CN106836798A - 一种新加模施工方法及护栏结构 - Google Patents
一种新加模施工方法及护栏结构 Download PDFInfo
- Publication number
- CN106836798A CN106836798A CN201710058999.9A CN201710058999A CN106836798A CN 106836798 A CN106836798 A CN 106836798A CN 201710058999 A CN201710058999 A CN 201710058999A CN 106836798 A CN106836798 A CN 106836798A
- Authority
- CN
- China
- Prior art keywords
- jiamo
- xin
- template
- bar
- guard rail
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G13/00—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
- E04G13/04—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for lintels, beams, or transoms to be encased separately; Special tying or clamping means therefor
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G17/00—Connecting or other auxiliary members for forms, falsework structures, or shutterings
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
本发明公开了一种新加模施工方法及其护栏结构,该方法采用在预制梁吊装前,将新加模护栏下部固定在预制梁两侧的边梁上,预制梁吊装完成后安装新加模护栏上部插入方通,通过插销固定,从而形成模板栏杆一体化,新加模护栏安装完成后既完成了外侧模板的施工又完成外侧作业防护,本发明实现防护与模板一体化,操作简便,节约成本,适用与装配式工程防护推广,且本发明结构简单,制作方便,实用性强。
Description
技术领域
本发明涉及建筑施工技术领域,尤其是一种新加模施工方法及护栏结构。
背景技术
目前外墙采用预制墙板的装配式工程项目外架一般采用爬架和外挂架等,对于干挂PC外墙板,其强度满足不了爬架或外挂架附着基座的受力要求,而采用传统脚手架又不能按照规范设置连墙件。
发明内容
本发明所要解决的技术问题是:提供一种新加模施工方法及护栏结构,以满足装配式工程项目施工防护要求,为外墙采用干挂PC墙板提供条件,从而推广预制装配式工程的发展,以克服现有技术的不足。
本发明是这样实现的:
一种新加模施工方法,该方法采用在预制梁吊装前,将新加模护栏下部固定在预制梁两侧的边梁上,预制梁吊装完成后安装新加模护栏上部插入方通,通过插销固定,从而形成模板栏杆一体化,新加模护栏安装完成后既完成了外侧模板的施工又完成外侧作业防护,从而实现边梁模板的安装和边梁现浇部分作业防护,解决干挂PC外墙板的弊端,促进预制装配式工程发展。
一种新加模护栏结构,包括已预制好的边梁结构和位于边梁结构上方的现浇部分,在现浇部分两侧设置边梁模板,外防护栏杆均匀分布在边梁模板外侧并固定,在外防护栏杆顶部设置小直径的方通。
前述的一种新加模护栏结构中,所述外防护栏杆为L型结构,与水平面平行的外防护栏杆一侧通过螺栓固定在边梁结构上,与水平面垂直的外防护栏杆一侧紧贴边梁模板使之形成边梁模板的加强背肋。
前述的一种新加模护栏结构中,所述外防护栏杆顶部为浅槽结构,方通采用插销式插入浅槽并与外防护栏杆固定使之形成护栏结构。
由于采用了上述技术方案,与现有技术相比,本发明实现防护与与模板一体化,操作简便,节约成本,适用与装配式工程防护推广,且本发明结构简单,制作方便,实用性强。
附图说明
附图1是本发明的结构示意图;
附图2是方通、栏杆和模板彼此连接示意图。
具体实施方式
本发明的实施例:一种新加模施工方法,该方法采用在预制梁吊装前,将新加模护栏下部固定在预制梁两侧的边梁上,预制梁吊装完成后安装新加模护栏上部插入方通,通过插销固定,从而形成模板栏杆一体化,新加模护栏安装完成后既完成了外侧模板的施工又完成外侧作业防护,本实施例是为了配合干挂PC外墙板的施工而设计的,利用预制构件的提前预埋和吊装特点,进行新加模护栏的简便安装,从而实现边梁模板的安装和边梁现浇部分作业防护,解决干挂PC外墙板的弊端,促进预制装配式工程发展。
根据上述方法所需的一种新加模护栏结构,如附图所示,包括已预制好的边梁结构4和位于边梁结构4上方的现浇部分5,在现浇部分5两侧设置边梁模板1,外防护栏杆2均匀分布在边梁模板1外侧并固定,在外防护栏杆2顶部设置小直径的方通2.1。
其中该外防护栏杆2为L型结构,与水平面平行的外防护栏杆2一侧通过螺栓3固定在边梁结构4上,与水平面垂直的外防护栏杆2一侧紧贴边梁模板1使之形成边梁模板1的加强背肋,外防护栏杆2顶部为浅槽结构,方通2.1采用插销式插入浅槽并与外防护栏杆2固定使之形成护栏结构。
上述方案的描述是为便于该技术领域的普通技术人员能理解和使用的发明,熟悉本领域技术的人员显然可以容易地对实施方案做出各种修改,因此,本发明不限于上述实方案,本领域技术人员根据本发明的方法,不脱离本发明范畴所做出的改进和修改都应该在本发明的保护范围之内。
Claims (4)
1.一种新加模施工方法,其特征在于:该方法采用在预制梁吊装前,将新加模护栏下部固定在预制梁两侧的边梁上,预制梁吊装完成后安装新加模护栏上部插入方通,通过插销固定,从而形成模板栏杆一体化,新加模护栏安装完成后既完成了外侧模板的施工又完成外侧作业防护,从而实现边梁模板的安装和边梁现浇部分作业防护,解决干挂PC外墙板的弊端,促进预制装配式工程发展。
2.一种新加模护栏结构,包括已预制好的边梁结构(4)和位于边梁结构(4)上方的现浇部分(5),在现浇部分(5)两侧设置边梁模板(1),其特征在于:外防护栏杆(2)均匀分布在边梁模板(1)外侧并固定,在外防护栏杆(2)顶部设置小直径的方通(2.1)。
3.根据权利要求2所述的一种新加模护栏结构,其特征在于:所述外防护栏杆(2)为L型结构,与水平面平行的外防护栏杆(2)一侧通过螺栓(3)固定在边梁结构(4)上,与水平面垂直的外防护栏杆(2)一侧紧贴边梁模板(1)使之形成边梁模板(1)的加强背肋。
4.根据权利要求2所述的一种新加模护栏结构,其特征在于:所述外防护栏杆(2)顶部为浅槽结构,方通(2.1)采用插销式插入浅槽并与外防护栏杆(2)固定使之形成护栏结构。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710058999.9A CN106836798A (zh) | 2017-01-23 | 2017-01-23 | 一种新加模施工方法及护栏结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710058999.9A CN106836798A (zh) | 2017-01-23 | 2017-01-23 | 一种新加模施工方法及护栏结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106836798A true CN106836798A (zh) | 2017-06-13 |
Family
ID=59122522
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710058999.9A Withdrawn CN106836798A (zh) | 2017-01-23 | 2017-01-23 | 一种新加模施工方法及护栏结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106836798A (zh) |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2736374A1 (fr) * | 1995-07-04 | 1997-01-10 | Bouygues Sa | Dispositif de protection au vide pour panneau de coffrage et panneaux de banches equipes de ce dispositif |
WO2002063117A1 (en) * | 2001-02-08 | 2002-08-15 | Willy Johansson | Arch shut-off |
EP1544378A1 (de) * | 2003-12-16 | 2005-06-22 | System Albanese | Verfahren zum Setzen eines Verankerungselements für wiederverwendbare und verlorene Deckenrandschalungsplatten sowie ein Verankerungselement zur Durchführung des Verfahrens |
FR2909698A1 (fr) * | 2006-12-08 | 2008-06-13 | Gie Bouygues Contruction Mater | Dispositif de protection frontale anti-chute pour un operateur appele a se tenir sur une plate-forme situee en partie haute d'une banche. |
CN103334379A (zh) * | 2013-06-27 | 2013-10-02 | 中铁四局集团第三建设有限公司 | 一种用于高速公路防撞护栏悬空部分的施工方法 |
CN204151690U (zh) * | 2014-10-11 | 2015-02-11 | 江苏省交通工程集团有限公司 | 桥梁护栏浇筑安全防护装置 |
CH709836B1 (de) * | 2014-11-08 | 2016-01-15 | Rocco Cimino | Schutzgeländervorrichtung. |
CN105507144A (zh) * | 2015-12-04 | 2016-04-20 | 中交二公局第三工程有限公司 | 一种桥梁外防撞护栏及其安全施工方法 |
CN105696802A (zh) * | 2016-04-15 | 2016-06-22 | 中冶建工集团有限公司 | 应用于大面积楼面模板施工中的临边防护栏及其安装方法 |
CN206468003U (zh) * | 2017-01-23 | 2017-09-05 | 中建四局第三建筑工程有限公司 | 一种新加模护栏结构 |
CN217174378U (zh) * | 2021-12-13 | 2022-08-12 | 中交路桥建设有限公司 | 一种设有防护结构的桥梁防撞护栏施工模板 |
-
2017
- 2017-01-23 CN CN201710058999.9A patent/CN106836798A/zh not_active Withdrawn
