CN106869343B - Building cemented platform roof crack craft leakage mending method - Google Patents

Building cemented platform roof crack craft leakage mending method Download PDF

Info

Publication number
CN106869343B
CN106869343B CN201710249448.0A CN201710249448A CN106869343B CN 106869343 B CN106869343 B CN 106869343B CN 201710249448 A CN201710249448 A CN 201710249448A CN 106869343 B CN106869343 B CN 106869343B
Authority
CN
China
Prior art keywords
glue
crack
roof
packing element
cemented platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710249448.0A
Other languages
Chinese (zh)
Other versions
CN106869343A (en
Inventor
吴建仁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Carrier Construction Engineering Group Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710249448.0A priority Critical patent/CN106869343B/en
Publication of CN106869343A publication Critical patent/CN106869343A/en
Application granted granted Critical
Publication of CN106869343B publication Critical patent/CN106869343B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints
    • E04B1/6801Fillings therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0203Arrangements for filling cracks or cavities in building constructions
    • E04G23/0211Arrangements for filling cracks or cavities in building constructions using injection

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

The invention discloses a kind of building cemented platform roof crack craft leakage mending method, crack location is found out in roof clear water of splashing, and carry out mark in crack location;Will be according to A glue: B glue be that the AB glue that the weight proportion of 1:1 mixes equably is blown into crack from the crack breach of roof lower surface, and the first AB glue plugged zone is formed after AB glue is sufficiently hardened and is solidified;Will be according to A glue: B glue be that the AB glue that the volume ratio of 1:1 mixes equably is blown into crack from the crack breach of roof upper surface, the second AB glue plugged zone is formed after AB glue is sufficiently hardened and is solidified, overflow port is reserved at the both ends along fracture length direction simultaneously, and reserves injecting glue port in the middle position of the length direction along crack;Will be according to A glue: the AB glue that the weight proportion that B glue is 3:1 mixes be under the weather condition that high temperature is exposed to the sun, by glue filling device to roof fracture layers injecting glue.Leak repairing construction efficiency of the present invention is higher, and leak repairing effect is good, long service life.

Description

Building cemented platform roof crack craft leakage mending method
Technical field
The present invention relates to a kind of the realm of building construction, it particularly relates to which a kind of building cemented platform roof crack is mended Leakage method.
Background technique
Building mostly uses the tectonic type of cast-in-situ steel reinforced concrete platform roof, generally existing because being easy to appear crack And the problem of causing leak, especially encountering rainy season will lead to roof leak, soaks wall, influences to live.To find out its cause, mainly Due to lower margin or local subsidence cause stress to change and generating crack and prolonged exposing to the weather leads to concrete It expands with heat and contract with cold uneven and generates crack.For above-mentioned seepy question, the existing most common way of roof leakproof means of people has Two kinds: first is that spreading one layer of leakproofing material again in roof, such as spreading one layer of cement sandstone, not only waste material, also will increase roof The pressure of top surface, more importantly leakproof and not up to ideal effect, deficiency existing for this method is that service life is short, generally It is 3 to 5 years;Second is that repairing the crack on roof surface by the pitch for enduring, the defect of this method is that pitch can only cover The shallow-layer part in roof crack is difficult to penetrate into crack deep layer, and be in crack shallow-layer pitch can because exposing to the weather and embrittlement, Weathering and delamination, cracking, rainwater again can be with former crack-leakage, and the roof surface after repairing is uneven, irregular, reprocesses Amount is big.
In view of the above problems, the present invention provides and a kind of disposably can be filled that whole crack, leak repairing effect be good, environmentally friendly, construction Easy building cemented platform roof crack craft leakage mending method.
Summary of the invention
In view of the above shortcomings, the present invention provides it is a kind of disposably can be filled whole crack, leak repairing effect it is good, it is environmentally friendly, The building cemented platform roof crack craft leakage mending method of easy construction, it is carried out as steps described below:
Step (1), cemented platform roof look for seam, i.e., splash clear water in building cemented platform roof, so as to clear roof The accurate location in crack, and mark is carried out in the position split in crack, so as to later period leak repairing construction;
Step (2), splits to the crack of roof lower surface and dehisces to block, i.e., finds to penetrate on roof lower surface and split The position of seam, and determine crack split tonicity and length, firstly, by AB glue according to A glue: B glue be 1:1 weight proportion into Row mixing;Then, mixed AB glue is split to be open from the crack of roof lower surface and is equably blown into crack, filled to AB glue The first AB glue plugged zone is formed after dividing cured for solidification consolidation, reaches from roof lower surface and closure is sealed to roof crack Purpose;
Step (3), splits to the crack of roof upper surface and dehisces to block, it may be assumed that firstly, by AB glue according to A glue: B glue It is mixed for the weight proportion of 1:1;Then, mixed AB glue is split to be open from the crack of roof upper surface and is equably scraped Overflow port is reserved into crack, while at the both ends in crack, and reserves injecting glue in the middle position of the length direction along crack Port;The second AB glue plugged zone is formed after AB glue is sufficiently hardened and solidifies consolidation, is reached from roof upper surface to roof crack It is sealed the purpose of closure;
Trapping device is fixed on corresponding crack first and reserved by step (4) by glue filling device to roof fracture layers injecting glue Injecting glue port position;Secondly by AB glue according to A glue: B glue is that the weight proportion of 3:1 is uniformly mixed;Then after mixing AB glue be packed into trapping device packing element in;Continuous finally by inflator slowly inflates pressurization, constantly increases using in packing element Big air pressure pushes AB glue slowly to inject entire roof via gum-injecting port, the reserved injecting glue port in crack of trapping device and split It stitches in layer, until the overflow port that crack both ends reserve has AB glue outflow to stop injecting glue.
In order to further realize the present invention, the first AB glue plugged zone with a thickness of 3~5mm in the step (2).
In order to further realize the present invention, the second AB glue plugged zone with a thickness of 3~5mm in the step (3).
In order to further realize the present invention, the width of the first AB glue plugged zone is greater than roof lower surface in the step (2) The gap width in crack.
In order to further realize the present invention, the width of the second AB glue plugged zone is greater than roof lower surface in the step (3) The gap width in crack.
In order to further realize the present invention, the trapping device in the step (4) includes packing element fixing seat, packing element, packing element Lid and inflator, the packing element fixing seat are removably disposed in the bottom of packing element, and the bottom surface of the packing element fixing seat is equipped with Gum-injecting port, the packing element lid are removably disposed in the top of packing element, and the packing element, which covers to be provided with, inflates hole, the inflator Escape pipe with inflate hole and be connected.
In order to further realize the present invention, the packing element fixing seat is connect with packing element by being threadedly engaged.
In order to further realize the present invention, the packing element is made of transparent plastic material, in order in injecting glue process The injection volume of AB glue in middle observation packing element.
In order to further realize the present invention, the packing element lid is connect with packing element by being threadedly engaged.
In order to further realize the present invention, the diameter design of the packing element fixing seat is big at the drum diameter than packing element.
Beneficial effects of the present invention:
1, building cemented platform roof crack craft leakage mending method of the invention need to only be mended along the crack of building roof Leakage, compared with the entire building roof of existing means all covers the technology of leakproofing material, saving material is more environmentally friendly, leak repairing construction efficiency It is more efficient, and whole crack can be almost full of by the AB glue water of pressurization injection roof fracture layers, AB glue water is sufficiently hardened And after consolidating, it is tightly combined with roof concrete, new crack, leak repairing good leak-proof effect, long service life will not be generated.
2, building cemented platform roof crack craft leakage mending method of the invention, the present invention, which is used, pours into roof crack for AB glue In layer, AB glue is the nickname of two liquid mixed hardening glue of A, B, and A liquid is this glue, and B liquid is curing agent, and component A is acrylic acid modified ring Oxygen or epoxy resin, or contain catalyst and other auxiliary agents, B component is modified amine or other curing agents, or containing catalyst and Other auxiliary agents, A glue, B glue could harden after being mixed in a certain ratio at normal temperature, and AB glue has very high adhesive strength, therefore Leak repairing is carried out come the crack to building roof using AB glue, effectively prevents the leak in crack;In addition, acrylated epoxy or Epoxy resin can penetrate into plugging cement micropore, pore in roof, with stronger adhesiveness, further improve roof and split The leakage resistance of seam and the service life for extending roof leakproof.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the upright placement of leak repairing glue filling device of the invention;
Fig. 2 is the structural schematic diagram that leak repairing glue filling device handstand of the invention is placed;
Fig. 3 is that the crack of roof lower surface of the invention is split the structural schematic diagram for dehiscing to be blocked;
Fig. 4 is that the crack of roof upper surface of the invention is split the structural schematic diagram for dehiscing to be blocked;
Fig. 5 is the sectional view that roof upper and lower surfaces crack of the invention blocks;
Fig. 6 be it is of the invention by leak repairing glue filling device to the structural schematic diagram of fracture layers injecting glue leak repairing.
Specific embodiment
The present invention is further elaborated with reference to the accompanying drawing, wherein direction of the invention is using Fig. 1 as standard.
As shown in Figures 1 to 6, implement leak repairing used by the craft leakage mending method of building cemented platform roof crack of the present invention to infuse Adhesive dispenser 1 includes packing element fixing seat 11, packing element 12, packing element lid 13 and inflator, wherein trapping device 1 is in longitudinally disposed, packing element The bottom of packing element 12 is arranged in fixing seat 11, and packing element fixing seat 11, which passes through to be threadedly engaged with packing element 12, realizes the detachable of hermetic seal It connects, middle position is equipped with gum-injecting port 111 up and down on the bottom surface of packing element fixing seat 11, and packing element 12 is brewed for storing The AB glue mixed, packing element 12 are made of the big plastic material of transparent compression strength, and wall thickness is in 5mm, 12 subscript of packing element There is scale, in order to observe and measure the injection volume of AB glue in packing element 12 during injecting glue, packing element 12 can also be saturating using being equipped with The metal materials such as the opaque plastics material of bright observation or aluminium alloy are made;The top of packing element 12, glue is arranged in packing element lid 13 Cover 13 and packing element 12, which pass through to be threadedly engaged, realizes being detachably connected for hermetic seal, is provided on packing element lid 13 and inflates hole 131, beats It is provided on stomata 131 and inflates connecting interface, inflator is realized using the prior art.
The construction procedure of building cemented platform roof crack of the present invention craft leakage mending method is as follows:
Step (1), cemented platform roof look for seam, it may be assumed that splash clear water in building cemented platform roof, so as to clear roof The accurate location in crack, and mark is carried out in the position split in crack, so as to later period leak repairing construction, powder is can be used in crack mark The trace that pen or hard object mark is as sign.
Step (2) splits to the crack of roof lower surface and dehisces 2 to block, it may be assumed that in roof lower surface (on roof The corresponding indoor ceiling in surface) on find the position for penetrating crack, and determine split tonicity and the length in crack, firstly, According to the temperature under different leak repairing construction environments, AB glue is mixed according to corresponding weight proportion (such as in construction environment Temperature is 35 DEG C, and the mixed proportion of AB glue is A glue: B glue is 1:1);Then, mixed AB glue is (indoor from roof lower surface Ceiling) crack opening of splitting equably blow into and form the first AB glue plugged zone 3 in the crack in, and by the crack of roof lower surface The AB glue for opening of splitting is scraped, and forms the first AB glue plugged zone 3;The crack of roof lower surface to be blown into is split opening After AB glue is sufficiently hardened and consolidates, the first AB glue plugged zone 3 with a thickness of 3~5mm, the width of the first AB glue plugged zone 3 is greater than The gap width in roof lower surface crack achievees the purpose that be sealed closure to roof crack from roof lower surface.
Step (3) splits to the crack of roof upper surface and dehisces 5 to block, it may be assumed that firstly, applying according to different leak repairings Temperature under work environment, it (is such as 35 DEG C in construction environment temperature, AB glue is mixed that AB glue is mixed according to corresponding volume ratio Composition and division in a proportion example is A glue: B glue is 1:1);Then, mixed AB glue is split from the crack of roof upper surface (cemented platform roof) Opening equably blow into crack, and by the crack of roof upper surface split opening AB glue strike off be shaped to the second AB glue envelope Blocking layer 4, the crack of roof upper surface split dehisce 5 length directions both ends at reserve overflow port 51, and along roof Split the dehisce middle position of 5 length directions of the crack on surface reserves injecting glue port 52;It splits in the crack of roof upper surface to be blown into Opening 5 at AB glue be sufficiently hardened and consolidate after, the second AB glue plugged zone 4 with a thickness of 3~5mm, the second AB glue plugged zone 4 Width be greater than roof lower surface crack gap width, reach the mesh for being sealed closure to roof crack from roof upper surface 's.
Step (4), by glue filling device 1 to 6 injecting glue of roof fracture layers, it may be assumed that firstly, the packing element of trapping device 1 is fixed The underrun AB glue of seat 11 is fixed on reserved 52 position of injecting glue port of corresponding fracture layers, and the gum-injecting port of packing element fixing seat 11 The reserved injecting glue port 52 of 111 positive fractures;Secondly, packing element 12 is hermetically pacified after packing element fixing seat 11 is completely fixed In packing element fixing seat 11, and by AB glue according to A glue: B glue is that the weight proportion of 3:1 is uniformly mixed;Then, it will mix AB glue afterwards is packed into packing element 12, covers packing element lid 13, and the connector on 14 escape pipe of inflator is connected on packing element lid 13 Inflate the inflating in connecting interface of hole 131;Finally, passing through the continuous slow of inflator 14 under the weather condition that high temperature is exposed to the sun Slowly it inflates pressurization, the AB glue in packing element 12 is deposited in using the air pressure promotion constantly increased in packing element 12, so that AB glue is via note The reserved injecting glue port 52 in glue mouth 111, crack and slowly inject in entire roof fracture layers 6, reserved until crack both ends Overflow port 51 has AB glue outflow to stop injecting glue;When there is AB glue in the overflow port 51 that crack both ends reserve, stop injecting glue And wipe clean the glue remained in packing element fixing seat 11.
In order to which further increase building cemented platform roof crack of the present invention craft leakage mending method fills up plugging effect, in step Suddenly it can also ensure that crack top achievees the effect that sufficiently to fill up by injecting glue again in (4), it may be assumed that in roof fracture layers 6 first After secondary injecting glue, after the AB glue crack injected for the first time in order to prevent is fully absorbed and solidifies, the upper of roof fracture layers 6 is caused There is local cavity and best plugging effect is not achieved in portion, and needs after every two days, and second by glue filling device 1 to roof 6 note AB glue of fracture layers, to refill to may cause 6 top of roof fracture layers after first time injecting glue and hollow sectors occur It blocks.
It is flat to enhance packing element fixing seat 11 and roof in order to further increase the contact area of packing element fixing seat 11 Yu roof Leakproofness between table top is big at the drum diameter than packing element 12 by the diameter design of packing element fixing seat 11.
Key problem in technology of the invention is the weight proportion of waterproof binding agent AB glue, and the weight proportion of the AB glue of the present embodiment is Obtained by multiple repetition test, proportion is stringent science, when by AB glue according to A glue: B glue is the weight proportion of 3:1 It carries out after evenly mixing, the density of transparent AB is nearly identical to water, can not only be full of whole crack, also be not in because occurring B glue is excessive and causes AB glue setting time short-range missile fracturing seam that cannot fill AB glue completely and influence plugging effect, be not in because A glue occur excessively causes AB glue excessively to soften and is difficult to solidify influence plugging effect in time.In addition, transparent AB glue also can be replaced Amber glue, polyester resin etc..
The foregoing is merely better embodiments of the invention, and the invention is not limited to above embodiment, are implementing The structural modification small there may be part in the process, if various changes or modifications of the invention are not departed from essence of the invention Mind and range, and belong within the scope of claim and equivalent technologies of the invention, then the present invention is also intended to encompass these changes And modification.

Claims (10)

1. a kind of building cemented platform roof crack craft leakage mending method, which is characterized in that it is carried out as steps described below:
Step (1), cemented platform roof look for seam, i.e., splash clear water in building cemented platform roof, so as to clear roof crack Accurate location, and mark is carried out in the position split in crack, so as to later period leak repairing construction;
Step (2), splits to the crack of roof lower surface and dehisces to block, i.e., finds on roof lower surface and penetrate crack Position, and determine split tonicity and the length in crack, firstly, by AB glue according to A glue: B glue is that the weight proportion of 1:1 mixes It closes;Then, mixed AB glue is split to be open from the crack of roof lower surface and is equably blown into crack, it is sufficiently hard to AB glue Change and form the first AB glue plugged zone after solidifying consolidation, reaches the mesh for being sealed closure to roof crack from roof lower surface 's;
Step (3), splits to the crack of roof upper surface and dehisce to block, it may be assumed that firstly, by AB glue according to A glue: B glue is 1:1 Weight proportion mixed;Then, mixed AB glue is split to be open equably to blow into from the crack of roof upper surface and is split In seam, while overflow port is reserved at the both ends in crack, and reserve injecting glue port in the middle position of the length direction along crack; The second AB glue plugged zone is formed after AB glue is sufficiently hardened and solidifies consolidation, reaches close to the progress of roof crack from roof upper surface The purpose blocked;
Trapping device is fixed on the reserved note in corresponding crack first by glue filling device to roof fracture layers injecting glue by step (4) Glue port position;Secondly by AB glue according to A glue: B glue is that the weight proportion of 3:1 is uniformly mixed;Then by mixed AB Mucilage binding enters in the packing element of trapping device;Continuous finally by inflator slowly inflates pressurization, utilizes what is constantly increased in packing element Air pressure pushes AB glue slowly to inject entire roof fracture layers via gum-injecting port, the reserved injecting glue port in crack of trapping device In, until the overflow port that crack both ends reserve has AB glue outflow to stop injecting glue.
2. building cemented platform roof crack according to claim 1 craft leakage mending method, it is characterised in that: the step (2) the first AB glue plugged zone with a thickness of 3~5mm in.
3. building cemented platform roof crack according to claim 1 craft leakage mending method, it is characterised in that: the step (3) the second AB glue plugged zone with a thickness of 3~5mm in.
4. building cemented platform roof crack according to claim 1 craft leakage mending method, it is characterised in that: the step (2) width of the first AB glue plugged zone is greater than the gap width in roof lower surface crack in.
5. building cemented platform roof crack according to claim 1 craft leakage mending method, it is characterised in that: the step (3) width of the second AB glue plugged zone is greater than the gap width in roof lower surface crack in.
6. building cemented platform roof crack according to claim 1 craft leakage mending method, it is characterised in that: the step (4) trapping device in includes packing element fixing seat, packing element, packing element lid and inflator, and the packing element fixing seat is removably disposed In the bottom of packing element, the bottom surface of the packing element fixing seat is equipped with gum-injecting port, and the packing element lid is removably disposed in packing element Top, the packing element, which covers to be provided with, inflates hole, the inflator escape pipe with inflate hole and be connected.
7. building cemented platform roof crack according to claim 6 craft leakage mending method, it is characterised in that: the packing element is solid Reservation is connect with packing element by being threadedly engaged.
8. building cemented platform roof crack according to claim 6 craft leakage mending method, it is characterised in that: the packing element is adopted It is made of transparent plastic material, in order to observe the injection volume of AB glue in packing element during injecting glue.
9. building cemented platform roof crack according to claim 7 craft leakage mending method, it is characterised in that: the packing element lid It is connect with packing element by being threadedly engaged.
10. building cemented platform roof crack according to claim 7 craft leakage mending method, it is characterised in that: the packing element The diameter design of fixing seat is big at the drum diameter than packing element.
CN201710249448.0A 2017-04-17 2017-04-17 Building cemented platform roof crack craft leakage mending method Active CN106869343B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710249448.0A CN106869343B (en) 2017-04-17 2017-04-17 Building cemented platform roof crack craft leakage mending method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710249448.0A CN106869343B (en) 2017-04-17 2017-04-17 Building cemented platform roof crack craft leakage mending method

Publications (2)

Publication Number Publication Date
CN106869343A CN106869343A (en) 2017-06-20
CN106869343B true CN106869343B (en) 2018-12-07

Family

ID=59162513

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710249448.0A Active CN106869343B (en) 2017-04-17 2017-04-17 Building cemented platform roof crack craft leakage mending method

Country Status (1)

Country Link
CN (1) CN106869343B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101285345A (en) * 2008-06-02 2008-10-15 南通华新建工集团有限公司 Repairing method for cast-in-situ crack between box beam and face by wide span post-tensioning method
CN203128992U (en) * 2013-03-22 2013-08-14 刘国太 Practical epoxy resin glue injector
JP2015048281A (en) * 2013-09-02 2015-03-16 国立大学法人 東京大学 Water leakage crack water-stopping material using high-performance inorganic crack injection material and water-stopping method using the same
CN204282229U (en) * 2014-09-29 2015-04-22 德州市公路工程总公司 Hole injecting glue reinforced structure is drawn in a kind of prestressing force prefabricated case beam crack
CN105545006A (en) * 2016-02-22 2016-05-04 中国水利水电第十一工程局有限公司 HF-3 double-component polysulfide building sealant crack repairing method
CN205577463U (en) * 2016-04-18 2016-09-14 中冶武汉冶金建筑研究院有限公司 Concrete structure crack repairing injecting glue ware

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101285345A (en) * 2008-06-02 2008-10-15 南通华新建工集团有限公司 Repairing method for cast-in-situ crack between box beam and face by wide span post-tensioning method
CN203128992U (en) * 2013-03-22 2013-08-14 刘国太 Practical epoxy resin glue injector
JP2015048281A (en) * 2013-09-02 2015-03-16 国立大学法人 東京大学 Water leakage crack water-stopping material using high-performance inorganic crack injection material and water-stopping method using the same
CN204282229U (en) * 2014-09-29 2015-04-22 德州市公路工程总公司 Hole injecting glue reinforced structure is drawn in a kind of prestressing force prefabricated case beam crack
CN105545006A (en) * 2016-02-22 2016-05-04 中国水利水电第十一工程局有限公司 HF-3 double-component polysulfide building sealant crack repairing method
CN205577463U (en) * 2016-04-18 2016-09-14 中冶武汉冶金建筑研究院有限公司 Concrete structure crack repairing injecting glue ware

Also Published As

Publication number Publication date
CN106869343A (en) 2017-06-20

Similar Documents

Publication Publication Date Title
CN108149945A (en) A kind of quick crack repairing structure of easy construction and its construction method
CN104404844A (en) Method for repairing and reinforcing open joint of filling layer of slab ballastless track
CN106958716B (en) A kind of PCCP pipe joint caulking joint construction method
CN206396627U (en) Hidden seam type expansion joint structure
CN206143827U (en) Underground works crack repairing structure
CN108868182A (en) A kind of concrete structure longitudinal crack method for repairing and mending
CN106812265A (en) A kind of femerell constructs treating seepage structure and construction method
CN207846696U (en) A kind of compound leak stopping system
CN106869343B (en) Building cemented platform roof crack craft leakage mending method
CN209011169U (en) A kind of experimental rig for simulating underground engineering impervious blocking material
CN105545006A (en) HF-3 double-component polysulfide building sealant crack repairing method
CN103452081A (en) Construction method for flexible composite impermeable layer of upstream face of high arch dam
CN217810438U (en) Asphalt pavement pit repairing structure
CN204282229U (en) Hole injecting glue reinforced structure is drawn in a kind of prestressing force prefabricated case beam crack
US20210285179A1 (en) Method for stabilizing and lifting channel boards by underwater grouting
KR100998727B1 (en) Outside of concrete construction injection repair method for leaks of oils such as asphalt solution and others
CN106337449A (en) Crack repairing structure for underground engineering and construction method of crack repairing structure
JP2009019441A (en) Method for repairing concrete
CN109653764B (en) Method for repairing tunnel water seepage flow whitening
CN202509637U (en) Cantilever type cover plate deformation joint structure of roofing for people to climb
CN206752868U (en) A kind of femerell constructs treating seepage structure
KR101192270B1 (en) Repairing method of pavement sunken
CN101871264B (en) Inner cavity non-shrinking filling technology of thin-wall art GRC (Glass-fiber Reinforced Composite) board
JP2011069154A (en) Method for repairing road surface
CN113833500B (en) Restoration method for waterproof and impermeable layer of mountain cave depot

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20191225

Address after: Room 401, building C1-C4, jinruilugu Science Park, No. 28, Ludian Road, Yuelu District, Changsha City, Hunan Province

Patentee after: Carrier Construction Engineering Group Co., Ltd

Address before: 524200 Guangdong city of Zhanjiang province Leizhou City, No. 88 Room 101 Feng Zhen Chang

Patentee before: Wu Jianren