CN106958716B - A kind of PCCP pipe joint caulking joint construction method - Google Patents

A kind of PCCP pipe joint caulking joint construction method Download PDF

Info

Publication number
CN106958716B
CN106958716B CN201710314943.5A CN201710314943A CN106958716B CN 106958716 B CN106958716 B CN 106958716B CN 201710314943 A CN201710314943 A CN 201710314943A CN 106958716 B CN106958716 B CN 106958716B
Authority
CN
China
Prior art keywords
pccp
pressure
component
joint
pipe joint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710314943.5A
Other languages
Chinese (zh)
Other versions
CN106958716A (en
Inventor
陈涛涛
张龙杰
周雪娇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 18th Bureau Group Co Ltd
Fourth Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd
Original Assignee
China Railway 18th Bureau Group Co Ltd
Fourth Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 18th Bureau Group Co Ltd, Fourth Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd filed Critical China Railway 18th Bureau Group Co Ltd
Priority to CN201710314943.5A priority Critical patent/CN106958716B/en
Publication of CN106958716A publication Critical patent/CN106958716A/en
Application granted granted Critical
Publication of CN106958716B publication Critical patent/CN106958716B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L55/00Devices or appurtenances for use in, or in connection with, pipes or pipe systems
    • F16L55/16Devices for covering leaks in pipes or hoses, e.g. hose-menders
    • F16L55/168Devices for covering leaks in pipes or hoses, e.g. hose-menders from outside the pipe
    • F16L55/175Devices for covering leaks in pipes or hoses, e.g. hose-menders from outside the pipe by using materials which fill a space around the pipe before hardening
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B28/00Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements
    • C04B28/02Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements containing hydraulic cements other than calcium sulfates
    • C04B28/04Portland cements
    • CCHEMISTRY; METALLURGY
    • C09DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
    • C09JADHESIVES; NON-MECHANICAL ASPECTS OF ADHESIVE PROCESSES IN GENERAL; ADHESIVE PROCESSES NOT PROVIDED FOR ELSEWHERE; USE OF MATERIALS AS ADHESIVES
    • C09J181/00Adhesives based on macromolecular compounds obtained by reactions forming in the main chain of the macromolecule a linkage containing sulfur, with or without nitrogen, oxygen, or carbon only; Adhesives based on polysulfones; Adhesives based on derivatives of such polymers
    • C09J181/04Polysulfides
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2111/00Mortars, concrete or artificial stone or mixtures to prepare them, characterised by specific function, property or use
    • C04B2111/34Non-shrinking or non-cracking materials
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2111/00Mortars, concrete or artificial stone or mixtures to prepare them, characterised by specific function, property or use
    • C04B2111/70Grouts, e.g. injection mixtures for cables for prestressed concrete
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2201/00Mortars, concrete or artificial stone characterised by specific physical values
    • C04B2201/50Mortars, concrete or artificial stone characterised by specific physical values for the mechanical strength

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • General Engineering & Computer Science (AREA)
  • Ceramic Engineering (AREA)
  • Organic Chemistry (AREA)
  • Structural Engineering (AREA)
  • Materials Engineering (AREA)
  • Inorganic Chemistry (AREA)
  • Mechanical Engineering (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
  • Road Paving Structures (AREA)
  • Sealing Material Composition (AREA)

Abstract

The invention discloses a kind of PCCP pipe joint caulking joint construction methods, including physics to restore renovation technique and two-component polysulfide sealant renovation technique.Increasingly increased severely using the large-scale water delivery engineering of PCCP pipe, PCCP prestressed concrete pipe has the not replaceable advantage of other concrete, is mainly manifested in caliber is big, is laid with distance etc..And for prestressed concrete pipe, pipe seam is connected to become the key link of construction quality in the construction process, interface find in third time bulge test after pipeline backfill, pressure value, which occurs, in partially prestressed concrete pipe joint reduces phenomenon, does not reach design requirement.If carrying out changing Guan Congxin backfill cost prohibitive and complex process, a kind of PCCP pipe joint caulking joint construction method is proposed, solve third time and suppress unqualified situation.Not only save the cost, easy to operate, and nozzle reliable in quality after caulking joint.

Description

A kind of PCCP pipe joint caulking joint construction method
Technical field
The present invention relates to a kind of PCCP pipe joint caulking joint construction methods, belong to large-scale water delivery engineering technical field of construction.
Background technique
Using in the large-scale water delivery engineering construction of PCCP pipe, carrying out pressure detecting to mounted PCCP pipeline is to guarantee pipe The essential step of road installation quality, bulge test must be carried out to interface after pipeline backfill for the third time by suppressing, and pressure experiment value is Design value+0.3Mpa, and pressure stabilizing 2min, pressure value do not fall to qualification.In actual test, part PCCP pipeline is suppressed for the third time Pressure value, which occurs, in interface reduces phenomenon, does not reach design requirement, analyzing its reason mainly has the following:
1, winter freeze thawing phenomenon leads to part PCCP pipeline cushion rubber contraction distortion, and non-reversible deformation occurs.
2, micro- sedimentation, which occurs, for pipeline foundation causes cushion rubber to misplace, and does not have sealing function.
3, for the first time, suppress for the second time during, experimental pressure is excessively high, and cushion rubber is caused to deform.
If carrying out changing Guan Congxin backfill cost prohibitive, complex process, urgent need proposes a kind of PCCP pipe joint caulking joint construction Method solves third time and suppresses unqualified situation.
Summary of the invention
The present invention is to solve PCCP pipe third times to suppress underproof technical problem, and a kind of PCCP pipeline provided connects Mouth caulking joint construction method, the specific implementation steps of the method are as follows:
Carry out multiple pressure to underproof PCCP pipe joint is suppressed for the third time, multiple pressure pressure by design conditions+0.3MPa into Row is suppressed, pressure stabilizing 2min not pressure release, and it is qualified to determine, such as still unqualified, then is handled with pipe internal vibration renovation technique, i.e. method One: multiple hydraulic water is changed into vegetable oil, so that the lubrication of cushion rubber resets.Multiple pressure pressure presses design conditions+0.3MPa, reaches rule After level pressure force value, PCCP inner wall of the pipe female end side tapping with wooden mallet, does circumferential percussion, multiple pressure is examined again, and it is such as qualified, change Multiple pressure is carried out with water, is reached after authorized pressure value (design conditions+0.3MPa), pressure stabilizing 2min, no pressure release, then can determine that close Lattice, reparation terminate.
It is as unqualified in still pressed again for 5 times repeatedly, then determine that the interface peripheral doses measure is failed, it is close to use two-component polysulfide instead Sealing processing scheme is handled, i.e. method two: using 2.5cm two-component polysulfide sealant is injected in seam, interface is remaining Part pours into mortar, and the method that interface surface brushing SK hand scrapes polyureas composite tyre base fabric is handled.
Detailed description of the invention
The schematic diagram of Fig. 1 pipe joint surface layer flexible protective.
Infuse polysulfide sealant schematic diagram in Fig. 2 inseam bottom.
In figure: 1, SK hand scrapes polyureas, 2, PCCP pipe concrete surface, 3, concrete overlap edge, 4, grout filler, 5, tire base Cloth, 6, interface, 7, cushion rubber, 8, polysulfide sealant, 9, M20 mortar-chalked joint, 10, covering mortar.
Specific embodiment
Below with reference to specific example, the embodiment for patent that the present invention is further explained.It is to be understood that example is only used In the range for illustrating the invention patent rather than limitation patent of invention.Furthermore it is to be understood that being said having read the invention patent After the content stated, technical staff can do various modifications to the present invention, and such equivalent forms equally fall within the appended power of the application The range limited in sharp claim.
