CN205077449U - Design mould is used in rapid trough construction - Google Patents

Design mould is used in rapid trough construction Download PDF

Info

Publication number
CN205077449U
CN205077449U CN201520798492.3U CN201520798492U CN205077449U CN 205077449 U CN205077449 U CN 205077449U CN 201520798492 U CN201520798492 U CN 201520798492U CN 205077449 U CN205077449 U CN 205077449U
Authority
CN
China
Prior art keywords
base plate
pieces
formwork
rapid
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520798492.3U
Other languages
Chinese (zh)
Inventor
李雷
彭亚威
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Highway Engineering Co Ltd
Haiwei Engineering Construction Co Ltd of FHEC of CCCC
Original Assignee
CCCC First Highway Engineering Co Ltd
Haiwei Engineering Construction Co Ltd of FHEC of CCCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Highway Engineering Co Ltd, Haiwei Engineering Construction Co Ltd of FHEC of CCCC filed Critical CCCC First Highway Engineering Co Ltd
Priority to CN201520798492.3U priority Critical patent/CN205077449U/en
Application granted granted Critical
Publication of CN205077449U publication Critical patent/CN205077449U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Revetment (AREA)

Abstract

本实用新型提供了一种急流槽施工用定型模具,所述急流槽施工用定型模具包括两块内模板(2)和两块外模板(1),两块内模板(2)均沿竖直方向设置,两块外模板(1)设置在两块内模板(2)外,两块内模板(2)和两块外模板(1)的上端通过横向连接杆(6)连接固定,两块内模板(2)的下端通过底板(12)连接,在竖直方向上,外模板(1)的高度小于内模板(2)的高度。该急流槽施工用定型模具在施工时在急流槽的外侧不用预留支模及回填空间;急流槽混凝土浇筑后与外侧路基土方结合紧密,一次成型,节省多道工序;彻底解决了以往急流槽外侧雨水冲刷严重问题,消除了影响路基稳定的隐患。

The utility model provides a shaping mold for the construction of the rapid flow trough. The shaping mold for the construction of the rapid flow trough includes two inner formworks (2) and two outer formworks (1). Direction setting, the two outer formworks (1) are arranged outside the two inner formworks (2), and the upper ends of the two inner formworks (2) and the two outer formworks (1) are connected and fixed by a transverse connecting rod (6), and the two The lower end of the inner formwork (2) is connected through the bottom plate (12), and in the vertical direction, the height of the outer formwork (1) is smaller than the height of the inner formwork (2). The stereotyped mold for the construction of the rapid trough does not need to reserve formwork and backfill space on the outside of the rapid trough during construction; after the rapid trough concrete is poured, it is closely combined with the outer subgrade earthwork, and it is formed at one time, saving multiple processes; it completely solves the problem of the previous rapid trough There is a serious problem of rainwater scouring on the outside, which eliminates the hidden danger of affecting the stability of the roadbed.

Description

急流槽施工用定型模具Shaping mold for the construction of rapid flow tank

技术领域technical field

本实用新型涉及筑路施工领域,具体的是一种急流槽施工用定型模具。The utility model relates to the field of road construction, in particular to a shaping die for the construction of a rapid flow trough.

背景技术Background technique

在传统的急流槽施工工艺中,若急流槽外侧夯实不密实将给边坡稳定留下隐患,即急流槽与边坡的结合处在雨水冲刷过程中受损最为严重,严重的影响了路基的稳定性,大大缩短了急流槽及公路的使用年限。In the traditional rapid trough construction process, if the outer side of the rapid trough is not compacted, it will leave a hidden danger to the stability of the slope, that is, the joint between the rapid trough and the slope is most severely damaged during the rain erosion process, which seriously affects the stability of the subgrade. Stability greatly shortens the service life of the rapids and roads.

造成上述问题的原因有:1、木模板的纵、横肋设置不当可能导致模板刚度不够,使得急流槽外观粗糙,线形不顺直;2、木模板随着周转次数的增多,将呈现不同程度的损坏,如不及时更换将严重影响急流槽成品质量,特别是外观质量;3、采用机械开挖基槽尺寸难以控制,存在过大或过小,给后序施工带来不便;4、基槽开挖后为方便支模,往往要留有一定空间,空间过小不便支模且不能满足后序急流槽外侧回填夯实要求,空间过大则增大了后序回填量;5、急流槽外侧空间回填夯实因位于斜坡上施工,工作难度大、费时、费力、进度慢且夯实过程中容易破坏急流槽;6、急流槽外侧空间回填夯实质量难以控制,如果夯实不密实将给边坡稳定留下隐患,根据以往案例此处在雨水冲刷过程中最为严重,严重的影响了路基的稳定性,大大缩短了急流槽及公路的使用年限。The reasons for the above problems are as follows: 1. Improper setting of the longitudinal and transverse ribs of the wooden formwork may lead to insufficient rigidity of the formwork, which makes the appearance of the rush trough rough and the line shape is not straight; 2. With the increase of the number of turnovers, the wooden formwork will show different degrees If it is not replaced in time, it will seriously affect the quality of the finished jet trough, especially the appearance quality; 3. It is difficult to control the size of the foundation trench by mechanical excavation, and it may be too large or too small, which will bring inconvenience to subsequent construction; 4. After the groove is excavated, in order to facilitate the formwork support, a certain space is often left. If the space is too small, it is inconvenient to support the formwork and cannot meet the backfill and compaction requirements of the subsequent rapid flow groove. If the space is too large, the subsequent backfill amount will be increased; 5. The rapid flow groove The backfilling and compaction of the outer space is located on a slope, so the work is difficult, time-consuming, laborious, slow in progress and easy to damage the jet channel during the compaction process; 6. It is difficult to control the quality of the backfill and compaction of the outer space of the jet channel. If the compaction is not dense, the slope will be unstable. Leaving hidden dangers, according to previous cases, this place is the most serious in the process of rainwater erosion, which seriously affects the stability of the roadbed and greatly shortens the service life of the rapids and the road.

