CN106894774A - 一种欠平衡更换管柱工艺方法 - Google Patents

一种欠平衡更换管柱工艺方法 Download PDF

Info

Publication number
CN106894774A
CN106894774A CN201710085533.8A CN201710085533A CN106894774A CN 106894774 A CN106894774 A CN 106894774A CN 201710085533 A CN201710085533 A CN 201710085533A CN 106894774 A CN106894774 A CN 106894774A
Authority
CN
China
Prior art keywords
liquid
pressure
oil
gas
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710085533.8A
Other languages
English (en)
Other versions
CN106894774B (zh
Inventor
邓继学
孙虎
王祖文
杜焰
兰建平
张冕
吕希祥
景志明
谢涛
高燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Petroleum Corp
CNPC Chuanqing Drilling Engineering Co Ltd
Original Assignee
Changqing Downhole Operation Co of CNPC Chuanqing Drilling Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changqing Downhole Operation Co of CNPC Chuanqing Drilling Engineering Co Ltd filed Critical Changqing Downhole Operation Co of CNPC Chuanqing Drilling Engineering Co Ltd
Priority to CN201710085533.8A priority Critical patent/CN106894774B/zh
Publication of CN106894774A publication Critical patent/CN106894774A/zh
Application granted granted Critical
Publication of CN106894774B publication Critical patent/CN106894774B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B19/00Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
    • E21B19/18Connecting or disconnecting drill bit and drilling pipe

Abstract

本发明属于油、气井修井更换作业管柱工艺技术领域,具体提供了一种欠平衡更换管柱工艺方法,包括如下步骤:采用套管和油管的气压平衡法求取参数;求取施工参数;液、气压力置换法置换油管内气压;液、气压力置换法置换套管内气压;欠平衡法起钻或者下钻,该欠平衡更换管柱工艺方法带压作业更换管柱方法周期长,费用大,风险高,实现了对油气层的保护,安全环保,施工过程中,没有液体返出,无环境污染。

