CN106996483B - A kind of city integrated piping lane pipe sedimentation automatic control support - Google Patents

A kind of city integrated piping lane pipe sedimentation automatic control support Download PDF

Info

Publication number
CN106996483B
CN106996483B CN201710214591.6A CN201710214591A CN106996483B CN 106996483 B CN106996483 B CN 106996483B CN 201710214591 A CN201710214591 A CN 201710214591A CN 106996483 B CN106996483 B CN 106996483B
Authority
CN
China
Prior art keywords
elevator
pipeline
bracket
bearing
bearing plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201710214591.6A
Other languages
Chinese (zh)
Other versions
CN106996483A (en
Inventor
丁勇
周凯笛
张昊
龚燚
刘康康
蔡武达
杨叶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing University of Science and Technology
Original Assignee
Nanjing University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing University of Science and Technology filed Critical Nanjing University of Science and Technology
Priority to CN201710214591.6A priority Critical patent/CN106996483B/en
Publication of CN106996483A publication Critical patent/CN106996483A/en
Application granted granted Critical
Publication of CN106996483B publication Critical patent/CN106996483B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L3/00Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
    • F16L3/16Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets with special provision allowing movement of the pipe
    • F16L3/20Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets with special provision allowing movement of the pipe allowing movement in transverse direction
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/10Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Pipeline Systems (AREA)

Abstract

The invention discloses a kind of city integrated piping lane pipe sedimentations to automatically control support, including elevator, elevator bracket, bearing plate placing device, bearing plate, bearing foundation and pressure sensor, the support by using pressure sensor monitoring support base pressure method, judge the sedimentation situation between each support of pipeline, Pipeline lift or the reduction at position will be settled by the elevator of automatic control, and pressure-bearing steel plate is inserted under lifting bracket using steel plate placing device and undertakes pressure, to achieve the purpose that change the position pipe support height, it prevents and causes pipe stress collection caused by pipe sedimentation to neutralize breakoff phenomenon because of piping lane sedimentation.The present invention can be realized full automation, round-the-clock running, it is rapid for burst sedimentation event response, ratio of precision manual operation is higher in terms of settlement Control, can not only save labour expenses, also can be reduced because personnel often pass in and out pipe gallery bring security risk.

Description

A kind of city integrated piping lane pipe sedimentation automatic control support
Technical field
The invention belongs to field of civil engineering, and in particular to a kind of city integrated piping lane pipe sedimentation automatic control branch Seat.
Background technique
City integrated piping lane is exactly the comprehensive corridor of underground urban duct.A tunnel space is built in Urban Underground, it will Electric power, communication, the various utilities pipelines such as combustion gas, heat supply, plumbing are integrated in one, and are equipped with special access hole, hoisting port and prison Examining system implements unified planning, Uniting, unification construction and management, is important infrastructure and the " life for ensureing city operations Order line ".
Tap water, coal gas, electric power, the communication line for maintaining city function are not only incorporated inside city integrated piping lane, and And the equipment such as piping lane itself function power, illumination, draining for using are various, any pipeline breaks down or leakage, has Other equipment along the line may be impacted, or even cause the serious consequences such as leak electricity, pour water, explode, the sedimentation of pipeline is to occur The big key factor of the one of Pipeline damage, therefore the pipe sedimentation control in city integrated piping lane is significant.
The method that the settlement Control of pipeline mostly uses personal monitoring at this stage, by pipeline be fixedly mounted directly or No-touching-pipeline monitoring point, survey crew periodically use the equipment such as theodolite or total station to carry out the measurement of higher degree to each monitoring point, obtain Settling data, engineering staff are handled the pipeline in the region near differential settlement point according to obtained data, Hand excavation's pipeline foundation reduces its height suitably, or backfills pipeline after lifting pipeline using equipment such as hydraulic jacks Basis properly increases pipeline foundation height, and this method is time-consuming, disturbs to pipeline big, and the degree of automation is low, for it is long away from It is big from pipeline manual correction error, be not suitable for promoting the use of.
Summary of the invention
The purpose of the present invention is to provide a kind of city integrated piping lane pipe sedimentations to automatically control support, prevents piping lane heavy It drops bring pipe stress collection and neutralizes destruction.
Realize the technical solution of the object of the invention are as follows: a kind of city integrated piping lane pipe sedimentation automatic control support, packet Include elevator, elevator bracket, bearing plate placing device, bearing plate, bearing foundation and pressure sensor;
Pipeline is arranged on elevator bracket, and bearing plate and bearing foundation is arranged in elevator bracket separately below, for branch The weight in stay tube road and elevator bracket;
The pressure sensor is mounted on bearing foundation or elevator bracket base, for directly monitoring bearing foundation or mentioning The base pressure for rising machine bracket, obtains the base pressure of pipeline;
When pressure sensor monitoring to pressure value is lower than normal value, elevator recommends elevator bracket, bearing plate automatically Bearing plate is placed to below elevator bracket by placing device, and power is recommended in elevator release, by the Gravitative Loads of pipeline in pressure-bearing On plate;
When pressure sensor monitoring to pressure value is higher than normal value, power, bearing plate placing device are recommended in elevator effect The bearing plate placed is extracted out, power is recommended in elevator release, and pipeline is placed on bearing plate.
Compared with prior art, the present invention its remarkable advantage are as follows:
(1) present invention is directed to the demand of Practical Project, devises a kind of city integrated piping lane and is automatically controlled with pipe sedimentation Support can prevent piping lane from settling bring pipe stress according to the differential pressure value of pipe support, adjust automatically height of support Collection, which neutralizes, to be destroyed;
(2) present invention can be realized full automation, round-the-clock running, rapid for burst sedimentation event response, heavy The attainable ratio of precision manual operation of drop control aspect is higher, can not only save labour expenses, on the other hand also can be reduced because Personnel often pass in and out pipe gallery bring security risk.
Detailed description of the invention
Fig. 1 is that the city integrated piping lane pipe sedimentation automatic control support of the present invention uses schematic diagram.
Specific embodiment
In conjunction with Fig. 1, a kind of city integrated piping lane pipe sedimentation automatic control support, including elevator 102, elevator support Frame 103, bearing plate placing device 104, bearing plate 105, bearing foundation 106 and pressure sensor 107;
Pipeline 101 is arranged on elevator bracket 103, and bearing plate 105 and pressure-bearing is arranged in elevator bracket 103 separately below Basis 106, is used to support the weight of pipeline 101 and elevator bracket 103;
The pressure sensor 107 is mounted on 103 bottom of bearing foundation 106 or elevator bracket, holds for directly monitoring The base pressure of pressure basis 106 or elevator bracket 103, obtains the base pressure of pipeline 101;
When pressure sensor 107 monitors pressure value lower than normal value, elevator 102 recommends elevator bracket automatically 103,104 automatic running of bearing plate placing device, is placed to 103 lower section of elevator bracket, elevator for bearing plate 105 at this time Power is recommended in 102 releases, by the Gravitative Loads of pipeline 101 on bearing plate 105;
When pressure sensor 107 monitors that pressure value is higher than normal value, power is recommended in the effect of elevator 102, at this time pressure-bearing 104 automatic running of plate placing device extracts the bearing plate 105 placed out, and power is recommended in the release of elevator 102, by pipeline 101 are placed on bearing plate 105.
Further, the bearing plate 105 is steel plate.
Further, the elevator 102 uses hydraulic hoisting machine.
Further, the elevator bracket 103 uses L bracket, and bottom is provided with arc with what pipeline 101 contacted on one side Connected in star, for placing pipeline 101.
Further, the bearing foundation 106 uses Extended chemotherapy form.
Further, the bearing plate placing device 104 includes motor, controller, plate putting machine and deposits plate storehouse, is controlled Device is for controlling motor, and motor is for driving plate putting machine that bearing plate 105 is placed to promotion from depositing to grab in plate storehouse 103 lower section of machine bracket, or the bearing plate 105 of 103 lower section of elevator bracket is grabbed and deposits plate storehouse.
Present invention is further described in detail for specific embodiments and the drawings below.
Embodiment
It includes elevator 102, elevator bracket 103, steel plate placement dress that the pipe sedimentation of the present embodiment, which automatically controls support, Set 104, pressure-bearing steel plate 105, bearing foundation 106 and the pressure sensor 107 for being mounted on bearing foundation bottom.
Pipeline 101 is carried on elevator bracket 103, and elevator bracket 103 has pressure-bearing steel plate 105 and pressure-bearing separately below Basis 106, is used to support the weight of pipeline 101 and elevator bracket 103.
106 bottom of bearing foundation is installed by pressure sensor 107, the pressure carried for monitoring bearing foundation 106.Pressure Sensor 107 can monitor the base pressure of pipeline 101 indirectly.
When the pressure sensor 107 of 106 bottom of bearing foundation monitors pressure value lower than normal value, 102 meeting of elevator Automatically elevator bracket 103 is recommended, at this time 104 automatic running of steel plate placing device, pressure-bearing steel plate 105 is placed to elevator support 103 lower section of frame, power is recommended in the release of elevator 102, by the Gravitative Loads of pipeline 101 on pressure-bearing steel plate 105.
Likewise, being promoted when the pressure sensor 107 of 106 bottom of bearing foundation monitors that pressure value is higher than normal value Power is recommended in the effect of machine 102, and 104 automatic running of steel plate placing device, the pressure-bearing steel plate 105 placed is extracted out, is mentioned at this time Power is recommended in machine 102 release of liter, and pipeline 101 is placed on pressure-bearing steel plate 105.
Basic principles and main features of the invention have been shown and described above.It should be understood by those skilled in the art that The present invention is not limited to the above embodiments, and the above embodiments and description only illustrate the principle of the present invention, Without departing from the spirit and scope, various changes and improvements may be made to the invention, these changes and improvements are all fallen Enter in scope of the claimed invention.The scope of the present invention is defined by the appended claims and its equivalents.

Claims (6)

1. a kind of city integrated piping lane automatically controls support with pipe sedimentation, which is characterized in that including elevator (102), promoted Machine bracket (103), bearing plate placing device (104), bearing plate (105), bearing foundation (106) and pressure sensor (107);
Pipeline (101) be arranged on elevator bracket (103), elevator bracket (103) be arranged separately below bearing plate (105) and Bearing foundation (106) is used to support the weight of pipeline (101) and elevator bracket (103);
The pressure sensor (107) is mounted on bearing foundation (106) or elevator bracket (103) bottom, for directly monitoring The base pressure of bearing foundation (106) or elevator bracket (103), obtains the base pressure of pipeline (101);
When pressure sensor (107) monitors pressure value lower than normal value, elevator (102) recommends elevator bracket automatically (103), one piece of new bearing plate (105) is placed to below elevator bracket (103) by bearing plate placing device (104), is promoted Power is recommended in machine (102) release, by the Gravitative Loads of pipeline (101) on bearing plate (105);
When pressure sensor (107) monitors that pressure value is higher than normal value, power, bearing plate peace are recommended in elevator (102) effect It puts device (104) to extract one piece of bearing plate (105) of the top layer placed out, power is recommended in elevator (102) release, will Pipeline (101) is placed on remaining bearing plate (105).
2. city integrated piping lane according to claim 1 automatically controls support with pipe sedimentation, which is characterized in that described to hold Pressing plate (105) is steel plate.
3. city integrated piping lane according to claim 1 automatically controls support with pipe sedimentation, which is characterized in that described to mention It rises machine (102) and uses hydraulic hoisting machine.
4. city integrated piping lane according to claim 1 automatically controls support with pipe sedimentation, which is characterized in that described to mention It rises machine bracket (103) and uses L bracket, bottom is provided with arc groove with what pipeline (101) contacted on one side, for placing pipeline (101)。
5. city integrated piping lane according to claim 1 automatically controls support with pipe sedimentation, which is characterized in that described to hold Basic (106) are pressed to use Extended chemotherapy form.
6. city integrated piping lane according to claim 1 automatically controls support with pipe sedimentation, which is characterized in that described to hold Pressing plate placing device (104) includes motor, controller, plate putting machine and deposits plate storehouse, and controller is electronic for controlling motor Machine is placed under elevator bracket (103) for driving plate putting machine to crawl out bearing plate (105) from depositing in plate storehouse Side, or the bearing plate (105) below elevator bracket (103) is grabbed and deposits plate storehouse.
CN201710214591.6A 2017-04-01 2017-04-01 A kind of city integrated piping lane pipe sedimentation automatic control support Expired - Fee Related CN106996483B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710214591.6A CN106996483B (en) 2017-04-01 2017-04-01 A kind of city integrated piping lane pipe sedimentation automatic control support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710214591.6A CN106996483B (en) 2017-04-01 2017-04-01 A kind of city integrated piping lane pipe sedimentation automatic control support

Publications (2)

Publication Number Publication Date
CN106996483A CN106996483A (en) 2017-08-01
CN106996483B true CN106996483B (en) 2019-05-07

Family

ID=59435718

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710214591.6A Expired - Fee Related CN106996483B (en) 2017-04-01 2017-04-01 A kind of city integrated piping lane pipe sedimentation automatic control support

Country Status (1)

Country Link
CN (1) CN106996483B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110424448B (en) * 2019-08-06 2021-04-09 重庆交通大学 Sedimentation monitoring compensation system and method for underground conveying pipeline
CN115095711A (en) * 2022-06-21 2022-09-23 广东易力建安工程有限公司 Construction method of double-anticorrosion plastic-coated composite pipe
CN115467367B (en) * 2022-08-17 2023-06-16 湖北工业大学 Construction method for actively compensating deformation of underpass operation tunnel in upper engineering construction

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150345711A1 (en) * 2014-05-29 2015-12-03 Charles Shepherd Surge-Based Flow Isolation System
CN104595728B (en) * 2015-01-25 2017-11-07 上海市政工程设计研究总院(集团)有限公司 The warning monitoring system and its method of work of a kind of underground piping interface seepage
KR101663490B1 (en) * 2015-04-29 2016-10-07 (주)한국플랜트관리 Remote Monitoring System for sealing leakage of industrial Ball valve
CN105333233A (en) * 2015-12-13 2016-02-17 青岛集圣特机械制造有限公司 Vehicle cable supporting frame capable of measuring pressure

Also Published As

Publication number Publication date
CN106996483A (en) 2017-08-01

Similar Documents

Publication Publication Date Title
CN106996483B (en) A kind of city integrated piping lane pipe sedimentation automatic control support
CN107460888B (en) Mounting structure and method for concrete prefabricated pipe gallery
CN103123016B (en) Construction method for laying gas pipelines along bridge
CN205576972U (en) Three storehouse formula utility tunnel structures
CN104776268B (en) Mechanical construction method for mounting large-caliber reinforced concrete drainage pipe
CN103485410B (en) Installation and construction method for super-large-diameter reinforced concrete rebated pipe
CN105806311A (en) Optical fiber slope dam displacement settlement monitoring system
CN109026032B (en) Lower shield translation construction method for limit invasion of downward-turning beam
CN208153001U (en) The long-range control more accurate quantitative filling devices of pit shaft desulfurizing agent of well group
CN106869173B (en) A kind of pipe sedimentation for city integrated piping lane corrects support automatically
CN102704512B (en) Immersed tube bottom jack type deviation rectifying fine adjusting system and adjusting technology
CN210423954U (en) Movable lifting hook for hoisting pipeline in pipe gallery
CN104949140B (en) The spiral deslagging device of station boiler and installation method
CN105926549A (en) Transportation construction method for in-tunnel pressure steel tube
CN202913431U (en) Immersed tube bottom end jack type deviation-rectifying accurate adjustment system
CN105804087A (en) Installation method for steel structure below large deep foundation pit supporting beam
CN206737106U (en) Prefabricated pumping plant Lift-on/Lift-off System
CN204002926U (en) A kind of pipe gallery electric power storehouse installation of electrical equipment panel
CN201490602U (en) Transformer overhauling and lifting device
CN205577015U (en) Motor -pumped well pressurizing equipment
CN213542087U (en) Valve well of oil filling pipeline of civil transportation airport apron
CN104878777B (en) The pipeline connecting box of civilian infrastructure pipeline temporary construction and construction method
CN101826389B (en) Rectification transformer in-situ trouble-shooting hoisting device and trouble-shooting method
CN205663021U (en) Adjustable combination formula flood control water pump mounting platform
CN211008471U (en) Oil-well rig counter weight base

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190507