实用新型内容Utility model content

为了解决传统工艺浇筑出的急流槽与边坡中土方结合不紧密容易受雨水冲刷的问题,本实用新型提供了一种急流槽施工用定型模具,该急流槽施工用定型模具在施工时在急流槽的外侧不用预留支模及回填空间;急流槽混凝土浇筑后与外侧路基土方结合紧密,一次成型,节省多道工序;彻底解决了以往急流槽外侧雨水冲刷严重问题,消除了影响路基稳定的隐患。In order to solve the problem that the rapid trough poured by the traditional technology is not tightly combined with the earthwork in the slope and is easily washed by rainwater, the utility model provides a shaping mold for the construction of the rapid trough. There is no need to reserve formwork and backfill space on the outside of the trough; after the pouring of the rapids trough, the concrete is tightly combined with the outer subgrade earthwork, and one-time forming saves multiple processes; it completely solves the serious problem of rainwater erosion outside the rapids trough in the past, and eliminates the impact on the stability of the subgrade. Hidden danger.

本实用新型解决其技术问题所采用的技术方案是:一种急流槽施工用定型模具,包括两块内模板和两块外模板,两块内模板均沿竖直方向设置,两块外模板设置在两块内模板外,两块内模板和两块外模板的上端通过横向连接杆连接固定,两块内模板的下端通过底板连接,在竖直方向上,外模板的高度小于内模板的高度。The technical solution adopted by the utility model to solve the technical problem is: a shaping mold for rapid flow trough construction, including two inner formworks and two outer formworks, the two inner formworks are arranged along the vertical direction, and the two outer formworks are arranged Outside the two inner formworks, the upper ends of the two inner formworks and the two outer formworks are connected and fixed by horizontal connecting rods, and the lower ends of the two inner formworks are connected by a bottom plate. In the vertical direction, the height of the outer formwork is smaller than that of the inner formwork .

两块内模板相互平行,外模板平行于内模板,两块内模板的大小和形状相同,两块外模板的大小和形状也相同。The two inner formworks are parallel to each other, the outer formwork is parallel to the inner formwork, the size and shape of the two inner formworks are the same, and the size and shape of the two outer formworks are also the same.

内模板和外模板的上端均焊接有间隔垫块,横向连接杆通过螺钉与间隔垫块连接固定,横向连接杆垂直于内模板。The upper ends of the inner formwork and the outer formwork are welded with spacer blocks, the transverse connecting rods are connected and fixed with the spacer blocks through screws, and the transverse connecting rods are perpendicular to the inner formwork.

每个外模板的外侧均设有多个侧向支撑腿,侧向支撑腿固定于外模板的上端,侧向支撑腿垂直于外模板,侧向支撑腿上设有用于插入固定钢筋的通孔。There are multiple lateral support legs on the outside of each outer formwork, the lateral support legs are fixed on the upper end of the outer formwork, the lateral support legs are perpendicular to the outer formwork, and the lateral support legs are provided with through holes for inserting and fixing steel bars .

底板由左底板和右底板组成,左底板的一侧和右底板的一侧对应地与两块内模板连接,左底板的另一侧设有向左底板的一侧倾斜的第一斜向翻边,右底板的另一侧设有向右底板的一侧倾斜的第二斜向翻边,第一斜向翻边和第二斜向翻边通过螺丝钉连接固定。The base plate is composed of a left base plate and a right base plate, one side of the left base plate and one side of the right base plate are connected with two inner formworks correspondingly, and the other side of the left base plate is provided with a first oblique turning to one side of the left base plate. side, the other side of the right base plate is provided with a second oblique flange inclined to one side of the right base plate, and the first oblique flange and the second oblique flange are connected and fixed by screws.

左底板和右底板位于同一平面,与左底板连接的内模板垂直于左底板,与右底板连接的内模板垂直于右底板,左底板和右底板上均含有通气孔。The left base plate and the right base plate are located on the same plane, the inner formwork connected with the left base plate is perpendicular to the left base plate, the inner formwork connected with the right base plate is perpendicular to the right base plate, and both the left base plate and the right base plate contain ventilation holes.

