CN204676387U - A kind of cement concrete pavement becomes base layer structure - Google Patents

A kind of cement concrete pavement becomes base layer structure Download PDF

Info

Publication number
CN204676387U
CN204676387U CN201520038295.1U CN201520038295U CN204676387U CN 204676387 U CN204676387 U CN 204676387U CN 201520038295 U CN201520038295 U CN 201520038295U CN 204676387 U CN204676387 U CN 204676387U
Authority
CN
China
Prior art keywords
concrete
cement concrete
pavement
concrete pavement
base layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520038295.1U
Other languages
Chinese (zh)
Inventor
严建忠
顾菊花
陈庆州
徐晓勇
刘伟华
范青
何文军
季忠富
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Continental Transportation Construction Group Co Ltd
Original Assignee
Continental Transportation Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Continental Transportation Construction Group Co Ltd filed Critical Continental Transportation Construction Group Co Ltd
Priority to CN201520038295.1U priority Critical patent/CN204676387U/en
Application granted granted Critical
Publication of CN204676387U publication Critical patent/CN204676387U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

A kind of cement concrete pavement becomes base layer structure, and described cement concrete pavement comprises particulate formula bituminous concrete, Chinese style bituminous concrete, emulsification concrete bond plaster, former cement concrete pavement and roadbed; Described particulate formula bituminous concrete, Chinese style bituminous concrete, emulsification concrete bond plaster and former cement concrete pavement are from top to bottom successively set on roadbed; This cement concrete pavement becomes base layer structure, its easily construction method and cheap cost will make its more and more concerned with accept extensively but in the process of constructing, no matter be the construction that construction or the road pavement bituminous concrete of cement concrete basic unit are paved, all conscientiously must process meticulously, control every one working procedure well, such ability workmanship is controlled preferably, duration shortens, and creates economic benefit and social benefit.