Description

一种欠平衡更换管柱工艺方法
技术领域
本发明属于油、气井修井更换作业管柱工艺技术领域,具体涉及一种欠平衡更换管柱工艺方法。
背景技术
对于已开发十多年的老井,需要更换作业管柱,或要对原作业层位进行增产作业,不能对现有层位造成污染,当前采取方法为压井更换管柱或采用带压作业更换采油(气)管柱。
压井更换作业管柱时,由于采气多年,地层亏空,需注入大量的压井液才能将井压住,再更换管柱,而进入地层的液体会对地层形成水锁,不易排出,形成二次伤害;使干法CO2或N2气泡沫增产作业效果不佳,或给二次排液带来更大的作业费用。
带压作业更换管柱方法周期长,费用大,风险高;在油气价格处于低位时,起到增产不增收的作用,作业成本不允许进行增产作业。
针对以保护油(气)层,降本增效为核心的作业要求,发明了欠平衡更换采油(气)管柱工艺方法。
发明内容
本发明的目的是通过液、气压力置换法,对油、套管气体用液体进行平衡置换,使套管内对地层的回压由气、液构成,油管内对地层的回压由液体构成,并用液体胶塞封堵,当起钻或下钻时,释放套管内气压,使起、下钻过程形成欠平衡状态,达到对油气层的保护要求。
为此,本发明提供了一种欠平衡更换管柱工艺方法,包括如下步骤:采用套管和油管的气压平衡法求取参数;求取施工参数;液、气压力置换法置换油管内气压;液、气压力置换法置换套管内气压;欠平衡法起钻或者下钻。
所述的参数为井内液面深度及井底压力,施工参数为套管注入液量、油管放压气量、油管注入压井总液量、胶液塞顶替量、前置压井液量、套管放压气量、套管和油管的最大控放的临界天然气流量及最大的注入压井液流量、欠平衡起钻时井内液柱高度、欠平衡压力值。
所述液、气压力置换法置换油管内气压的方法为:向套管内注入压井液,同时在油管进行控制放压;油管气体控制放压的流量,以连续下降的油管气压及温度计算出相应气体放喷的流量,进行控制放压;当注入套管的液量达到设计量后,油管的气压应达到零,气体量应达到计算量。
所述液、气压力置换法置换套管内气压的方法为:当油管内气压释放为零后,在油管内注入压井液量、胶塞液量和顶替液量,同时在套管进行控制放压;套管气体控制放压的流量,以连续下降的套管气压及温度计算出相应气体放喷的流量,进行控制放压;当注入油管的液量达到设计量后,套管的气压应达到设计的压力值,气量应达到设计的放气量。
所述的欠平衡法起钻包括如下步骤:更换井口,将原井口更换为环形防喷器和双闸板防喷器;试提钻具,若钻具能够提动,则进行液、气压力置换法压井;上提油管起钻;钻具到井口位置,卸掉环形防喷器,在双闸板防喷器上安装防喷管,防喷管上部再安装环形防喷器,将钻具起到防喷管中,关闭全封闸板后,卸防喷管,取出钻具;安装井口,等下步措施。
所述的欠平衡法下钻包括如下步骤:井口安装双闸板防喷器;套管放压;钻具下部连接一个可蹩掉式堵头,并将环形防喷器与防喷管连为一体;将油管穿过环形防喷器后将钻具置于防喷管内,然后将防喷管安装在双闸板防喷器上;打开全封闸板,将钻具下入井内;关闭半封闸板,卸掉防喷管后,将环形防喷器安装在双闸板防喷器上,正常下钻,直至下到预定深度;坐好采气井口,并连接好采气管线;在油管中注入气体,将钻具底部堵头蹩掉;采用抽汲诱喷法,排除井内压井液;在油管上连接气液分离器将压井液分离在储液罐中,排出气体点火燃烧。
所述的油管内压井液入口处安装节流器,油管内的液体压井时采用液体胶塞进行封堵。
所述的欠平衡更换管柱工艺方法的质量技术要求为:入地液量≤0.5m3;起钻和下钻过程中套放口点火;压井液的密度г≥1;液体胶塞的延迟胶联时间为1-2min,10MPa下,稳压30min,压力下降小于1MPa,水化时间为3-5h;环形防喷器的承压为35MPa,最小通径为180mm,气密封压力为0-15MPa;闸板防喷器的承压为35MPa,最小通径为180mm,双闸板为全封和半封;防喷管的内径为157mm,长度≤2m,连接方式为井口法兰连接;仪表的液体流量计精度为1%,量程为5m3/min,内径为2”,连接方式为油壬连接在注液管线上,供电方式为自供电;仪表的气体流量计的计量方式为温度补偿式压差流量计,连接方式为法兰连接,法兰内径为62mm。
本发明的有益效果:本发明提供的这种欠平衡更换管柱工艺方法,包括如下步骤:采用套管和油管的气压平衡法求取参数;求取施工参数;液、气压力置换法置换油管内气压;液、气压力置换法置换套管内气压;欠平衡法起钻或者下钻;该欠平衡更换管柱工艺方法实现了对油气层的保护,安全环保,施工过程中,没有液体返出,无环境污染。
附图说明
以下将结合附图对本发明做进一步详细说明。
图1是平衡后的井内压力状态图。
附图标记说明:1、环形防喷器;2、双闸板防喷器;3、阀门;4、套管;5、油管;6、第一封隔器;7第二封隔器;8、节流器;P地层压力;P油气油管气压;P套气套管气压;h平衡后油套液位差
具体实施方式
实施例1:
如图1所示,油管5内套于套管4,环形防喷器1、双闸板防喷器2和阀门3自上而下依次连接于油管5的顶部,油管5的内部自上而下依次连接第一封隔器6、第二封隔器7和节流器8,第一封隔器6的上部连接阀门3。
一种欠平衡更换管柱工艺方法,包括如下步骤:1)采用套管4和油管5的气压平衡法求取参数;2)求取施工参数;3)液、气压力置换法置换油管5内气压;4)液、气压力置换法置换套管4内气压;5)欠平衡法起钻或者下钻,所述的参数为井内液面深度及井底压力。
1、所述的步骤1:采用套管4和油管5的气压平衡法求取井内液面深度和井底压力的计算方法为:
(1)起钻前井内压力状态:
P +P =P (1)
P +P =P (2)
P ≥P (3)
P ≥P (4)
(2)液、气压力置换法置换压井后达到的目标状态:
P +P =P (5)
P =0 (6)
P :压井前套管内气压,MPa
P :压井后,套管内气体压力,MPa
P :平衡压井后的液柱压力,MPa
P :压井前套管内液体压力,MPa
P :压井前油管内气压,MPa
P :压井前油管内液压,MPa
P:采气井的地层压力,MPa
(3)将油、套管气体连通,可使井内液柱的高度平衡,且达到液面高度相等,通过列方程,可进行计算液面深度,为确定油管液体胶塞的顶替液量作计算依据;井底压力为采油、气工艺作参考依据。
已知条件
P :油管内气体压力,MPa
P :套管内气体压力,MPa
S:环空面积,m2
S:油管内截面积,m2
H:管鞋深度,m
求取参数:
P :油、套管气压平衡后的井口压力,MPa
h:压井前油管液柱高度,m
h:压井前套管内液柱高度,m
h:油套管气压平衡后,井内液面高度,m
计算参数:
P:井底压力,MPa
α:地层压力系数
1)压井前,油、套管内气体压力与液柱压力之和等于地层压力,得方程1式。
P +h/102=P +h/102 (7)
2)压井前、后,油、套管内的液量保持不变,得方程2式
Sh+Sh=(S+S)h (8)
3)根据压井前后,油套管内的气体质量相等,得方程3式
P S(H-h)+P S(H-h)=P (S+S)(H-h) (9)