The invention patent proposes a kind of PCCP pipe joint caulking joint construction method, proposes two kinds for different pressure conditions Restorative procedure, including physics restore renovation technique and two-component polysulfide sealant renovation technique.
S1, physics restore renovation technique
Multiple pressure is carried out to suppressing underproof PCCP pipe joint for the third time first, and such as still unqualified, multiple hydraulic water changes into Vegetable oil, so that the lubrication of cushion rubber resets.Multiple pressure pressure uses wooden mallet after reaching authorized pressure value by design conditions+0.3MPa PCCP inner wall of the pipe female end side is tapped, circumferential percussion is done, multiple pressure is examined again, and it is such as qualified, it uses water instead and carries out multiple pressure, reach After authorized pressure value (design conditions+0.3MPa), pressure stabilizing 2min, no pressure release then can determine that as qualification, reparation terminates.Such as multiple pressure As a result still unqualified, repeat percussion vibration, then the multiple pressure detection of row, still press again for such as repeatedly 5 times unqualified, then determines the interface Locate the failure of physics restoring method reclamation activities, is changed to be handled using the method for two-component polysulfide sealant.
S2, two-component polysulfide sealant renovation technique
It is close using 2.5cm two-component polysulfide is injected in seam for suppressing underproof PCCP pipe joint for the third time Sealing, interface remainder pour into mortar, and the method that interface surface brushing SK hand scrapes polyureas composite tyre base fabric carries out repair process.
(1) two-component polysulfide sealant is that reinforcing agent, toughener, thickening is added using liquid polysulphide rubber as host agent Base cream is processed into agent, thixotropic agent and the configuration of other additives;It is configured to vulcanization cream with metal oxide etc., it can after the mixing of two components It is cured as elaxtic seal.
Two-component polysulfide sealant be with concrete self-adhesiveness can, using liquid polysulphide rubber as the room temperature of base-material Vulcanize two-component and build B class Grade A polysulfide sealant, there is filleting sealing ability.
The product can be located at the interior of engineering structure and show up, and directly contact with drinking water, need certain anti-aging and nothing Toxicity.
(2) PCCP joint treatment before gluing: by PCCP seam and the eliminating impurities of surrounding are clean, dust is removed, is guaranteed Basal plane is dry.Base surface is cleaned out, and self-test checks and accepts base surface by the rear management of notice in time, can be carried out after acceptance(check) It constructs in next step.
(3) sealant configuration technique
1) the material configuration and operation instruction of primary coat: the material of primary coat is formed by two component combine of first, second, by first when use Component (colorless and transparent) is uniformly mixed with component B (bronzing) by 1:1, is painted on PCCP pipeline joint-seam two sides injecting glue with hairbrush On basal plane, after primed surface is dry on basal plane, injecting glue is carried out.The necessary surface drying rear injecting glue of primary coat, otherwise will seriously affect on basal plane Bonding.The product is volatile, and two components are individually packed, and in sealing, storage period is 1 year, and mixed primary coat requires one It is secondary to be finished.
2) the material configuration of two-component TR sealant
Material mixture ratio: component A (white base cream) hereinafter referred to as A;It is prepared by A:B=10:1.
Mixed glue: it opens component A and divides Packing bucket bung, B component is added in component A pail pack, stirs tool on electric hammer card, first Start low speed switch, stir 3 minutes from top to bottom, restart middling speed switch, stirring 5~8 minutes to sizing material color uniformity, Complete preparation and mixed adhesive process.
(4) rifle technique is filled
1) it will fill in the glue surface mixed in the moulding disk merging piston bucket for having plastic hole and distance rod in rifle device.
2) the forward and backward blind nut of injecting glue gun barrel is removed, gun barrel mouth is directed at the gum outlet among moulding disk, pushes gun barrel and thrust Bar firmly pushes, and sizing material uplink is fitted into gun barrel at this time, and air in tube is discharged along gun barrel tail portion, until filling.
3) the forward and backward blind nut for filling glue is loaded onto, loaded onto while filling blind nut and is glued the narrow adaptable rifle mouth of slit width, it is complete At dress adhesive process, that is, injectable gluing.
(5) injecting glue is constructed
1) rifle mouth is inserted into PCCP pipe joint to be sealed, by the injecting sealant of projected depth uniform density It in PCCP pipe joint, is then carried out scraping shaping with the shaping tool with radian, the seam face after shaping is in crescent, after solidification Colloid surface answer smooth bubble-free, closely knit no broken end should be kept inside colloid, and keep cohering securely, no degumming is disconnected It splits, seep water phenomenon.
2) it is that not can be carried out airtight, water in 7 days, 7 days that the glue, which reaches suitable strength in the room temperature curing time (25 ± 3 DEG C), Close, oily close destructive testing and various performance tests.
3) polysulfide sealant for being 2.5cm or so in the PCCP pipe joint bottom injection depth of leakage pressure, injecting glue Shi Keyi Secondary molding.
(6) mortar smears seam, and after the completion of polysulfide sealant maintenance, management is tested, after the assay was approved to pipe joint Remaining part carries out grouting procedure, and mortar smears the primary completion of seam.
Mortar technical requirements:
1) sand use hard, clean, the good natural sand of gradation, except meet national current standard " regular concrete sand, Stone quality and the method for inspection " (JGJ52-2006) outside, containing soil, mica and other objectionable impurities weight no more than total weight 2%.Sand size grading should be selected in Mortar Mixing Ratio Design and Experiment according to construction technology, construction condition.
2) cement should use P.O.42.5 grades or more of ordinary portland cement.
3) mixing water is using clean water on strength of cement mortar, durability without influence, and being removed with water should meet that " concrete is mixed And water supply standard " JGJ63 regulation outside, and require its pH value be greater than 6.5, chloride ion content be less than 100mg/L, sulfate ion Content is less than 350mg/L.
4) it blends expanding admixture appropriate and makes non-constricted cement mortar.
5) strength of cement mortar is not less than 20MPa.
(7) SK hand scrapes polyureas composite tyre base fabric construction technology: mortar smear seam construction finish reach some strength after line up Periphery concrete surface is polished (width 30cm), is cleaned, and BE14 interfacial agents (width 28cm) is brushed after drying, to interfacial agents It directly scratches first layer SK hand after surface drying to scrape polyureas (width 25cm), the half an hour interior bedding tire within the scope of the 10cm of expansion joint position Base fabric, then brush 2~3 times SK hands and scrape polyureas, thick middle, two sides are thin.The permissible working time that brushing SK hand scrapes polyureas every time exists Within 2h, until position polyureas thickness is thick up to 4mm, both sides 2mm among expansion joint.
1) SK hand scrapes the processing of the receipts side between polyureas and concrete scrap (bridge), and edge is polished into triangular form, edge depth 2mm, Edge flexible paint and concrete seamlessly transit.
2) guarantee that nozzle position coating layer thickness is greater than 4mm.
3) it brushes uniformly, brushes and use one-shot forming technique, prevent from applying repeatedly and parcel occur.

Claims (2)

1. a kind of PCCP pipe joint caulking joint construction method, it is characterised in that: the specific implementation steps of the method are as follows:
Multiple pressure is carried out to underproof PCCP pipe joint is suppressed, multiple pressure pressure is suppressed by design conditions+0.3MPa, pressure stabilizing 2min not pressure release, it is qualified to determine, such as still unqualified, then is handled with pipe internal vibration renovation technique, change multiple hydraulic water into plant Object oil, so that the lubrication of cushion rubber resets;Multiple pressure pressure is struck after reaching authorized pressure value with wooden mallet by design conditions+0.3MPa PCCP inner wall of the pipe female end side is hit, circumferential percussion is done, multiple pressure is examined again, and it is such as qualified, it uses water instead and carries out multiple pressure, reach rule After level pressure force value, pressure stabilizing 2min, no pressure release then can determine that as qualification, reparation terminates;
It is as unqualified in still pressed again for 5 times repeatedly, then determine that the interface peripheral doses measure is failed, uses two-component polysulfide sealant instead Processing scheme is handled, and using two-component polysulfide sealant is injected in seam, interface remainder pours into mortar, interface table It brushes the method that SK hand scrapes polyureas composite tyre base fabric and is handled in face.
2. a kind of PCCP pipe joint caulking joint construction method according to claim 1, it is characterised in that: restored including physics Renovation technique and two-component polysulfide sealant renovation technique;
S1, physics restore renovation technique
Multiple pressure is carried out to suppressing underproof PCCP pipe joint for the third time first, and such as still unqualified, multiple hydraulic water changes plant into Oil, so that the lubrication of cushion rubber resets;Multiple pressure pressure is tapped after reaching authorized pressure value with wooden mallet by design conditions+0.3MPa PCCP inner wall of the pipe female end side, does circumferential percussion, and multiple pressure is examined again, such as qualified, uses water instead and carries out multiple pressure, reaches regulation After pressure value, pressure stabilizing 2min, no pressure release then can determine that as qualification, reparation terminates;Such as pressure result is still unqualified again, repeats Percussion vibration, then the multiple pressure detection of row, still press for such as repeatedly 5 times unqualified again, then determine the interface physics restoring method reclamation activities Failure, is changed to be handled using the method for two-component polysulfide sealant;
S2, two-component polysulfide sealant renovation technique
For suppressing underproof PCCP pipe joint for the third time, using injecting 2.5cm two-component polysulfide sealant in seam, Interface remainder pours into mortar, and the method that interface surface brushing SK hand scrapes polyureas composite tyre base fabric carries out repair process;
(1) two-component polysulfide sealant is that reinforcing agent, toughener, tackifier, touching is added using liquid polysulphide rubber as host agent Become agent and base cream is processed into additive configuration;It is configured to vulcanization cream with metal oxide, it is curable for elasticity after the mixing of two components Sealing material;
Two-component polysulfide sealant be with concrete self-adhesiveness can, using liquid polysulphide rubber as the auto-vulcanization of base-material Two-component builds B class Grade A polysulfide sealant, has filleting sealing ability;
Two-component polysulfide sealant is located at the interior of engineering structure and shows up, and directly contacts with drinking water, has centainly anti-aging And nontoxicity;
(2) PCCP joint treatment before gluing: by PCCP seam and the eliminating impurities of surrounding are clean, dust is removed, guarantees injecting glue Basal plane is dry;Injecting glue basal plane is cleaned out, and self-test checks and accepts injecting glue basal plane by the rear management of notice in time, can after acceptance(check) Carry out next step construction;
(3) sealant configuration technique
1) the material configuration and operation instruction of primary coat: the material of primary coat is formed by two component combine of first, second, by component A when use It is uniformly mixed, is painted on the injecting glue basal plane of PCCP pipeline joint-seam two sides with hairbrush, primary coat table on injecting glue basal plane by 1:1 with component B After face is dry, injecting glue is carried out;The necessary surface drying rear injecting glue of primary coat, otherwise will seriously affect bonding on injecting glue basal plane;The product is easily waved Hair, two components are individually packed, and in sealing, storage period is 1 year, and mixed primary coat requires once to be finished;
2) the material configuration of two-component TR sealant
Material mixture ratio: component A hereinafter referred to as A;It is prepared by A:B=10:1;
Mixed glue: it opens component A and divides Packing bucket bung, B component is added in component A pail pack, tool is stirred on electric hammer card, first starts Low speed switch stirs 3 minutes from top to bottom, restarts middling speed switch, and stirring 5~8 minutes that is, complete to sizing material color uniformity At preparation and mixed adhesive process;
(4) rifle technique is filled
1) it will fill in the glue surface mixed in the moulding disk merging piston bucket for having plastic hole and distance rod in rifle device;
2) the forward and backward blind nut of injecting glue gun barrel is removed, gun barrel mouth is directed at the gum outlet among moulding disk, pushes gun barrel and distance rod, uses Power pushes, and sizing material uplink is fitted into gun barrel at this time, and air in tube is discharged along gun barrel tail portion, until filling;
3) the forward and backward blind nut for filling glue is loaded onto, is loaded onto while filling blind nut and the sizing narrow adaptable rifle mouth of slit width, completion dress Adhesive process, that is, injectable gluing;
(5) injecting glue is constructed
1) rifle mouth is inserted into PCCP pipe joint to be sealed, by the managing sealant injection PCCP of projected depth uniform density It in pipeline joint, is then carried out scraping shaping with the shaping tool with radian, the seam face after shaping is in crescent, the colloid after solidification Smooth bubble-free is answered on surface, and closely knit no broken end should be kept inside colloid, and is kept cohering securely, no degumming fracture, infiltration Phenomenon;
2) it is that not can be carried out the close destructive examination of airtight, watertight, oil in 7 days, 7 days that the glue, which reaches suitable strength in the room temperature curing time, It tests and various performance tests;
3) polysulfide sealant for being 2.5cm or so in the PCCP pipe joint bottom injection depth of leakage pressure, when injecting glue can once at Type;
(6) mortar smears seam, and after the completion of polysulfide sealant maintenance, management is tested, after the assay was approved to pipe joint residue Part carry out grouting procedure, mortar smears that seam is primary to be completed;
Mortar technical requirements:
1) sand uses hard, clean, the good natural sand of gradation, except meeting national current standard " regular concrete sand, Shi Zhi Amount and the method for inspection " (JGJ52-2006) outside, containing soil, mica and other objectionable impurities weight be not more than total weight 2%; Sand size grading should be selected in Mortar Mixing Ratio Design and Experiment according to construction technology, construction condition;
2) cement should use P.O.42.5 grades or more of ordinary portland cement;
3) mixing water is using clean water on strength of cement mortar, durability without influence, and being removed with water should meet that " concrete mixes and stirs use Water quality standard " JGJ63 regulation outside, and require its pH value be greater than 6.5, chloride ion content be less than 100mg/L, sulfate ion content Less than 350mg/L;
4) it blends expanding admixture appropriate and makes non-constricted cement mortar;
5) strength of cement mortar is not less than 20MPa;
(7) SK hand scrapes polyureas composite tyre base fabric construction technology: mortar smear seam construction finish reach some strength after line up periphery Concrete surface is polished, is cleaned, and BE14 interfacial agents are brushed after drying, first layer SK hand is directly scratched after interfacial agents surface drying Polyureas, the half an hour interior bedding tire base fabric within the scope of the 10cm of expansion joint position are scraped, then brushes 2~3 times SK hands and scrapes polyureas, it is intermediate Thickness, two sides are thin;Each brushing SK hand scrapes the permissible working time of polyureas within 2h, until position polyureas thickness among expansion joint Up to 4mm, both sides 2mm thickness;
1) SK hand scrapes the processing of the receipts side between polyureas and concrete scrap (bridge), and edge is polished into triangular form, edge depth 2mm, edge Flexible paint and concrete seamlessly transit;
2) guarantee that nozzle position coating layer thickness is greater than 4mm;
3) it brushes uniformly, brushes and use one-shot forming technique, prevent from applying repeatedly and parcel occur.
CN201710314943.5A 2017-05-07 2017-05-07 A kind of PCCP pipe joint caulking joint construction method Active CN106958716B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710314943.5A CN106958716B (en) 2017-05-07 2017-05-07 A kind of PCCP pipe joint caulking joint construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710314943.5A CN106958716B (en) 2017-05-07 2017-05-07 A kind of PCCP pipe joint caulking joint construction method

Publications (2)

Publication Number Publication Date
CN106958716A CN106958716A (en) 2017-07-18
CN106958716B true CN106958716B (en) 2019-04-26

Family

ID=59482764

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710314943.5A Active CN106958716B (en) 2017-05-07 2017-05-07 A kind of PCCP pipe joint caulking joint construction method

Country Status (1)

Country Link
CN (1) CN106958716B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107989156B (en) * 2017-11-28 2024-06-07 北京中水科海利工程技术有限公司 Structure for PCCP pipe faucet seam, pipeline and construction method
CN109723933A (en) * 2019-02-16 2019-05-07 中铝矿业有限公司 A kind of Rapid leakage repairing method of pipeline leakage point
CN110332412B (en) * 2019-07-31 2023-12-29 南方工程检测修复技术研究院 Broken wire PCCP excavation restoration supporting device and construction method thereof
CN112443720A (en) * 2020-12-09 2021-03-05 无锡华毅管道有限公司 Repair method for leakage of prestressed concrete cylinder pipe joint
CN114476016B (en) * 2022-03-04 2024-04-12 成都沃飞天驭科技有限公司 Method for connecting components and aircraft
CN114409323B (en) * 2022-03-31 2022-06-28 中铁十八局集团第四工程有限公司 High-adhesion repair concrete for first-aid repair of PCCP (prestressed concrete cylinder pipe) and preparation method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101216141A (en) * 2008-01-04 2008-07-09 中国航空工业第一集团公司北京航空材料研究院 Pipeline damage rehabilitation method
CN202577327U (en) * 2012-05-25 2012-12-05 中铁十八局集团有限公司 Grout stopping structure for final joint of immersed tube tunnel
CN102936482A (en) * 2011-08-15 2013-02-20 张耀华 Preparation method of self-leveling polysulfide building sealant
CN203363529U (en) * 2013-06-07 2013-12-25 义乌工商职业技术学院 Concrete pipe repairing device of water supply prestress steel cylinder
CN204127563U (en) * 2014-10-29 2015-01-28 中国水利水电第五工程局有限公司 The dull and stereotyped end cap of seal of tube Dual side reinforced suppressed by PCCP pipeline
CN205786121U (en) * 2016-07-01 2016-12-07 中铁二十局集团市政工程有限公司 PCCP pipe joint bulge test constructing structure

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004284909A (en) * 2003-03-25 2004-10-14 Taiheiyo Cement Corp Grout

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101216141A (en) * 2008-01-04 2008-07-09 中国航空工业第一集团公司北京航空材料研究院 Pipeline damage rehabilitation method
CN102936482A (en) * 2011-08-15 2013-02-20 张耀华 Preparation method of self-leveling polysulfide building sealant
CN202577327U (en) * 2012-05-25 2012-12-05 中铁十八局集团有限公司 Grout stopping structure for final joint of immersed tube tunnel
CN203363529U (en) * 2013-06-07 2013-12-25 义乌工商职业技术学院 Concrete pipe repairing device of water supply prestress steel cylinder
CN204127563U (en) * 2014-10-29 2015-01-28 中国水利水电第五工程局有限公司 The dull and stereotyped end cap of seal of tube Dual side reinforced suppressed by PCCP pipeline
CN205786121U (en) * 2016-07-01 2016-12-07 中铁二十局集团市政工程有限公司 PCCP pipe joint bulge test constructing structure

Also Published As

Publication number Publication date
CN106958716A (en) 2017-07-18

Similar Documents

Publication Publication Date Title
CN106958716B (en) A kind of PCCP pipe joint caulking joint construction method
CN109267709A (en) A kind of deformation joint anti-seepage drain structure and its restorative procedure
CN209082427U (en) A kind of New-old concrete sealing connection structure having pressure head
CN105239789A (en) Construction process for plugging and consolidating concrete crack through chemical grouting
KR100989919B1 (en) Repair method for concrete joint part
CN106869341A (en) A kind of architectural engineering wall waterproof construction method
CN103397587A (en) Silicon PU court and manufacturing method thereof
CN206861108U (en) A kind of armored concrete leakproof socket joint pipe joint
CN106801768B (en) PCCP pipeline socket rings and steel cylinder weld seam Micro blazed-grating treatment process have been installed
CN107023176A (en) A kind of low pressure concrete structural cracks method for repairing and mending and device
CN108868182A (en) A kind of concrete structure longitudinal crack method for repairing and mending
CN206143827U (en) Underground works crack repairing structure
CN205929645U (en) Phosphoric acid by wet process extraction tank back timber anticorrosion structure
CN108425692A (en) A kind of tunnel outer waterproofing layer construction method
CN103452081B (en) A kind of construction method of flexible composite impermeable layer of upstream face of high arch dam
CN207846696U (en) A kind of compound leak stopping system
CN209369199U (en) A kind of deformation joint anti-seepage drain structure
CN105545006A (en) HF-3 double-component polysulfide building sealant crack repairing method
CN111217569A (en) Repair mortar and repair construction method for concrete structure damaged part
JP2016053254A (en) Deck plate waterproof method
CN110388087A (en) A kind of low-pressure injection enclosure method of concrete group crack
KR101922069B1 (en) Method and apparatus for repairing crack of concrete structures
CN104929379A (en) Reinforcing method for reinforced concrete beam board
US2417026A (en) Filling for and treatment of fractured masonry walls
JP2016056607A (en) Method of repairing concrete structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant