CN106927353A - LNG storage tank tank inner tube pipe fitting method - Google Patents

LNG storage tank tank inner tube pipe fitting method Download PDF

Info

Publication number
CN106927353A
CN106927353A CN201710248405.0A CN201710248405A CN106927353A CN 106927353 A CN106927353 A CN 106927353A CN 201710248405 A CN201710248405 A CN 201710248405A CN 106927353 A CN106927353 A CN 106927353A
Authority
CN
China
Prior art keywords
tank
interior conduit
pulley
tank interior
lng storage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710248405.0A
Other languages
Chinese (zh)
Other versions
CN106927353B (en
Inventor
张鹏
郭鹏亮
林乐忠
徐树凯
王当当
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Nuclear Industry Fifth Construction Co Ltd
Original Assignee
China Nuclear Industry Fifth Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Nuclear Industry Fifth Construction Co Ltd filed Critical China Nuclear Industry Fifth Construction Co Ltd
Priority to CN201710248405.0A priority Critical patent/CN106927353B/en
Publication of CN106927353A publication Critical patent/CN106927353A/en
Application granted granted Critical
Publication of CN106927353B publication Critical patent/CN106927353B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/12Slings comprising chains, wires, ropes, or bands; Nets
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66DCAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
    • B66D1/00Rope, cable, or chain winding mechanisms; Capstans
    • B66D1/02Driving gear
    • B66D1/14Power transmissions between power sources and drums or barrels
    • B66D1/20Chain, belt, or friction drives, e.g. incorporating sheaves of fixed or variable ratio

Abstract

The invention belongs to LNG storage tank construction field, and in particular to a kind of LNG storage tank tank inner tube pipe fitting method.During in order to solve LNG storage tank tank interior conduit to be lifted using prior art, there is a problem of that the engineering time is long, construction cost is high and work high above the ground risk, the invention discloses a kind of LNG storage tank tank inner tube pipe fitting method.The LNG storage tank tank inner tube pipe fitting method, being included in tank inside carries out prefabricated, installation and arrangement to hanging device, and the lifting by hoist engine to tank interior conduit to tank interior conduit.By using LNG storage tank tank inner tube pipe fitting method of the invention, can not only avoid carrying out the risk of height lifting operation outside storage tank, improve the security of hoisting process, and by that can realize in tank inside lifting the once completion of tank interior conduit to the arrangement of hanging device, so as to reduce the lifting time, lifting construction cost is reduced.

Description

LNG storage tank tank inner tube pipe fitting method
Technical field
The invention belongs to LNG storage tank construction field, and in particular to a kind of LNG storage tank tank inner tube pipe fitting method.
Background technology
During the installation of all LNG storage tanks, can all be related to the installation for tank inside pipeline, such as pin Installation to feed tube, pump line and various gauge pipes.With 160,000 m3LNG storage tank as a example by, the inner canister diameter of storage tank is about 80 meters, tank inner bottom plating is about more than 40 meters apart from the height of abhiseca, and wherein bottom liquid inlet pipe and pump line are erected in storage tank Portion, and the outside of abhiseca is vertically extended to by tank inner bottom plating, the length of such bottom liquid inlet pipe and pump line is general 40 Rice or so.
At present, the installation for tank inside pipeline typically completes to install in the interior tank shell and storage tank dome of storage tank Afterwards, the sleeve pipe by large-scale crane by tank interior conduit from dome outside tank by lifting to tank, then completes the peace to tank interior conduit Fill and fixed.This method lifted by crane, the inside and outside workmen of storage tank is not required nothing more than, and there is hight coordinate to match somebody with somebody Conjunction ability, and during the high-altitude that pipeline is hung to more than 40 meters by large-scale crane is put into tank inside afterwards again, exist Very big work high above the ground risk.Wherein, to 160,000 m3When the feed tube of LNG storage tank is lifted, due to being to enter out of doors Row operation, and lifting operation radius is big, and hoisting height is high, therefore the usual crane from a 300T carries out lifting operation, Just can guarantee that the safety and stability of whole hoisting process.Further, since the length of bottom liquid inlet pipe and pump line is on 40 meters of left sides The right side, and the gross weight of bottom liquid inlet pipe reaches 14T or so, therefore cannot once be completed to bottom liquid inlet pipe in installation process Lifting, it is necessary to pipeline is segmented repeatedly come and go lifting, pipeline is carried out in layer again in tank inside then Stacking welding.The engineering time is so not only considerably increased, and extends the use time to large-scale crane, and then increased The construction cost of Pipe installing.
The content of the invention
During in order to solve to install the tank interior conduit of LNG storage tank using prior art, exist the engineering time it is long, construction The problem of high cost and work high above the ground risk, the present invention proposes a kind of LNG storage tank tank inner tube pipe fitting method.The LNG is stored up Tank tank inner tube pipe fitting method, comprises the following steps:
Step S1, prefabricated tanks interior conduit;Tank interior conduit is carried out in tank inside it is prefabricated, and in the upper of the tank interior conduit End sets at least two hangers, and the hanger is distributed on the outer surface of the tank interior conduit along the circumferencial direction of the tank interior conduit On;
Step S2, installs hanging device;The hanging device includes hoist engine, first pulley, second pulley and pulley Component;The hoist engine is located on tank inner bottom plating, and the first pulley is located at the connection position of the tank inner bottom plating and interior tank shell Put, the second pulley is located on the dome longeron of the interior tank shell, the pulley assembly is located at and the tank inner tube On the dome longeron of road correspondence sleeve pipe both sides;The rope that the hoist engine stretches out by extending to institute successively after the first pulley State second pulley and the pulley assembly;By the hoist engine to the retractable operation of the rope, the pulley assembly is controlled In pulley carry out raising and lowering;
Step S3, lifts tank interior conduit;The rope is dropped to by the tank inner bottom plating by the pulley assembly first Near, and be fixedly connected with the hanger of the tank interior conduit upper end;Then start hoist engine and reclaim rope, by the tank Pipeline lift is to vertical state;Finally position is carried out to the tank interior conduit to fix.
Preferably, in the step S1, the lower end position of the tank interior conduit is additionally provided with slipping tail hanger.
It is further preferred that the hanging device also includes crane, the crane is connected with the slipping tail hanger, aids in institute State lifting operation of the hoist engine completion to the tank interior conduit.
Preferably, in the step S2, the pulley assembly includes a movable pulley and two fixed pulleys, wherein described Movable pulley is provided with suspension hook;The dome longeron connection of two fixed pulleys sleeve pipe both sides corresponding with the tank interior conduit respectively, The movable pulley is located on the rope between two fixed pulleys, and perpendicular to the retractable operation edge of rope with the hoist engine Nogata is ramped up and declined.
It is further preferred that in the step S3, connected by steel wire rope between the hanger of the tank interior conduit upper end, It is connected with the suspension hook on the movable pulley again.
Preferably, the upper end of the tank interior conduit is provided with least two auxiliary hangers, the tank interior conduit correspondence sleeve pipe two The dome longeron of side is provided with least two guide chains;When the hoist engine lifts to vertical state the tank interior conduit, and carry It is raised to when near described sleeve pipe, the guide chain is connected with the auxiliary hanger, and the micro- of locus is carried out to the tank interior conduit Adjust.
It is further preferred that the upper end of the tank interior conduit is provided with four auxiliary hangers, the dome of described sleeve pipe both sides is indulged Beam is provided with two guide chains, two floor stringers is provided between the dome longeron of described sleeve pipe both sides, and set on each floor stringer There is a guide chain.