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2736374A1 (fr) * | 1995-07-04 | 1997-01-10 | Bouygues Sa | Dispositif de protection au vide pour panneau de coffrage et panneaux de banches equipes de ce dispositif |
WO2002063117A1 (en) * | 2001-02-08 | 2002-08-15 | Willy Johansson | Arch shut-off |
EP1544378A1 (de) * | 2003-12-16 | 2005-06-22 | System Albanese | Verfahren zum Setzen eines Verankerungselements für wiederverwendbare und verlorene Deckenrandschalungsplatten sowie ein Verankerungselement zur Durchführung des Verfahrens |
FR2909698A1 (fr) * | 2006-12-08 | 2008-06-13 | Gie Bouygues Contruction Mater | Dispositif de protection frontale anti-chute pour un operateur appele a se tenir sur une plate-forme situee en partie haute d'une banche. |
CN103334379A (zh) * | 2013-06-27 | 2013-10-02 | 中铁四局集团第三建设有限公司 | 一种用于高速公路防撞护栏悬空部分的施工方法 |
CN204151690U (zh) * | 2014-10-11 | 2015-02-11 | 江苏省交通工程集团有限公司 | 桥梁护栏浇筑安全防护装置 |
CH709836B1 (de) * | 2014-11-08 | 2016-01-15 | Rocco Cimino | Schutzgeländervorrichtung. |
CN105507144A (zh) * | 2015-12-04 | 2016-04-20 | 中交二公局第三工程有限公司 | 一种桥梁外防撞护栏及其安全施工方法 |
CN105696802A (zh) * | 2016-04-15 | 2016-06-22 | 中冶建工集团有限公司 | 应用于大面积楼面模板施工中的临边防护栏及其安装方法 |
CN206468003U (zh) * | 2017-01-23 | 2017-09-05 | 中建四局第三建筑工程有限公司 | 一种新加模护栏结构 |
CN217174378U (zh) * | 2021-12-13 | 2022-08-12 | 中交路桥建设有限公司 | 一种设有防护结构的桥梁防撞护栏施工模板 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205077845U (zh) | 建筑物核心筒井道液压智能爬升操作脚手架 | |
CN205242706U (zh) | 高层外檐窗间填充墙现浇构造柱与墙体同步施工结构 | |
CN204983662U (zh) | 一种对拉螺杆与钢管排架组合单侧支模装置 | |
CN105347142B (zh) | 一种施工升降机安装在地下室顶板上的穿板安装方法 | |
CN203257090U (zh) | 外挑楼板的模板系统 | |
CN205348767U (zh) | 利用钢筋笼作骨架的外挂支模系统 | |
CN207228633U (zh) | 免模板现浇筑保温装饰成型墙体用插接式预制连接件 | |
CN109138431A (zh) | 一种超高层泵管过桥装置及其施工方法 | |
CN206468003U (zh) | 一种新加模护栏结构 | |
CN204715764U (zh) | 一种构造柱与主体结构同时施工的结构 | |
CN202865996U (zh) | 一种核电厂房间模块结构 | |
CN210508129U (zh) | 一种结构装饰一体化楼梯防护栏杆 | |
CN106836798A (zh) | 一种新加模施工方法及护栏结构 | |
CN111622483A (zh) | 一种逆作式悬挑脚手架搭设方法 | |
CN115467451A (zh) | 一种超高层建筑外墙不燃性实体墙及施工方法 | |
CN203066493U (zh) | 一种柱子主筋精确施工定位模具 | |
CN114033171A (zh) | 悬挑屋面板的夹具式三角支撑体系及其施工方法 | |
CN106939697A (zh) | 一种施工核心筒用的组合模板及其施工方法 | |
CN207846750U (zh) | 轻钢混凝土砌块组合墙 | |
CN206205475U (zh) | 一种剪力墙结构竖向洞口防护装置 | |
CN207392754U (zh) | 一种螺杆拉片转接连接器 | |
CN110056103A (zh) | 一种预制墙板与叠合梁连接节点及其施工方法 | |
CN205712613U (zh) | 用于预制整体装配保温外模板与外墙保温外模架的连接件 | |
CN105064710B (zh) | 一种用于隔声改造的挑梁式阳台加固方法与加固结构 | |
CN204609291U (zh) | 支模体系 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20170613 |