Description

A kind of cement concrete pavement becomes base layer structure
Technical field
The utility model relates to urban construction restoration and reuse technical field, and especially a kind of cement concrete pavement becomes base layer structure.
Background technology
Along with the expanding day of urban construction transformation scale, existing technology transform base layer structure as concrete surface can not well create economic benefit and social benefit; Why there will be this situation, be because in construction method a not only simple but also rigorous construction method, therefore the utility model proposes a kind of cement concrete pavement and become base layer structure.
Utility model content
Prior art is difficult to solve current Problems existing, and for making up prior art deficiency, the utility model aims to provide a kind of cement concrete pavement and becomes base layer structure.
For achieving the above object, the utility model is by the following technical solutions: a kind of cement concrete pavement becomes base layer structure, and described cement concrete pavement comprises particulate formula bituminous concrete, Chinese style bituminous concrete, emulsification concrete bond plaster, former cement concrete pavement and roadbed; Described particulate formula bituminous concrete, Chinese style bituminous concrete, emulsification concrete bond plaster and former cement concrete pavement are from top to bottom successively set on roadbed.
Further, cement concrete pavement becomes base layer structure, and its construction method is: one, and pavement deflection detects; Two, the process of bad plate; Three, along the section of connecing construction; Four, joint treatment; Five, the construction of manhole cover and six, the process of cement concrete substrate surface and health cleaning.
The beneficial effects of the utility model are: this cement concrete pavement becomes base layer structure, its easily construction method and cheap cost will make its more and more concerned with accept extensively but in the process of constructing, no matter be the construction that construction or the road pavement bituminous concrete of cement concrete basic unit are paved, all conscientiously must process meticulously, control every one working procedure well, such ability workmanship is controlled preferably, duration shortens, and creates economic benefit and social benefit.
Accompanying drawing explanation
Fig. 1 is overall sectional view of the present utility model;
Wherein: 1, particulate formula bituminous concrete, 2, Chinese style bituminous concrete, 3, emulsification concrete bond plaster, former 4, cement concrete pavement.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the utility model embodiment, be clearly and completely described the technical scheme in the utility model embodiment, obviously, described embodiment is only the utility model part embodiment, instead of whole embodiments.Based on the embodiment in the utility model, those of ordinary skill in the art are not making other embodiments all obtained under creative work prerequisite, all belong to the scope of the utility model protection.
Refer to Fig. 1, in the utility model embodiment, a kind of cement concrete pavement becomes base layer structure, and described cement concrete pavement comprises particulate formula bituminous concrete 1, Chinese style bituminous concrete 2, emulsification concrete bond plaster 3, former cement concrete pavement 4 and roadbed; Described particulate formula bituminous concrete 1, Chinese style bituminous concrete 2, emulsification concrete bond plaster 3 and former cement concrete pavement 4 are from top to bottom successively set on roadbed.
Further, cement concrete pavement becomes base layer structure, and its construction method is:
One, pavement deflection detects
The supporting capacity of cement concrete pavement adopts deflection testing to evaluate, the performance condition of main reflection 3 aspects: (1) integrated carrying ability, and the modulus of elasticity calculating sub-layer mainly through deflection test in plate and rigidity composition analysis reflects; (2) void beneath slab conner situation, by plate angle deflection test, judges according to deflection value; (3) joint slab merit rating, calculates flexure difference and load transfer coefficient by two deflection sensors striding across transverse joint.Test flexure is a very important basic work; First, draw entire road plate floor map: then carry out deflection test to 4 angle points of every block plate, joint slab ability adopts flexure ratio method to calculate, evaluates, and carries out classification gather, as the foundation of plate process test data.
Two, the process of bad plate
Cement concrete pavement is that the cement concrete slab separated by shrinkage joint combines (size of plate is 3.5m × 5m).Old cement concrete uses through long-time, just there will be that some cement concrete slabs are squished by wheel, crush, rupture, arrisdefect etc., and when " changing black in vain " constructs, these problems all must solve.If indivedual cement concrete slab badly broken, can not continue to use, then old plate thoroughly must be removed, Deteriorated concrete pavement plate is excavated outward transport, then again build the cement concrete that label is not less than former road surface.When old plate is broken: 1. will note not using sledgehammer, artificial or that pneumatic pick is broken method can be adopted, more adopt loader to go down to shovel dress after fragmentation and can adopt the method manually taken out of by rubble, with the bed course avoiding construction disturbance darker; Do not damage adjacent concrete slab when 2. will note fragmentation, also will remove the end, hole after the removing of rock ballast soil simultaneously and loosen the soil, note whether there is cavity etc. below adjacent panels, also must by same method process.Again, during concreting, carry out vibrating in strict accordance with code requirement, plucking, the construction such as maintenance, finally cut the shrinkage joint with adjacent panels as early as possible, in case heat causes concrete slab swelling cracking.
Three, along the section of connecing construction
Owing to cement concrete pavement being wanted black top concrete, thus cause new old asphalt concrete pavement elevation inconsistent along the section of connecing at former cement concrete pavement and the longitudinal of asphalt concrete pavement, therefore will carry out the two along the section of connecing construction processing.Processing method is that cement concrete slab joint being about 10 ~ 15m is pounded by the method for process bad plate and removed, then again by along connecing high range request casting cement rigid pavement.For ensureing the construction quality along meeting place, steel mesh reinforcement and dowel bar to be laid in new casting cement rigid pavement toward contact, forming steel concrete subbase.Laterally the suitable section of connecing is because area is little, the magnitude of traffic flow is less, and the method for grain formula bituminous concrete in laying on Old cement concrete can be taked to make elevation consistent.
Four, joint treatment
Shrinkage joint process is the important procedure in base treatment construction.First adopt joint cutter to carry out joint-cutting cleaning to gap, then use bitumen crack-pouring machine to asphalt reperfusion matizhi in the seam after cleaning.Foreign material in seam are mainly thoroughly removed by seam machine raked joint, will ensure that the seam that certain saw clears out deeply will have enough degree of depth generally to want 8 ~ 10cm at least during raked joint.To clean clean after raked joint in time and carry out the cementation of fissures as early as possible, in order to avoid foreign material enter gap again.Asphalt reperfusion matizhi in the shrinkage joint cleared out, has generally been come by special matizhi pouring machine.Will adjust pouring machine before the cementation of fissures, the coal tar ins and outs making it to flow out are greasy, even.The cementation of fissures will have been come by special operating personnel, and cementation of fissures hourly velocity wants slow, ensure that the bitumastic in stitching is evenly closely knit, make it slowly to staticize to solidify.
Five, the construction of manhole cover
Because road surface is raised, need that adjustment is carried out to the manhole cover on former road surface and raise well reinforcing.Raise the method for reinforcing and can adopt steel bar concrete reinforcement method.For not affecting asphalt concrete pavement construction, manhole cover raises reinforcing should in the end carry out before spreading out by one deck bituminous concrete.First should check the region of cement concrete pavement well lid surrounding 30 ~ 40cm and manually abolish the dark left and right of 30cm, remove dregs, the Scheme of Strengthening provided by design department and drawing have propped up template, have put into reinforcing cage, by the good manhole cover base of design height pad, and make it with elevation is consistent along connecing around to surrounding elongation line, be not less than the cement concrete on former road surface subsequently to well lid surrounding cast label, vibrate by specification, maintenance etc., ensure workmanship.
Six, the process of cement concrete substrate surface and health cleaning
Also have the work that one important before spilling mulseal, paving geotextiles, carry out process and the health cleaning work of cement concrete substrate surface exactly, the outstanding corner angle of the dribs and drabs on Old cement concrete all will be removed.For ensureing planeness, the pavement strip on former road surface also all must manually be removed.
To those skilled in the art, obvious the utility model is not limited to the details of above-mentioned one exemplary embodiment, and when not deviating from spirit of the present utility model or essential characteristic, can realize the utility model in other specific forms.Therefore, no matter from which point, all should embodiment be regarded as exemplary, and be nonrestrictive, scope of the present utility model is limited by claims instead of above-mentioned explanation, and all changes be therefore intended in the implication of the equivalency by dropping on claim and scope are included in the utility model.Any Reference numeral in claim should be considered as the claim involved by limiting.
The above; be only preferred embodiment of the present utility model; not in order to limit the utility model, every above embodiment is done according to technical spirit of the present utility model any trickle amendment, equivalently replace and improve, within the protection domain that all should be included in technical solutions of the utility model.

Claims (1)

1. cement concrete pavement becomes a base layer structure, and described cement concrete pavement comprises particulate formula bituminous concrete (1), Chinese style bituminous concrete (2), emulsification concrete bond plaster (3), former cement concrete pavement (4) and roadbed; It is characterized in that: described particulate formula bituminous concrete (1), Chinese style bituminous concrete (2), emulsification concrete bond plaster (3) and former cement concrete pavement (4) are from top to bottom successively set on roadbed.
CN201520038295.1U 2015-01-16 2015-01-16 A kind of cement concrete pavement becomes base layer structure Expired - Fee Related CN204676387U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520038295.1U CN204676387U (en) 2015-01-16 2015-01-16 A kind of cement concrete pavement becomes base layer structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520038295.1U CN204676387U (en) 2015-01-16 2015-01-16 A kind of cement concrete pavement becomes base layer structure

Publications (1)

Publication Number Publication Date
CN204676387U true CN204676387U (en) 2015-09-30

Family

ID=54176092

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520038295.1U Expired - Fee Related CN204676387U (en) 2015-01-16 2015-01-16 A kind of cement concrete pavement becomes base layer structure

Country Status (1)

Country Link
CN (1) CN204676387U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109594448A (en) * 2018-11-28 2019-04-09 中国华冶科工集团有限公司 The temporary road construction method of linear engineering

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109594448A (en) * 2018-11-28 2019-04-09 中国华冶科工集团有限公司 The temporary road construction method of linear engineering

Similar Documents

Publication Publication Date Title
CN106638696A (en) Installation and construction method for anti-settling manhole cover
CN109914173B (en) Foam light soil pouring table back structure in expressway reconstruction and extension project and construction method thereof
CN106192698A (en) Highway pavement rubblization processes recycling laying construction structure and technique
CN110644324A (en) Splicing construction method for reconstructing and expanding new road and old road
CN104452510B (en) Immediate construction method of rural road
Garilli et al. Stone pavement materials and construction methods in Europe and North America between the 19th and 20th century
CN104911974A (en) Inclined prestress cement concrete-asphalt concrete composite pavement and construction method thereof
CN111778796A (en) Roadbed construction process
CN108193572A (en) A kind of method recycled to precast beam precasting yard hardened layer
CN116815733A (en) Construction process for quality control of high-fill roadbed in collapsible loess area
CN108252176A (en) A kind of pavement engineering construction method equipped with inspection shaft
CN204676387U (en) A kind of cement concrete pavement becomes base layer structure
CN105803887A (en) Barrier-free construction method for base layer of city and town road
CN109082961B (en) Road construction method with steep slope
CN112627168A (en) High-density polymer grouting reinforcement method for roadbed at sunken part of bridge and culvert butt strap
CN204662193U (en) Oblique prestressing force cement concrete-bituminous concrete composite pavement
CN108797298A (en) Road surface multiple head crushing construction method
CN109797730A (en) Ground heddle combined pressure reality dam filling construction is made in a kind of Gullied Rolling Loess Region embankment
CN213114142U (en) Be used for old road to widen roadbed structure
CN109082986A (en) The synthesis improvement method of cold in place recycling Lime-soil subbase
CN204849511U (en) Handle road surface overhaul structure that different lane road surfaces road conditions differed greatly
CN108951383A (en) A kind of construction technology that the regeneration of cement stabilized macadam base presplitting formula is reinforced
CN114908630A (en) Factory road structure and secondary permanent-temporary combined layered construction method
CN209443368U (en) The overhead anti-ponding structure in bridge floor edge
CN114411921A (en) Method and structure for building roadbed drainage ditch through road reconstruction and extension

Legal Events

Date Code Title Description
C14 Grant of patent or utility model