It is further preferred that the distance between described auxiliary hanger and upper end port of the tank interior conduit are more than the tank Interior conduit stretches into the length in described sleeve pipe.
Preferably, the position height of the first pulley is highly identical with the rope of the hoist engine.
Preferably, the second pulley is located at same vertical direction with the first pulley
Using LNG storage tank tank inner tube pipe fitting method of the invention, the pipeline in LNG storage tank is installed, with Lower beneficial effect:
1st, the present invention is to the lifting of tank interior conduit by that will operate in the prior art, by by large-scale crane outside storage tank The lifting operations improvement that repeatedly comes and goes being segmented is to carry out lifting once to tank interior conduit by hoist engine in tank inside Operation.So not only eliminate the upper air installing Job Operations carried out outside storage tank by large-scale crane, it is to avoid high-altitude work The security risk problem existed during industry, and operated by the lifting that hoist engine can once complete pipeline in tank inside, greatly Reduce the height of lifting operation and commander's difficulty of hoisting process and lifting time greatly, so as to improve lifting efficiency and The security of hoisting process.
2nd, in the present invention, include that two fixed pulleys and a pulley assembly for movable pulley enter to tank interior conduit by use Row lifting, makes the 1/3 of the active force only tank interior conduit gross weight that rope finally bears.So not only greatly reduce to lifting The intensity requirement of equipment, reduces the use cost of hanging device, and further ensures the peace of tank interior conduit hoisting process Full property and stability.
Brief description of the drawings
Fig. 1 is lifting schematic diagram when being installed to tank interior conduit using the method for the present invention;
Fig. 2 is the attachment structure schematic diagram in Fig. 1 between F directions pulley assembly and tank interior conduit.
Specific embodiment
The technical scheme in the present invention is described in detail below in conjunction with the accompanying drawings.
With reference to shown in Fig. 1 and Fig. 2, using LNG storage tank tank inner tube pipe fitting method of the invention, tank interior conduit is pacified What is filled concretely comprises the following steps:
Step S1, prefabricated tanks interior conduit.After the interior tank shell 11 to storage tank 1 and storage tank dome 12 complete to install, will All segmented conduits of tank interior conduit 2 are carried to the inside of storage tank 1.Prefabricated work is carried out to tank interior conduit 2 on tank inner bottom plating 13 Make, and the tank interior conduit 2 for completing prefabricated work is lain in a horizontal plane on tank inner bottom plating 13.So, by the ground to overlength Pipeline carries out prefabricated work, can reduce operation difficulty, the prefabricated efficiency and prefabricated precision of pipeline is improved, so as to ensure pipeline Prefabricated quality.Additionally, in the prefabrication process for carrying out tank interior conduit 2, setting at least two in the upper end position of tank interior conduit 2 and hanging Ear 21, and hanger 21 is distributed on the outer surface of tank interior conduit 2 along the circumferencial direction of tank interior conduit 2.In the present invention, in tank Two hangers 21 are fixed with the external peripheral surface of interior conduit 2 by way of welding, and two hangers 21 are located at tank inner tube The two ends of the same diameter in road 2.Equally, according to other tank interior conduits weight and the intensity from hanger, can be in tank inner tube The upper end circumferencial direction in road 2 sets more hangers 21, so as to reduce the active force that each hanger 21 bears, it is ensured that in tank The stability and security of the hoisting process of pipeline 2.
Step S2, installs hanging device.Hanging device includes hoist engine 31, first pulley 32, second pulley 33 and slides Wheel assembly 34.Wherein, hoist engine 31 is fixedly mounted on tank inner bottom plating 13, and first pulley 32 is located at tank inner bottom plating 13 and interior tank skin The link position of plate 11, second pulley 33 is located on the dome longeron of interior tank shell 11, and pulley assembly 34 is located at sleeve pipe 4 Lower position, and be fixedly connected with the dome longeron 121 of the both sides of sleeve pipe 4.Sleeve pipe 4 is one section of pipeline through dome 12, both may be used For wearing tank interior conduit 2, and tank interior conduit 2 is protected and position is fixed, such as it is corresponding with gauge pipe and pump line Sleeve pipe;Can be used for being docked with tank interior conduit 2, realize the connection outside tank interior conduit 2 and storage tank 1, such as with feed tube Corresponding sleeve pipe.
Preferably, in the present invention, hoist engine 31 is fixed in tank inner bottom plating 13 position for being close to interior tank shell 11, this Sample can reduce occupancy of the hoist engine 31 to the zone line of tank inner bottom plating 13, in order to have bigger space for prefabricated and placement Tank interior conduit 2.First pulley 32 is held within tank inner bottom plating 13 and the anchoring hanger of the link position of interior tank shell 11, and The height and position of first pulley 32 is in same level highly with the rope 311 that hoist engine 31 stretches out, and can so make hoist engine Rope 311 between 31 and first pulley 32 keeps horizontality.So, in hoisting process, can be subject to hoist engine 31 The pulling force of rope 311 is maintained at horizontality, it is ensured that the stabilization fixation of hoist engine 31.Second pulley 33 is located at first pulley 32 Surface, makes rope 311 between the two keep vertical state.
In the present invention, pulley assembly 34 includes two fixed pulleys 341 and a movable pulley 342, two of which fixed pulley 341 are separately fixed on the dome longeron 121 of the both sides of sleeve pipe 4, and movable pulley 342 is located at the rope 311 between two fixed pulleys 341 On.Along with the retractable operation of rope 311, movable pulley 342 vertically carries out raising and lowering.Additionally, in movable pulley 342 A suspension hook is provided with, is fixedly connected for the upper end to tank interior conduit 2.
The rope 311 that hoist engine 31 stretches out, it is horizontally extending first to first pulley 32, then pass around the first cunning Take turns 32 and the vertical direction along interior tank shell 11 extends to second pulley 33, then bypass second pulley 33 and extend to pulley assembly 34.In pulley assembly 34, rope 311 first passes around two fixed pulleys 341, is then fixedly connected with movable pulley 342, and will be dynamic On the rope that pulley 342 is placed between two fixed pulleys 341.So, tank interior conduit 2 is lifted by the pulley assembly 34 During lifting, it is only necessary to apply the active force of the about weight 1/3 of tank interior conduit 2 to rope 311, you can to realize to tank interior conduit 2 lifting operation, so as to substantially reduce the job requirement to hanging device, reduces construction cost.Wherein, to 160,000 m3LNG When the maximum bottom liquid inlet pipe of weight is lifted in storage tank, it is only necessary to can just be realized to bottom from a hoist engine of 5T The lifting operation of feed tube.
Step S3, lifts tank interior conduit.First, two hangers of the upper end position of tank interior conduit 2 will be located at by steel wire rope 21 are attached, and tie point is placed in the mouth of pipe position directly above of tank interior conduit 2.Then, hoist engine 31 is started, to rope 311 carry out release operation, and the movable pulley 342 that will be provided with suspension hook is dropped near tank inner bottom plating 13.Then, by movable pulley 342 Suspension hook be fixedly connected with the tie point position of steel wire rope, and be again started up hoist engine 31, recovery behaviour is carried out to rope 311 Make, drive movable pulley 342 to rise, and then tank interior conduit 2 is promoted to vertical state by horizontal positioned state, and by tank interior conduit 2 align with sleeve pipe 4.Finally, position is carried out to tank interior conduit 2 to fix.If feed tube, then by the end portion of feed tube with Tank inner bottom plating 13 carries out position and fixes.If other need the pipeline through sleeve pipe 4, such as gauge pipe, then by the upper of pipeline End part is welded and fixed with corresponding sleeve pipe 4.
Preferably, the lower end position in tank interior conduit 2 is additionally provided with slipping tail hanger 22.Now, in hoist engine 31 to tank inner tube Before road 2 is lifted, a truck crane 35 is opened into the inside into storage tank 1, and be attached with slipping tail hanger 22.Wherein, for 160000 m3The feed tube lifting operation of LNG storage tank, auxiliary lifting requirements can be just met from a truck crane of 25T.So, During carrying out being promoted to vertical state by horizontal positioned state to tank interior conduit 2 by hoist engine 31, by truck crane 35 pairs of lower ends of tank interior conduit 2 carry out service hoisting, so as to avoid tank interior conduit 2 from dawdling and collide with tank inner bottom plating 13. Meanwhile, angle is continually changing along with the position height of tank interior conduit 2 and between storage tank bottom plate 13, can also be by vapour Car hangs the real-time movement of 35 positions, and the change to the lower end position of tank interior conduit 2 is in time adjusted, it is to avoid tank interior conduit 2 is sent out The problem that life freely swings and collided with tank inside other equipment, so as to ensure tank interior conduit 2 in hoisting process Stability and security.
Additionally, when being installed to the tank interior conduit for needing to carry out position fixation with sleeve pipe using the method for the present invention. First, in the prefabrication process of tank interior conduit, at least two are set in the upper end position of tank interior conduit and aids in hanger.Wherein, it is auxiliary Distance is greater than the length that tank interior conduit stretches into sleeve pipe between helping the upper end port of hanger and tank interior conduit, in order to pass through guide chain The length that tank interior conduit stretches into inside pipe casing is controlled and adjusted.Meanwhile, set on the dome longeron near sleeve pipe to Few two chain slings.Then, after the lower position that tank interior conduit is promoted to sleeve pipe by hoist engine, guide chain is carried out with auxiliary hanger Connection, and remove the connection between pulley assembly and hanger.Then, lifting and the sky of height are carried out to tank interior conduit by guide chain Between position adjustment, make tank interior conduit keep vertical state and being alignd with the central axis of sleeve pipe.Finally, the auxiliary in guide chain is made Under, the position completed between tank interior conduit and sleeve pipe is fixed.Preferably, four auxiliary hangings are set in the upper end of tank interior conduit Ear, and four auxiliary hangers are uniform along the circumferencial direction of tank interior conduit.Meanwhile, two are set between the longeron of sleeve pipe both sides Floor stringer, a guide chain is respectively provided with two longerons and two floor stringers, the auxiliary hanger for connecting correspondence position.This Sample can be finely adjusted to the position of tank interior conduit and angle, it is ensured that tank interior conduit when tank interior conduit is fixedly connected with sleeve pipe The stabilization of position.
In addition, when being installed under different operating modes, the intensity of weight and hanging device according to tank interior conduit, for example The intensity of the tensile strength of rope and single hanger, can set buttress brace and to assembly pulley between the longeron of sleeve pipe both sides Pulley quantity and pulley combination mode in part carry out appropriate adjustment, so as to reduce the pulling force of rope, it is ensured that to tank inner tube The safety and stability of road installation process.

Claims (10)

1. a kind of LNG storage tank tank inner tube pipe fitting method, it is characterised in that the installation method is comprised the following steps:
Step S1, prefabricated tanks interior conduit;Tank interior conduit is carried out in tank inside prefabricated, and set in the upper end of the tank interior conduit At least two hangers are put, the hanger is distributed on the outer surface of the tank interior conduit along the circumferencial direction of the tank interior conduit;
Step S2, installs hanging device;The hanging device includes hoist engine, first pulley, second pulley and pulley assembly; The hoist engine is located on tank inner bottom plating, and the first pulley is located at the link position of the tank inner bottom plating and interior tank shell, institute State second pulley to be located on the dome longeron of the interior tank shell, the pulley assembly is located at corresponding with the tank interior conduit On the dome longeron of sleeve pipe both sides;The rope that the hoist engine stretches out by extending to described second successively after the first pulley Pulley and the pulley assembly;By the hoist engine to the retractable operation of the rope, the cunning in the pulley assembly is controlled Wheel carries out raising and lowering;
Step S3, lifts tank interior conduit;The rope is dropped near the tank inner bottom plating by the pulley assembly first, And be fixedly connected with the hanger of the tank interior conduit upper end;Then start hoist engine and reclaim rope, by the tank interior conduit It is promoted to vertical state;Finally position is carried out to the tank interior conduit to fix.
2. LNG storage tank tank inner tube pipe fitting method according to claim 1, it is characterised in that in the step S1, institute The lower end position for stating tank interior conduit is additionally provided with slipping tail hanger.
3. LNG storage tank tank inner tube pipe fitting method according to claim 2, it is characterised in that the hanging device is also wrapped Crane is included, the crane is connected with the slipping tail hanger, aid in the hoist engine to complete the lifting operation to the tank interior conduit.
4. LNG storage tank tank inner tube pipe fitting method according to claim 1, it is characterised in that in the step S2, institute Stating pulley assembly includes a movable pulley and two fixed pulleys, wherein the movable pulley is provided with suspension hook;Two fixed pulleys The dome longeron connection of sleeve pipe both sides corresponding with the tank interior conduit respectively, the movable pulley is located between two fixed pulleys Rope on, and with the hoist engine to the retractable operation of rope vertically raising and lowering.
5. LNG storage tank tank inner tube pipe fitting method according to claim 4, it is characterised in that in the step S3, institute State and connected by steel wire rope between the hanger of tank interior conduit upper end, then be connected with the suspension hook on the movable pulley.
6. the LNG storage tank tank inner tube pipe fitting method according to any one in claim 1-5, it is characterised in that described The upper end of tank interior conduit is provided with least two auxiliary hangers, the dome longeron of the tank interior conduit correspondence sleeve pipe both sides be provided with to Few two guide chains;When the hoist engine lifts to vertical state the tank interior conduit, and lifted during near described sleeve pipe, institute State guide chain to be connected with the auxiliary hanger, the fine setting of locus is carried out to the tank interior conduit.
7. LNG storage tank tank inner tube pipe fitting method according to claim 6, it is characterised in that the tank interior conduit it is upper End is provided with four auxiliary hangers, and the dome longeron of described sleeve pipe both sides is provided with two guide chains, and the dome of described sleeve pipe both sides is indulged Two floor stringers are provided between beam, and each floor stringer is provided with a guide chain.
8. LNG storage tank tank inner tube pipe fitting method according to claim 6, it is characterised in that the auxiliary hanger and institute State the length that the distance between upper end port of tank interior conduit is stretched into described sleeve pipe more than the tank interior conduit.
9. the LNG storage tank tank inner tube pipe fitting method according to any one in claim 1-5, it is characterised in that described The position height of first pulley is highly identical with the rope of the hoist engine.
10. the LNG storage tank tank inner tube pipe fitting method according to any one in claim 1-5, it is characterised in that described Second pulley is located at same vertical direction with the first pulley.
CN201710248405.0A 2017-04-17 2017-04-17 LNG storage tank tank inner tube pipe fitting method Active CN106927353B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710248405.0A CN106927353B (en) 2017-04-17 2017-04-17 LNG storage tank tank inner tube pipe fitting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710248405.0A CN106927353B (en) 2017-04-17 2017-04-17 LNG storage tank tank inner tube pipe fitting method

Publications (2)

Publication Number Publication Date
CN106927353A true CN106927353A (en) 2017-07-07
CN106927353B CN106927353B (en) 2018-10-26

Family

ID=59436951

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710248405.0A Active CN106927353B (en) 2017-04-17 2017-04-17 LNG storage tank tank inner tube pipe fitting method

Country Status (1)

Country Link
CN (1) CN106927353B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107601274A (en) * 2017-11-03 2018-01-19 中国能源建设集团广东火电工程有限公司 A kind of slipping tail hanging apparatus and slipping tail hanging method
CN108715397A (en) * 2018-07-27 2018-10-30 深圳市施罗德工业测控设备有限公司 A kind of service hoisting cable suitable for pipe crawling device
CN109052264A (en) * 2018-10-08 2018-12-21 广东大鹏液化天然气有限公司 A kind of LNG storage tank tank skin wall maintenance auxiliary hanging device
CN109607392A (en) * 2018-10-31 2019-04-12 沪东中华造船(集团)有限公司 A kind of LNG ship cargo tank gas vault hanging object device and its application method
CN112240431A (en) * 2019-09-09 2021-01-19 南京扬子石油化工设计工程有限责任公司 Method for installing pipeline in vertical storage tank
CN112830407A (en) * 2021-01-22 2021-05-25 中建安装集团有限公司 Hoisting method of petrochemical device module in engineering structure
CN115108464A (en) * 2022-05-31 2022-09-27 中国化学工程第三建设有限公司 Double-layer tank inner tank wall plate hoisting assembly device and assembly method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11141799A (en) * 1997-11-13 1999-05-28 Ishikawajima Harima Heavy Ind Co Ltd Method for installing sheathed temperature measuring resistor
CN202864736U (en) * 2012-10-16 2013-04-10 中石化第十建设有限公司 Hoist for oil tank construction in cave depot
CN203638979U (en) * 2013-12-13 2014-06-11 中石化南京工程有限公司 Device for mounting tank floor in low-temperature storage tank
CN104477755A (en) * 2014-12-24 2015-04-01 中国化学工程第三建设有限公司 Method for rapidly hoisting suspended type vertical vessel
CN205367532U (en) * 2016-01-28 2016-07-06 中石化第十建设有限公司 Interim work platform of LNG storage tank inner tank demolishs device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11141799A (en) * 1997-11-13 1999-05-28 Ishikawajima Harima Heavy Ind Co Ltd Method for installing sheathed temperature measuring resistor
CN202864736U (en) * 2012-10-16 2013-04-10 中石化第十建设有限公司 Hoist for oil tank construction in cave depot
CN203638979U (en) * 2013-12-13 2014-06-11 中石化南京工程有限公司 Device for mounting tank floor in low-temperature storage tank
CN104477755A (en) * 2014-12-24 2015-04-01 中国化学工程第三建设有限公司 Method for rapidly hoisting suspended type vertical vessel
CN205367532U (en) * 2016-01-28 2016-07-06 中石化第十建设有限公司 Interim work platform of LNG storage tank inner tank demolishs device

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
《大型设备吊装技术》编委会: "《大型设备吊装技术》", 31 May 2012 *
刘兵: "《钢结构工程预决算快学快用(第2版)》", 30 April 2014 *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107601274A (en) * 2017-11-03 2018-01-19 中国能源建设集团广东火电工程有限公司 A kind of slipping tail hanging apparatus and slipping tail hanging method
CN108715397A (en) * 2018-07-27 2018-10-30 深圳市施罗德工业测控设备有限公司 A kind of service hoisting cable suitable for pipe crawling device
CN109052264A (en) * 2018-10-08 2018-12-21 广东大鹏液化天然气有限公司 A kind of LNG storage tank tank skin wall maintenance auxiliary hanging device
CN109052264B (en) * 2018-10-08 2024-04-09 广东大鹏液化天然气有限公司 LNG storage tank wall maintenance auxiliary hoisting equipment
CN109607392A (en) * 2018-10-31 2019-04-12 沪东中华造船(集团)有限公司 A kind of LNG ship cargo tank gas vault hanging object device and its application method
CN112240431A (en) * 2019-09-09 2021-01-19 南京扬子石油化工设计工程有限责任公司 Method for installing pipeline in vertical storage tank
CN112240431B (en) * 2019-09-09 2021-06-04 南京扬子石油化工设计工程有限责任公司 Method for installing pipeline in vertical storage tank
CN112830407A (en) * 2021-01-22 2021-05-25 中建安装集团有限公司 Hoisting method of petrochemical device module in engineering structure
CN115108464A (en) * 2022-05-31 2022-09-27 中国化学工程第三建设有限公司 Double-layer tank inner tank wall plate hoisting assembly device and assembly method
CN115108464B (en) * 2022-05-31 2023-08-04 中国化学工程第三建设有限公司 Double-layer tank inner tank wall plate hoisting assembly device and assembly method

Also Published As

Publication number Publication date
CN106927353B (en) 2018-10-26

Similar Documents

Publication Publication Date Title
CN106927353A (en) LNG storage tank tank inner tube pipe fitting method
CN104652807B (en) Certainly turnover construction system and the method for climbing tower support steel beam in hydraulic climbing die block system
CN205953370U (en) Perpendicular transport means of unitized curtain wall
CN104973517B (en) A kind of electronic gantry platform that installs for sintering machine head device and its using method
CN102659043B (en) Improved sustaining wall rod dismantling device of tower type crane
CN105776011B (en) Blast furnace roof crane girder installation method
CN111648585A (en) Construction method and device of suspended support type steel truss platform
CN101649684B (en) Installing method of roof mast
CN209797332U (en) Hoisting system for complex space heavy pipeline equipment
CN113264458A (en) Tower crane system and method for removing attachment rod thereof
CN104030176B (en) The equalizer bar of hoisting platform truss and hanging method thereof
CN209601982U (en) A kind of flat-top tower crane convenient for manpower transport's installation
CN203959697U (en) The equalizing bar of hoisting platform truss
CN102587676A (en) Method for mounting internal girder structure of nuclear island at nuclear power station
CN110760634A (en) Blast furnace shell installation method
CN105735641B (en) A kind of scaffold with reel drawknot adjusting means, which is encorbelmented, expects platform
CN108221697A (en) A kind of entirety steel arch bridge bridge floor panel grider construction method for hanging
CN210480628U (en) Rotatory hoist of two-way self-balancing
CN207827722U (en) For the installation of canopy holder, remove special-purpose vehicle
CN110424811A (en) A kind of construction method of steel construction indirect cool tower expansion platform
CN207046708U (en) A kind of short group's davit lifts the Lift-on/Lift-off System of tall and big anaerobism tank body
CN205346600U (en) Big plate -girder hoist and mount specialized tool
CN205855760U (en) A kind of oxygen rifle landing means of transport
CN214611259U (en) Storage tank vault lift formula rack joist
CN205034986U (en) Be used for electronic longmen of sintering machine head equipment fixing platform

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant