CN106884379A - 一种用于变坡预制拼装梁桥的支座调坡装置 - Google Patents
一种用于变坡预制拼装梁桥的支座调坡装置 Download PDFInfo
- Publication number
- CN106884379A CN106884379A CN201710171397.4A CN201710171397A CN106884379A CN 106884379 A CN106884379 A CN 106884379A CN 201710171397 A CN201710171397 A CN 201710171397A CN 106884379 A CN106884379 A CN 106884379A
- Authority
- CN
- China
- Prior art keywords
- bearing
- steel plate
- bolt
- crab
- gradient
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/04—Bearings; Hinges
- E01D19/048—Bearings being adjustable once installed; Bearings used in incremental launching
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Description
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710171397.4A CN106884379B (zh) | 2017-03-21 | 2017-03-21 | 一种用于变坡预制拼装梁桥的支座调坡装置及其安装方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710171397.4A CN106884379B (zh) | 2017-03-21 | 2017-03-21 | 一种用于变坡预制拼装梁桥的支座调坡装置及其安装方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106884379A true CN106884379A (zh) | 2017-06-23 |
CN106884379B CN106884379B (zh) | 2019-03-15 |
Family
ID=59180828
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710171397.4A Active CN106884379B (zh) | 2017-03-21 | 2017-03-21 | 一种用于变坡预制拼装梁桥的支座调坡装置及其安装方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106884379B (zh) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107402289A (zh) * | 2017-07-28 | 2017-11-28 | 扬州大学 | 一种可移动式坡度可变的边坡模拟装置 |
CN108797327A (zh) * | 2018-08-03 | 2018-11-13 | 辽宁省交通规划设计院有限责任公司 | 坡度自适应球面支座 |
CN109610287A (zh) * | 2019-01-18 | 2019-04-12 | 王丽娟 | 自调坡均压支座垫板、自调坡桥梁及其安装方法 |
CN109930478A (zh) * | 2019-04-22 | 2019-06-25 | 王丽娟 | 自调坡减震球型铰支座及其施工方法 |
CN111270602A (zh) * | 2020-03-20 | 2020-06-12 | 中铁第四勘察设计院集团有限公司 | 一种可无级调节的桥梁支座 |
CN112853952A (zh) * | 2021-01-27 | 2021-05-28 | 山东东泰工程咨询有限公司 | 一种桥梁支座调平楔块连接方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3302204A1 (de) * | 1982-02-02 | 1983-08-11 | Magyar Goerdueloecsapagy Mueve | "vorspannvorrichtung zum rollenumlaufschuh" |
CN2665200Y (zh) * | 2003-06-30 | 2004-12-22 | 中国路桥(集团)新津筑路机械厂 | 桥梁大转角坡型球形支座 |
CN201162178Y (zh) * | 2008-03-10 | 2008-12-10 | 衡水橡胶股份有限公司 | 一种桥梁调坡支座 |
CN202000254U (zh) * | 2010-12-20 | 2011-10-05 | 衡水市桃城区鑫归机械加工厂 | 调高自调坡球形支座 |
CN104480854A (zh) * | 2014-12-16 | 2015-04-01 | 中铁第四勘察设计院集团有限公司 | 水平向可调支座 |
CN206599737U (zh) * | 2017-03-21 | 2017-10-31 | 山西省交通科学研究院 | 一种用于变坡预制拼装梁桥的支座调坡装置 |
-
2017
- 2017-03-21 CN CN201710171397.4A patent/CN106884379B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3302204A1 (de) * | 1982-02-02 | 1983-08-11 | Magyar Goerdueloecsapagy Mueve | "vorspannvorrichtung zum rollenumlaufschuh" |
CN2665200Y (zh) * | 2003-06-30 | 2004-12-22 | 中国路桥(集团)新津筑路机械厂 | 桥梁大转角坡型球形支座 |
CN201162178Y (zh) * | 2008-03-10 | 2008-12-10 | 衡水橡胶股份有限公司 | 一种桥梁调坡支座 |
CN202000254U (zh) * | 2010-12-20 | 2011-10-05 | 衡水市桃城区鑫归机械加工厂 | 调高自调坡球形支座 |
CN104480854A (zh) * | 2014-12-16 | 2015-04-01 | 中铁第四勘察设计院集团有限公司 | 水平向可调支座 |
CN206599737U (zh) * | 2017-03-21 | 2017-10-31 | 山西省交通科学研究院 | 一种用于变坡预制拼装梁桥的支座调坡装置 |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107402289A (zh) * | 2017-07-28 | 2017-11-28 | 扬州大学 | 一种可移动式坡度可变的边坡模拟装置 |
CN108797327A (zh) * | 2018-08-03 | 2018-11-13 | 辽宁省交通规划设计院有限责任公司 | 坡度自适应球面支座 |
CN109610287A (zh) * | 2019-01-18 | 2019-04-12 | 王丽娟 | 自调坡均压支座垫板、自调坡桥梁及其安装方法 |
CN109930478A (zh) * | 2019-04-22 | 2019-06-25 | 王丽娟 | 自调坡减震球型铰支座及其施工方法 |
CN111270602A (zh) * | 2020-03-20 | 2020-06-12 | 中铁第四勘察设计院集团有限公司 | 一种可无级调节的桥梁支座 |
CN112853952A (zh) * | 2021-01-27 | 2021-05-28 | 山东东泰工程咨询有限公司 | 一种桥梁支座调平楔块连接方法 |
Also Published As
Publication number | Publication date |
---|---|
CN106884379B (zh) | 2019-03-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106884379A (zh) | 一种用于变坡预制拼装梁桥的支座调坡装置 | |
US8851800B2 (en) | Concentrically loaded, adjustable piering system | |
JP4702862B1 (ja) | 構造物用高さ調整支承装置および構造物用支承装置の高さ調整工法 | |
CN107268430A (zh) | 一种适用于梁桥的锚固装置与调高支座及其施工方法 | |
CN107254836A (zh) | 一种垫板调高支座及施工方法 | |
CN206599737U (zh) | 一种用于变坡预制拼装梁桥的支座调坡装置 | |
KR101668465B1 (ko) | 유지보수가 가능한 회전형 앵커시스템을 포함하는 교좌장치 | |
CN108442196A (zh) | 一种无砟轨道变形调整结构及调整方法 | |
CN207244435U (zh) | 一种适用于梁桥的锚固装置与调高支座 | |
CN106499420B (zh) | 一种机械式高恒阻单体支柱安装方法及支设方法 | |
CN207079467U (zh) | 一种垫板调高支座 | |
KR102598836B1 (ko) | 승강조절이 가능한 앵커장치가 적용된 교량받침 | |
CN206015523U (zh) | 独立式索塔内置钢锚梁精确定位装置 | |
CN212656253U (zh) | 柱脚螺栓安装结构 | |
CN106930406A (zh) | 一种钢柱脚锚栓就位结构的制备方法 | |
CN106149563B (zh) | 独立式索塔内置钢锚梁精确定位装置及安装方法 | |
CN106638650B (zh) | 装配式混凝土基础结构 | |
CN217580582U (zh) | 建筑隔震支座安装结构 | |
CN220955611U (zh) | 隧道底板腋角位置之可拆卸式垫座 | |
CN220977734U (zh) | 一种可拆卸式的桥梁撑脚装置 | |
CN2415115Y (zh) | 地铁站台屏蔽门系统底部支承节点 | |
CN219910215U (zh) | 一种列车检修坑装配式短立柱连接结构 | |
CN220079743U (zh) | 自适应梁底调平装置 | |
CN109914466B (zh) | 利用可调斜铁进行设备安装的方法 | |
CN220414033U (zh) | 一种反压装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information |
Inventor after: Liu Zhihua Inventor after: Guo Xuebing Inventor after: Wang Lei Inventor after: Lu Peng Inventor after: Mao Min Inventor after: Guo Wenlong Inventor after: Ji Jiandong Inventor after: Shen Yanpeng Inventor after: Han Zhijiang Inventor after: Xie Lian Inventor after: Lv Lining Inventor after: Liu Xiaojun Inventor before: Liu Zhihua Inventor before: Guo Xuebing Inventor before: Wang Lei Inventor before: Lu Peng Inventor before: Han Zhijiang Inventor before: Guo Wenlong Inventor before: Ji Jiandong Inventor before: Liu Xiaojun Inventor before: Mao Min Inventor before: Xie Lian Inventor before: Lv Lining Inventor before: Shen Yanpeng |
|
CB03 | Change of inventor or designer information | ||
GR01 | Patent grant | ||
GR01 | Patent grant |