CN106869363A - A kind of decoration type composite thermal-insulating wall and its construction method - Google Patents

A kind of decoration type composite thermal-insulating wall and its construction method Download PDF

Info

Publication number
CN106869363A
CN106869363A CN201710087925.8A CN201710087925A CN106869363A CN 106869363 A CN106869363 A CN 106869363A CN 201710087925 A CN201710087925 A CN 201710087925A CN 106869363 A CN106869363 A CN 106869363A
Authority
CN
China
Prior art keywords
wall
hole
type composite
composite thermal
foaming
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710087925.8A
Other languages
Chinese (zh)
Inventor
李少杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Binzhou Shenghua Building Materials Co Ltd
Original Assignee
Binzhou Shenghua Building Materials Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Binzhou Shenghua Building Materials Co Ltd filed Critical Binzhou Shenghua Building Materials Co Ltd
Priority to CN201710087925.8A priority Critical patent/CN106869363A/en
Publication of CN106869363A publication Critical patent/CN106869363A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/02Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls built-up from layers of building elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/74Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls
    • E04B1/76Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to heat only

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Acoustics & Sound (AREA)
  • Finishing Walls (AREA)

Abstract

The present invention relates to a kind of decoration type composite thermal-insulating wall and its construction method, belong to wall inclination field.In order to overcome the cost of ornamental heat-preserving wall in the prior art higher, the technical deficiency of complexity of constructing, the present invention provides a kind of decoration type composite thermal-insulating wall and its construction method, and the decorating wall includes siphonal lobe wall, heat-insulation layer, internal lobe wall, aproll structure and compression-member, the construction technology of its heat-insulation layer are simple, and its decoration of exterior wall is attractive in appearance, excellent thermal insulation performance, greatly reduces technical operation difficulty and cost, is adapted to popularization and application.

