CN217810438U - Asphalt pavement pit repairing structure - Google Patents

Asphalt pavement pit repairing structure Download PDF

Info

Publication number
CN217810438U
CN217810438U CN202222133351.2U CN202222133351U CN217810438U CN 217810438 U CN217810438 U CN 217810438U CN 202222133351 U CN202222133351 U CN 202222133351U CN 217810438 U CN217810438 U CN 217810438U
Authority
CN
China
Prior art keywords
spill
repairing
patching
repair
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222133351.2U
Other languages
Chinese (zh)
Inventor
李晓军
王晓华
芮少权
唐翠仁
赵建有
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Anyite New Material Co ltd
Shaanxi Communications Holding Group Co ltd
Xian University of Science and Technology
Original Assignee
Shaanxi Anyite New Material Co ltd
Shaanxi Communications Holding Group Co ltd
Xian University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaanxi Anyite New Material Co ltd, Shaanxi Communications Holding Group Co ltd, Xian University of Science and Technology filed Critical Shaanxi Anyite New Material Co ltd
Priority to CN202222133351.2U priority Critical patent/CN217810438U/en
Application granted granted Critical
Publication of CN217810438U publication Critical patent/CN217810438U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a bituminous paving pot hole repairing structure, including the first body and the second body of mending, the first body of mending is including the spill and mends the body and mend the stake, and the second is mended body upper surface and is flushed with bituminous paving surface, and the spill is mended and is provided with first waterproof tie coat between the external side of body upper portion and the bituminous paving, and the top of the body is mended to the spill, and the spill is mended and is provided with the waterproof tie coat of second between the body inboard and the second of body upper portion, and the body is mended for pitch to the second, and the intensity of the first body of mending is greater than the intensity that the body was mended to the second. The utility model discloses a first body of mending that intensity is high is consolidated bottom the hole groove, and a plurality of repairs that stretch into in the first body of mending to the pitch road surface are piled and are improved joint strength and effect, and the body is mended to the spill and is born the second and mend the body, and former road surface, the first body of mending and the second are mended the body and loop through first waterproof tie coat and the waterproof tie coat of second and are connected as an organic wholely, the life on extension road surface under the prerequisite that does not change the pitch road surface form.

Description

Asphalt pavement pit repairing structure
Technical Field
The utility model belongs to the technical field of bituminous paving hole groove repairs, concretely relates to bituminous paving hole groove repairs structure.
Background
In the long-term use process of asphalt pavements, pavement diseases can gradually develop into pits. Once a pit occurs in a road surface, the existing method mostly adopts the following steps to repair: before repairing local damage of asphalt pavement, slotting and forming the broken part, then planing out the dug-out old materials, cleaning broken stones and waste residues in and around the pit groove, pouring the repairing materials into the pit groove to fill up, and compacting after uniform laying.
The repairing material is directly poured into the pit groove forming groove, so that the repairing effect is poor, two modes are adopted for repairing in the prior art, firstly, the asphalt mixture is injected after a vertical hole of a hole is expanded at the lower part of the groove bottom, and the moving-out of the asphalt material is reduced; secondly, high-strength concrete material is directly poured into the vertical hole drilled at the bottom of the groove for repairing. In the first repairing mode, asphalt concrete belongs to a sparse repairing material, the combination degree of a new road surface and an old road surface is not high, and the service life is still short; the second repair mode changes the appearance of the asphalt pavement, is not beautiful and does not meet the repair standard. Therefore, a long-service-life asphalt pavement pit repairing structure without changing the form of the asphalt pavement is lacked nowadays.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the technical problem that not enough among the above-mentioned prior art is directed against, the utility model provides a bituminous paving hole groove repair structure, its novel in design is reasonable, adopt the high first body of repairing of intensity to consolidate the hole groove bottom, a plurality of repair piles that stretch into in the first body of repairing improve joint strength and effect to the bituminous paving in improve the body, the body is repaired to spill in the first body of repairing bears the second and repairs the body, the body is repaired to the second adoption and the unanimous pitch of former road surface material, former road surface, the first body of repairing and the second body of repairing loop through first waterproof bonding layer and the waterproof bonding layer of second and are connected as an organic wholely, long service life on road surface under the prerequisite that does not change bituminous paving form, therefore, the clothes hanger is strong in practicability, and convenient to popularize and use.
In order to solve the technical problem, the utility model discloses a technical scheme is: the utility model provides a bituminous paving hole groove repair structure which characterized in that: including carrying out the first repair body of reinforcement to the tank bottom position in the pit groove shaping groove in pit groove, first repair body includes spill repair body and a plurality of edge spill repair body bottom stretches into the repair stake in the bituminous paving, spill repair body and a plurality of it pours as an organic wholely to repair the stake, spill repair body height is less than the height in pit groove shaping groove, spill repair body inboard is provided with the second repair body, the upper surface and the bituminous paving surface of the second repair body flush, be provided with first waterproof bonding layer between the upper portion outside of spill repair body and the bituminous paving, the top of spill repair body and be provided with the waterproof bonding layer of second between the upper portion inboard of spill repair body and the second repair body, first waterproof bonding layer and the waterproof bonding layer of second are connected as an organic wholely, and the top surface and the bituminous paving surface of the waterproof bonding layer of second flush, the second repair body is the bituminous repair body, the intensity of first repair body is greater than the intensity of the second repair body.
Foretell bituminous paving hole groove repair structure which characterized in that: the bottom position of the pit groove forming groove of the pit groove is drilled with a plurality of vertical holes which all extend into the deep part of the bituminous pavement, and the number of the repairing piles is equal to that of the vertical holes and corresponds to that of the vertical holes one by one.
Foretell bituminous paving hole groove repair structure which characterized in that: the first repairing body is an UHPC repairing body or an RPC repairing body.
Foretell bituminous paving hole groove repair structure which characterized in that: the first waterproof bonding layer and the second waterproof bonding layer are both KD-HYP epoxy resin waterproof bonding layers.
The beneficial effects of the utility model are that, novel in design is reasonable, adopt the high first repair body of intensity to consolidate pit slot bottom, a plurality of repair stake that stretch into in the pitch road surface in the first repair body improve joint strength and effect, the spill repair body bears the second repair body in the first repair body, the second repair body adopts and mends the body with the pitch of former road surface material unanimity, former road surface, the first repair body and the second repair body loop through first waterproof bonding layer and second waterproof bonding layer and connect as an organic wholely, the life on extension road surface under the prerequisite that does not change the pitch road surface form, and convenient popularization and use.
The technical solution of the present invention is further described in detail by the accompanying drawings and examples.
Drawings
Fig. 1 is a construction state diagram of the utility model.
Description of reference numerals:
1-asphalt pavement; 2-pit; 3-pit groove forming groove;
4-vertical hole; 5-a first waterproof adhesive layer; 6-a first prosthesis;
7-a second waterproof adhesive layer; and 8, a second repairing body.
Detailed Description
As shown in fig. 1, the utility model discloses a tank bottom position to pit groove shaping groove 3 of pit groove 2 carries out the first repair body 6 of reinforcement, first repair body 6 includes that the spill mends body and a plurality of edge the spill mends body bottom and stretches into the repair stake in bituminous paving 1, the spill mends body and a plurality of the repair stake is pour as an organic wholely, the spill is mended the height that the body highly is less than pit groove shaping groove 3, the spill is mended internal side and is provided with second and mends body 8, the upper surface and the bituminous paving 1 surface of second repair body 8 flush, be provided with first waterproof tie coat 5 between the upper portion outside of the spill repair body and bituminous paving 1, the top of the spill repair body and be provided with second waterproof tie coat 7 between the upper portion inboard of the spill repair body and the second repair body 8, first waterproof tie coat 5 and second waterproof tie coat 7 connect as an organic wholely, and the top surface and bituminous paving 1 surface of second waterproof tie coat 7 flush, second repair body 8 is the bituminous body, the second repair body, first repair body 6's intensity is greater than the second repair body 8.
It should be noted that the pit slot bottom is reinforced by the first repairing body with high strength, the connecting strength and the effect are improved by the plurality of repairing piles extending into the asphalt pavement in the first repairing body, the concave repairing body in the first repairing body bears the second repairing body, the second repairing body is the asphalt repairing body which is consistent with the original pavement material, the original pavement, the first repairing body and the second repairing body are connected into a whole through the first waterproof bonding layer and the second waterproof bonding layer in sequence, and the service life of the pavement is prolonged on the premise that the form of the asphalt pavement is not changed.
In this embodiment, a plurality of vertical holes 4 extending into the deep part of the asphalt pavement 1 are drilled at the bottom of the pit forming groove 3 of the pit 2, and the number of the repairing piles is equal to that of the vertical holes 4 and corresponds to that of the repairing piles one by one.
In this embodiment, the first repairing body 6 is an UHPC repairing body or an RPC repairing body.
In this embodiment, the first waterproof bonding layer 5 and the second waterproof bonding layer 7 are both KD-HYP epoxy waterproof bonding layers.
It should be noted that the purpose of using KD-HYP epoxy resin waterproof bonding layers for both the first waterproof bonding layer 5 and the second waterproof bonding layer 7 is to ensure that the first repairing body 6 and the asphalt mixture can be effectively bonded and the gap is waterproof in both high-temperature environment and normal-temperature environment.
The utility model discloses during the implementation, carry out broken fluting shaping earlier to pot hole 2, acquire pot hole shaping groove 3, the old material that will dig out again digs out, reach in the pot hole shaping groove 3 and rubble all around, the waste residue clean up, bore in 3 bottoms in pot hole shaping groove and establish a plurality of vertical holes 4 again, paint first waterproof tie coat 5 on 3 inner wall upper portions in pot hole shaping groove, then fill UHPC repair material or RPC repair material, form first repair body 6, treat first repair body 6 shaping back, at the top of the spill body, and paint second waterproof tie coat 7 on the upper portion inside wall of the spill repair body, repair the internal pitch that fills of spill at last and repair the body, the construction is accomplished in the flattening.
The above, only be the utility model discloses a preferred embodiment, it is not right the utility model discloses do any restriction, all according to the utility model discloses the technical entity all still belongs to any simple modification, change and the equivalent structure change of doing above embodiment the utility model discloses technical scheme's within the scope of protection.

Claims (4)

1. The utility model provides a bituminous paving hole groove repair structure which characterized in that: including carrying out the first patching body (6) of reinforcement to the tank bottom position of the pit groove shaping groove (3) of pit groove (2), first patching body (6) are including spill patching body and a plurality of edge spill patching body bottom stretches into the repair stake in bituminous paving (1), spill patching body and a plurality of it pours as an organic wholely to repair the stake, spill patching body height is less than the height in pit groove shaping groove (3), spill patching body inboard is provided with second patching body (8), the upper surface and the bituminous paving (1) surface of second patching body (8) flush, be provided with first waterproof bonding layer (5) between the upper portion outside of spill patching body and bituminous paving (1), the top of spill patching body and be provided with second waterproof bonding layer (7) between the upper portion inboard of spill patching body and second patching body (8), first waterproof bonding layer (5) and second waterproof bonding layer (7) are connected as an organic wholely, the top surface and bituminous paving (1) surface of second waterproof bonding layer (7), second patching body (8) surface intensity is greater than the intensity of second patching body (6) and intensity.
2. The asphalt pavement pit repairing structure according to claim 1, wherein: the tank bottom position of the pit groove forming groove (3) of the pit groove (2) is drilled with a plurality of vertical holes (4) which all extend into the depth of the asphalt pavement (1), and the quantity of the repairing piles is equal to that of the vertical holes (4) and corresponds to that of the repairing piles one by one.
3. The asphalt pavement pit repairing structure according to claim 1, wherein: the first repairing body (6) is an UHPC repairing body or an RPC repairing body.
4. The asphalt pavement pit repairing structure according to claim 1, wherein: the first waterproof bonding layer (5) and the second waterproof bonding layer (7) are both KD-HYP epoxy resin waterproof bonding layers.
CN202222133351.2U 2022-08-12 2022-08-12 Asphalt pavement pit repairing structure Active CN217810438U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222133351.2U CN217810438U (en) 2022-08-12 2022-08-12 Asphalt pavement pit repairing structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222133351.2U CN217810438U (en) 2022-08-12 2022-08-12 Asphalt pavement pit repairing structure

Publications (1)

Publication Number Publication Date
CN217810438U true CN217810438U (en) 2022-11-15

Family

ID=83974400

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222133351.2U Active CN217810438U (en) 2022-08-12 2022-08-12 Asphalt pavement pit repairing structure

Country Status (1)

Country Link
CN (1) CN217810438U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115679839A (en) * 2022-12-30 2023-02-03 湖南省交通规划勘察设计院有限公司 Bridge with continuous simply-supported bridge deck, reinforcement and construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115679839A (en) * 2022-12-30 2023-02-03 湖南省交通规划勘察设计院有限公司 Bridge with continuous simply-supported bridge deck, reinforcement and construction method

Similar Documents

Publication Publication Date Title
CN109972659B (en) Novel municipal inspection well structure and construction method
CN101368383A (en) Method for treating soft soil roadbed by artificial composite crust layer
CN110965416B (en) Bamboo reinforcement system for reinforcing mountain area high-fill roadbed and construction method
CN217810438U (en) Asphalt pavement pit repairing structure
CN107313320B (en) The embedded reinforcement asphalt pavement structure of cement concrete pavement and construction method
CN104328730A (en) Construction method for transforming cement concrete pavement with embedded reinforced asphalt layer
CN109681235A (en) Method for repairing highway tunnel lining cavity with poor surrounding rock
CN209324375U (en) A kind of reparation structure of the poor highway tunnel lining cavity of pair of country rock
CN101892637A (en) Ring type anchor rod locking method for repairing cracks on abutment side wall of highway bridge abutment
CN204282229U (en) Hole injecting glue reinforced structure is drawn in a kind of prestressing force prefabricated case beam crack
CN110055845A (en) A kind of construction method that highway bridge and culvert two sides are soft soil roadbed
CN213013834U (en) Multi-angle oblique crossing reinforcing structure for crack space of old cement pavement
CN205711985U (en) The reparation structure of severe cold area morbid state concrete gravity dam
CN208777143U (en) A kind of oblique prestressing force cement concrete cracks repairing structure
CN211171537U (en) Road repairing roadbed structure
CN111691279A (en) Old asphalt pavement pit reinforcing structure and method
CN220555776U (en) Pitch road surface pit repair structure
CN207775646U (en) A kind of roadbed preventing reflection crack
CN207310186U (en) A kind of water channel gool side leads to prefabricated-member mould
CN111636290A (en) Improved generation overflow bridge structure
CN218454330U (en) Collapsible loess area urban road crack maintenance structure
CN206902487U (en) The embedded reinforcement asphalt pavement structure of cement concrete pavement
CN214033228U (en) Urban road extension is with road surface structure that can avoid linking up and subside height crack
CN218712096U (en) Semi-rigid base asphalt pavement microcrack homogenization treatment pavement structure
CN213233013U (en) Road and bridge crack repairing structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant