CN106886204A CN201710295488.9A CN201710295488A CN106886204A CN 106886204 A CN106886204 A CN 106886204A CN 201710295488 A CN201710295488 A CN 201710295488A CN 106886204 A CN106886204 A CN 106886204A
Authority
CN
China
Prior art keywords
data
module
remote
alarm
configuration
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710295488.9A
Other languages
Chinese (zh)
Other versions
CN106886204B (en
Inventor
张丕军
王青
毕庚尧
尹磊
武云荣
高超
卢忠阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Guoshun Construction Group Co Ltd
Original Assignee
Shandong Guoshun Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Guoshun Construction Group Co Ltd filed Critical Shandong Guoshun Construction Group Co Ltd
Priority to CN201710295488.9A priority Critical patent/CN106886204B/en
Publication of CN106886204A publication Critical patent/CN106886204A/en
Application granted granted Critical
Publication of CN106886204B publication Critical patent/CN106886204B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
    • G05B19/4185Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by the network communication
    • G05B19/4186Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by the network communication by protocol, e.g. MAP, TOP
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/30Nc systems
    • G05B2219/33Director till display
    • G05B2219/33273DCS distributed, decentralised controlsystem, multiprocessor

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Quality & Reliability (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Automation & Control Theory (AREA)
  • Testing And Monitoring For Control Systems (AREA)
  • Alarm Systems (AREA)

Abstract

The invention discloses the industrial 4.0 coal-fired flue-gas pollution reducing facility remote comprehensive control system of one kind, including for the remote engineering teacher station of completion system database, history library, figure, control language configuration and lower dress function;With, the figure for calling and showing configuration, displaying scene real time data and state show historical data, and complete to control to adjust, trend shows, the remote operation station of alarm indication function;With, the figure for calling and showing configuration, displaying scene real time data, equipment state, trend show, the client of alarm indication function;With the cloud service system for completing client data request and real time data push task;With for the Field Monitoring System of monitoring site various kinds of equipment;With, for realize with all kinds of fieldbus instruments, PLC, smart machine, RTU communication, complete explanation and the data form translation function of various communication protocols, the security gateway of historgraphic data recording.

Description

Industrial 4.0 coal-fired flue-gas pollution reducing facility remote comprehensive control systems
Technical field
The present invention relates to environment protection desulphurization DCS is long-range and Video Remote Comprehensive Control Technology field, specifically a kind of work The coal-fired flue-gas pollution reducing facility remote comprehensive control system of industry 4.0.
Background technology
DCS control systems traditional at this stage are the products that computer technology, control technology and network technology are highly combined, The numerous control points in a production process are controlled using several controllers (process station) generally, are led between each controller Cross network connection and data exchange can be carried out.Operation uses computer operator station, is connected with controller by network, collects production Data, pass on operational order.Therefore, the main feature of DCS be attributed in short be exactly:Decentralised control is managed concentratedly.Video is supervised Control system is then made up of shooting, transmission, control, display, 5 major parts of record registration.Video camera will by coaxial video cable To control main frame, vision signal is assigned to each monitor and video recording equipment to transmission of video images by control main frame again, while can be by The voice signal of transmission is needed synchronously to be entered into video recorder.By control main frame, operating personnel can send instruction, to head The action of upper and lower, left and right is controlled and camera lens is carried out the operation of focusing and zooming, and can be realized many by control main frame Switching between road video camera and head.Using special video record processing pattern, typing, playback, treatment etc. can be carried out to image Operation, makes video recording effect reach most preferably.Traditional DCS and video monitoring system is focused only in some power plant or steel mill is only Vertical operation, large-scale specialized running team, when many projects are possessed, it is impossible to looked into real time in same control room See the traffic-operating period for being distributed in nationwide each project.For the construction for runing team, there is same scene dispersion In the case of many set DCS systems of distribution, the independent operating of system can bring more personnel depalies to operation team, increase business Cost.
The content of the invention
It is an object of the invention to provide the industrial 4.0 coal-fired flue-gas pollution reducing facility remote comprehensive control system of one kind, It is independent operating for solving existing DCS and video monitoring system, Large-scale professionalization operation team can not be in the same time Real time inspection is distributed in the traffic-operating period of nationwide each project in section, it is impossible to which what is occurred during analysis operation in time is latent In problem, when many set DCS system dispersed distributions occurs in a scene, the independent operating of system can bring more to operation team Personnel depaly, considerably increase the problem of operation cost.
The technical scheme adopted by the invention to solve the technical problem is that:Industrial 4.0 coal-fired flue-gas pollution reducing facilities are remote Journey complex control system, it is characterized in that, including
For the remote engineering teacher station of completion system database, history library, figure, control language configuration and lower dress function; With,
Figure for calling and showing configuration, displaying scene real time data and state, show historical data, and complete control System regulation, trend show, the remote operation station of alarm indication function;With,
Figure for calling and showing configuration, displaying scene real time data, equipment state, trend show, alarm indication The client of function;With,
The cloud service system of task is pushed for completing client data request and real time data;With,
For the Field Monitoring System of monitoring site various kinds of equipment;With,
For realize with all kinds of fieldbus instruments, PLC, smart machine, RTU communication, complete various communication protocols Explain and data form translation function, the security gateway of historgraphic data recording.
Further, remote engineering teacher station includes GTPLUS Project Configuration systems, and GTPLUS Project Configurations system is including being System deployment configuration, graphic configuration, database con-figuration, communications protocol configuration, remote download instrument;
