CN106869173B - A kind of pipe sedimentation for city integrated piping lane corrects support automatically - Google Patents
A kind of pipe sedimentation for city integrated piping lane corrects support automatically Download PDFInfo
- Publication number
- CN106869173B CN106869173B CN201710214589.9A CN201710214589A CN106869173B CN 106869173 B CN106869173 B CN 106869173B CN 201710214589 A CN201710214589 A CN 201710214589A CN 106869173 B CN106869173 B CN 106869173B
- Authority
- CN
- China
- Prior art keywords
- elevator
- bearing plate
- pipeline
- pipe
- piping lane
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000004062 sedimentation Methods 0.000 title claims abstract description 30
- 238000012544 monitoring process Methods 0.000 claims abstract description 10
- 238000012545 processing Methods 0.000 claims description 4
- 230000005540 biological transmission Effects 0.000 claims description 3
- 230000000694 effects Effects 0.000 claims description 3
- 239000000284 extract Substances 0.000 claims description 3
- 229910000831 Steel Inorganic materials 0.000 claims description 2
- 238000002512 chemotherapy Methods 0.000 claims description 2
- 238000000151 deposition Methods 0.000 claims description 2
- 239000010959 steel Substances 0.000 claims description 2
- 238000000034 method Methods 0.000 description 3
- 238000004891 communication Methods 0.000 description 2
- 230000006378 damage Effects 0.000 description 2
- 238000009412 basement excavation Methods 0.000 description 1
- 239000003034 coal gas Substances 0.000 description 1
- 239000000567 combustion gas Substances 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000012937 correction Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 239000000835 fiber Substances 0.000 description 1
- 238000005286 illumination Methods 0.000 description 1
- 238000007726 management method Methods 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 238000009428 plumbing Methods 0.000 description 1
- 230000001737 promoting effect Effects 0.000 description 1
- 239000008399 tap water Substances 0.000 description 1
- 235000020679 tap water Nutrition 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/10—Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Chemical & Material Sciences (AREA)
- Oil, Petroleum & Natural Gas (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Pipeline Systems (AREA)
Abstract
The invention discloses a kind of pipe sedimentations for city integrated piping lane to correct support automatically, the data information that the support passes through the external sedimentation monitoring system of reception, judge sedimentation situation of the pipeline on whole length direction, Pipeline lift or the reduction at position will be settled by the elevator of automatic control, and bearing plate is inserted under lifting bracket using bearing plate placing device and undertakes pressure, to achieve the purpose that change the position pipe support height, prevents and cause pipe stress collection caused by pipe sedimentation to neutralize breakoff phenomenon because of piping lane sedimentation.The present invention can be realized full automation, round-the-clock running, it is rapid for burst sedimentation event response, the ratio of precision manual operation reached in terms of settlement Control is higher, can not only save labour expenses, also can be reduced because personnel often pass in and out pipe gallery bring security risk.
Description
Technical field
The invention belongs to field of civil engineering, and in particular to a kind of pipe sedimentation for city integrated piping lane is corrected automatically
Support.
Background technique
City integrated piping lane is exactly the comprehensive corridor of underground urban duct.A tunnel space is built in Urban Underground, it will
Electric power, communication, the various utilities pipelines such as combustion gas, heat supply, plumbing are integrated in one, and are equipped with special access hole, hoisting port and prison
Examining system implements unified planning, Uniting, unification construction and management, is important infrastructure and the " life for ensureing city operations
Order line ".
Tap water, coal gas, electric power, the communication line for maintaining city function are not only incorporated inside city integrated piping lane, and
And the equipment such as piping lane itself function power, illumination, draining for using are various, any pipeline breaks down or leakage, has
Other equipment along the line may be impacted, or even cause the serious consequences such as leak electricity, pour water, explode, the sedimentation of pipeline is to occur
The big key factor of the one of Pipeline damage, therefore the pipe sedimentation control in city integrated piping lane is significant.
The method that the settlement Control of pipeline mostly uses personal monitoring at this stage, by pipeline be fixedly mounted directly or
No-touching-pipeline monitoring point, survey crew periodically use the equipment such as theodolite or total station to carry out level measurement to each monitoring point, obtain
Settling data, engineering staff are handled the pipeline in the region near differential settlement point according to obtained data,
Hand excavation's pipeline foundation reduces its height suitably, or backfills pipeline after lifting pipeline using equipment such as hydraulic jacks
Basis properly increases pipeline foundation height, and this method is time-consuming, disturbs to pipeline big, and the degree of automation is low, for it is long away from
It is big from pipeline manual correction error, be not suitable for promoting the use of.
Summary of the invention
The purpose of the present invention is to provide a kind of pipe sedimentations for city integrated piping lane to correct support automatically, prevents pipe
Corridor settles bring pipe stress collection and neutralizes destruction.
Realize the technical solution of the object of the invention are as follows: a kind of pipe sedimentation for city integrated piping lane corrects branch automatically
Seat, including elevator, elevator bracket, bearing plate placing device, bearing plate and bearing foundation;
Pipeline is arranged on elevator bracket, and bearing plate and bearing foundation is arranged in elevator bracket separately below, for branch
The weight in stay tube road and elevator bracket;
The elevator is provided with settling data processing module, the sedimentation that sedimentation monitoring system transmission comes outside real-time reception
Data information;
When elevator monitors this support top pipeline absolute altitude lower than other pipe supports, elevator recommends promotion automatically
Bearing plate is placed to below elevator bracket by machine bracket, bearing plate placing device, power is recommended in elevator release, by pipeline from
Recast is used for bearing plate;
When elevator monitors that this support top pipeline absolute altitude is higher than other pipe supports, power is recommended in elevator effect,
Bearing plate placing device extracts the bearing plate placed out, and power is recommended in elevator release, and pipeline is placed on bearing plate.
Compared with prior art, the present invention its remarkable advantage are as follows:
(1) present invention is directed to the demand of Practical Project, and it is automatic to devise a kind of pipe sedimentation for city integrated piping lane
Support is corrected, can prevent piping lane from settling bring according to the differential settlement data of pipe support, adjust automatically height of support
Pipe stress collection, which neutralizes, to be destroyed;
(2) present invention can be realized full automation, round-the-clock running, rapid for burst sedimentation event response, heavy
The attainable ratio of precision manual operation of drop control aspect is higher, can not only save labour expenses, on the other hand also can be reduced because
Personnel often pass in and out pipe gallery bring security risk.
Detailed description of the invention
Fig. 1 is the use schematic diagram that the present invention corrects support for the pipe sedimentation of city integrated piping lane automatically.
Specific embodiment
In conjunction with Fig. 1, a kind of pipe sedimentation for city integrated piping lane corrects support automatically, including elevator 102, is promoted
Machine bracket 103, bearing plate placing device 104, bearing plate 105 and bearing foundation 106;
Pipeline 101 is arranged on elevator bracket 103, and bearing plate 105 and pressure-bearing is arranged in elevator bracket 103 separately below
Basis 106, is used to support the weight of pipeline 101 and elevator bracket 103;
The elevator 102 is provided with settling data processing module, and sedimentation monitoring system transmission comes outside real-time reception
Settling data information;The module carries out judgement processing to received settling data, identifies pipeline absolute altitude above this support
Highly;Optionally, external sedimentation monitoring system uses GPS sedimentation monitoring system or fiber grating sedimentation monitoring system.
When elevator 102 monitors this support top pipeline absolute altitude lower than other pipe supports, elevator 102 mentions automatically
Elevator bracket 103 is lifted, bearing plate 105 is placed to 103 lower section of elevator bracket, elevator 102 by bearing plate placing device 104
Power is recommended in release, by the Gravitative Loads of pipeline 101 on bearing plate 105;
When elevator 102 monitors that this support top pipeline absolute altitude is higher than other pipe supports, the effect of elevator 102 is mentioned
Lifting force, bearing plate placing device 104 extract the bearing plate 105 placed out, and power is recommended in the release of elevator 102, by pipeline
101 are placed on bearing plate 105.
Further, the bearing plate 105 is steel plate.
Further, the elevator 102 uses hydraulic hoisting machine.
Further, the elevator bracket 103 uses L bracket, and bottom is provided with arc with what pipeline 101 contacted on one side
Connected in star, for placing pipeline 101.
Further, the bearing foundation 106 uses Extended chemotherapy form.
Further, the bearing plate placing device 104 includes motor, controller, plate putting machine and deposits plate storehouse, is controlled
Device is for controlling motor, and motor is for driving plate putting machine that bearing plate 105 is placed to promotion from depositing to grab in plate storehouse
103 lower section of machine bracket, or the bearing plate 105 of 103 lower section of elevator bracket is grabbed and deposits plate storehouse.
Basic principles and main features of the invention have been shown and described above.It should be understood by those skilled in the art that
The present invention is not limited to the above embodiments, and the above embodiments and description only illustrate the principle of the present invention,
Without departing from the spirit and scope, various changes and improvements may be made to the invention, these changes and improvements are all fallen
Enter in scope of the claimed invention.The scope of the present invention is defined by the appended claims and its equivalents.
Claims (6)
1. a kind of pipe sedimentation for city integrated piping lane corrects support automatically, which is characterized in that including elevator (102),
Elevator bracket (103), bearing plate placing device (104), bearing plate (105) and bearing foundation (106);
Pipeline (101) be arranged on elevator bracket (103), elevator bracket (103) be arranged separately below bearing plate (105) and
Bearing foundation (106) is used to support the weight of pipeline (101) and elevator bracket (103);
The elevator (102) is provided with settling data processing module, and sedimentation monitoring system transmission comes heavy outside real-time reception
Drop data information;
When elevator (102) monitors this support top pipeline absolute altitude lower than other pipe supports, elevator (102) mentions automatically
It lifts elevator bracket (103), one piece of new bearing plate (105) is placed to elevator bracket by bearing plate placing device (104)
(103) lower section, power is recommended in elevator (102) release, by the Gravitative Loads of pipeline (101) on bearing plate (105);
When elevator (102) monitors that this support top pipeline absolute altitude is higher than other pipe supports, elevator (102) effect is mentioned
Lifting force, bearing plate placing device (104) extract the one piece of bearing plate (105) of top layer placed out, and elevator (102) is released
It puts and recommends power, pipeline (101) is placed on remaining bearing plate (105).
2. the pipe sedimentation according to claim 1 for city integrated piping lane corrects support automatically, which is characterized in that institute
Stating bearing plate (105) is steel plate.
3. the pipe sedimentation according to claim 1 for city integrated piping lane corrects support automatically, which is characterized in that institute
Elevator (102) are stated using hydraulic hoisting machine.
4. the pipe sedimentation according to claim 1 for city integrated piping lane corrects support automatically, which is characterized in that institute
Elevator bracket (103) are stated using L bracket, bottom is provided with arc groove with what pipeline (101) contacted on one side, for placing
Pipeline (101).
5. the pipe sedimentation according to claim 1 for city integrated piping lane corrects support automatically, which is characterized in that institute
Bearing foundation (106) are stated using Extended chemotherapy form.
6. the pipe sedimentation according to claim 1 for city integrated piping lane corrects support automatically, which is characterized in that institute
Bearing plate placing device (104) to be stated to include motor, controller, plate putting machine and deposit plate storehouse, controller is used to control motor,
Motor is placed to elevator bracket (103) for driving plate putting machine to crawl out bearing plate (105) from depositing in plate storehouse
Lower section, or the bearing plate (105) below elevator bracket (103) is grabbed and deposits plate storehouse.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710214589.9A CN106869173B (en) | 2017-04-01 | 2017-04-01 | A kind of pipe sedimentation for city integrated piping lane corrects support automatically |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710214589.9A CN106869173B (en) | 2017-04-01 | 2017-04-01 | A kind of pipe sedimentation for city integrated piping lane corrects support automatically |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106869173A CN106869173A (en) | 2017-06-20 |
CN106869173B true CN106869173B (en) | 2019-02-22 |
Family
ID=59159829
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710214589.9A Expired - Fee Related CN106869173B (en) | 2017-04-01 | 2017-04-01 | A kind of pipe sedimentation for city integrated piping lane corrects support automatically |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106869173B (en) |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2946275B2 (en) * | 1994-02-28 | 1999-09-06 | 東急建設株式会社 | How to build an underground space |
CN106049535A (en) * | 2016-07-29 | 2016-10-26 | 中冶华天工程技术有限公司 | Adjusting device for internal pipeline of comprehensive pipe gallery |
-
2017
- 2017-04-01 CN CN201710214589.9A patent/CN106869173B/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN106869173A (en) | 2017-06-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106996483B (en) | A kind of city integrated piping lane pipe sedimentation automatic control support | |
CN107460888B (en) | Mounting structure and method for concrete prefabricated pipe gallery | |
CN103669216A (en) | Steel box girder scattered-splicing sliding device and installation method | |
CN103123016B (en) | Construction method for laying gas pipelines along bridge | |
CN104776268B (en) | Mechanical construction method for mounting large-caliber reinforced concrete drainage pipe | |
CN109026032B (en) | Lower shield translation construction method for limit invasion of downward-turning beam | |
CN111750172A (en) | Pipe jacking construction process | |
CN106869173B (en) | A kind of pipe sedimentation for city integrated piping lane corrects support automatically | |
CN110714774A (en) | Bidirectional split starting method for small shield in narrow shaft | |
CN102704512B (en) | Immersed tube bottom jack type deviation rectifying fine adjusting system and adjusting technology | |
CN1458435A (en) | Mounting and construction equipment for large span large bore river crossing bridge pipe and its construction method | |
CN110053936A (en) | A kind of pipeline transporter and applied pipeline transportation method | |
CN206888009U (en) | Realize sewage pipe in corridor without the underground pipe gallery sewage branch mouth structure for falling damage and picking out | |
CN104299662B (en) | Nuclear power plant of movable marine nuclear power platform | |
CN100366832C (en) | Construction technique for hoisting steel made coal hopper on-site | |
CN105926549A (en) | Transportation construction method for in-tunnel pressure steel tube | |
CN112728209A (en) | Construction method for communicating new pipe and old pipe in non-excavation mode | |
CN202913431U (en) | Immersed tube bottom end jack type deviation-rectifying accurate adjustment system | |
CN102704508B (en) | Immersed tube bottom end fork truck type deviation correcting fine adjusting system and regulating process of system | |
CN215371539U (en) | Large buried water supply pipeline inspection drainage device | |
CN201490602U (en) | Transformer overhauling and lifting device | |
Li et al. | Earthquake damage and countermeasure of industrial lifeline and equipment | |
CN213542087U (en) | Valve well of oil filling pipeline of civil transportation airport apron | |
CN101826389B (en) | Rectification transformer in-situ trouble-shooting hoisting device and trouble-shooting method | |
CN216075437U (en) | Intelligent air valve well of ultra-deep sewage pressure pipeline |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190222 |