所述急流槽施工用定型模具由多个沿急流槽长度方向的单元节组成,每个所述单元节的长度为1米,相邻的两个所述单元节之间通过螺栓连接固定。The shaping die for the rapid chute construction is composed of a plurality of unit sections along the length direction of the rapid chute. The length of each unit section is 1 meter, and two adjacent unit sections are connected and fixed by bolts.

内模板和外模板均为金属板。Both the inner formwork and the outer formwork are metal plates.

本实用新型的有益效果是,The beneficial effects of the utility model are:

1、采用钢模板解决了模板刚度问题,及模板易于损坏问题及周转次数问题;1. The use of steel formwork solves the rigidity of the formwork, the easy damage of the formwork and the number of turnovers;

2、采用钢模板确保了急流槽内在质量、线型及外观质量;2. The use of steel formwork ensures the internal quality, line shape and appearance quality of the rapid flow tank;

3、定型钢模尺寸固定,便于安装和加固,提高工作效率;3. The size of the shaped steel mold is fixed, which is convenient for installation and reinforcement, and improves work efficiency;

4、采用人工配合机械开挖基槽,开挖尺寸精度高;4. The foundation trench is excavated manually and mechanically, and the excavation has high dimensional accuracy;

5、采用定型钢模与土模结合,施工急流槽外侧不用预留支模及回填空间;5. The combination of shaped steel formwork and soil formwork is adopted, and there is no need to reserve formwork and backfill space outside the rapid flow tank;

6、模具的下部呈开放式结构,急流槽混凝土浇筑后与外侧路基土方结合紧密,一次成型,节省多道工序;6. The lower part of the mold is an open structure. After pouring the concrete of the rapid flow trough, it is closely combined with the earthwork of the outer subgrade, and it can be formed at one time, saving multiple processes;

7、彻底解决了以往急流槽外侧雨水冲刷严重问题,消除了影响路基稳定的隐患。采用定型钢模与土模结合施工急流槽加快施工进度、节省机械和人工、保证了工期、带来了经济效益。7. It has completely solved the serious problem of rainwater scouring outside the rapids trough in the past, and eliminated the hidden dangers affecting the stability of the roadbed. The combination of shaped steel mold and soil mold is used to construct the rapid flow tank to speed up the construction progress, save machinery and labor, ensure the construction period, and bring economic benefits.

附图说明Description of drawings

下面结合附图对本实用新型作进一步详细的描述。Below in conjunction with accompanying drawing, the utility model is described in further detail.

图1为急流槽施工用定型模具的俯视示意图。Fig. 1 is a top view schematic diagram of a shaping die for construction of a jet trough.

图2为急流槽施工用定型模具的右视示意图。Fig. 2 is a schematic view of the right side view of the shaping die used for the construction of the rapid trough.

图3为急流槽施工用定型模具的仰视示意图。Fig. 3 is a schematic bottom view of a shaping die for construction of a rapid trough.

图4为急流槽施工用定型模具的使用示意图。Fig. 4 is a schematic diagram of the use of the shaping mold for the construction of the rapid trough.

图5为施工完成形成的急流槽的示意图。Fig. 5 is a schematic diagram of the jet trough formed after construction.

其中1.外模板,2.内模板,3.侧向支撑腿,4.斜向接口,5.螺钉,6.横向连接杆,7.间隔垫块,8.固定钢筋,9.螺丝钉,10.螺栓,11.通气孔,12.底板;Among them 1. Outer formwork, 2. Inner formwork, 3. Lateral support legs, 4. Oblique interface, 5. Screws, 6. Transverse connecting rods, 7. Spacer blocks, 8. Fixing steel bars, 9. Screws, 10 .Bolts, 11. Air vents, 12. Bottom plate;

41.第一斜向翻边,42.第二斜向翻边,121.左底板,122.右底板;41. the first oblique flanging, 42. the second oblique flanging, 121. the left bottom plate, 122. the right bottom plate;

20.土模槽,30.急流槽。20. Soil mold groove, 30. Rapid flow groove.

具体实施方式detailed description

需要说明的是,在不冲突的情况下,本申请中的实施例及实施例中的特征可以相互组合。下面将参考附图并结合实施例来详细说明本实用新型。It should be noted that, in the case of no conflict, the embodiments in the present application and the features in the embodiments can be combined with each other. The utility model will be described in detail below with reference to the accompanying drawings and in conjunction with the embodiments.

一种急流槽施工用定型模具,包括两块内模板2和两块外模板1,使用时两块内模板2均沿竖直方向设置,两块外模板1设置在两块内模板2外(即左侧的外模板1在左侧的内模板2的左侧,右侧的外模板1在右侧的内模板2的右侧),两块内模板2的上端和两块外模板1的上端通过横向连接杆6连接固定,两块内模板2的下端通过底板12连接,在竖直方向上,外模板1的高度小于内模板2的高度,如图1至图3所示。A stereotyped mold for rapid trough construction, comprising two inner formworks 2 and two outer formworks 1, the two inner formworks 2 are all arranged in the vertical direction during use, and the two outer formworks 1 are arranged outside the two inner formworks 2 ( That is, the outer template 1 on the left side is on the left side of the inner template 2 on the left side, the outer template 1 on the right side is on the right side of the inner template 2 on the right side), the upper ends of the two inner templates 2 and the two outer templates 1 The upper end is connected and fixed by the transverse connecting rod 6, and the lower ends of the two inner templates 2 are connected by the bottom plate 12. In the vertical direction, the height of the outer template 1 is less than the height of the inner template 2, as shown in Fig. 1 to Fig. 3 .

由于外模板1的高度小于内模板2的高度,外模板1的下部呈开放式结构,在施工时在急流槽的外侧不用预留支模及回填空间;急流槽混在凝土浇筑后与外侧路基土方结合紧密,一次成型,彻底解决了以往急流槽外侧雨水冲刷严重问题,消除了影响路基稳定的隐患。Since the height of the outer formwork 1 is smaller than the height of the inner formwork 2, the lower part of the outer formwork 1 is an open structure, and there is no need to reserve formwork and backfill space on the outside of the rush trough during construction; the rush trough is mixed with the outer subgrade after concrete pouring The earthwork is closely combined and formed at one time, which completely solves the serious problem of rainwater scouring outside the rapids trough in the past, and eliminates the hidden danger affecting the stability of the roadbed.

在本实施例总中,两块内模板2相互平行,外模板1平行于内模板2,两块内模板2的大小和形状相同,两块内模板2左右对称设置,两块外模板1的大小和形状也相同,两块外模板1也左右对称设置,如图3所示。内模板2和外模板1的上端均焊接有间隔垫块7,横向连接杆6通过螺钉5与间隔垫块7连接固定,横向连接杆6垂直于内模板2。间隔垫块7为立方体结构,设置间隔垫块7能起到更好的固定作用。In this embodiment, the two inner templates 2 are parallel to each other, and the outer template 1 is parallel to the inner template 2. The size and shape of the two inner templates 2 are the same, and the two inner templates 2 are arranged symmetrically. The size and shape are also the same, and the two outer templates 1 are arranged symmetrically, as shown in Figure 3 . The upper ends of the inner formwork 2 and the outer formwork 1 are welded with spacer blocks 7, the transverse connecting rods 6 are connected and fixed with the spacer blocks 7 by screws 5, and the transverse connecting rods 6 are perpendicular to the inner formwork 2. The spacer block 7 is a cube structure, and the spacer block 7 can be provided for a better fixing effect.

在本实施例总中,每个外模板1的外侧均设有多个侧向支撑腿3,即如图1所示,左侧的外模板1的左侧设有多个侧向支撑腿3,右侧的外模板1的右侧设有多个侧向支撑腿3,侧向支撑腿3固定于外模板1的上端,如图3所示,侧向支撑腿3为角钢,侧向支撑腿3垂直于外模板1,侧向支撑腿3上设有用于插入固定钢筋8的通孔。In this embodiment, a plurality of lateral support legs 3 are provided on the outside of each outer formwork 1, that is, as shown in Figure 1, a plurality of lateral support legs 3 are provided on the left side of the outer formwork 1 on the left. , the right side of the outer formwork 1 on the right is provided with a plurality of lateral support legs 3, and the lateral support legs 3 are fixed on the upper end of the outer formwork 1, as shown in Figure 3, the lateral support legs 3 are angle steel, and the lateral support legs The legs 3 are perpendicular to the outer template 1, and the lateral support legs 3 are provided with through holes for inserting the fixing steel bars 8.

在本实施例总中,底板12由左底板121和右底板122组成,左底板121的左侧和右底板122的右侧对应地与两块内模板2连接(即左底板121的左侧与左侧的内模板2的下端连接,右底板122的右侧与右侧的内模板2的下端连接,如图3所示),左底板121的右侧设有向左底板121的左侧倾斜的第一斜向翻边41,右底板122的左侧设有向右底板122的右侧倾斜的第二斜向翻边42,第一斜向翻边41和第二斜向翻边42组成了斜向接口4,第一斜向翻边41和第二斜向翻边42通过螺丝钉9连接固定,从而使两块内模板2的下部连接固定。优选左底板121和右底板122位于同一平面,与左底板121连接的左侧的内模板2垂直于左底板121,与右底板122连接的右侧的内模板2垂直于右底板122,左底板121和右底板122上均含有通气孔11,如图所示。In the present embodiment, base plate 12 is made up of left base plate 121 and right base plate 122, and the left side of left base plate 121 and the right side of right base plate 122 are correspondingly connected with two inner templates 2 (that is, the left side of left base plate 121 and The lower end of the inner formwork 2 on the left side is connected, the right side of the right base plate 122 is connected with the lower end of the inner formwork 2 on the right side, as shown in Figure 3), the right side of the left base plate 121 is provided with the left side inclined to the left base plate 121 The first oblique flange 41, the left side of the right base plate 122 is provided with the second oblique flange 42 inclined to the right side of the right base plate 122, the first oblique flange 41 and the second oblique flange 42 are composed of The oblique interface 4 is formed, and the first oblique flange 41 and the second oblique flange 42 are connected and fixed by screws 9, so that the lower parts of the two inner templates 2 are connected and fixed. Preferably, the left base plate 121 and the right base plate 122 are located on the same plane, and the inner formwork 2 on the left side connected with the left base plate 121 is perpendicular to the left base plate 121, and the inner formwork 2 on the right side connected with the right base plate 122 is perpendicular to the right base plate 122, and the left base plate 121 and the right bottom plate 122 all contain vent holes 11, as shown in the figure.

在本实施例总中,所述急流槽施工用定型模具由多个沿急流槽长度方向(即沿图1中的上下方向)的单元节组成,每个所述单元节的长度为1米,相邻的两个所述单元节之间通过螺栓10连接固定。可以理解为图1中所示的为一个组成该急流槽施工用定型模具的所述单元节,多个图1所示的该单元节沿图1中的上下方向通过螺栓10连接固定而组合成了所述急流槽施工用定型模具,图1所示的外模板1的长度(即沿图1中的上下方向的长度)小于内模板2的长度,但在组成该急流槽施工用定型模具时,除了上下两端的该单元节中的外模板1可以小于内模板2的长度,其他的该单元节中的外模板1的长度和内模板2的长度均相同。In the present embodiment, the shaping mold for the construction of the rapid chute is composed of a plurality of unit sections along the length direction of the rapid chute (that is, along the up and down direction in Fig. 1), and the length of each of the unit sections is 1 meter. Two adjacent unit sections are connected and fixed by bolts 10 . It can be understood that what is shown in FIG. 1 is a described unit section that forms the shaping mold for the construction of the rapid trough, and a plurality of the unit sections shown in FIG. 1 are connected and fixed by bolts 10 along the up and down direction in FIG. According to the setting mold for the construction of the rapid chute, the length of the outer template 1 shown in Fig. 1 (i.e. the length along the up and down direction in Fig. 1) is less than the length of the inner template 2, but when forming the shaping mold for the construction of the rapid chute , except that the outer template 1 in the unit section at the upper and lower ends can be shorter than the length of the inner template 2, the length of the outer template 1 in the other unit sections is the same as the length of the inner template 2.

在本实施例总中,内模板2和外模板1均为金属板,图1至图3中所示的所述急流槽施工用定型模具的其他零部件也为金属制成,优选内模板2、外模板1和底板12均为钢板。In the present embodiment, the inner formwork 2 and the outer formwork 1 are metal plates, and other parts of the shaping mold for the construction of the rapid trough shown in Fig. 1 to Fig. 3 are also made of metal, preferably the inner formwork 2 , The outer template 1 and the bottom plate 12 are steel plates.

下面介绍一种急流槽的施工方法,该施工方法包括以下步骤:The construction method of a rapid trough is introduced below, and the construction method includes the following steps:

步骤1、挖急流槽的土模槽20;Step 1, digging the soil mold groove 20 of the rapid flow groove;

步骤2、组装上述的急流槽施工用定型模具,再将组装好的该急流槽施工用定型模具放置于土模槽内并固定;Step 2, assembling the above-mentioned rapid chute construction shaping mold, and then placing the assembled rapid chute construction shaping mold in the soil mold groove and fixing it;

步骤3、浇筑混凝土;Step 3, pouring concrete;

步骤4、拆模;Step 4, demoulding;

步骤5、养生。Step 5. Keep in good health.

在步骤1中,按设计要求放出急流槽的上下控制点,挂线确定中线,按设计要求的宽度确定出开挖宽度。人工配合小型挖掘机开挖基槽20,注意控制好开挖深度、坡度及防滑平台位置。In step 1, release the upper and lower control points of the jet trough according to the design requirements, determine the center line by hanging the line, and determine the excavation width according to the width required by the design. Manually cooperate with the small excavator to excavate the foundation trench 20, and pay attention to controlling the excavation depth, slope and the position of the anti-skid platform.

在本实施例总中,步骤2具体包括以下步骤:In this embodiment, step 2 specifically includes the following steps:

步骤2.1、用横向连接杆6将两块内模板2和两块外模板1连接,并在间隔垫块7部位用螺钉5将横向连接杆6、两块内模板2和两块外模板1连接固定,第一斜向翻边41和第二斜向翻边42通过螺丝钉9,组合成一个如图2所示的单元节,在每个单元节组装完成后用螺栓10将多个该单元节组成一个完整的急流槽施工用定型模具;Step 2.1. Connect the two inner formworks 2 and the two outer formworks 1 with the transverse connecting rod 6, and connect the transverse connecting rod 6, the two inner formworks 2 and the two outer formworks 1 with the screws 5 at the spacer block 7 Fixed, the first oblique flange 41 and the second oblique flange 42 are combined into a unit section as shown in Figure 2 through screws 9, and after each unit section is assembled, bolts 10 are used to fasten a plurality of the unit sections To form a complete shaping mold for rapid trough construction;

步骤2.2、将组装完成的该急流槽施工用定型模具采用人工配合机械的方式放置于基槽20内;Step 2.2, placing the assembled forming mold for the construction of the rapid flow tank in the foundation tank 20 manually and mechanically;

步骤2.3、通过外模板1将该急流槽施工用定型模具固定于基槽20两侧的路基边坡上,即利用侧向支撑腿3和固定钢筋8将急流槽施工用定型模具固定于路基边坡上,注意保证急流槽底部和侧面厚度,如图4所示。Step 2.3: Fix the shaping mold for rapid chute construction on the embankment slope on both sides of the foundation groove 20 through the outer formwork 1, that is, use the lateral support legs 3 and the fixed steel bars 8 to fix the shaping mold for rapid chute construction on the side of the roadbed On the slope, pay attention to ensure the thickness of the bottom and side of the rapids, as shown in Figure 4.

在步骤3中,混凝土在拌合站集中拌制,运输车运至现场浇筑,采取分段连续浇筑,插入式振捣棒振捣,不得漏振、过振。振捣时注意观察直到混凝土不再下沉,表面泛浆;混凝土初凝时进行收浆抹面以保证混凝土外观符合规范要求。In step 3, the concrete is mixed centrally at the mixing station, and the transport vehicle is transported to the site for pouring. Continuous pouring is carried out in sections, and the plug-in vibrating rod is vibrated without leakage or excessive vibration. When vibrating, pay attention to observe until the concrete no longer sinks and the surface is flooded; when the concrete is initially set, collect the slurry and plaster the surface to ensure that the appearance of the concrete meets the requirements of the specification.

在步骤4中,待急流槽达到一定强度后将该急流槽施工用定型模具拆除。拆除时,先将横向连接杆6拆除,然后将外模板1直接拆除,然后再将螺丝钉9和螺栓10拆除,最后将内模板2向内部撬动后拆除。底板12设有斜向接口4,以便于内模板2的拆卸,底板12留有通气孔11,利于浇筑时排出气泡并查看急流槽底板是否密实。In step 4, after the rapid trough reaches a certain strength, the shaping mold for the rapid trough construction is removed. When dismantling, first remove the transverse connecting rod 6, then directly remove the outer formwork 1, then remove the screws 9 and bolts 10, and finally remove the inner formwork 2 by prying it inward. The bottom plate 12 is provided with an oblique interface 4 to facilitate the disassembly of the inner formwork 2, and the bottom plate 12 has vent holes 11, which are beneficial to discharge air bubbles during pouring and check whether the bottom plate of the rapid flow tank is dense.

在步骤5中,该急流槽施工用定型模具拆除完成后覆膜养生,不得少于7天,最后形成急流槽30,如图5所示。In step 5, after the shaping mold for construction of the rapid trough is removed, the rapid trough 30 is finally formed, and then the rapid trough 30 is formed, as shown in FIG. 5 .

该急流槽的施工方法包括以下步骤:The construction method of this rapid launder comprises the following steps:

步骤6、急流槽出水口防冲刷护砌施工;Step 6. Construction of anti-scour protective masonry at the outlet of the rapid flow tank;

在急流槽出水口防冲刷护砌施工时,砂浆集中拌和,片石边长不小于15cm,强度不低于30MPa,片石的锈面不得外漏;该急流槽出水口采用坐浆法施工,砂浆饱满密实;该急流槽出水口的外露面用M10砂浆勾平缝。During the construction of the anti-scour protection at the outlet of the rapid trough, the mortar is concentrated and mixed, the side length of the chip is not less than 15cm, the strength is not less than 30MPa, and the rusty surface of the chip is not leaked; the outlet of the rapid trough is constructed by the sitting slurry method, and the mortar is full Dense; the exposed surface of the outlet of the rapid flow tank is smoothed with M10 mortar.

步骤7、急流槽八字进水口施工;步骤7具体包括以下步骤:Step 7, construction of the water inlet of the rapid flow tank; step 7 specifically includes the following steps:

步骤7.1、检测急流槽八字进水口预制块;急流槽八字进水口预制块采用符合线型要求的定型模具进行浇筑施工,产品运至现场后进行检测:产品三证(指营业执照、产品合格证及检测报告)、尺寸等。Step 7.1. Detect the prefabricated block of the splayed water inlet of the rapid trough; the prefabricated block of the splayed water inlet of the rapid trough is poured with a mold that meets the linear requirements, and the product is transported to the site for inspection: three certificates of the product (referring to the business license and the product qualification certificate and test report), size, etc.

步骤7.2、按设计要求放出八字进水口的内边控制线,按设计要求的宽度加0.5米确定沥青混凝土清除范围,人工凿除急流槽八字进水口位置的沥青混凝土;Step 7.2. Release the inner edge control line of the water inlet according to the design requirements, add 0.5 meters to the width required by the design to determine the asphalt concrete removal range, and manually remove the asphalt concrete at the water inlet position of the rapid flow tank;

步骤7.3、按设计要求的高程用M10砂浆作为找平层人工安装急流槽八字进水口预制块并校正,安装时急流槽八字进水口预制块与槽身、拦水带结合良好,达到顺适美观,急流槽八字进水口预制块与槽身、拦水带接缝处用M10砂浆进行填缝,外露表面进行勾缝处理;Step 7.3. Use M10 mortar as the leveling layer according to the elevation required by the design. Manually install and correct the prefabricated block of the eight-character water inlet of the rapid flow tank. The joints between the prefabricated block of the eight-character water inlet of the rapid flow tank, the tank body and the water barrier are filled with M10 mortar, and the exposed surface is jointed;

步骤7.4、混凝土浇筑,混凝土的强度等级为C30,浇筑成型后覆膜养生,养生时间不得少于7天;Step 7.4. Concrete pouring. The strength grade of the concrete is C30. After pouring and forming, the curing time should not be less than 7 days;

步骤7.5、用油砂填充沥青混凝土与八字进水口预制块之间的缝隙,要求填筑饱满密实。Step 7.5: Fill the gap between the asphalt concrete and the prefabricated block of the water inlet with oil sand, and the filling is required to be full and dense.

本工艺施工急流槽方便快捷,线形直顺,外观优美,边坡稳定。另外,接急流槽3米范围内边沟采用M7.5浆砌片石防护加固,浆砌片石厚度30cm,下设10cm砂砾垫层,片石强度等级MU30。The construction of the jet trough by this technology is convenient and quick, the line is straight and smooth, the appearance is beautiful, and the slope is stable. In addition, the side ditch within 3 meters of the rapid flow tank is protected and reinforced with M7.5 mortar rubble. The thickness of the mortar rubble is 30cm, and there is a 10cm gravel cushion under it. The strength of the rubble is MU30.

本实用新型的优点是:The utility model has the advantages of:

1、采用钢模板解决了模板刚度问题,及模板易于损坏问题及周转次数问题;1. The use of steel formwork solves the rigidity of the formwork, the easy damage of the formwork and the number of turnovers;

2、采用钢模板确保了急流槽内在质量、线型及外观质量;2. The use of steel formwork ensures the internal quality, line shape and appearance quality of the rapid flow tank;

3、定型钢模尺寸固定,便于安装和加固,提高工作效率;3. The size of the shaped steel mold is fixed, which is convenient for installation and reinforcement, and improves work efficiency;

4、采用人工配合机械开挖基槽,开挖尺寸精度高;4. The foundation trench is excavated manually and mechanically, and the excavation has high dimensional accuracy;

5、采用定型钢模与土模结合,施工急流槽外侧不用预留支模及回填空间;5. The combination of shaped steel formwork and soil formwork is adopted, and there is no need to reserve formwork and backfill space outside the rapid flow tank;

6、模具的下部呈开放式结构,急流槽混凝土浇筑后与外侧路基土方结合紧密,一次成型,节省多道工序;6. The lower part of the mold is an open structure. After pouring the concrete of the rapid flow trough, it is closely combined with the earthwork of the outer subgrade, and it can be formed at one time, saving multiple processes;

7、彻底解决了以往急流槽外侧雨水冲刷严重问题,消除了影响路基稳定的隐患。采用定型钢模与土模结合施工急流槽加快施工进度、节省机械和人工、保证了工期、带来了经济效益。7. It has completely solved the serious problem of rainwater scouring outside the rapids trough in the past, and eliminated the hidden dangers affecting the stability of the roadbed. The combination of shaped steel mold and soil mold is used to construct the rapid flow tank to speed up the construction progress, save machinery and labor, ensure the construction period, and bring economic benefits.

以上所述,仅为本实用新型的具体实施例,不能以其限定实用新型实施的范围,所以其等同组件的置换,或依本实用新型专利保护范围所作的等同变化与修饰,都应仍属于本专利涵盖的范畴。另外,本实用新型中的技术特征与技术特征之间、技术特征与技术方案之间、技术方案与技术方案之间均可以自由组合使用。The above is only a specific embodiment of the utility model, and it cannot limit the scope of utility model implementation, so the replacement of its equivalent components, or the equivalent changes and modifications made according to the patent protection scope of the utility model should still belong to areas covered by this patent. In addition, the technical features and technical features, technical features and technical solutions, and technical solutions and technical solutions in the utility model can be used in free combination.

Claims (8)

1. a chute construction shaper, it is characterized in that, described chute construction shaper comprises two pieces of inner formwords (2) and two pieces of exterior sheathings (1), two pieces of inner formwords (2) are all vertically arranged, two pieces of exterior sheathings (1) are arranged on two pieces of inner formwords (2) outward, the upper end of two pieces of inner formwords (2) and two pieces of exterior sheathings (1) is connected and fixed by lateral connection bar (6), the lower end of two pieces of inner formwords (2) is connected by base plate (12), in the vertical direction, the height of exterior sheathing (1) is less than the height of inner formword (2).
2. chute construction shaper according to claim 1, it is characterized in that, two pieces of inner formwords (2) are parallel to each other, exterior sheathing (1) is parallel to inner formword (2), the size and shape of two pieces of inner formwords (2) is identical, and the size and shape of two pieces of exterior sheathings (1) is also identical.
3. chute construction shaper according to claim 2, it is characterized in that, the upper end of inner formword (2) and exterior sheathing (1) is all welded with interval cushion block (7), lateral connection bar (6) is connected and fixed by screw (5) and interval cushion block (7), and lateral connection bar (6) is perpendicular to inner formword (2).
4. chute construction shaper according to claim 1, it is characterized in that, the outside of each exterior sheathing (1) is equipped with multiple lateral support leg (3), lateral support leg (3) is fixed on the upper end of exterior sheathing (1), lateral support leg (3) is perpendicular to exterior sheathing (1), and lateral support leg (3) is provided with the through hole for inserting fixing reinforcing bar (8).
5. chute construction shaper according to claim 1, it is characterized in that, base plate (12) is made up of left bottom plate (121) and right base plate (122), the side of left bottom plate (121) is connected with two pieces of inner formwords (2) accordingly with the side of right base plate (122), the opposite side of left bottom plate (121) is provided with the first oblique flange (41) of the lopsidedness to left bottom plate (121), the opposite side of right base plate (122) is provided with the second oblique flange (42) of the lopsidedness of base plate (122) to the right, first oblique flange (41) and the second oblique flange (42) are connected and fixed by screw (9).
6. chute construction shaper according to claim 5, it is characterized in that, left bottom plate (121) and right base plate (122) are positioned at same plane, the inner formword (2) be connected with left bottom plate (121) is perpendicular to left bottom plate (121), the inner formword (2) be connected with right base plate (122) perpendicular to right base plate (122), all containing air vent (11) on left bottom plate (121) and right base plate (122).
7. chute construction shaper according to claim 1, it is characterized in that, described chute construction shaper is saved by multiple unit along chute length direction and forms, the length of each described unit joint is 1 meter, is connected and fixed between adjacent two described unit joints by bolt (10).
8. chute construction shaper according to claim 1, is characterized in that, inner formword (2) and exterior sheathing (1) are metal sheet.
CN201520798492.3U 2015-10-15 2015-10-15 Design mould is used in rapid trough construction Expired - Fee Related CN205077449U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520798492.3U CN205077449U (en) 2015-10-15 2015-10-15 Design mould is used in rapid trough construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520798492.3U CN205077449U (en) 2015-10-15 2015-10-15 Design mould is used in rapid trough construction

Publications (1)

Publication Number Publication Date
CN205077449U true CN205077449U (en) 2016-03-09

Family

ID=55429864

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520798492.3U Expired - Fee Related CN205077449U (en) 2015-10-15 2015-10-15 Design mould is used in rapid trough construction

Country Status (1)

Country Link
CN (1) CN205077449U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105155474A (en) * 2015-10-15 2015-12-16 中交第一公路工程局有限公司 Shaping mold for torrent gutter construction and torrent gutter construction method
CN114319060A (en) * 2021-12-28 2022-04-12 中铁建工集团有限公司 Filling device for highway construction

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105155474A (en) * 2015-10-15 2015-12-16 中交第一公路工程局有限公司 Shaping mold for torrent gutter construction and torrent gutter construction method
CN114319060A (en) * 2021-12-28 2022-04-12 中铁建工集团有限公司 Filling device for highway construction
CN114319060B (en) * 2021-12-28 2024-01-30 中铁建工集团有限公司 Filler device for highway construction

Similar Documents

Publication Publication Date Title
CN101906768B (en) Panel construction method of concrete faced rock-fill dam
CN105134253A (en) Tunnel inverted arch combined integrated template and method for concreting construction
CN206545215U (en) A kind of precast spliced sinking type garage parking
CN107059920A (en) Loess formation piping lane construction technology
CN114808776A (en) Prefabricated installation construction method for prefabricated box culvert pipe
CN105275097A (en) A post-cast strip water-stop steel plate and demolition-free template net installing method
CN203729322U (en) Precast concrete pipeline foundation
CN106968692B (en) Tunnel excavation supporting structure and construction method thereof
CN107354953A (en) Concrete rib band and the reinforced Retaining wall structure of intensive aspect and construction method
CN107816056A (en) Filled type concrete gravity retaining wall and its construction technology
CN105155474B (en) Chute construction shaper and the construction method of chute
CN107558483A (en) A kind of building foundation and its construction method for installing wallboard
CN205077449U (en) Design mould is used in rapid trough construction
CN206902741U (en) Concrete rib band and the reinforced Retaining wall structure of intensive aspect
CN110344439B (en) Construction method of rear retaining wall drain hole
CN111335355A (en) Special-shaped block post-pouring type light retaining wall supporting structure and construction method thereof
CN106988339A (en) Sandy gravel stratum piping lane construction technology
CN110820455A (en) Construction process for lapping and expanding roadbed of asphalt concrete highway
CN108385612A (en) A kind of construction method of the good concrete protecting face plate of stability
CN216007015U (en) Soft soil foundation brick bed die construction structures
CN216691101U (en) Low side wall of tunnel lining and whole construction formwork of side ditch
CN216193749U (en) Assembly type road structure for construction site
CN110593914A (en) A kind of construction method of underground excavation of side wall waterproof and counter-work joints of subway stations
CN109267580A (en) A kind of steel bar combined structure and casting method of concrete
CN113756352A (en) Soft soil foundation brick moulding bed construction structure and construction method thereof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160309