Description

A kind of decoration type composite thermal-insulating wall and its construction method
Technical field
The present invention relates to a kind of decoration type composite thermal-insulating wall and its construction method, belong to wall inclination field.
Background technology
The total amount that building energy consumption accounts for 1/3 China's building energy consumption of social total energy consumption rises year by year, in energy aggregate consumption In shared ratio from the 10% of last century late nineteen seventies, rise to 27.45%.And the building energy consumption of developed country in the world Typically constitute from 33% or so of national total energy consumption.Inferred with this, the research of science and technology department of Minstry of Housing and Urban-Rural Development of People Republic of China (MOHURD) shows, with urbanization process Accelerate the improvement with people's living standard, China's architectural energy consumption ratio finally will also rise to 35% or so.So huge ratio Weight, architectural energy consumption has become the weakness of China's economic development.
China's built house has more than 40,000,000,000 square metres to belong to highly energy-consuming building, and total amount is huge, huge energy danger of hiding Machine.Because highly energy-consuming building ratio is big, annual just many 18,000,000 tons of the standard coals of consumption in single northern heating area, direct economic loss is up to 70 Hundred million yuan, 520,000 tons of multiple rows of carbon dioxide.According to analysis, China is in and builds the ancient cooking vessel most productive period, and the floor space for building up every year is up to 1,600,000,000 To 2,000,000,000 square metres, the summation of construction area is built up year more than all developed countries, and 97% above is high energy consumption is built.Therefore, If not starting to focus on energy-saving design in construction, will directly aggravate energy crisis.
The enforcement period of the ninth five-year plan, Novel wall body heat insulation material enters Rapid development stage, has been in currently large-scale development;2001 Year, country further increases superseded traditional material, promotes the dynamics of Novel wall body heat insulation material, and promoted extension is to small city City, cities and towns extend, and extend to rural area, extend to industrial building.For the novel wall material that national policy is said, there is hollow Building block, aerated-block, gypsum hollow block, aerating flyash brick, porous clay brick, GRC wallboards, reinforcing fiber cement plate, folder Core plate, fly ash aerated wallboard and composite thermo-insulating wall board, it may be said that species is various.But block and plate are only for the market share There is dividing for size, whom who eats;It is each has something to recommend him for properties of product;But combined wall is abroad shared by developed country Ratio occupies high.
201410051631.6 disclose a kind of decorative heat preservation composite wall and preparation method thereof, wherein, the preparation method For:The first metal joist is fixed on the body construction;The first inorganic board and second are respectively provided with the both sides of the first metal joist Inorganic board;Many screw rods are sequentially passed through and are fixed on the first inorganic board, the first metal joist and the second inorganic board, wherein, position Screw rod at agent structure is sequentially passed through and is fixed on the first inorganic board, the first metal joist and agent structure;Insulation is starched Material is injected into the space between the first inorganic board and the second inorganic board;Decorative plate of outer wall is installed, will be dry on decorative plate of outer wall Suspension member is fixed on the outside of the first inorganic board, and gap is provided between decorative plate of outer wall and the first inorganic board.But its complex structure, Building cost can be caused significantly to rise in work progress.
The content of the invention
In order to overcome the cost of ornamental heat-preserving wall in the prior art higher, complicated technical deficiency of constructing, this Invention provides a kind of decoration type composite thermal-insulating wall and its construction method, and the decorating wall includes siphonal lobe wall, heat-insulation layer, internal lobe Wall, aproll structure and compression-member, the construction technology of its heat-insulation layer are simple, and its decoration of exterior wall is attractive in appearance, excellent thermal insulation performance, Technical operation difficulty and cost are greatly reduced, is adapted to popularization and application.
A kind of decoration type composite thermal-insulating wall, it includes siphonal lobe wall, heat-insulation layer, internal lobe wall, aproll structure and pressure-bearing structure Part, wherein described siphonal lobe wall is built by laying bricks or stones using decorative block and formed, internal lobe wall materials for wall is concrete small size hollow building block, mixes The combination of one or more material in solidifying soil porous brick, sintered perforated brick.
Decoration type composite thermal-insulating wall as described above, the specification of described decorative block for 390mm × 90mm × 190mm.Decorative block performance indications should still meet in addition to it should meet table 1 and require《Decorative buiding block of concrete》JC/T 641-2008 Regulation.The decorative block main performance index of the interior wall is as shown in table 1.
The decorative block main performance index of table 1
Decoration type composite thermal-insulating wall as described above, the masonry mortar strength grade of the exterior wall is not less than Mb7.5;Build sand by laying bricks or stones Slurry strength grade is not less than Mb 5;
Decoration type composite thermal-insulating wall as described above, the grade of compressive strength of the internal lobe wall materials for wall is not less than MU10.
Decoration type composite thermal-insulating wall as described above, described heat-insulation layer is molding styrofoam(EPS), extruded polystyrene board (XPS), hard polyurethane board(PU), phenolic foam board(PF), urea formaldehyde resin foam(UF)In one or more insulation material Prepare.Its main performance index should meet table 2, table 3, table 4, the requirement of table 5,6.
Table 2 molds styrofoam(EPS)Performance indications
The extrusion molding polystyrol plastic foam plate of table 3(XPS)Performance indications
The hard polyurethane board of table 4(PU)Performance of heat protective material index
The phenolic foam board of table 5(PF) the performance indications of insulation material
Inspection project Unit Performance requirement
Bulk density(A classes) kg/m³ ≤60
Thermal conductivity factor W/ (㎡ .k) ≤0.033
Compressive strength(II classes) MPa ≥0.10
Dimensional stability % ≤2
Bend fracture power N ≥10
Volume water absorption rate % ≤7.5
Moisture permeable coefficient ng/(m·s·Pa) ≤8.5
Burning behavior class -- It is not less than B1 grades
The Lauxite of table 6 pours into a mould cellular insulant(UF performance indications)
Decoration type composite thermal-insulating wall as described above, it in longitudinal direction there are multiple reinforced mesh to enter between-line spacing, described Reinforced mesh is welded by the cold-drawn low-carbon wires of φ 4, and antirust treatment, described reinforcing bar are carried out using hot-dip process before welding The size in the neighbouring hole of mesh sheet is 140mm × 400mm and 160mm × 400mm.
The present invention also provides a kind of construction method of above-mentioned decoration type composite thermal-insulating wall, and it specifically includes following step:
Internal lobe wall three skins of piece are built first high, place insulation material, then build siphonal lobe wall piece, the horizontal joint between interior siphonal lobe wall piece and perpendicular Seam should prevent mortar, debris from falling into the crack of two wall pieces with building with hick joint is scraped, and then setting reinforced mesh carries out drawknot;Protect Must closely be connected between warm bulk, 45° angle is cut at perps and negative and positive angle to inserting jam-packed;When wherein heat-insulation layer pours into a mould foam Construction method include:Mortar and debris in clean-out hatch and at any time cleaning cavity should be left when building by laying bricks or stones in bottom, ash is used Plate cleans out the mortar omitted when building by laying bricks or stones or overflowed and residue, scrapes flat joint mortar, completes to confirm to leave a blank in advance when building by laying bricks or stones It is interior without any residue, cavity completely close when carry out cast heat-insulation layer.
The cast of foaming thermal-insulating includes drilling, and --- --- foaming emulsion is prepared and test --- --- foaming cast is applied Work --- --- checks and accepts --- --- plug-hole and cleaning, it specifically includes following steps:
1)Drilling:Drilled along building block length direction at the mortar joint of wall bottom about 300 ~ 400mm high, hole diameter is 18 ~ 20mm Level interval is about 800 ~ 1000mm, and vertical spacing is 600mm;Hole is assumed diamond in shape arrangement along metope, and hole is encrypted at corner, Away from being 400 ~ 600mm, generally drilling preferably, side is carried out indoors;
2)Foaming emulsion is prepared and tested:Two groups of material proportions of resin emulsion and foaming emulsion are adjusted by pressure, is tested and is adjusted Section makes the wet density of foaming thermal-insulating in 6 prescribed limits, then carries out presentation quality inspection and reactivity test;
3)Foaming casting and constructing:During foaming casting and constructing, since the hole of wall bottom, hole one by one in the horizontal direction Parallel cast;After next layer of hole casting complete, start upper strata cast, until completing all cast, to continue to pour into a mould per hole Until foam overflows from last layer hole can change hole;
4)Check and accept:Pouring compactness inspection is carried out to wall, is checked according to acceptance requirement after insulation material casting complete, passed through Check that uncompacted position must teeming;
5)Plug-hole and cleaning:After all foaming plug holes or inspection hole acceptance(check), closed and smeared using materials such as mortars Flat, cast cleans out the discarded insulation material of the expanded material scope of operation and scene residual after terminating.
The present invention relative to prior art it is a technical advantage that, ornamental wall of the present invention include siphonal lobe wall, Heat-insulation layer, internal lobe wall, aproll structure and compression-member, wherein described siphonal lobe wall is built by laying bricks or stones using decorative block and formed, internal lobe Wall materials for wall is the group of one or more material in concrete small size hollow building block, concrete perforated brick, sintered perforated brick Close.Described decorative block good appearance, preferable aesthetic can be obtained without other decorations, and sandwich of layers uses thermal insulating material Flitch or insulation material are poured and formed, and have attractive in appearance and insulation advantage concurrently, therefore have very strong application prospect.It is of the present invention Ornamental heat-insulating wall structure and construction method in the Ten Fort cell of Bincheng District two, win ancient cooking vessel cell, Huimin County Qinghe town Used in the building construction of Qinghe cell and Yangxin County rich people community, building constructions quality and heat insulation effect significantly, are received Leader and the huge approval of community resident.
Brief description of the drawings
Fig. 1 present invention dicoration composite thermal-insulating wall structures.
Fig. 2 reinforced mesh schematic diagrames of the present invention.
The schematic cross-sectional view of Fig. 3 present invention dicoration combined walls.
Fig. 4 present invention dicoration combined wall sequence of construction schematic diagrames.
Specific embodiment
The present invention is further described below by way of specific embodiments and the drawings, but the embodiment is limited never in any form The scope of fixed patent protection of the present invention.
A kind of decoration type composite thermal-insulating wall, it includes siphonal lobe wall, heat-insulation layer, internal lobe wall, aproll structure and pressure-bearing structure Part, wherein described siphonal lobe wall is built by laying bricks or stones using decorative block and formed, internal lobe wall materials for wall is concrete small size hollow building block, mixes The combination of one or more material in solidifying soil porous brick, sintered perforated brick.
Described decoration type composite thermal-insulating wall, the specification of described decorative block for 390mm × 90mm × 190mm.Decorative block performance indications should still meet in addition to it should meet table 1 and require《Decorative buiding block of concrete》JC/T 641-2008 Regulation.
Decoration type composite thermal-insulating wall as described above, the masonry mortar strength grade of the exterior wall is not less than Mb7.5;Build Build strength classes of mortar and be not less than Mb 5;Described decoration type composite thermal-insulating wall, the pressure resistance of the internal lobe wall materials for wall Degree grade is not less than MU10.
Decoration type composite thermal-insulating wall as described above, described heat-insulation layer is molding styrofoam(EPS), extruded polystyrene board (XPS), hard polyurethane board(PU), phenolic foam board(PF), urea formaldehyde resin foam(UF)In one or more insulation material Prepare.
Premixing mortar should use mechanical agitation or premixing mortar.Mixing time:Cement mortar and cement mixing mortar must not Less than 2 minutes;The mortar for mixing additive must not be less than 3 minutes;The mortar for mixing organic plasticizer must not be less than 3-5 minutes. Should also have preferable workability, water-retaining property simultaneously, general denseness is advisable with 5-7cm.
Decoration type composite thermal-insulating wall as described above, it in longitudinal direction there are multiple reinforced mesh to enter between-line spacing, institute The reinforced mesh stated is welded by the cold-drawn low-carbon wires of φ 4, and antirust treatment is carried out using hot-dip process before welding, described The size in the neighbouring hole of reinforced mesh is 140mm × 400mm and 160mm × 400mm;Refer to Fig. 1.
The present invention also provides a kind of construction method of above-mentioned decoration type composite thermal-insulating wall, and it specifically includes following step:
Internal lobe wall three skins of piece are built first high, place insulation material, then build siphonal lobe wall piece, the horizontal joint between interior siphonal lobe wall piece and perpendicular Seam should prevent mortar, debris from falling into the crack of two wall pieces with building with hick joint is scraped, and then setting reinforced mesh carries out drawknot;Protect Must closely be connected between warm bulk, 45° angle is cut at perps and negative and positive angle to inserting jam-packed;When wherein heat-insulation layer pours into a mould foam Construction method include:Mortar and debris in clean-out hatch and at any time cleaning cavity should be left when building by laying bricks or stones in bottom, ash is used Plate cleans out the mortar omitted when building by laying bricks or stones or overflowed and residue, scrapes flat joint mortar, completes to confirm to leave a blank in advance when building by laying bricks or stones It is interior without any residue, cavity completely close when carry out cast heat-insulation layer.
The cast of foaming thermal-insulating includes drilling, and --- --- foaming emulsion is prepared and test --- --- foaming cast is applied Work --- --- checks and accepts --- --- plug-hole and cleaning, it specifically includes following steps:
1)Drilling:Drilled along building block length direction at the mortar joint of wall bottom about 300 ~ 400mm high, hole diameter is 18 ~ 20mm Level interval is about 800 ~ 1000mm, and vertical spacing is 600mm;Hole is assumed diamond in shape arrangement along metope, and hole is encrypted at corner, Away from being 400 ~ 600mm, generally drilling preferably, side is carried out indoors;
2)Foaming emulsion is prepared and tested:Two groups of material proportions of resin emulsion and foaming emulsion are adjusted by pressure, is tested and is adjusted Section makes the wet density of foaming thermal-insulating in prescribed limit, then carries out presentation quality inspection and reactivity test;
3)Foaming casting and constructing:During foaming casting and constructing, since the hole of wall bottom, hole one by one in the horizontal direction Parallel cast;After next layer of hole casting complete, start upper strata cast, until completing all cast, to continue to pour into a mould per hole Until foam overflows from last layer hole can change hole;
4)Check and accept:Pouring compactness inspection is carried out to wall, is checked according to acceptance requirement after insulation material casting complete, passed through Check that uncompacted position must teeming;
5)Plug-hole and cleaning:After all foaming plug holes or inspection hole acceptance(check), closed and smeared using materials such as mortars Flat, cast cleans out the discarded insulation material of the expanded material scope of operation and scene residual after terminating.Fig. 3 is seen in wall cross section It is shown.Wall construction order as shown in Figure 4
Because building block arrangement directly affects the globality of wall, therefore must enter by following principle, method and requirement before construction Row arrangement.It is specific as follows:
1)Masonry should build arrangement before building by laying bricks or stones according to engineering design figure, kind, specification, drafting masonry group with reference to building block Figure(Mainly join junction), skin number and row, and through audit it is errorless after, build figure and result of calculation arrangement building block by group.
2)When building block is arranged, should try one's best using master ga(u)ge lattice, the daily output is built by laying bricks or stones to improve.Diameter should be buried under first skin building block Not less than 5mm, the water guide rope made of hemp of spacing 800mm, so that the condensed water in cavity derives wall.
3)Building block arrangement answers the device to hole fissure of displacement to take block, takes block length no less than 90mm, if overlap joint fissure of displacement length is unsatisfactory for The requirement of regulation should take pressure to build reinforced mesh or set the measures such as tension rib, and specific configuration presses design code.If design is random Regularly, the reinforced mesh of Φ 4 can typically be matched somebody with somebody, length is no less than 1000mm.
4)The vertical lap seam of masonry should mutually stagger with the side line of door-window opening, must not straight joint, the spacing that staggers should be greater than 150mm, must not cut and inlay using brick.
Building by laying bricks or stones should be since outside exterior wall corner or at positioning, and inner-outer wall builds crisscross overlap joint by laying bricks or stones simultaneously;Bottom surface is answered in building block Down, if during building block reeded using one end, one end of reeded one end then tack should be built by laying bricks or stones;Masonry is built by laying bricks or stones necessarily Will with line, " on line, under with rib, left and right is adjacent will be to flat ".Should be checked at any time simultaneously, to avoid doing over again.Whenever finishing building One piece, should then carry out the jointing of mortar joint(Jointing)Jointing depth is generally 3-5mm.Should be first clear during decoration splitting block jointing Reason is rinsed with water moisten again, is constructed with special jointing agent, striking surfaces Shunping County, 2-3mm more recessed than building block, after the completion of note Maintenance.
Laying for pipeline is fixed with equipment supporter:
1)The hole of design code, groove and built-in fitting should reserve or pre-buried on internal lobe wall when building by laying bricks or stones, forbid puzzling Beaten on wall chisel or with impact drilled as holes.
2)Electric wire pipeline lays electrical casing pipe in the vertical core bore of building block, by the location arrangements electrical junction box of regulation, is building Under block upper shed after complete box use Cb20 pea gravel concreten reinforcement, electric spool can the horizontal laying in Bars In Poured Concrete Slab, should not along collar tie beam, Electric pipeline is laid in lintel.

Claims (8)

1. a kind of decoration type composite thermal-insulating wall, it includes siphonal lobe wall, heat-insulation layer, internal lobe wall, aproll structure and compression-member, Wherein described siphonal lobe wall is built by laying bricks or stones using decorative block and formed, and internal lobe wall materials for wall is concrete small size hollow building block, coagulation The combination of one or more material in native porous brick, sintered perforated brick.
2. decoration type composite thermal-insulating wall according to claim 1, it is characterised in that the specification chi of described decorative block Very little is 390mm × 90mm × 190mm.
3. decoration type composite thermal-insulating wall according to claim 1, it is characterised in that the masonry mortar intensity of the exterior wall Grade is not less than Mb7.5;Masonry mortar strength grade is not less than Mb 5;The grade of compressive strength of the internal lobe wall materials for wall is not Less than MU10.
4. decoration type composite thermal-insulating wall according to claim 1, it is characterised in that described heat-insulation layer is molding polyphenyl Plate(EPS), extruded polystyrene board(XPS), hard polyurethane board(PU), phenolic foam board(PF), urea formaldehyde resin foam(UF)In One or more insulation material is prepared.
5. decoration type composite thermal-insulating wall according to claim 1, it is characterised in that it has multiple steel in longitudinal direction Muscle mesh sheet enters between-line spacing, and described reinforced mesh is welded by the cold-drawn low-carbon wires of φ 4, is entered using hot-dip process before welding Row antirust treatment.
6. decoration type composite thermal-insulating wall according to claim 1, it is characterised in that the phase up and down of described reinforced mesh The size in adjacent hole is 140mm × 400mm and 160mm × 400mm.
7. a kind of construction method of above-mentioned decoration type composite thermal-insulating wall, it specifically includes following step:
Internal lobe wall three skins of piece are built first high, place insulation material, then build siphonal lobe wall piece, the horizontal joint between interior siphonal lobe wall piece and perpendicular Seam should prevent mortar, debris from falling into the crack of two wall pieces with building with hick joint is scraped, and then setting reinforced mesh carries out drawknot;Protect Must closely be connected between warm bulk, 45° angle is cut at perps and negative and positive angle to inserting jam-packed;When wherein heat-insulation layer pours into a mould foam Construction method include:Mortar and debris in clean-out hatch and at any time cleaning cavity should be left when building by laying bricks or stones in bottom, ash is used Plate cleans out the mortar omitted when building by laying bricks or stones or overflowed and residue, scrapes flat joint mortar, completes to confirm to leave a blank in advance when building by laying bricks or stones It is interior without any residue, cavity completely close when carry out cast heat-insulation layer.
8. decoration type composite thermal-insulating wall according to claim 1, it is characterised in that the cast of foaming thermal-insulating includes --- --- foaming emulsion is prepared and tested, and --- --- foaming casting and constructing --- --- checks and accepts --- --- plug-hole and cleaning, its tool for drilling Body comprises the following steps:
1)Drilling:Drilled along building block length direction at the mortar joint of wall bottom about 300 ~ 400mm high, hole diameter is 18 ~ 20mm Level interval is about 800 ~ 1000mm, and vertical spacing is 600mm;Hole is assumed diamond in shape arrangement along metope, and hole is encrypted at corner, Away from being 400 ~ 600mm, generally drilling preferably, side is carried out indoors;
2)Foaming emulsion is prepared and tested:Two groups of material proportions of resin emulsion and foaming emulsion are adjusted by pressure, is tested and is adjusted Section makes the wet density of foaming thermal-insulating in prescribed limit, then carries out presentation quality inspection and reactivity test;
3)Foaming casting and constructing:During foaming casting and constructing, since the hole of wall bottom, hole one by one in the horizontal direction Parallel cast;After next layer of hole casting complete, start upper strata cast, until completing all cast, to continue to pour into a mould per hole Until foam overflows from last layer hole can change hole;
4)Check and accept:Pouring compactness inspection is carried out to wall, is checked according to acceptance requirement after insulation material casting complete, passed through Check that uncompacted position must teeming;
5)Plug-hole and cleaning:After all foaming plug holes or inspection hole acceptance(check), closed and smeared using materials such as mortars Flat, cast cleans out the discarded insulation material of the expanded material scope of operation and scene residual after terminating.
CN201710087925.8A 2017-02-18 2017-02-18 A kind of decoration type composite thermal-insulating wall and its construction method Pending CN106869363A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710087925.8A CN106869363A (en) 2017-02-18 2017-02-18 A kind of decoration type composite thermal-insulating wall and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710087925.8A CN106869363A (en) 2017-02-18 2017-02-18 A kind of decoration type composite thermal-insulating wall and its construction method

Publications (1)

Publication Number Publication Date
CN106869363A true CN106869363A (en) 2017-06-20

Family

ID=59166853

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710087925.8A Pending CN106869363A (en) 2017-02-18 2017-02-18 A kind of decoration type composite thermal-insulating wall and its construction method

Country Status (1)

Country Link
CN (1) CN106869363A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107555928A (en) * 2017-09-06 2018-01-09 山东省建设发展研究院 A kind of sandwich composite wall body prepared using trade waste and preparation method
CN108756027A (en) * 2018-06-28 2018-11-06 美好建筑装配科技有限公司 A kind of sandwich heat preservation overlapped shear wall and its construction technology
CN113202308A (en) * 2020-04-03 2021-08-03 天津通鸿防水保温工程有限公司 Winter formwork heat preservation method and device
CN115370026A (en) * 2022-08-23 2022-11-22 江苏尼高科技有限公司 Polyurethane foam pouring wall body heat preservation system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101806108A (en) * 2010-03-19 2010-08-18 黄靓 Heat-preservation wall system being applicable to framework structure
CN102345352A (en) * 2010-07-29 2012-02-08 齐齐哈尔龙铁建筑安装股份有限公司 Multilayer structure of building outer wall in severe cold region and construction method of multilayer structure
CN104695565A (en) * 2013-12-09 2015-06-10 孙大勇 Plinth structure for external wall insulation
DE202015005729U1 (en) * 2015-01-17 2015-10-08 Johann Bergmann Gmbh & Co masonry

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101806108A (en) * 2010-03-19 2010-08-18 黄靓 Heat-preservation wall system being applicable to framework structure
CN102345352A (en) * 2010-07-29 2012-02-08 齐齐哈尔龙铁建筑安装股份有限公司 Multilayer structure of building outer wall in severe cold region and construction method of multilayer structure
CN104695565A (en) * 2013-12-09 2015-06-10 孙大勇 Plinth structure for external wall insulation
DE202015005729U1 (en) * 2015-01-17 2015-10-08 Johann Bergmann Gmbh & Co masonry

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
栾景阳: "《建筑节能》", 31 July 2006 *
韩喜林: "《建筑保温施工与工程质量缺陷对策》", 31 January 2015 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107555928A (en) * 2017-09-06 2018-01-09 山东省建设发展研究院 A kind of sandwich composite wall body prepared using trade waste and preparation method
CN108756027A (en) * 2018-06-28 2018-11-06 美好建筑装配科技有限公司 A kind of sandwich heat preservation overlapped shear wall and its construction technology
CN113202308A (en) * 2020-04-03 2021-08-03 天津通鸿防水保温工程有限公司 Winter formwork heat preservation method and device
CN115370026A (en) * 2022-08-23 2022-11-22 江苏尼高科技有限公司 Polyurethane foam pouring wall body heat preservation system
CN115370026B (en) * 2022-08-23 2024-09-20 江苏尼高科技有限公司 Polyurethane foam pouring wall insulation system

Similar Documents

Publication Publication Date Title
CN105604239B (en) A kind of foam concrete functionally gradient composite plate and preparation method thereof
CN102561584B (en) The production method of fiber reinforced cement composite concrete precast construction member
CN105619596B (en) A kind of preparation method of foam concrete composite board material
CN104358341B (en) Building brickwork and masonry construction method of building brickwork
CN102182265B (en) A kind of Multifunctional die wallboard structural system for fast house building
CN106869363A (en) A kind of decoration type composite thermal-insulating wall and its construction method
CN102155059A (en) Multi-row hole thermal insulation building block reinforcing bar masonry wall system
CN101748816B (en) Steam-free aerated concrete composite external wall insulation block and production method thereof
CN105649235A (en) Construction technique for MS dense thin-wall building block filling
CN103590508B (en) A kind of construction method of composite thermal-insulating wall
CN103306419B (en) Earthquake-proof energy-saving chained block
CN107806206A (en) Entire body gradual change cement plate and preparation method thereof
CN201507040U (en) Fireproof energy-saving composite thermal-insulation wall body
CN102409798A (en) Self-insulating brick
CN102304952A (en) Inner partition board formed by cast-in-situ and manufacture method thereof
CN202299092U (en) Self-heat-insulating brick
CN202124954U (en) Cement board
CN106906943A (en) A kind of building block system chain lock block structure of novel belt insulation
CN203008223U (en) Male and female matching type ceramsite plate
CN207332099U (en) A kind of two-way combined wall board of assembled
CN113958033A (en) Construction method of assembled prefabricated wall
CN104802282B (en) A kind of preparation method of foam cement composite plate
CN204571068U (en) Steel-wire carcass insulation blocks
CN1232711C (en) Light heat-insulating wall block
CN103883068A (en) L-shaped heat-preservation bearing building block provided with high-performance cement mortar plate and build-in light ecological material

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170620