Described system deployment configuration is used to create newly built construction, and newly built construction is grouped and newly built construction is calculated Machine quantity and IP are configured;Described graphic configuration is used to carry out the graphic element on flow for displaying figure;Described database Configuration is used to store data;Described communications protocol configuration be used for communicate, including Profibus DP, Modbus RTU, Modbus TCP, OPC agreement, ODBC agreements, custom protocol, Hollysys MACSV communications protocol, Hollysys MACS6 communications protocol, Siemens's S7400 communications protocol;Described remote download instrument is used to filled under Project Configuration data place remote;
Remote operation station includes that flow chart display module, remote control adjustment module, alarm monitoring module, historical data are looked into Ask module, large screen display module;
Described flow chart display module is used for the technical process and relevant dynamic at the scene of showing to graphically Information, and with being operated to dynamic point;Described remote control adjustment module is used to control various closed loop regulation behaviour Make device, remotely modifying setting value, switching control mode and loop parameter of adjusting;Control various open loop control operation device faces Plate, remote operation is carried out to being steered object;Described alarm monitoring module includes that technique Realtime Alerts and equipment state are monitored, Described technique Realtime Alerts show Process Alarm information, including switching value alarm and analog quantity alarm, institute in alarm window mode The equipment state monitoring stated can in time find fault bit with each nodes of Real-time Feedback scene DCS, module, the running status of passage Put;Described the inquiry of historical data module is entered according to " after disk space utilization rate > 70%, space is according to the mode for moving in circles " Row store historical data, history data store time span is influenceed by storage number of labels and historical data collection period;Institute The large screen display module stated is used for display process chart in real time;
Client includes flow chart display module, the inquiry of historical data module, alarm monitoring and pushing module, equipment fault Display module;Described flow chart display module is used for the technical process and relevant dynamic at the scene of showing to graphically Information, and with being operated to dynamic point;Described the inquiry of historical data module according to " after disk space utilization rate > 70%, Space is according to the mode for moving in circles " carry out store historical data, history data store time span by storage number of labels and The influence of historical data collection period;Described alarm monitoring includes that technique Realtime Alerts and equipment state are supervised with pushing module Depending on, described technique Realtime Alerts show Process Alarm information, including switching value alarm and analog quantity alarm in alarm window mode, Described equipment state monitoring can in time find failure with each nodes of Real-time Feedback scene DCS, module, the running status of passage Position;And client is displayed in the way of information pushing to warning message;Described equipment fault display module is used for real-time There is position in each nodes of feed back on-site DCS, module, the trouble point of passage and failure;
Further, by switching, base map recalls mode to described remote control adjustment module or focus is called and switched over To each process chart picture, the switching time of picture<=1s, refresh time<=2 seconds;Switching base map recalls mode for not At the preceding session operation of pipe in what state, as long as operator presses each base map button in header area, just shown on screen Go out corresponding process chart picture;When focus is called as picture configuration on each width picture the equal some focuses of definable, by Picture defined in focus, operator can be switched to corresponding picture and show by focus when online.
Further, the graphic element on described process chart, the dynamic characteristic of support includes:
Word Dynamic Announce characteristic, i.e., show the instantaneous value of collection point in a digital manner;
Horizontally or vertically the overall movement of mobility, i.e. object, can simulate movement of the article on streamline;
Revolving property, can simulate rotation, the rotation of fan of gauge pointer;
Change Fill Color characteristic, the change of on off state or data value can be reflected;
Display/hidden attribute, can reflect the change of on off state or data value;
Blinking characteristic, can reflect the change of on off state or data value;
Historical data line shows;
Tracking data line shows;
Custom script shows.
Further, described historical data line and tracking data line can be scanned according to analog quantity scan period and switching value Cycle stores, and the holding time is limited to hard-disk capacity;Described custom script includes Luwa script online analyzings.
