete footing 9 casting process, attachment means base 9 dorsad Side is arranged, and vertically disposed panel 1 is as the vertical framework poured.
In order to improve integral rigidity and intensity, it is provided with horizontal floor 2, horizontal floor 2 further in side, panel 1 top Base 9 side is arranged dorsad, and described attachment means is arranged between horizontal floor 2 and engineering foundation 8 basal plane.
Wherein, described attachment means includes upper connecting rod 5 and the earth anchor 7 being arranged on engineering foundation 8 basal plane, described upper connecting rod 5 one end are connected with horizontal floor 2, the other end is connected with earth anchor 7;Described upper connecting rod 5 and earth anchor 7 are two or more, two ends upper Pull bar 5 and earth anchor 7 are separately positioned on outside panel 1 two ends.
As a kind of preferred structure, below described horizontal floor 2, it is additionally provided with stringer plate 10, described stringer Plate 10 is connected with earth anchor 7 by lower link 6.Utilize horizontal floor 2 and stringer plate 10 can improve the integral rigidity of template.
Such as Fig. 2, described panel 1 is interval with vertical floor 3, and vertical floor 3 base 9 side dorsad is arranged.Equally, vertically Floor 3 also can improve the integral rigidity of template, extends its service life.
In order to load and unload, convenient in carrying, panel 1 is designed as segmentation structure, the length of every section of panel 1 and longitudinal piecemeal The length of every section of reinforced concrete footing 9 matches;Two sections of adjacent panels 1 are connected by bindiny mechanism, and every section of panel 1 is the most logical Cross attachment means bar to be connected with engineering foundation 8 basal plane.
Further preferred structure, described bindiny mechanism includes vertically connecting floor 31 and connecting bolt is secondary, described vertically Connecting floor 31 and be arranged on the connection end of every section of panel 1, the vertical floor 31 that connects is provided with plural bolt through-hole 32, institute Stating the secondary bolt 33 of connecting bolt and run through bolt through-hole 32 and nut screw connection, two set bolt pairs are arranged on vertical connection floor 31 Upper and lower side, it is secondary that midfeather arranges one or more connecting bolt.
As it is shown on figure 3, described upper connecting rod 5 and lower link 6 are adjustable structure, all include the stagewise body of rod and trocar sheath 11, two stagewise bodies of rod are coordinated with trocar sheath 11 by screw thread.By upper connecting rod 5 and the lower link 6 of adjustable structure, adjust face Plate 1 is in plumbness, makes horizontal floor 2 and stringer plate 10 holding level, can add by suitably raising level simultaneously The bottom of strong floor 10, it is simple to observing from template exterior bottom and closure spillage point, upper connecting rod 5 and lower link 6 are at an angle Support panel 1, the stability of available triangle realizes the fixing of template.
Installing/dismounting upper connecting rod 5 and lower link 6 for convenience, is equipped with drag hook 12 at upper connecting rod 5 and lower link 6 upper end, It is connected with the link 13 below horizontal floor 2 and stringer plate 10 respectively by drag hook 12;Described upper connecting rod 5 and lower link 6 lower ends are equipped with draw ring 14, are connected with earth anchor 7 by draw ring 14.
Because during casting concrete, need to utilize leveling tamping equipment concrete is flattened and vibrates, and whole Flat tamping equipment needs to arrange walking rails and is easy to walk along reinforced concrete footing length direction, therefore at horizontal floor 2 and stringer plate 10 be equipped with the jack 4 of vertical direction, and on the jack 4 on horizontal floor 2 and stringer plate 10 Lower correspondence, is provided with inserted link below leveling tamping equipment track, is inserted by inserted link in jack 4, thus realizes leveling tamping equipment Track carries out spacing, supports without still further arranging track, simplifies construction equipment configuration;Construct complete, leveling is shaken Smash device track dismounting after, and do not affect panel 1 again with, decrease material consumption.
The present invention not only can meet the needs pouring seat concrete, simultaneously facilitates observation and the closure of bottom spillage point, Stop " rotten " phenomenon;Provide seat concrete leveling, the positioning function of tamping equipment walking rails, to improving base Flatness, degree of compaction, drainage grade provide condition;This invention is constructed for seat concrete, can improve efficiency, improve matter Amount, reduction construction cost, it is achieved fast standardization is constructed.This invention can be as the sizing of CRTS III type non-fragment orbit base construction Frock, also can be applicable in other types non-fragment orbit and Subway track engineering.
Principle and the embodiment of the present invention are set forth by specific case used herein, saying of above example Bright method and the core concept thereof being only intended to help to understand the present invention.It should be pointed out that, the ordinary skill for the art For personnel, under the premise without departing from the principles of the invention, it is also possible to the present invention is carried out some improvement and modification, these improve Also fall in the protection domain of the claims in the present invention with modifying.

Claims (10)

1. a concreting template, it is characterised in that: including vertically disposed panel, described panel is by coagulation dorsad Soil pours the attachment means of side setting and is connected on engineering foundation basal plane.
A kind of concreting template the most according to claim 1, it is characterised in that: described upper panel side is provided with Horizontal floor, horizontal ribs backboard is arranged to concreting side, and described attachment means is arranged on horizontal floor and engineering foundation Between basal plane.
A kind of concreting template the most according to claim 2, it is characterised in that: described attachment means includes pull-up Bar and the earth anchor being arranged on engineering foundation basal plane, described upper connecting rod one end is connected with horizontal floor, the other end is connected with earth anchor; Described upper connecting rod and earth anchor are two or more, and the upper connecting rod at two ends and earth anchor are separately positioned on outside panel two ends.
A kind of concreting template the most according to claim 3, it is characterised in that: also set below described horizontal floor Having stringer plate, described stringer plate is connected with earth anchor by lower link.
A kind of concreting template the most according to claim 1, it is characterised in that: described panel is interval with vertically Floor, vertical floor concreting side dorsad is arranged.
6. according to a kind of concreting template described in claim 1,2,3,4 or 5, it is characterised in that: described panel is Segmentation structure, two sections of adjacent panels are connected by bindiny mechanism, and every section of panel is all by attachment means bar and engineering foundation Basal plane connects.
A kind of concreting template the most according to claim 6, it is characterised in that: described bindiny mechanism includes vertically Connecting floor and connecting bolt is secondary, described vertical connection floor is arranged on the connection end of every section of panel, and vertical connection sets on floor There are plural bolt through-hole, the bolt-through bolt through-hole of described connecting bolt pair and nut screw connection.
A kind of concreting template the most according to claim 4, it is characterised in that: described upper connecting rod and lower link are equal For adjustable structure, all include that the stagewise body of rod and trocar sheath, two stagewise bodies of rod are coordinated with trocar sheath by screw thread.
A kind of concreting template the most according to claim 4, it is characterised in that: on described upper connecting rod and lower link End is equipped with drag hook, is connected with the link below horizontal floor and stringer plate respectively by drag hook;Described upper connecting rod and Lower link lower end is equipped with draw ring, is connected with earth anchor by draw ring.
A kind of concreting template the most according to claim 4, it is characterised in that: described horizontal floor and level Deep floor is equipped with the jack of vertical direction, and the jack on horizontal floor and stringer plate is the most corresponding.
CN201610631940.XA 2016-08-04 2016-08-04 A kind of concreting template Active CN106087671B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610631940.XA CN106087671B (en) 2016-08-04 2016-08-04 A kind of concreting template

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610631940.XA CN106087671B (en) 2016-08-04 2016-08-04 A kind of concreting template

Publications (2)

Publication Number Publication Date
CN106087671A true CN106087671A (en) 2016-11-09
CN106087671B CN106087671B (en) 2018-07-31

Family

ID=57454582

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610631940.XA Active CN106087671B (en) 2016-08-04 2016-08-04 A kind of concreting template

Country Status (1)

Country Link
CN (1) CN106087671B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106906726A (en) * 2017-03-13 2017-06-30 王本勋 A kind of cement concrete pavement steel form
CN106930173A (en) * 2017-03-13 2017-07-07 王本勋 A kind of water-saving concrete road face die plate
CN107119514A (en) * 2017-05-15 2017-09-01 中铁四局集团机电设备安装有限公司 A kind of complete frock of the plate-type unballasted track bed plates of CRTS III construction
CN109958041A (en) * 2017-12-23 2019-07-02 蒋芳荣 A kind of road shoulder concrete construction formwork
CN110541332A (en) * 2019-08-14 2019-12-06 中铁六局集团有限公司 construction method of railway integral ballast bed in narrow tunnel

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08184183A (en) * 1994-12-28 1996-07-16 Toutetsu Kogyo Kk Slag leakage preventing device for lower part of pillar form and wall form
CN201512741U (en) * 2009-10-21 2010-06-23 中国航空港建设第八工程总队 Adjustable support of airport pavement concrete template
CN202220315U (en) * 2011-08-05 2012-05-16 中铁十四局集团有限公司 Low-plasticity concrete construction mould of ballastless track roadbed supporting layer
CN203846357U (en) * 2014-03-19 2014-09-24 北京铁五院工程机械有限公司 Novel die for double-block-type ballastless track base plate
CN203855864U (en) * 2014-05-15 2014-10-01 宝鸡中铁宝桥天元实业发展有限公司 Ballastless track bed concrete formwork for high-speed railway construction
CN105525571A (en) * 2014-10-27 2016-04-27 牟绍林 Construction method of anti-collision wall
CN205999731U (en) * 2016-08-04 2017-03-08 中铁十七局集团第三工程有限公司 A kind of concreting template

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08184183A (en) * 1994-12-28 1996-07-16 Toutetsu Kogyo Kk Slag leakage preventing device for lower part of pillar form and wall form
CN201512741U (en) * 2009-10-21 2010-06-23 中国航空港建设第八工程总队 Adjustable support of airport pavement concrete template
CN202220315U (en) * 2011-08-05 2012-05-16 中铁十四局集团有限公司 Low-plasticity concrete construction mould of ballastless track roadbed supporting layer
CN203846357U (en) * 2014-03-19 2014-09-24 北京铁五院工程机械有限公司 Novel die for double-block-type ballastless track base plate
CN203855864U (en) * 2014-05-15 2014-10-01 宝鸡中铁宝桥天元实业发展有限公司 Ballastless track bed concrete formwork for high-speed railway construction
CN105525571A (en) * 2014-10-27 2016-04-27 牟绍林 Construction method of anti-collision wall
CN205999731U (en) * 2016-08-04 2017-03-08 中铁十七局集团第三工程有限公司 A kind of concreting template

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106906726A (en) * 2017-03-13 2017-06-30 王本勋 A kind of cement concrete pavement steel form
CN106930173A (en) * 2017-03-13 2017-07-07 王本勋 A kind of water-saving concrete road face die plate
CN106906726B (en) * 2017-03-13 2018-12-18 林云清 A kind of cement concrete pavement steel form
CN106930173B (en) * 2017-03-13 2019-01-18 浙江永和建材有限公司 A kind of water-saving concrete road face die plate
CN107119514A (en) * 2017-05-15 2017-09-01 中铁四局集团机电设备安装有限公司 A kind of complete frock of the plate-type unballasted track bed plates of CRTS III construction
CN109958041A (en) * 2017-12-23 2019-07-02 蒋芳荣 A kind of road shoulder concrete construction formwork
CN110541332A (en) * 2019-08-14 2019-12-06 中铁六局集团有限公司 construction method of railway integral ballast bed in narrow tunnel

Also Published As

Publication number Publication date
CN106087671B (en) 2018-07-31

Similar Documents

Publication Publication Date Title
CN106087671A (en) A kind of concreting template
CN107268348B (en) Subway column check pit construction method
CN104294769B (en) A kind of piling and the construction method increasing the built bridge abutment structure of platform cap composite reinforcement
CN108951322A (en) A kind of ballastless track structure sedimentation lifting apparatus and its lifting method
CN107816056A (en) Filled type concrete gravity retaining wall and its construction technology
CN208362850U (en) A kind of L-type side ditch sliding form apparatus
CN110106751B (en) Settlement adjustment method suitable for CRTS II type plate ballastless track
CN215947749U (en) Prefabricated assembled ballast bed
CN110093850A (en) A kind of seamless bridge corbel back slab construction and its construction method with X-shaped steel muscle
CN204097889U (en) A kind of piling and the built bridge abutment structure of increase platform cap composite reinforcement
CN205999731U (en) A kind of concreting template
CN106320374A (en) Steel pipe column for subway station and construction process of steel pipe column
CN216237943U (en) Rural highway cement concrete pavement assembled structure of small traffic
CN207498814U (en) The longitudinal spliced structure of highway hollow slab girder and fixture
CN207073045U (en) A kind of prefabricated board wall for being applied to industrialization construction is without earth roadbed
CN205999730U (en) A kind of non-fragment orbit base pours uses template
CN205314539U (en) Large -scale cantilever type combination steel form
CN209307801U (en) A kind of railroad crossing mouth structure
CN202830788U (en) Supporting structure with beam fulcrum below bridge cantilever
CN210049373U (en) Assembly type I-steel composite floor slab mounting structure
CN106049205A (en) Formwork for ballast-less track base casting
CN209144677U (en) A kind of suspension type cushion cap bed die bracket
CN206666971U (en) A kind of assembled road
CN205999729U (en) The non-fragment orbit base cast running gear that vibrates
CN206428700U (en) A kind of perpendicularity guider based on permanent support structure prefabricated tubular pile

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210428

Address after: 050081 No. 979 West Zhongshan Road, Hebei, Shijiazhuang

Patentee after: CR17 BUREAU NO.3 ENGINEERING Co.,Ltd.

Patentee after: CHINA RAILWAY 17TH BUREAU GROUP SHANGHAI RAIL TRANSIT ENGINEERING Co.,Ltd.

Address before: 050081 Zhongshan West Road Hebei city of Shijiazhuang province (Village) No. 979

Patentee before: CR17 BUREAU NO.3 ENGINEERING Co.,Ltd.

TR01 Transfer of patent right
CP03 Change of name, title or address

Address after: 050081 no.979, Zhongshan West Road, Shijiazhuang City, Hebei Province

Patentee after: CR17 BUREAU NO.3 ENGINEERING Co.,Ltd.

Country or region after: China

Patentee after: China Railway 17th Bureau Group Municipal Construction Co.,Ltd.

Address before: 050081 no.979, Zhongshan West Road, Shijiazhuang City, Hebei Province

Patentee before: CR17 BUREAU NO.3 ENGINEERING Co.,Ltd.

Country or region before: China

Patentee before: CHINA RAILWAY 17TH BUREAU GROUP SHANGHAI RAIL TRANSIT ENGINEERING CO.,LTD.

CP03 Change of name, title or address