通过解联立方程组,计算结果如下
h=(P (S+S)H-P SH-102P S(P -P )S/(S+S)-P SH+102P S(P -P )-102P S(P -P )S/(S+S))/(P (S+S)-P S-P油气S)/(S+S)(10)
h=h-102(P -P )S/(S+S) (11)
h=102(P -P )+h (12)
地层压力及压力系数计算如下
P=P +h/102 (13)
α≈102P/H (14)
2、所述的步骤2:求取施工参数;施工参数为套管4注入液量、油管5放压气量、油管5注入压井总液量、胶液塞顶替量、前置压井液量、套管4放压气量、套管4和油管5的最大控放的临界天然气流量及最大的注入压井液流量、欠平衡起钻时井内液柱高度、欠平衡压力值。
所述液、气压力置换法置换油管5内气压的方法为:向套管4内注入压井液,同时在油管5进行控制放压;油管5气体控制放压的流量,以连续下降的油管5气压及温度计算出相应气体放喷的流量,进行控制放压;当注入套管4的液量达到设计量后,油管5的气压应达到零,气体量应达到计算量。
(1)套管注入液量:
V =102P S (15)
V :注入套管液量,m3
P :油套平衡后,油管气体压力,MPa;
S:油管内截面,m2
102:换算系数1MPa=102m液柱压力;
(2)油管放压气量:
V =10.13(P +0.1)V (T1+273)/(T2+273) (16)
V :地面温度下油管内天然气体积量m3
P :油套平衡后,油管气体压力,MPa
T1:井内温度℃
T2:地面温度℃
所述液、气压力置换法置换套管4内气压的方法为:当油管5内气压释放为零后,在油管5内注入压井液量、胶塞液量和顶替液量,同时在套管4进行控制放压;套管4气体控制放压的流量,以连续下降的套管4气压及温度计算出相应气体放喷的流量,进行控制放压;当注入油管5的液量达到设计量后,套管4的气压应达到设计的压力值,气量应达到设计的放气量。
(3)油管5注入压井总液量V
V =102(P -P )S
V :油管注入总液量(包括胶塞液),m3
P :套管气体压力,MPa;
P :气、液置换后的套管气体压力,即为欠平衡预留的套管气压,
MPa
S:套管内截面,m2
102:换算系数1MPa=102m液柱压力;
(4)胶液塞顶替量:
将地层压力换算为油管内液柱高度,液柱形成的液量为顶替量。
V=102PS-V (18)
V:顶替胶塞液量,m3
V :胶塞液量,m3
P:计算出的地层压力,MPa
(5)前置压井液量
前面计算的V 值为注入油管中的总液量,该液量包括前置压井液量,胶塞液量和胶塞顶替液量。
V =V -V -V (19)
V :胶液量,m2
V :胶塞液注完后,置换的压井液,m3
V:顶替胶塞液量,m3
(6)套管4放压气量V套气
V =10.13(P -P +0.1)V (T1+273)/(T2+273) (20)
V :地面温度下套管内天然气体积量,m3
V :油管内注入的胶塞液量+压井液量,m3
P :油套平衡后,套管内天然气压力,MPa
P :预留套管气压,以形成欠平衡压力,MPa
T1:井内温度℃
T2:地面温度℃
所述的液、气压力置换法置换时,注入液体流量小于最大注入液流量,控放气流量小于最大控放气流量。
天然气在井内的流动速度大于临界速度时,会将井内积液或压井液携带出井外,因此,不管在油管内放压或在套管内放压,须保持管内的天然气流速小于或等于其携液的临界流速,其临界流速的计算公式如下:
天然气携液临界流速
vg=1.85((ρlg)σ/ρg)1/4 (21)
vg:液滴在气流中的最小运动速度,m/s;
ρl:液体密度,kg/m3
ρg:天然气密度,kg/m3
g:重力加速度,m/s2
σ:气液界面张力,N/m;
Cd:为曳力系数。井筒中液滴为椭球状,曳力系数约为1
(7)油、套管最大控放的临界天然气流量
当临界流速计算出来后,可根据下式计算出油套管的最大控放流量如下
油管内最大控放的临界流量
Q =173611.1SPvg/Z/T (22)
套管内最大控放的临界流量
Q =173611.1SPvg/Z/T (23)
Q :油管内最小携液产量,m3/min;
Q :套管内最小携液产量,m3/min;
S:油管横截面积,m2
P:油管或套管放压时的井口流动压力,MPa
Z:不同温度、压力条件下的气体压缩因子
T:为温度,K。
(8)油、套管内最大的注入压井液流量
临界流速是天然气在井口控放压力下的流速,该流速与油管内截面或与油套环空面之积,就是置换压井时注入油套内的最大流量;当注入流量大于该值时,会出现瞬间的井内压力大于地层压力,使部分液体被压入地层。
Q =60Svg (24)
Q =60Svg (25)
Q :置换套管内气体时,油管内最大注入液量,m3/min;
Q :置换油管内气体时,套管内最大注入液量,m3/min;
以一定液流量注入时,控放气流量计算
前面计算了采用液、气压力置换法置换压井时,最大注入液流量与最大的控放气流量,设计和施工时不能超过这个参数,否则会部分液体压入地层中,或放压时会将井内液体随气体排出;由于设备性能的限制,注入流量的变化范围不可能在太大,因此,以定液流量注入的方式,来控制随气压变化的气流量,其计算公式如下:
Q =10.13(P +0.1)Q (T1+273)/(T2+273) (26)
Q =10.13(P +0.1)Q (T1+273)/(T2+273) (27)
Q :油管控放气流量,m3/min
Q :套管注入液的流量,m3/min
P :套管中控制放压时的井口压力,MPa
P :油管中控制放压时的井口压力,MPa
Q :套管内注入的流量,m3/min
Q :油管内注入的流量,m3/min
对于7”套管,27/8"油管采用液、气压力置换法压井时,注入液流量与控放
气流量之间的关系如下表:
(9)欠平衡起钻时井内液柱高度
当完成液、气压力置换法压井后,套管内为欠平衡状态预留的压力P 释放后,井内液体压力略小于地层压力,井内油、套管液面达到平衡状态;将套管气压换算为井内液柱高度,将地层压力亦换算为井内液柱高度,两者之差,即为井内欠平衡状态时的液柱高度,计算式如下
h =102P-102P S/(S+S) (28)
(10)欠平衡压力值:
P=P-h /102 (29)
欠平衡压力值的大小,以套放口有稳定的天然气燃烧为原则,该值太小火焰易熄灭,该值太大,浪费井内天然气资源。
P:欠平衡起钻时的欠压值,MPa
P:油、套管液、气压力置换法求取的地层压力,MPa
h :欠平衡起钻时,井内液面高度,m
V :注入油管中的总液量,m3
所述的油管5内压井液入口处安装节流器8,油管5内的液体压井时采用液体胶塞进行封堵。
1)油管限流注液法:
在置换套管内气体时,油管内的气压为零,而液体进入空油管后,在自身重力作用下,会形成负压,会使压井液不受控制地自动流入油管中,很快将油管灌满,而套管内的放压流量与注入流量不能及时匹配,很快使井内的压力高于地层压力,造成井内液体被压入地层,使地层受到伤害。