Further, described security gateway is dual-CPU architecture, is divided into secure side and open sides, secure side connection scene Monitoring system or equipment, are responsible for data acquisition;Open sides connect external network, are responsible for data transfer.
The beneficial effects of the invention are as follows:
DCS is long-range and Video Remote complex control system is compared with traditional DCS and video monitoring system, can be intuitively DCS system data to covering all parts of the country are obtained more in real time, the project to covering DCS system same live dispersed distribution more, can It is further to reduce personnel depaly, reduce running cost.For example:Steel operation project management department's 5 years indentured periods of operation day, DCS system 6 Set, master control room 4, each master control room falls to calculate according to Fourth Shift three needs the people of operating personnel 44 altogether, after tele-control system use, Only needing to 18 people just can complete 4 operations of control room, and remaining people of operating personnel 26 can go to other posies, according to each operation 50000 yuan of work annual pay, the only personnel's spending of operation in 5 years can save 6,500,000 yuan of (50000 yuan * 26 people * 5 years).
Brief description of the drawings
Fig. 1 is Organization Chart of the invention;
Fig. 2 creates newly built construction schematic diagram for the present invention;
Fig. 3 is steam turbine of the present invention, the total looks flow chart of boiler;
Fig. 4 is alert interface figure of the present invention;
Fig. 5 is client alarm schematic diagram.
Specific embodiment
As shown in figure 1, industrial 4.0 coal-fired flue-gas pollution reducing facility remote comprehensive control system, including
For the remote engineering teacher station of completion system database, history library, figure, control language configuration and lower dress function; With,
Figure for calling and showing configuration, displaying scene real time data and state, show historical data, and complete control System regulation, trend show, the remote operation station of alarm indication function;With,
Figure for calling and showing configuration, displaying scene real time data, equipment state, trend show, alarm indication The client of function;With,
The cloud service system of task is pushed for completing client data request and real time data;With,
For the Field Monitoring System of monitoring site various kinds of equipment;With,
For realize with all kinds of fieldbus instruments, PLC, smart machine, RTU communication, complete various communication protocols Explain and data form translation function, the security gateway of historgraphic data recording.Security gateway is dual-CPU architecture, is divided into secure side And open sides, secure side connection Field Monitoring System or equipment, it is responsible for data acquisition;Open sides connect external network, are responsible for number According to transmission.
Remote engineering teacher station includes GTPLUS Project Configuration systems, and GTPLUS Project Configurations system includes system deployment group State, graphic configuration, database con-figuration, communications protocol configuration, remote download instrument;
As shown in Fig. 2 system deployment configuration is used to create newly built construction, and newly built construction is grouped and newly built construction is carried out Number of computers and IP are configured;Graphic configuration is used to carry out the graphic element on flow for displaying figure;Database con-figuration is used for Data are stored;Communications protocol configuration is used to communicate, including Profibus DP, Modbus RTU, Modbus TCP, OPC Agreement, ODBC agreements, custom protocol, Hollysys MACSV communications protocol, Hollysys MACS6 communications protocol, Siemens S7400 lead to News agreement;Remote download instrument is used to filled under Project Configuration data place remote;
Remote operation station includes that flow chart display module, remote control adjustment module, alarm monitoring module, historical data are looked into Ask module, large screen display module;
Flow chart display module is used for the technical process and relevant multidate information at the scene of showing to graphically, and With being operated to dynamic point;As shown in figure 3, being steam turbine of the present invention, the total looks flow chart of boiler.Remote control adjustment module is used Operators, remotely modifying setting value, switching control mode and loop parameter of adjusting are adjusted in various closed loops are controlled;Control is each Open loop control operation device panel is planted, remote operation is carried out to being steered object;Alarm monitoring module is reported in real time including technique Alert and equipment state monitoring, as shown in figure 4, technique Realtime Alerts show Process Alarm information, including switch in alarm window mode Amount alarm and analog quantity alarm, equipment state monitoring can with each nodes of Real-time Feedback scene DCS, module, the running status of passage, Abort situation is found in time;The inquiry of historical data module is according to " after disk space utilization rate > 70%, space is according to moving in circles Mode " carry out store historical data, history data store time span is by storage number of labels and historical data collection period Influence;Large screen display module is used for display process chart in real time;
Client includes flow chart display module, the inquiry of historical data module, alarm monitoring and pushing module, equipment fault Display module;Flow chart display module is used for the technical process and relevant multidate information at the scene of showing to graphically, And with being operated to dynamic point;The inquiry of historical data module is according to " after disk space utilization rate > 70%, space is according to following The reciprocal mode of ring " carries out store historical data, and history data store time span is adopted by storage number of labels and historical data The influence in collection cycle;Alarm monitoring includes that technique Realtime Alerts and equipment state are monitored with pushing module, technique Realtime Alerts with Alarm window mode shows Process Alarm information, including switching value alarm and analog quantity alarm, and equipment state monitoring can be anti-in real time Each nodes of feedback scene DCS, module, the running status of passage, find abort situation in time;As shown in figure 5, to warning message believing Cease the mode for pushing and be displayed in client;Equipment fault display module is used for each nodes of Real-time Feedback scene DCS, module, passage Trouble point and failure occur position.
By switching, base map recalls mode to remote control adjustment module or focus is called and performs handover to each technological process Picture face, the switching time of picture<=1s, refresh time<=2 seconds;It is regardless of preceding session behaviour that switching base map recalls mode At work in what state, as long as operator presses each base map button in header area, corresponding technique stream is just shown on screen Journey figure picture;When focus is called as picture configuration on each width picture the equal some focuses of definable, the picture defined in focus, Operator can be switched to corresponding picture and show by focus when online.
Graphic element on process chart, the dynamic characteristic of support includes:
Word Dynamic Announce characteristic, i.e., show the instantaneous value of collection point in a digital manner;
Horizontally or vertically the overall movement of mobility, i.e. object, can simulate movement of the article on streamline;
Revolving property, can simulate rotation, the rotation of fan of gauge pointer;
Change Fill Color characteristic, the change of on off state or data value can be reflected;
Display/hidden attribute, can reflect the change of on off state or data value;
Blinking characteristic, can reflect the change of on off state or data value;
Historical data line shows;
Tracking data line shows;
Custom script shows.
Historical data line and tracking data line can store according to analog quantity scan period and switching value scan period, during preservation Between be limited to hard-disk capacity;Described custom script includes Luwa script online analyzings.
Security gateway is dual-CPU architecture, is divided into secure side and open sides, and secure side connects Field Monitoring System or equipment, It is responsible for data acquisition;Open sides connect external network, are responsible for data transfer.Be one kind meet highly reliable requirement, support it is unidirectional every From industrial gateway, be capable of achieving communication with all kinds of fieldbus instruments, PLC, smart machine, RTU and other subsystems, complete The function such as the explanation of various communication protocols and Data Format Transform.
Cloud service system is made up of the virtual machine with public network IP address and data transmission and processing software, for completing The task that client data request and real time data are pushed.
Although above-mentioned be described with reference to accompanying drawing to specific embodiment of the invention, not to present invention protection model The limitation enclosed, on the basis of technical scheme, those skilled in the art do by need not paying creative work The various modifications or deformation for going out are still within protection scope of the present invention.

Claims (6)

1. industrial 4.0 coal-fired flue-gas pollution reducing facility remote comprehensive control system, it is characterized in that, including
For the remote engineering teacher station of completion system database, history library, figure, control language configuration and lower dress function;With,
Figure for calling and showing configuration, displaying scene real time data and state, show historical data, and complete control and adjust Section, trend show, the remote operation station of alarm indication function;With,
Figure for calling and showing configuration, displaying scene real time data, equipment state, trend show, alarm indication function Client;With,
The cloud service system of task is pushed for completing client data request and real time data;With,
For the Field Monitoring System of monitoring site various kinds of equipment;With,
For realize with all kinds of fieldbus instruments, PLC, smart machine, RTU communication, complete the explanation of various communication protocols With data form translation function, the security gateway of historgraphic data recording.
2. industrial 4.0 coal-fired flue-gas pollution reducing facility remote comprehensive control system according to claim 1, its feature It is that remote engineering teacher station includes GTPLUS Project Configuration systems, GTPLUS Project Configurations system includes system deployment configuration, figure Configuration, database con-figuration, communications protocol configuration, remote download instrument;
Described system deployment configuration is used to create newly built construction, and newly built construction is grouped and computer number is carried out to newly built construction Amount and IP are configured;Described graphic configuration is used to carry out the graphic element on flow for displaying figure;Described database con-figuration For being stored to data;Described communications protocol configuration be used for communicate, including Profibus DP, Modbus RTU, Modbus TCP, OPC agreement, ODBC agreements, custom protocol, Hollysys MACSV communications protocol, Hollysys MACS6 communications protocol, Siemens's S7400 communications protocol;Described remote download instrument is used to filled under Project Configuration data place remote;
Remote operation station includes flow chart display module, remote control adjustment module, alarm monitoring module, the inquiry of historical data mould Block, large screen display module;
Described flow chart display module is used for the technical process and relevant multidate information at the scene of showing to graphically, And with being operated to dynamic point;Described remote control adjustment module is used to control various closed loop regulation operators, Remotely modifying setting value, switching control mode and loop parameter of adjusting;Various open loop control operation device panels are controlled, to quilt Manipulation object carries out remote operation;Described alarm monitoring module includes that technique Realtime Alerts and equipment state are monitored, described Technique Realtime Alerts show Process Alarm information, including switching value alarm and analog quantity alarm in alarm window mode, and described sets Standby Stateful Inspection can in time find abort situation with each nodes of Real-time Feedback scene DCS, module, the running status of passage;It is described The inquiry of historical data module stored according to " after disk space utilization rate > 70%, space is according to the mode for moving in circles " Historical data, history data store time span is influenceed by storage number of labels and historical data collection period;Described is big Screen display module is used for display process chart in real time;
Client includes that flow chart display module, the inquiry of historical data module, alarm monitoring show with pushing module, equipment fault Module;Described flow chart display module is used for the technical process and relevant dynamic letter at the scene of showing to graphically Breath, and with being operated to dynamic point;Described the inquiry of historical data module is according to " empty after disk space utilization rate > 70% Between according to the mode for moving in circles " carry out store historical data, history data store time span is by storage number of labels and goes through The influence of history data collection cycle;Described alarm monitoring includes that technique Realtime Alerts and equipment state are monitored with pushing module, Described technique Realtime Alerts show Process Alarm information, including switching value alarm and analog quantity alarm, institute in alarm window mode The equipment state monitoring stated can in time find fault bit with each nodes of Real-time Feedback scene DCS, module, the running status of passage Put;And client is displayed in the way of information pushing to warning message;Described equipment fault display module is used for anti-in real time There is position in each nodes of feedback scene DCS, module, the trouble point of passage and failure.
3. industrial 4.0 coal-fired flue-gas pollution reducing facility remote comprehensive control system according to claim 2, its feature It is that by switching, base map recalls mode to described remote control adjustment module or focus is called and performs handover to each technological process Picture face, the switching time of picture<=1s, refresh time<=2 seconds;It is regardless of preceding session behaviour that switching base map recalls mode At work in what state, as long as operator presses each base map button in header area, corresponding technique stream is just shown on screen Journey figure picture;When focus is called as picture configuration on each width picture the equal some focuses of definable, the picture defined in focus, Operator can be switched to corresponding picture and show by focus when online.
4. industrial 4.0 coal-fired flue-gas pollution reducing facility remote comprehensive control system according to claim 2, its feature It is that the graphic element on described process chart, the dynamic characteristic of support includes:
Word Dynamic Announce characteristic, i.e., show the instantaneous value of collection point in a digital manner;
Horizontally or vertically the overall movement of mobility, i.e. object, can simulate movement of the article on streamline;
Revolving property, can simulate rotation, the rotation of fan of gauge pointer;
Change Fill Color characteristic, the change of on off state or data value can be reflected;
Display/hidden attribute, can reflect the change of on off state or data value;
Blinking characteristic, can reflect the change of on off state or data value;
Historical data line shows;
Tracking data line shows;
Custom script shows.
5. industrial 4.0 coal-fired flue-gas pollution reducing facility remote comprehensive control system according to claim 4, its feature It is that described historical data line and tracking data line can store according to analog quantity scan period and switching value scan period, preserve The limited time is in hard-disk capacity;Described custom script includes Luwa script online analyzings.
6. industrial 4.0 coal-fired flue-gas pollution reducing facility remote comprehensive control system according to claim 1, its feature It is that described security gateway is dual-CPU architecture, is divided into secure side and open sides, secure side connects Field Monitoring System or equipment, It is responsible for data acquisition;Open sides connect external network, are responsible for data transfer.
CN201710295488.9A 2017-04-28 2017-04-28 Coal-fired flue-gas pollution reducing facility remote comprehensive control system Active CN106886204B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710295488.9A CN106886204B (en) 2017-04-28 2017-04-28 Coal-fired flue-gas pollution reducing facility remote comprehensive control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710295488.9A CN106886204B (en) 2017-04-28 2017-04-28 Coal-fired flue-gas pollution reducing facility remote comprehensive control system

Publications (2)

Publication Number Publication Date
CN106886204A true CN106886204A (en) 2017-06-23
CN106886204B CN106886204B (en) 2019-05-17

Family

ID=59183780

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710295488.9A Active CN106886204B (en) 2017-04-28 2017-04-28 Coal-fired flue-gas pollution reducing facility remote comprehensive control system

Country Status (1)

Country Link
CN (1) CN106886204B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111143171A (en) * 2019-12-31 2020-05-12 北京华能新锐控制技术有限公司 Monitoring method, device and system
CN111435234A (en) * 2019-01-15 2020-07-21 上海多维明软信息技术有限公司 Intelligent gateway control system and method
CN111988573A (en) * 2020-08-27 2020-11-24 浙江中控技术股份有限公司 Industrial control information display method, device and system
CN114913736A (en) * 2022-05-20 2022-08-16 机械工业教育发展中心 Flexible production line device for flow type intelligent manufacturing

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6647315B1 (en) * 2000-09-29 2003-11-11 Fisher-Rosemount Systems, Inc. Use of remote soft phases in a process control system
US20080040477A1 (en) * 1999-06-11 2008-02-14 Invensys Systems, Inc. Methods and apparatus for control using control devices that provide a virtual machine environment and that communicate via an ip network
CN201383106Y (en) * 2009-03-04 2010-01-13 福州福大自动化科技有限公司 Novel control system
CN201749343U (en) * 2010-03-30 2011-02-16 深圳达实智能股份有限公司 Sewage treatment control system
CN103676849A (en) * 2013-11-28 2014-03-26 成都淞幸科技有限责任公司 Distributed control system and distributed control method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080040477A1 (en) * 1999-06-11 2008-02-14 Invensys Systems, Inc. Methods and apparatus for control using control devices that provide a virtual machine environment and that communicate via an ip network
US6647315B1 (en) * 2000-09-29 2003-11-11 Fisher-Rosemount Systems, Inc. Use of remote soft phases in a process control system
CN201383106Y (en) * 2009-03-04 2010-01-13 福州福大自动化科技有限公司 Novel control system
CN201749343U (en) * 2010-03-30 2011-02-16 深圳达实智能股份有限公司 Sewage treatment control system
CN103676849A (en) * 2013-11-28 2014-03-26 成都淞幸科技有限责任公司 Distributed control system and distributed control method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111435234A (en) * 2019-01-15 2020-07-21 上海多维明软信息技术有限公司 Intelligent gateway control system and method
CN111143171A (en) * 2019-12-31 2020-05-12 北京华能新锐控制技术有限公司 Monitoring method, device and system
CN111988573A (en) * 2020-08-27 2020-11-24 浙江中控技术股份有限公司 Industrial control information display method, device and system
CN114913736A (en) * 2022-05-20 2022-08-16 机械工业教育发展中心 Flexible production line device for flow type intelligent manufacturing

Also Published As

Publication number Publication date
CN106886204B (en) 2019-05-17

Similar Documents

Publication Publication Date Title
CN108873842B (en) One-stop unattended pump station automatic control system
CN106886204B (en) Coal-fired flue-gas pollution reducing facility remote comprehensive control system
CN108919765A (en) A kind of the intelligence manufacture factory Virtual Debugging and virtual monitor method and method twin based on number
CN202026140U (en) Distribution type distribution room environment and power distribution comprehensive monitor system
CN110047150B (en) Complex equipment operation on-site simulation system based on augmented reality
CN108287533A (en) A kind of industrial manufaturing data acquisition system based on the displaying of VR panoramas
US10809753B2 (en) Real-time simulator and controller of power system using distributed data streaming server
CN108681288A (en) A kind of novel maintenance system based on cloud platform
US20130212420A1 (en) Time-stamping of industrial cloud data for synchronization
CN209170419U (en) One kind is based on the twinborn apparatus remote maintenance system of digitlization
CN103984308B (en) A kind of remote internet supervisory system of gypsum lath product line data
CN101114160A (en) Real-time synchronized control and simulation within a process plant
CN110430128A (en) Edge calculations gateway
CN114518736A (en) Intelligent construction industry integrated management and control system
CN112187917A (en) Data acquisition monitoring system and method based on industrial internet
US20240153257A1 (en) Monitoring system and method based on digital converter station
CN104615105A (en) Simulation teaching system for petrochemical industry
CN106094775A (en) A kind of cutting production line long distance control system
CN109392192B (en) Method and system for device connection of SCADA system for fast communication
CN204143228U (en) A kind of remote internet supervisory system of gypsum lath product line data
CN117043825A (en) Real-time control visual twin factory system
CN115922736B (en) System for realizing remote control and remote operation and maintenance of robot based on 5G network
CN207051725U (en) A kind of intelligent label power plant architecture system
CN111783184B (en) Virtual configuration system and method
CN107992013A (en) A kind of Chinese medicine preparation equipment integrated system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder

Address after: 250300 No.001 Guoshun Road, Jinan Economic Development Zone, Changqing District, Jinan City, Shandong Province

Patentee after: SHANDONG GUOSHUN CONSTRUCTION GROUP Co.,Ltd.

Address before: 250300 No. 2169, Longquan street, Changqing District, Jinan City, Shandong Province

Patentee before: SHANDONG GUOSHUN CONSTRUCTION GROUP Co.,Ltd.

CP02 Change in the address of a patent holder
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Remote integrated control system for coal-fired flue gas pollution control facilities

Effective date of registration: 20221228

Granted publication date: 20190517

Pledgee: Qilu bank Limited by Share Ltd. Ji'nan Changqing branch

Pledgor: SHANDONG GUOSHUN CONSTRUCTION GROUP Co.,Ltd.

Registration number: Y2022980029384

PE01 Entry into force of the registration of the contract for pledge of patent right