CN202591864U - Lifting type welding service trolley - Google Patents

Lifting type welding service trolley Download PDF

Info

Publication number
CN202591864U
CN202591864U CN2012202299298U CN201220229929U CN202591864U CN 202591864 U CN202591864 U CN 202591864U CN 2012202299298 U CN2012202299298 U CN 2012202299298U CN 201220229929 U CN201220229929 U CN 201220229929U CN 202591864 U CN202591864 U CN 202591864U
Authority
CN
China
Prior art keywords
chassis
trolley
top layer
lifting type
type welding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2012202299298U
Other languages
Chinese (zh)
Inventor
王文忠
邓发江
成自飞
杜江湖
熊伟
李选
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Ge Zhou Ba Group Is Second Project Co Ltd
Original Assignee
China Gezhouba Group No 2 Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Gezhouba Group No 2 Engineering Co Ltd filed Critical China Gezhouba Group No 2 Engineering Co Ltd
Priority to CN2012202299298U priority Critical patent/CN202591864U/en
Application granted granted Critical
Publication of CN202591864U publication Critical patent/CN202591864U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Butt Welding And Welding Of Specific Article (AREA)

Abstract

The utility model relates to a lifting type welding service trolley for installing a steel pressure pipe with large diameter of a high shaft. The lifting type welding service trolley comprises a trolley bottom layer, a plurality of supporting columns installed on the trolley bottom layer, a trolley middle layer and a trolley top layer respectively installed on the supporting columns, and a lifting elevator located in the middle of the trolley. A lug matched with a hook of a hoist is arranged on the trolley top layer. According to the lifting type welding service trolley provided by the utility model, constructors can weld the steel pressure pipe in a high shaft installation process in the shaft conveniently so that the constructors can conveniently use welding devices and other auxiliary devices, therefore, the welding process can be carried out orderly.

Description

Lift welding job chassis
Technical field:
The utility model relates to a kind of boom truck, particularly be that a kind of high vertical shaft major diameter penstock is installed lift welding job chassis.
Background technology:
At present; Being installed as example with the high vertical shaft of domestic silk screen secondary pressure steel pipe describes: silk screen secondary pressure steel pipe engineering project installation period is 40 months; Plan was installed the peak period 17 months; 982 tons/month of the monthly installation strength in peak period (55 save), the biggest month 1160 tons/month of installation strength (65 joint) has construction characteristics such as big, the many scope of operation of hoisting and hanging quantities is constructed simultaneously, the lifting of vertical shaft ultrahigh pump lift, the duration is tight, the installation peak period is long.
Particularly up to vertical shaft steel pipe installation in the hole of H=250.43m, it is high highly to be equivalent to 80 multi-stories, and the installing engineering amount accounts for about 58% (808 joint) of whole steel pipe installing engineering amount, and lifting installation intensity and security risk are very big, and be domestic also rare.
The utility model content:
The purpose of the utility model is in order to provide a kind of penstock that makes in high vertical shaft installation process, to be convenient to workmen's weld job in vertical shaft, is convenient to the workmen and uses welding equipment, other auxiliary equipment, makes the lift welding job chassis that welding procedure can be carried out in order.
The purpose of the utility model realizes like this:
The utility model lift welding job chassis; Comprise the chassis bottom; Several support columns that are loaded on the chassis bottom are loaded on chassis intermediate layer, chassis top layer on the support column respectively, are positioned at the elevator at chassis middle part; The hanger that cooperates with the headstock gear suspension hook is arranged on the chassis top layer, and wherein the chassis top layer mainly is to supply installation personnel to be used for tube coupling adjustment, butt joint, spelling, the use of tooled joint workbench; The chassis intermediate layer mainly is to be used to place welding equipment and material use; The chassis bottom is welding, polishing, flaw detection, inspection and the anticorrosion use that is used for tube coupling butt joint circumferential weld; Elevator in the middle of the chassis; Can supply to transport and carry vertical shaft steel pipe installation personnel, equipment and material usefulness up and down; Elevator also can work independently and go up and down voluntarily with installing that chassis rises overally and rise synchronously.
On above-mentioned chassis bottom, chassis intermediate layer, the chassis periphery opposite position pulley is arranged respectively, guarantee to slide during the lifting of headstock gear suspension hook at the penstock inwall.
On above-mentioned chassis bottom, chassis intermediate layer, the chassis top layer top layer periphery fence is arranged respectively, guarantee personal security.
During work, the up-down of the utility model boom truck can use top, vertical shaft hole bridge headstock gear to lift by crane, and also can adopt four chain blocks that are uniformly distributed with to carry out manual work.
The utility model is rational in infrastructure; Stability under loading; Dexterous convenient; Dress, tear open easily, in the practice of construction process, can effectively solve circumferential weld in the high vertical shaft, outer girth welding shop problem, guarantee that the workmen is at the girth welding quality and operating personnel's the safe construction that carry out after the vertical shaft penstock is installed.
Description of drawings:
Fig. 1 is the utility model structural representation.
Fig. 2 is chassis bottom, chassis top level structure sketch map.
Fig. 3 is a chassis interlayer structure sketch map.
Fig. 4 installs and uses sketch map for the utility model.
The specific embodiment:
Referring to Fig. 1~Fig. 3, present embodiment lift welding job chassis comprises chassis bottom 1, and several support columns 2 that are loaded on the chassis bottom are loaded on chassis intermediate layer 3, chassis top layer 4 on the support column respectively, is positioned at the elevator 5 at chassis middle part.The hanger 6 that cooperates with the headstock gear suspension hook is arranged on the chassis top layer.On chassis bottom, chassis intermediate layer, the chassis top layer periphery opposite position pulley 7 is arranged respectively.On chassis bottom, chassis intermediate layer, the chassis top layer periphery fence 8 is arranged respectively.The chassis bottom is preset the elevator position, guarantees that elevator can be parked in the chassis bottom.
Referring to Fig. 2, the girder 9 that is supported on the support column is arranged respectively on chassis bottom, the platform layer top layer, be loaded on the buttress brace 10 on the girder.
Referring to Fig. 3, there is the girder 11 that is supported on the support column in the chassis intermediate layer.
Fig. 4 installs and uses state diagram for the utility model.Sequence number 12,13,14 is respectively headstock gear suspension hook, tube coupling to be installed, the utility model welding job chassis among the figure.
The utility model lift welding job chassis is installed: after bend loss and the installation of vertical shaft section first segment straight tube tube coupling finish instantly; Hang in the second joint straight tube fall in place align temporary fixed firm after, can vertical shaft be installed chassis and hang in vertical shaft and come into operation.After treating that the second joint straight tube is installed the welding completion, can carry out the installment work of follow-up tube coupling successively, by that analogy, all accomplish until the installation of vertical shaft section straight tube tube coupling.Also can chassis be persisted temporarily and be fixed on vertical shaft straight length top, as the security platform of last bend loss tube coupling installation or interim operation platform, treat the whole installations of upper curved section tube coupling after, disassemble again and hang out chassis.
Lift welding job chassis dismounting: when vertical shaft section penstock is installed, welding finishes, and utilizes the headstock gear steel wire rope that hoistable platform is taken out from silo bottom; The lift jig takes out from the vertical shaft top.

Claims (3)

1. lift welding job chassis; It is characterized in that it comprises the chassis bottom; Several support columns that are loaded on the chassis bottom are loaded on chassis intermediate layer, chassis top layer on the support column respectively, are positioned at the elevator at chassis middle part, and the hanger that cooperates with the headstock gear suspension hook is arranged on the chassis top layer.
2. lift welding job chassis as claimed in claim 1 is characterized in that on chassis bottom, chassis intermediate layer, the chassis top layer periphery opposite position pulley being arranged respectively.
3. according to claim 1 or claim 2 lift welding job chassis is characterized in that on chassis bottom, chassis intermediate layer, the chassis top layer periphery fence being arranged respectively.
CN2012202299298U 2012-05-22 2012-05-22 Lifting type welding service trolley Expired - Lifetime CN202591864U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012202299298U CN202591864U (en) 2012-05-22 2012-05-22 Lifting type welding service trolley

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012202299298U CN202591864U (en) 2012-05-22 2012-05-22 Lifting type welding service trolley

Publications (1)

Publication Number Publication Date
CN202591864U true CN202591864U (en) 2012-12-12

Family

ID=47309447

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012202299298U Expired - Lifetime CN202591864U (en) 2012-05-22 2012-05-22 Lifting type welding service trolley

Country Status (1)

Country Link
CN (1) CN202591864U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107012844A (en) * 2017-06-02 2017-08-04 中国水利水电第七工程局有限公司 Vertical shaft section penstock elevating construction platform formula inner support
CN107060770A (en) * 2017-06-02 2017-08-18 中国水利水电第七工程局有限公司 A kind of penstock installs movable automatic tooled joint car
CN109556391A (en) * 2018-12-29 2019-04-02 广东汇兴精工智造股份有限公司 A kind of dry kiln car automatic loader and unloader structure
CN109941873A (en) * 2019-02-25 2019-06-28 中国葛洲坝集团第一工程有限公司 A kind of hoistable platform and construction method for vertical shaft penstock installation exercise
CN111267064A (en) * 2020-04-20 2020-06-12 中国水利水电第四工程局有限公司 Large-inclination hydroelectric penstock assembling and welding trolley
CN115781124A (en) * 2022-12-06 2023-03-14 运铮颜机器人技术(深圳)有限责任公司 In-pipeline welding equipment and engineering pipeline welding system

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107012844A (en) * 2017-06-02 2017-08-04 中国水利水电第七工程局有限公司 Vertical shaft section penstock elevating construction platform formula inner support
CN107060770A (en) * 2017-06-02 2017-08-18 中国水利水电第七工程局有限公司 A kind of penstock installs movable automatic tooled joint car
CN107060770B (en) * 2017-06-02 2023-09-19 中国水利水电第七工程局有限公司 Movable automatic pressure sewing machine for installing pressure steel pipes
CN109556391A (en) * 2018-12-29 2019-04-02 广东汇兴精工智造股份有限公司 A kind of dry kiln car automatic loader and unloader structure
CN109556391B (en) * 2018-12-29 2024-01-30 广东汇兴精工智造股份有限公司 Automatic loading and unloading mechanism for drying kiln car
CN109941873A (en) * 2019-02-25 2019-06-28 中国葛洲坝集团第一工程有限公司 A kind of hoistable platform and construction method for vertical shaft penstock installation exercise
CN111267064A (en) * 2020-04-20 2020-06-12 中国水利水电第四工程局有限公司 Large-inclination hydroelectric penstock assembling and welding trolley
CN115781124A (en) * 2022-12-06 2023-03-14 运铮颜机器人技术(深圳)有限责任公司 In-pipeline welding equipment and engineering pipeline welding system

Similar Documents

Publication Publication Date Title
CN202591864U (en) Lifting type welding service trolley
CN102816891B (en) Hoisting method for overhauling and dismantling vaporization flue fixed at first section of converter
WO2015021693A1 (en) Method of constructing steel chimney cylinder by upside-down mounting
CN104195948A (en) Bridge hanging pipeline pushing installation and construction method
CN204375432U (en) Spent fuel dry-type storage project underwater operation platform device for hoisting
CN103791156A (en) Superaltitude quick installation method of large-diameter glass fiber reinforced plastic pipes
CN103486330B (en) Either inside high-altitude pipeline mounting construction method
CN206590817U (en) A kind of Large Towers kind equipment self-unloading frock
CN212154097U (en) Overhead pipeline high-altitude operation platform device
CN204954202U (en) Blast furnace stove outer covering inner wall welded platform
CN202848854U (en) Fixture for lifting packing barrel
CN203486787U (en) Integral lifting device for cabinet top of Wiggins coal gas cabinet
CN104555833B (en) Method for hoisting steel inner cylinder of chimney
CN202346582U (en) Large diameter steel bar hoisting clamp
CN202729645U (en) Tower crane with elevator
CN116024904A (en) A method of installation and construction of a long-span basket arch bridge
CN102062538A (en) Method for mounting head sprocket wheel of belt sintering machine
CN105236320A (en) Jacking device for replacing saddle arm of rotating bearing of continuous casting rotating table and construction method of jacking device
CN201495028U (en) Large-tonnage tunnel concrete segment horizontal hoisting tool
CN204954201U (en) Blast furnace stove outer covering outer wall welding platform
CN116219878A (en) A construction method for installing suspenders of a large-span basket-carrying arch bridge
CN102896432B (en) High-altitude big-diameter pipeline vertical section pipe installation method
CN207108239U (en) A kind of Novel steel profile hoisting device
CN107117529A (en) A kind of safety jaw stake device and pile hanging method
CN205855760U (en) A kind of oxygen rifle landing means of transport

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: CHINA GE ZHOU BA GROUP IS SECOND PROJECT CO., LTD.

Free format text: FORMER NAME: GEZHOUBA GROUP NO.2 ENGINEERING CO.,LTD.

CP01 Change in the name or title of a patent holder

Address after: 610091 Sichuan Province, Chengdu District of Qingyang City Industrial Development Zone (East) with the road No. 8 Building 10

Patentee after: China Ge Zhou Ba group is second project Co., Ltd.

Address before: 610091 Sichuan Province, Chengdu District of Qingyang City Industrial Development Zone (East) with the road No. 8 Building 10

Patentee before: Gezhouba Group No.2 Engineering Co., Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20121212