CN204609291U - 支模体系 - Google Patents

支模体系 Download PDF

Info

Publication number
CN204609291U
CN204609291U CN201520063068.4U CN201520063068U CN204609291U CN 204609291 U CN204609291 U CN 204609291U CN 201520063068 U CN201520063068 U CN 201520063068U CN 204609291 U CN204609291 U CN 204609291U
Authority
CN
China
Prior art keywords
formwork
web member
beam forms
perpendicular web
supporting plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520063068.4U
Other languages
English (en)
Inventor
龚素华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaoxing Sheng Yuan Environmental Construction Co., Ltd.
Original Assignee
Chengdu Xunde Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Xunde Technology Co Ltd filed Critical Chengdu Xunde Technology Co Ltd
Priority to CN201520063068.4U priority Critical patent/CN204609291U/zh
Application granted granted Critical
Publication of CN204609291U publication Critical patent/CN204609291U/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

本实用新型公开了一种支模体系,包括支模本体,支模本体高度在五至十厘米之间,支模本体下表面设有支模板,支模板与支模本体之间内置销钉,支模板下表面设有上弦杆,上弦杆下表面设有竖腹杆,竖腹杆为两个,两竖腹杆顶部与上弦杆之间固定连接,其底部位于一拉杆端头上,拉杆端头通过球头与竖腹杆连接,拉杆端头位于一梁模板上,梁模板内设有钢箍,梁模板位于一下弦杆上表面上,且梁模板与下弦杆之间可拆卸连接。本支模体系可有效解决施工超高层的支模技术难题,且支模结构良好,不会出现塌陷现象,另外方便进行拆卸及安装,而且具有良好的固定性。

Description

支模体系
技术领域
本实用新型涉及一种土木工程结构,特别涉及一种支模体系。
背景技术
目前,超高层建筑设备层、避难层等楼层楼板均采用H型钢梁,即现浇混凝土楼板,在进行现浇混凝土楼板施工时,传统钢管脚手架支模方法存在工作量大,施工效率低及支撑性能差的问题,并且料具倒运困难,高空支模安全隐患大,不能更好的进行支护,而且一般的支模体系需要先浇筑一侧侧墙,然后浇筑另一侧侧墙,这种支模体系造成了施工繁琐的问题,同时有的还需搭设一定的支架,这样造成了搭建和拆卸费时费力,影响其施工进度。
实用新型内容
本实用新型要解决的技术问题是:克服上述问题,提供一种可有效解决施工超高层的支模技术难题,且支模结构良好,不会出现塌陷现象的支模体系。
为了实现上述目的,本实用新型采用的技术方案是这样的:本实用新型的支模体系,包括支模本体,支模本体高度在五至十厘米之间,支模本体下表面设有支模板,支模板与支模本体之间内置销钉,支模板下表面设有上弦杆,上弦杆下表面设有竖腹杆,竖腹杆为两个,两竖腹杆顶部与上弦杆之间固定连接,其底部位于一拉杆端头上,拉杆端头通过球头与竖腹杆连接,拉杆端头位于一梁模板上,梁模板内设有钢箍,梁模板位于一下弦杆上表面上,且梁模板与下弦杆之间可拆卸连接。
进一步的,作为一种具体的结构形式,本实用新型所述支模本体高度在两至五厘米之间。
进一步的,作为一种具体的结构形式,本实用新型所述支模板采用防水材料板。
进一步的,作为一种具体的结构形式,本实用新型所述竖腹杆穿插在上弦杆内。
进一步的,作为一种具体的结构形式,本实用新型所述钢箍上设有调节旋钮。
进一步的,作为一种具体的结构形式,本实用新型所述下弦杆与梁模板之间安装有螺钉。
与现有技术相比,本实用新型的优点在于:本支模体系可有效解决施工超高层的支模技术难题,且支模结构良好,不会出现塌陷现象,另外方便进行拆卸及安装,而且具有良好的固定性。
附图说明
下面结合附图和实施例对本实用新型进一步说明。
图1为本实用新型的结构示意图;
图中:1.支模本体;2.支模板;3.上弦杆;4.竖腹杆;5.拉杆端头;6.梁模板;7.钢箍;8.下弦杆。
具体实施方式
现在结合附图对本实用新型作进一步详细的说明。这些附图均为简化的示意图,仅以示意方式说明本实用新型的基本结构,因此其仅显示与本实用新型有关的构成。
如图1所示的本实用新型支模体系的优选实施例,包括支模本体1,支模本体1高度在五至十厘米之间,支模本体1下表面设有支模板2,支模板2与支模本体1之间内置销钉,支模板2下表面设有上弦杆3,上弦杆3下表面设有竖腹杆4,竖腹杆4为两个,两竖腹杆4顶部与上弦杆3之间固定连接,其底部位于一拉杆端头5上,拉杆端头5通过球头与竖腹杆4连接,拉杆端头5位于一梁模板6上,梁模板6内设有钢箍7,梁模板6位于一下弦杆8上表面上,且梁模板6与下弦杆8之间可拆卸连接,所述支模本体1高度在两至五厘米之间,所述支模板2采用防水材料板,所述竖腹杆4穿插在上弦杆3内,所述钢箍7上设有调节旋钮,所述下弦杆8与梁模板6之间安装有螺钉。
本实用新型的支模体系可有效解决施工超高层的支模技术难题,且支模结构良好,不会出现塌陷现象,另外方便进行拆卸及安装,而且具有良好的固定性。所述支模本体1高度在两至五厘米之间,所述支模板2采用防水材料板,提高了支撑性能,且具有良好的防水性;所述竖腹杆4穿插在上弦杆3内,使其竖腹杆4与上弦杆3之间连接更加稳固;所述钢箍7上设有调节旋钮,方便对钢箍7进行调节;所述下弦杆8与梁模板6之间安装有螺钉,提高了紧固性能。
以上述依据本实用新型的理想实施例为启示,通过上述的说明内容,相关工作人员完全可以在不偏离本项实用新型技术思想的范围内,进行多样的变更以及修改。本项实用新型的技术性范围并不局限于说明书上的内容,必须要根据权利要求范围来确定其技术性范围。

Claims (6)

1.一种支模体系,包括支模本体,其特征在于:支模本体高度在五至十厘米之间,支模本体下表面设有支模板,支模板与支模本体之间内置销钉,支模板下表面设有上弦杆,上弦杆下表面设有竖腹杆,竖腹杆为两个,两竖腹杆顶部与上弦杆之间固定连接,其底部位于一拉杆端头上,拉杆端头通过球头与竖腹杆连接,拉杆端头位于一梁模板上,梁模板内设有钢箍,梁模板位于一下弦杆上表面上,且梁模板与下弦杆之间可拆卸连接。
2.根据权利要求1所述的支模体系,其特征在于:所述支模本体高度在两至五厘米之间。
3.根据权利要求1所述的支模体系,其特征在于:所述支模板采用防水材料板。
4.根据权利要求1所述的支模体系,其特征在于:所述竖腹杆穿插在上弦杆内。
5.根据权利要求1所述的支模体系,其特征在于:所述钢箍上设有调节旋钮。
6.根据权利要求1所述的支模体系,其特征在于:所述下弦杆与梁模板之间安装有螺钉。
CN201520063068.4U 2015-01-29 2015-01-29 支模体系 Expired - Fee Related CN204609291U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520063068.4U CN204609291U (zh) 2015-01-29 2015-01-29 支模体系

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520063068.4U CN204609291U (zh) 2015-01-29 2015-01-29 支模体系

Publications (1)

Publication Number Publication Date
CN204609291U true CN204609291U (zh) 2015-09-02

Family

ID=53961856

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520063068.4U Expired - Fee Related CN204609291U (zh) 2015-01-29 2015-01-29 支模体系

Country Status (1)

Country Link
CN (1) CN204609291U (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104652808A (zh) * 2015-01-29 2015-05-27 成都迅德科技有限公司 支模体系

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104652808A (zh) * 2015-01-29 2015-05-27 成都迅德科技有限公司 支模体系

Similar Documents

Publication Publication Date Title
CN201826525U (zh) 建筑爬升模板体系装置
CN206903022U (zh) 一种钢筋桁架楼承板
CN106150087B (zh) 一种组合式框架柱模板及其施工方法
CN102146731A (zh) 一种钢结构房屋楼层模板支撑结构及施工方法
CN206352391U (zh) 承插型键槽式快拆支撑体系
CN203834926U (zh) 清水混凝土地下室外墙模板支模结构
CN205636516U (zh) 空心混凝土斜塔的翻转式模板系统
CN203257090U (zh) 外挑楼板的模板系统
CN202047592U (zh) 一种钢结构房屋楼层模板支撑结构
CN202509765U (zh) 悬挑平台模板
CN202125061U (zh) 大空间混凝土结构脚手架
CN204609291U (zh) 支模体系
CN206467828U (zh) 一种装配式结构保温装饰一体化板墙
CN102312563A (zh) 大跨度、超层高结构外脚手架连墙方法
CN105625732B (zh) 超高悬挑钢结构桁架无支撑施工方法
CN205348767U (zh) 利用钢筋笼作骨架的外挂支模系统
CN205088951U (zh) 多功能组合顶丝
CN201730330U (zh) 一种建筑用梁模板
CN203034805U (zh) 双砼墙板模板剪刀型支撑龙骨系统
CN203795459U (zh) 一种高空屋面塔式起重机的基础结构
CN204456813U (zh) 一种用于电梯井道的单支撑操作平台
CN104652808B (zh) 支模体系
CN207392754U (zh) 一种螺杆拉片转接连接器
CN206646645U (zh) 钢梁与立柱的连接节点结构
CN111173263A (zh) 基于狭窄伸缩缝的整体式铝模体

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Song Guoqiao

Inventor after: Li Shengyuan

Inventor after: Wu Qiong

Inventor after: Sheng Yongqiang

Inventor after: Li Qun

Inventor after: Chen Zhongru

Inventor after: Sun Shaojun

Inventor before: Gong Suhua

COR Change of bibliographic data
TR01 Transfer of patent right

Effective date of registration: 20151209

Address after: Wang Tan Zhen Zhejiang province Shaoxing Shunjiang garden 312055 District of Keqiao City

Patentee after: Shaoxing Sheng Yuan Environmental Construction Co., Ltd.

Address before: Jinjiang District Jinhua Road Chengdu City, Sichuan province 610000 section of No. 8 Building 1 11 unit 18 floor No. 1846

Patentee before: CHENGDU XUNDE TECHNOLOGY CO., LTD.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150902

Termination date: 20170129

CF01 Termination of patent right due to non-payment of annual fee