为了防止液体不受控制地进入油管,在油管内压井液入口处,安装一个节流器8,产生节流压差,使进入油管的压井液必须通过泵增压后,克服节流阻力,才能进入油管内,通过调节泵的流量,使进入油管中的流量受控,达到液、气压力置换法置换套管内气体的工艺要求。
当注入流量为0.5m3/min,节流压差为3.8MPa时,节流器的直径为12mm.
2)防少量管柱上窜计算与控制
a、计算
在套管放压过程中,气流会在大直径工具上产生一定的节流压差;若将管柱起到井内只剩余一根油管时,因油管内封堵,该节流压差作用在钻具的等效截面上,有将其推出井外的风险;气流在封隔器与套管之间形成的间隙产生的节流阻力,要克服管柱的重量,套管内形成的气压及气流量通过计算,其结果如下:
通过以上的计算可知,在7"的套管内,放气量达到5.6万方/天(41m3/min),才能产生57KPa的节流压差将一根油管推出井外;在51/2"的套管内,放气量达到5.2万方/天(37.1m3/min),才能产生96KPa的节流压差将一根油管推出井外,起钻时,通过欠平衡压力值,来控制套管的放气量,使释放气流量产生的节流压差分别低于20、32KPa;实质上套管放气量只有1000方/天左右,不可能产生以上的节流压差,在欠平衡状态起下钻时,钻具是喷不出井外的。
b、控制
通过控制环形防喷器的工作压力,提高管柱与环形防喷器的磨擦阻力,防止最后一根油管失控地向上窜动;当油管节箍或钻具进入到环形防喷器后,钻具被卡住,达到控制要求。
本发明的适用条件:
(1)高、低压气井的修井更换作业管柱;
(2)井内有气压的油井,更换采油管柱;
(3)更换气井采气井口。
本发明的质量技术要求:
(1)考核指标
入地液量:≤0.5m3;起、下钻过程中套放口点火。
(2)压井液:密度г≥1
(3)液体胶塞
延迟胶联时间:1-2min;
10MPa下,稳压30min,压力下降小于1MPa;
水化时间:3-5h;
(4)环形防喷器
承压:35MPa
最小通径:180mm
气密封压力:0-15MPa
(5)闸板防喷器:
承压:35MPa
最小通径:180mm
双闸板:全封和半封。
(6)防喷管:
内径:157mm
长度:≤2m
连接方式:井口法兰连接。
(7)仪表
1)液体流量计
精度1%
量程:5m3/min
内径:2"
连接方式:油壬,连接在注液管线上。
供电方式:自供电。
2)气体流量计
计量方式:温度补偿式压差流量计
连接方式:法兰
法兰内径:62mm
3、所述步骤3和4具体参见步骤2。
本发明的具体实施方法:
1)、将步骤1和2的参数填入设计表格中,以指导每步的施工程序。
2)、循环排净泵内空气,泵内返出液进入水柜。
3)、液、气压力置换法置换油管5内气压,详见步骤2的(1)和(2),在套管内以0.09m3/min的流量注入压井液,放喷气流量以油管放喷流量参数监控表和流量计结合,进行监控放压,使放喷过程中,保持注入液量形成的液柱压力,等于油管中气体的释放压力,当套管注够压井液量后停止注入,此时油管内压力应等于零。
4)、用水柜中的液体做小样,验证胶塞液的性能,延迟胶联时间为≥2min,挑挂后的冻胶30min内不掉落;此时胶塞液中不加水化剂。
5)、按胶塞液的参数及比例要求,在700型水柜内配制总量为0.3-0.5m3的表面活性剂胶液、胶联液,准备好胶塞液。
6)、若井内没有采气节流器,在井口油管上安装节流器内径为12mm在油管内以0.45m3/min的流量注入前置压井液+胶塞液+顶替液,放喷气流量以套管放喷流量参数监控表和流量计结合,进行监控放压。使放喷过程中,保持注入液量形成的液柱压力,等于油管中气体的释放压力;当套管压力等于设计的P欠气时,停止注入,或当油管注够设计液量后,套管内的压力应等于设计的P欠气。并记录相关参数,以进行标校参数,
注入液量=前置液+胶塞液+顶替液
7)、若井内有采气节流器,其内径只有3-5mm,注入节流阻力大,油管注入施工压力高,要求施工功率大;可根据实际施工的设备功率所能达到的压力及流量,按以上的计算公式,重新计算出套管释放的气流量,进行控制施工。
5、所述的步骤5的欠平衡法起钻或者下钻
所述的欠平衡法起钻包括如下步骤:
1)更换井口,将原井口更换为环形防喷器1和双闸板防喷器2。
2)试提钻具,若钻具能够提动,则进行液、气压力置换法压井;在套放口安装自动点火装置,释放套管内气压,且自动点火;为防止有气体泄漏,井口采用有害气体检测,并辅以风扇吹送有害气体,减少环境污染。
3)上提油管5起钻;在起钻过程中,若油管内有溢流,说明胶塞上移,采取防喷措施后,将胶塞推送到管鞋位置,可继续起钻;当起出油管中有胶塞时,油管上部连接水笼带,并起出油管,用700型水泥车将胶塞冲到计量罐中,并用水化剂水化。
4)钻具到井口位置,卸掉环形防喷器1,在双闸板防喷器2上安装防喷管,防喷管上部再安装环形防喷器1,将钻具起到防喷管中,关闭全封闸板后,卸防喷管,取出钻具。
5)安装井口,等下步措施。
所述的欠平衡法下钻包括如下步骤:
1)井口安装双闸板防喷器2;井口四通,并在套管口安装压力表。
2)套管4放压;参照套管最大放气流量放压并压点火,以防套放时,将井内液体带出井外,直止井口压力为零。
3)钻具下部连接一个可蹩掉式堵头,并将环形防喷器1与防喷管连为一体;将油管5穿过环形防喷器1后将钻具置于防喷管内,然后将防喷管安装在双闸板防喷器2上;
4)打开全封闸板,将钻具下入井内;
5)关闭半封闸板,卸掉防喷管后,将环形防喷器1安装在双闸板防喷器2上,正常下钻,直至下到预定深度;
6)坐好采气井口,并连接好采气管线;
7)在油管5中注入气体,将钻具底部堵头蹩掉;
8)采用抽汲诱喷法,排除井内压井液;
9)在油管5上连接气液分离器将压井液分离在储液罐中,排出气体点火燃烧。
实施例2
如图1所述,在实施例1的基础上,
1、所述的步骤1:采用套管4和油管5的气压平衡法求取井内液面深度和井底压力的计算方法为:
P=2MPa;P=10MPa;P =8.7MPa;7"套管S=0.0157m2;27/8"油管S=0.003m2;管鞋深度H=3500m,求取压井前油管液柱高度h,压井前套管内液柱高度h,油套管气压平衡后,井内液面高度h;并计算井底压力P,地层压力系数α
将已知参数代入下式:
h=(P (S+S)H-P SH-102P S(P -P )S/(S+S)-P SH+102P S(P -P )-102P S(P -P )S/(S+S))/(P (S+S)-P S-P油气S)/(S+S)
得:h
=(8.7*(0.003+0.0157)*3500-10*0.0157*3500-102*10*0.0157*(10-2)*0.003/(0.0157+0.003)-2*0.003*3500+102*2*0.003*(10-2)-102*2*0.003*(10-2)*0.003/(0.003+0.0157))/(8.7*(0.003+0.0157)-10*0.0157-2*0.0157)
=687.3m
将上式计算结果代入下式
h=h-102(P -P )S/(S+S)
得:
h=687.3-102*(10-2)*0.003/(0.0157+0.003)
=556.39m
再将上式计算结果代入下式
h=102(P -P )+h
得:
h=102*(10-2)+556.39
=1372.39m
再将上式结果代入下式:
P=P +h/102
得:
P=2+1372.39/102
=15.455MPa
再将上式结果代入下式
α≈102P/H
得:
α≈102*15.455/3500
=0.45
2、所述的步骤2:求取施工参数;施工参数为套管4注入液量、油管5放压气量、油管5注入压井总液量、胶液塞顶替量、前置压井液量、套管4放压气量、套管4和油管5的最大控放的临界天然气流量及最大的注入压井液流量、欠平衡起钻时井内液柱高度、欠平衡压力值。
液、气压力置换法置换油管内气体
(1)套管注入液量V
已知,井口油管压力P =8.7MPa,井内为27/8"采气管柱,利用公式V =102P S,计算出注入套管的置换液量如下,
V =102*8.7*0.003
=2.6m3
(2)油管内释放天然气量计算:
已知,油管内气体压力P =8.7MPa,V =2.6m3,按如下公式,计算得
V =10.13(P +0.1)V (T1+273)/(T2+273)
V =10.13*(8.7+0.1)*2.6*(20+273)/(30+273)
=224.1m3
(3)油管注入总液量(包括胶塞液)V
已知,P =8.7MPa,7"套管,27/8"油管,设计预留套管气压P =2MPa,注入油管总液量根据
V =102(P -P )S
计算如下:
V =102*(8.7-2)*0.0157
=10.73m3
(4)顶替液量:V=102PS-V胶液
V=102*15.455*0.003-0.3
=4.42m3
(5)前置压井液量:
将已知参数代入下式
V =V -V -V
V =10.73-0.3-4.42
=6.01m3
(6)套管释放气量计算
已知,P =8.7MPa,设计P =2MPa,地面温度T1=20℃,T2=30℃,根据计算公式
V =10.13(P -P +0.1)V (T1+273)/(T2+273)计算如下:
V =10.13*(8.7-2+0.1)*10.73*(20+273)/(30+273)
=714.73m3
(7)最大控放气流量
已知,液体密度ρl=1074(kg/m^3),表面张力σ=0.06(N/m),气体密度ρg=3.297(kg/m^3),井口压力P=0.1-15(MPa),井口温度T=273+30K(30℃);不同温度、压力条件下的气体压缩因子Z=0.995,取天然气体相对密度=0.57;S=0.003m2,S=0.157m2
将天然气携液临界流速vg=1.85((ρlg)σ/ρg)1/4,油管内最大控放的临界流量Q =173611.1SPvg/Z/T,套管内最大控放的临界流量Q =173611.1SPvg/Z/T,对于27/8"油管,S=0.003m2,在7"套管中的环形面积S=0.0157m2输入EXCELE表,进行计算,其计算结果如下:
液、气压力置换法置换套管内气体
设胶塞液量:暂堵10个油管,对于27/8”油管,总量为V =0.3m3
(8)最大注入液流量
将公式Q =60Svg和Q =60Svg输入EXCELE表,进行计算,其计算结果如下:
以一定液流量注入时,控放气流量的计算
根据公式:
Q =10.13(P +0.1)Q (T1+273)/(T2+273)
Q =10.13(P +0.1)Q (T1+273)/(T2+273)
设计油管注入流量Q =90m3/min,套管注入的液流量Q =450m3/min,井口温度T1=30℃,地面温度T2=20℃;根据井口压力的变化,油、套管内控制释放压力的气体流量,可将以上两个公式输入EXCELE表,进行计算,其计算结果如下:
套管内以0.09m3/min的压井液流量注入,油管控制放出的气体流量如上表所示,当油管压力为14.5MPa时,以13.76m3/min的气流量放压,并点火;当油管压力为1MPa时,以1.037m3/min的气流量放压并点火。
油管内以0.45m3/min的压井液流量注入,套管控制放出的气体流量如上表所示,当套管压力为14.5MPa时,以68.826m3/min的气流量放压,并点火;当套管压力为1MPa时,以5.185m3/min的气流量放压并点火。
(9)欠平衡起钻时井内液柱高度
将已知参数代入下式
h =102P-102P S/(S+S)
h =102*15.455-102*2*0.0157/(0.003+0.0157)
=1405.1m
(10)欠压值计算
设计P =2MPa,根据地层压力与井筒压力相等,可得如下计算式:
将已知参数代入下式
P=P-h /102得
P=15.455-1405.1/102
=1.68MPa
施工准备:
1.液体及材料:
压井液=1-1.5倍井筒容积(m3)
表面活性剂胶塞:50kg
2.设备
作业设备一套。
700型水泥车一台(带水柜)
30m3储液大罐2具
2方计量罐一具
双闸板防喷器:1套
环形防喷器:1套,备用胶套2个;
3.工具
防喷管:一套
可蹩掉堵塞器:1件
等气量放压阀:1件
自动点火器:一套
4.计量仪表:
压力表:2只,
液体流量计1个,气体流量计1个,
要求计量准确,提前对其进行计量标校。
5.地面放喷管线:
油管:10*9.6m
高压三通:8个
排酸筒:1-2个;
旋转地锚:30个
35Mpa水笼带:1*15m
简易操作台:高度2m。
放喷油管:15*9.6m油管。
高压三通:8个
具体实施方法
液、气压力置换法置换压井
针对7"套管和2 7/8"油管形成的采气井筒结构
1.以设计示例为参照,设计出施工参数,添入设计表格中,以指导每步的施工
程序。
附表:
步骤2-5参见实施例1。
本发明的工艺原理为:
通过压井液置换井内大部分天然气,使套管内气体压力与套管内液柱压力之和等于地层压力,使油管内液柱压力等于地层压力,油管井口压力为零,同时使油管内用胶塞封堵;在井口油管环空密封的条件下,套管放压点火,使地层压力处于欠平衡状态;再起、下钻具作业,以达到压井液不压入地层,保护油气层的目的。
本发明的有益效果:
1、利用井内原有的积液,辅之以液、气压力置换法置换压井,达到了保护气层的要求。
2、在压井的同时,使油管采用液体胶塞进行封堵,起钻时不会引起井喷,对环境无污染。
3、井控装置采用成熟的环形防喷器及闸板防喷器技术,可直接实施,不用投入研发。
4、液体胶塞采用表面活性剂类物质,产品低伤害,易于破胶,来源广,成本低,便于实施。
5、可替代带压作业工艺技术,更换井内管柱,防止地层污染,降低作业成本,达到安全、环保的作业要求,具有简单、经济、实用的特点,在三低气田推广应用前景广阔。
以上例举仅仅是对本发明的举例说明,并不构成对本发明的保护范围的限制,凡是与本发明相同或相似的设计均属于本发明的保护范围之内。

Claims (8)

1.一种欠平衡更换管柱工艺方法,其特征在于包括如下步骤:
1)采用套管(4)和油管(5)的气压平衡法求取参数;
2)求取施工参数;
3)液、气压力置换法置换油管(5)内气压;
4)液、气压力置换法置换套管(4)内气压;
5)欠平衡法起钻或者下钻。
2.如权利要求1所述的欠平衡更换管柱工艺方法,其特征在于:所述的参数为井内液面深度及井底压力,施工参数为套管(4)注入液量、油管(5)放压气量、油管(5)注入压井总液量、胶液塞顶替量、前置压井液量、套管(4)放压气量、套管(4)和油管(5)的最大控放的临界天然气流量及最大的注入压井液流量、欠平衡起钻时井内液柱高度、欠平衡压力值。
3.如权利要求1所述的欠平衡更换管柱工艺方法,其特征在于:所述液、气压力置换法置换油管(5)内气压的方法为:向套管(4)内注入压井液,同时在油管(5)进行控制放压;油管(5)气体控制放压的流量,以连续下降的油管(5)气压及温度计算出相应气体放喷的流量,进行控制放压;当注入套管(4)的液量达到设计量后,油管(5)的气压应达到零,气体量应达到计算量。
4.如权利要求1所述的欠平衡更换管柱工艺方法,其特征在于:所述液、气压力置换法置换套管(4)内气压的方法为:当油管(5)内气压释放为零后,在油管(5)内注入压井液量、胶塞液量和顶替液量,同时在套管(4)进行控制放压;套管(4)气体控制放压的流量,以连续下降的套管(4)气压及温度计算出相应气体放喷的流量,进行控制放压;当注入油管(5)的液量达到设计量后,套管(4)的气压应达到设计的压力值,气量应达到设计的放气量。
5.如权利要求1所述的欠平衡更换管柱工艺方法,其特征在于:所述的欠平衡法起钻包括如下步骤:
1)更换井口,将原井口更换为环形防喷器(1)和双闸板防喷器(2);
2)试提钻具,若钻具能够提动,则进行液、气压力置换法压井;
3)上提油管(5)起钻;
4)钻具到井口位置,卸掉环形防喷器(1),在双闸板防喷器(2)上安装防喷管,防喷管上部再安装环形防喷器(1),将钻具起到防喷管中,关闭全封闸板后,卸防喷管,取出钻具;
5)安装井口,等下步措施。
6.如权利要求1所述的欠平衡更换管柱工艺方法,其特征在于:所述的欠平衡法下钻包括如下步骤:
1)井口安装双闸板防喷器(2);
2)套管(4)放压;
3)钻具下部连接一个可蹩掉式堵头,并将环形防喷器(1)与防喷管连为一体;将油管(5)穿过环形防喷器(1)后将钻具置于防喷管内,然后将防喷管安装在双闸板防喷器(2)上;
4)打开全封闸板,将钻具下入井内;
5)关闭半封闸板,卸掉防喷管后,将环形防喷器(1)安装在双闸板防喷器(2)上,正常下钻,直至下到预定深度;
6)坐好采气井口,并连接好采气管线;
7)在油管(5)中注入气体,将钻具底部堵头蹩掉;
8)采用抽汲诱喷法,排除井内压井液;
9)在油管(5)上连接气液分离器将压井液分离在储液罐中,排出气体点火燃烧。
7.如权利要求1所述的欠平衡更换管柱工艺方法,其特征在于:所述的油管(5)内压井液入口处安装节流器(8),油管(5)内的液体压井时采用液体胶塞进行封堵。
8.如权利要求1所述的欠平衡更换管柱工艺方法,其特征在于:所述的欠平衡更换管柱工艺方法的质量技术要求为:入地液量≤0.5m3;起钻和下钻过程中套放口点火;压井液的密度г≥1;液体胶塞的延迟胶联时间为1-2min,10MPa下,稳压30min,压力下降小于1MPa,水化时间为3-5h;环形防喷器的承压为35MPa,最小通径为180mm,气密封压力为0-15MPa;闸板防喷器的承压为35MPa,最小通径为180mm,双闸板为全封和半封;防喷管的内径为157mm,长度≤2m,连接方式为井口法兰连接;仪表的液体流量计精度为1%,量程为5m3/min,内径为2”,连接方式为油壬连接在注液管线上,供电方式为自供电;仪表的气体流量计的计量方式为温度补偿式压差流量计,连接方式为法兰连接,法兰内径为62mm。
CN201710085533.8A 2017-02-17 2017-02-17 一种欠平衡更换管柱工艺方法 Active CN106894774B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710085533.8A CN106894774B (zh) 2017-02-17 2017-02-17 一种欠平衡更换管柱工艺方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710085533.8A CN106894774B (zh) 2017-02-17 2017-02-17 一种欠平衡更换管柱工艺方法

Publications (2)

Publication Number Publication Date
CN106894774A true CN106894774A (zh) 2017-06-27
CN106894774B CN106894774B (zh) 2019-04-16

Family

ID=59184025

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710085533.8A Active CN106894774B (zh) 2017-02-17 2017-02-17 一种欠平衡更换管柱工艺方法

Country Status (1)

Country Link
CN (1) CN106894774B (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108335611A (zh) * 2018-04-17 2018-07-27 陕西延长石油(集团)有限责任公司研究院 一种井下打捞作业模拟系统
CN109138977A (zh) * 2018-08-01 2019-01-04 中国石油天然气股份有限公司 三元复合驱分层产出井管柱验封方法
CN110656926A (zh) * 2019-11-14 2020-01-07 上海市城市建设设计研究总院(集团)有限公司 基于钻探设备浅层有害气体探测装置及其使用方法
CN113779898A (zh) * 2021-08-16 2021-12-10 中国舰船研究设计中心 小通径循环水系统的自流循环设计方法
CN114278250A (zh) * 2021-04-16 2022-04-05 中国海洋石油集团有限公司 一种海上低压气井不动管柱定点拖动连续排液管柱及其排液方法
CN114526023A (zh) * 2020-11-06 2022-05-24 中国石油化工股份有限公司 注剂与强排的复合排液设备和方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040069496A1 (en) * 2002-10-11 2004-04-15 Weatherford/Lamb, Inc. Wellbore isolation apparatus, and method for tripping pipe during underbalanced drilling
CN1891974A (zh) * 2005-07-01 2007-01-10 中国石油集团科学技术研究院 欠平衡完井方法及完井装置
CN101042043A (zh) * 2006-03-24 2007-09-26 中国石油天然气集团公司 一种实施欠平衡钻井作业的方法
CN103470221A (zh) * 2013-09-22 2013-12-25 中国石油集团西部钻探工程有限公司 欠平衡下油管、不压井气举、轴抽和检泵的联作方法
CN103485734A (zh) * 2012-06-11 2014-01-01 中国石油集团川庆钻探工程有限公司 一种顶驱钻机下的带压起下钻方法
CN104975818A (zh) * 2015-06-30 2015-10-14 中国石油天然气股份有限公司 起下油管的设备及工艺方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040069496A1 (en) * 2002-10-11 2004-04-15 Weatherford/Lamb, Inc. Wellbore isolation apparatus, and method for tripping pipe during underbalanced drilling
CN1891974A (zh) * 2005-07-01 2007-01-10 中国石油集团科学技术研究院 欠平衡完井方法及完井装置
CN101042043A (zh) * 2006-03-24 2007-09-26 中国石油天然气集团公司 一种实施欠平衡钻井作业的方法
CN103485734A (zh) * 2012-06-11 2014-01-01 中国石油集团川庆钻探工程有限公司 一种顶驱钻机下的带压起下钻方法
CN103470221A (zh) * 2013-09-22 2013-12-25 中国石油集团西部钻探工程有限公司 欠平衡下油管、不压井气举、轴抽和检泵的联作方法
CN104975818A (zh) * 2015-06-30 2015-10-14 中国石油天然气股份有限公司 起下油管的设备及工艺方法

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108335611A (zh) * 2018-04-17 2018-07-27 陕西延长石油(集团)有限责任公司研究院 一种井下打捞作业模拟系统
CN109138977A (zh) * 2018-08-01 2019-01-04 中国石油天然气股份有限公司 三元复合驱分层产出井管柱验封方法
CN110656926A (zh) * 2019-11-14 2020-01-07 上海市城市建设设计研究总院(集团)有限公司 基于钻探设备浅层有害气体探测装置及其使用方法
CN110656926B (zh) * 2019-11-14 2024-02-09 上海市城市建设设计研究总院(集团)有限公司 基于钻探设备浅层有害气体探测装置的使用方法
CN114526023A (zh) * 2020-11-06 2022-05-24 中国石油化工股份有限公司 注剂与强排的复合排液设备和方法
CN114278250A (zh) * 2021-04-16 2022-04-05 中国海洋石油集团有限公司 一种海上低压气井不动管柱定点拖动连续排液管柱及其排液方法
CN114278250B (zh) * 2021-04-16 2023-11-17 中国海洋石油集团有限公司 一种海上低压气井不动管柱定点拖动连续排液管柱及其排液方法
CN113779898A (zh) * 2021-08-16 2021-12-10 中国舰船研究设计中心 小通径循环水系统的自流循环设计方法
CN113779898B (zh) * 2021-08-16 2024-01-30 中国舰船研究设计中心 小通径循环水系统的自流循环设计方法

Also Published As

Publication number Publication date
CN106894774B (zh) 2019-04-16

Similar Documents

Publication Publication Date Title
CN106894774B (zh) 一种欠平衡更换管柱工艺方法
CN105547721B (zh) 双端封堵测漏一体化观测方法
CN102721634B (zh) 钻孔压力注水原位渗透试验方法及试验装置
SA113340690B1 (ar) التحكم في الضغط في عمليات الحفر
CN104213906A (zh) 一种钻井井筒压力校正方法
CN202731863U (zh) 定向井长效分层注水管柱
CN101775977B (zh) 双管分注井安全生产管柱
CN102720473A (zh) 开采煤层气的方法
RU2253009C1 (ru) Способ шарифова для одновременно-раздельной и поочередной эксплуатации нескольких пластов одной нагнетательной скважиной
CN106706416A (zh) 模拟承压水作用下地下室底板受力的试验装置及使用方法
Skalle Pressure control during oil well drilling
CN105971536A (zh) 全过程欠平衡钻井控压装置及使用方法
RU2262586C2 (ru) Скважинная установка для одновременно-раздельной и поочередной эксплуатации нескольких пластов одной скважиной
CN111764885A (zh) 一种可视化气井间歇生产模拟实验装置及方法
US2808887A (en) Method for loosening stuck drill pipe
RU2636842C1 (ru) Способ и компоновка для регулируемой закачки жидкости по пластам
CN2648058Y (zh) 稠油注汽井自动配汽阀
CN205858308U (zh) 一体化分段压裂完井管柱
CN112081535A (zh) 一种超深高含硫气井完井管柱及其施工方法
CN106401537A (zh) 地下储气库井完井管柱及完井方法
CN207144900U (zh) 一种油套环空压力自动保护控制装置
CN105781506B (zh) 一种油井分层注水的方法
CN204804725U (zh) 一种用于控压钻井的井口压力控制装置
CN112780184B (zh) 气井自平衡防污染完井管柱
CN110306976B (zh) 注惰性气体管控环空带压实验装置及其实验方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20211015

Address after: 100007 Oil Mansion, 9 North Avenue, Dongcheng District, Beijing, Dongzhimen

Patentee after: CHINA NATIONAL PETROLEUM Corp.

Patentee after: CHINA NATIONAL PETROLEUM CORPORATION CHUANQING DRILLING ENGINEERING Co.

Address before: 710018 room 1203, Changqing building, Changqing Xing Long Yuan District, Xi'an, Shaanxi

Patentee before: CHINA NATIONAL PETROLEUM CORPORATION CHUANQING DRILLING ENGINEERING COMPANY LIMITED CHANGQING DOWNHOLE TECHNOLOGY Co.