CN106853954B - A kind of installation method for tower Storage Tank - Google Patents

A kind of installation method for tower Storage Tank Download PDF

Info

Publication number
CN106853954B
CN106853954B CN201510894001.XA CN201510894001A CN106853954B CN 106853954 B CN106853954 B CN 106853954B CN 201510894001 A CN201510894001 A CN 201510894001A CN 106853954 B CN106853954 B CN 106853954B
Authority
CN
China
Prior art keywords
tubular section
storage tank
section
pillar stand
welded
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510894001.XA
Other languages
Chinese (zh)
Other versions
CN106853954A (en
Inventor
张军岭
杨建峰
范清厚
谭亨达
宋丽君
刘润清
石建平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Second Metallurgy Group Co Ltd
Original Assignee
China Second Metallurgy Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Second Metallurgy Group Co Ltd filed Critical China Second Metallurgy Group Co Ltd
Priority to CN201510894001.XA priority Critical patent/CN106853954B/en
Publication of CN106853954A publication Critical patent/CN106853954A/en
Application granted granted Critical
Publication of CN106853954B publication Critical patent/CN106853954B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The present invention relates to a kind of installation methods for tower Storage Tank, it is characterized in that: the tank body of tower Storage Tank is divided into upper tubular section, middle part pipeline section, lower tubular section, lower tubular section is welded on bottom plate first, the setting support hoisting platform in tower Storage Tank lower body part, support hoisting platform is made of lower pillar stand, platform platen, upper pillar stand, upper supporting beam, installs a jack in every upper pillar stand top outer;In floor manufacture upper tubular section, upper tubular section is sling vertically with crane, is sitting on tower Storage Tank lower body part;Middle part pipeline section is divided into three to four blocks of arc surface coaming plates;Worker station works on platform platen, is lifted upper tubular section with jack, slings the coaming plate of middle part pipeline section one by one with crane and is welded to connect with lower tubular section, and upper tubular section and middle part pipeline section are welded to connect.Its advantage is that: it is good using support hoisting platform progress operational stability, not by time restriction;The danger that high altitude operation is brought can effectively be solved.

Description

A kind of installation method for tower Storage Tank
Technical field
The present invention relates to a kind of installation methods for tower Storage Tank, belong to metallurgical machinery equipment installation field.
Background technique
In metallurgical machinery installing engineering project, some tall and big tower Storage Tanks can not crane installed, give engineering peace Inconvenience and puzzlement are brought in dress.Such as: tower Storage Tank, tank body steel plate thickness 30mm diameter 5m, the large tank of height 80m Body, can gradually increase because of tank body can bring difficulty to installation in an installation.Have the following problems: mounting condition restricts: (1) tank After gradually increasing, truck crane principal arm and the radius of gyration limit and increase once again body.If lifted with large automobile crane, when with vehicle Between it is long, it is costly.(2) while tower Storage Tank gradually increases, the interface of system is also being gradually increased, is also implying that high-altitude is made The height of industry is increasing, and increases the risk factors such as high altitude operation personnel, also increases additional workload.
Summary of the invention
The purpose of the present invention is to solve high altitude operation, general-utility cars to hang the problems such as principal arm is not high enough, provides a kind of use In the installation method of tower Storage Tank.
Technical scheme is as follows:
The tank body of tower Storage Tank is divided into three upper tubular section, middle part pipeline section and lower tubular section parts, lower tubular section height It is 2.5 meters, is made of arc surface coaming plate, tower Storage Tank lower body part is installed first, lower tubular section is welded on bottom plate, in tower Setting support hoisting platform, supports hoisting platform by lower pillar stand, platform platen, upper pillar stand, upper support in formula Storage Tank lower body part Beam is constituted, and lower pillar stand is arranged on bottom plate by circumference is equally spaced, is welded and fixed with bottom plate, and platform platen is fixed on lower pillar stand On, platform platen is no less than nine upper pillar stands by the equally spaced setting of circumference on platform platen, upper pillar stand is long away from 2 meters of bottom plate Degree is 3-3.5 meters, and upper supporting beam is fixed at the top of upper pillar stand, installs a jack in every upper pillar stand top outer;On ground Upper tubular section is made, and the length of upper tubular section is 3-3.5 meters, upper tubular section is sling vertically with small crane, crosses upper pillar stand Top covers upper pillar stand in upper tubular section, and finally upper tubular section is sitting on tower Storage Tank lower body part;The length of middle part pipeline section Degree is that the design height of tower Storage Tank subtracts the length that upper tubular section adds lower tubular section, and middle part pipeline section is divided into three to four pieces of circular arcs Face coaming plate, coaming plate are completed in floor manufacture;Worker station works on platform platen, with no less than nine jacks simultaneously from top Upper tubular section is lifted in the lower part of pipeline section, then slings the coaming plate of middle part pipeline section one by one with small crane and welds with lower tubular section Connection, and each coaming plate of middle part pipeline section is welded together;The upper tubular section lifted is fallen on the middle part pipeline section being welded, it will Upper tubular section and middle part pipeline section are welded to connect, and finally remove the intracorporal support hoisting platform of tower Storage Tank tank made.
The invention has the advantages that being fixed on the intracorporal support hoisting platform of tower Storage Tank tank using one 2m height of production It is good to carry out operational stability, not by time restriction;The method can effectively solve the danger that high altitude operation is brought.
Detailed description of the invention
Fig. 1 is tower Storage Tank scheme of installation of the invention.
Specific embodiment
Referring to attached drawing, the tank body of tower Storage Tank is divided into 4 three upper tubular section 11, middle part pipeline section 6 and lower tubular section portions Point, lower tubular section height is 2.5 meters, is made of arc surface coaming plate, installs tower Storage Tank lower body part first, lower tubular section is welded It connects on bottom plate 1, setting support hoisting platform, supports hoisting platform by lower pillar stand 2, platform platform in tower Storage Tank lower body part Plate 3, upper pillar stand 7, upper supporting beam 10 are constituted, and lower pillar stand is arranged on bottom plate by circumference is equally spaced, is welded and fixed with bottom plate, are put down Platform platen is fixed on lower pillar stand, and platform platen is away from 2 meters of bottom plate, by the equally spaced setting of circumference no less than nine on platform platen Root upper pillar stand, upper pillar stand length are 3-3.5 meters, cross the center of circle in the circumference that more upper supporting beams are linked to be at the top of each upper pillar stand It intersects, every upper one end of supporting beam is fixed with a upper pillar stand, fixes one in every upper pillar stand top outer Lifting lug 8, the jack 9 of one ten tons of connection on each lifting lug;In floor manufacture upper tubular section, the length of upper tubular section is 3-3.5 Rice, is sling upper tubular section with small crane vertically, crosses at the top of upper pillar stand, upper pillar stand is covered in upper tubular section, finally will Upper tubular section is sitting on tower Storage Tank lower body part;The length of middle part pipeline section is that the design height of tower Storage Tank subtracts upper tubular section Middle part pipeline section is divided into three to four blocks of arc surface coaming plates by the length for adding lower tubular section, and coaming plate is completed in floor manufacture;Worker station exists It works on platform platen, the equally spaced interim lifting lug 5 of fixation on the same circumference of the lower inner wall of upper tubular section, with no less than Nine jacks hook corresponding interim lifting lug simultaneously, lift upper tubular section from the lower part of upper tubular section, then use small hoist The coaming plate of middle part pipeline section is sling one by one and is welded to connect with lower tubular section by vehicle, and each coaming plate of middle part pipeline section is welded together; The upper tubular section lifted is fallen on the middle part pipeline section being welded, upper tubular section and middle part pipeline section are welded to connect, in welding The connecting sewing and be welded to connect upper tubular section and middle part pipeline section that pipeline section each coaming plate in portion's is asked, worker is by branch on platform platen Ladder welded;Finally remove the intracorporal support hoisting platform of tower Storage Tank tank and interim lifting lug made.

Claims (1)

1. a kind of installation method for tower Storage Tank, it is characterized in that: the tank body of tower Storage Tank is divided into upper tubular section, central tube Section and three parts of lower tubular section, lower tubular section height are 2.5 meters, are made of, install under tower Storage Tank first arc surface coaming plate Lower tubular section is welded on bottom plate by body portion, the setting support hoisting platform in tower Storage Tank lower body part, and support lifting is flat Platform is made of lower pillar stand, platform platen, upper pillar stand, upper supporting beam, and lower pillar stand is arranged on bottom plate by circumference is equally spaced, the bottom of with Plate is welded and fixed, and platform platen is fixed on lower pillar stand, and platform platen is away from 2 meters of bottom plate, on platform platen at equal intervals by circumference Setting be no less than nine upper pillar stands, upper pillar stand length is 3-3.5 meter, and upper supporting beam is fixed on upper pillar stand top, on every Column top outer installs a jack;In floor manufacture upper tubular section, the length of upper tubular section is 3-3.5 meters, uses small hoist Vehicle slings upper tubular section vertically, crosses at the top of upper pillar stand, upper pillar stand is covered in upper tubular section, is finally sitting in upper tubular section On tower Storage Tank lower body part;The length of middle part pipeline section subtracts upper tubular section for the design height of tower Storage Tank and adds lower tubular section Middle part pipeline section is divided into three to four blocks of arc surface coaming plates by length, and coaming plate is completed in floor manufacture;Worker station work on platform platen Make, from the lower part of upper tubular section lifted upper tubular section simultaneously with no less than nine jacks, then with small crane by middle part The coaming plate of pipeline section is sling one by one to be welded to connect with lower tubular section, and each coaming plate of middle part pipeline section is welded together;By what is lifted Upper tubular section is fallen on the middle part pipeline section being welded, and upper tubular section and middle part pipeline section are welded to connect, and finally dismounting is made The tower intracorporal support hoisting platform of Storage Tank tank.
CN201510894001.XA 2015-12-08 2015-12-08 A kind of installation method for tower Storage Tank Active CN106853954B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510894001.XA CN106853954B (en) 2015-12-08 2015-12-08 A kind of installation method for tower Storage Tank

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510894001.XA CN106853954B (en) 2015-12-08 2015-12-08 A kind of installation method for tower Storage Tank

Publications (2)

Publication Number Publication Date
CN106853954A CN106853954A (en) 2017-06-16
CN106853954B true CN106853954B (en) 2018-12-04

Family

ID=59131895

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510894001.XA Active CN106853954B (en) 2015-12-08 2015-12-08 A kind of installation method for tower Storage Tank

Country Status (1)

Country Link
CN (1) CN106853954B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002038718A (en) * 2000-07-31 2002-02-06 Ishikawajima Harima Heavy Ind Co Ltd Building with lifting-lowering stair and building lifting- lowering stair and its constructing method
CN102720386A (en) * 2011-12-31 2012-10-10 青岛安装建设股份有限公司 Inversing method of inner side clustering hoop of vertical storage tank
CN103924811A (en) * 2014-05-04 2014-07-16 葛洲坝集团第一工程有限公司 Method for manufacturing large cylindrical material storing tank
CN104627330A (en) * 2014-12-31 2015-05-20 中建一局集团安装工程有限公司 Oversize storage tank construction platform system and forward-erection construction method thereof

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002038718A (en) * 2000-07-31 2002-02-06 Ishikawajima Harima Heavy Ind Co Ltd Building with lifting-lowering stair and building lifting- lowering stair and its constructing method
CN102720386A (en) * 2011-12-31 2012-10-10 青岛安装建设股份有限公司 Inversing method of inner side clustering hoop of vertical storage tank
CN103924811A (en) * 2014-05-04 2014-07-16 葛洲坝集团第一工程有限公司 Method for manufacturing large cylindrical material storing tank
CN104627330A (en) * 2014-12-31 2015-05-20 中建一局集团安装工程有限公司 Oversize storage tank construction platform system and forward-erection construction method thereof

Also Published As

Publication number Publication date
CN106853954A (en) 2017-06-16

Similar Documents

Publication Publication Date Title
CN202785258U (en) Hoisting device for air overturn of large-sized steel column
CN105438960B (en) A kind of hanging method using U-shaped movable hood type hanger erection tower kind equipment
CN106927353A (en) LNG storage tank tank inner tube pipe fitting method
CN105692468A (en) Large latticed shell type arch crown integral elevation hoisting mechanism and using method thereof
CN202591864U (en) Lifting type welding service trolley
CN201703776U (en) Inverted lifting device of storage tank
CN206126750U (en) System is maintained to frame chassis , portable platform truck and steel pipe inclined shaft
CN106853954B (en) A kind of installation method for tower Storage Tank
CN202963332U (en) Device for manufacturing pile foundation reinforcement cage by using simple portal frame
CN110273039A (en) A kind of blast furnace bustle pipe hoisting structure and its installation method
CN103486330B (en) Either inside high-altitude pipeline mounting construction method
CN109110638A (en) Blast furnace overhaul lifting furnace shells tool
CN203486787U (en) Integral lifting device for cabinet top of Wiggins coal gas cabinet
CN204751999U (en) A remove portal frame that is used for CNG air entrainment three jars of relief valve dismouting at female station to detect
CN103541574B (en) Steel-making diffusing tower installation construction in narrow regions
CN201580924U (en) Safety protector for body of tower hoist
CN211496566U (en) Ring type balance beam for replacing high-altitude vertical equipment
CN204609267U (en) A kind of suspension bracket for tank inside construction
CN209536831U (en) A kind of Lift-on/Lift-off System
CN207737870U (en) A kind of large-scale storage tank fliping lifting device
CN216190378U (en) C-shaped lifting hook for lifting wind power tower cylinder
CN105154616A (en) Method for mounting suspended ball joint converter
CN108910728A (en) Hanging apparatus and Lift-on/Lift-off System
CN213950309U (en) Eight-claw special lifting appliance for hydropower station stator maintenance platform
CN201386114Y (en) Sulky derrick for hoisting

Legal Events

Date Code Title Description
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant