CN104652808A - 支模体系 - Google Patents

支模体系 Download PDF

Info

Publication number
CN104652808A
CN104652808A CN201510045796.7A CN201510045796A CN104652808A CN 104652808 A CN104652808 A CN 104652808A CN 201510045796 A CN201510045796 A CN 201510045796A CN 104652808 A CN104652808 A CN 104652808A
Authority
CN
China
Prior art keywords
framework supporting
formwork
framework
supporting plate
web member
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510045796.7A
Other languages
English (en)
Other versions
CN104652808B (zh
Inventor
龚素华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Jobon Construction Engineering Co., Ltd.
Original Assignee
Chengdu Xunde Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Xunde Technology Co Ltd filed Critical Chengdu Xunde Technology Co Ltd
Priority to CN201510045796.7A priority Critical patent/CN104652808B/zh
Publication of CN104652808A publication Critical patent/CN104652808A/zh
Application granted granted Critical
Publication of CN104652808B publication Critical patent/CN104652808B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

本发明公开了一种支模体系,包括支模本体,支模本体高度在五至十厘米之间,支模本体下表面设有支模板,支模板与支模本体之间内置销钉,支模板下表面设有上弦杆,上弦杆下表面设有竖腹杆,竖腹杆为两个,两竖腹杆顶部与上弦杆之间固定连接,其底部位于一拉杆端头上,拉杆端头通过球头与竖腹杆连接,拉杆端头位于一梁模板上,梁模板内设有钢箍,梁模板位于一下弦杆上表面上,且梁模板与下弦杆之间可拆卸连接。本支模体系可有效解决施工超高层的支模技术难题,且支模结构良好,不会出现塌陷现象,另外方便进行拆卸及安装,而且具有良好的固定性。

Description

支模体系
技术领域
本发明涉及一种土木工程结构,特别涉及一种支模体系。
背景技术
目前,超高层建筑设备层、避难层等楼层楼板均采用H型钢梁,即现浇混凝土楼板,在进行现浇混凝土楼板施工时,传统钢管脚手架支模方法存在工作量大,施工效率低及支撑性能差的问题,并且料具倒运困难,高空支模安全隐患大,不能更好的进行支护,而且一般的支模体系需要先浇筑一侧侧墙,然后浇筑另一侧侧墙,这种支模体系造成了施工繁琐的问题,同时有的还需搭设一定的支架,这样造成了搭建和拆卸费时费力,影响其施工进度。
发明内容
本发明要解决的技术问题是:克服上述问题,提供一种可有效解决施工超高层的支模技术难题,且支模结构良好,不会出现塌陷现象的支模体系。
为了实现上述目的,本发明采用的技术方案是这样的:本发明的支模体系,包括支模本体,支模本体高度在五至十厘米之间,支模本体下表面设有支模板,支模板与支模本体之间内置销钉,支模板下表面设有上弦杆,上弦杆下表面设有竖腹杆,竖腹杆为两个,两竖腹杆顶部与上弦杆之间固定连接,其底部位于一拉杆端头上,拉杆端头通过球头与竖腹杆连接,拉杆端头位于一梁模板上,梁模板内设有钢箍,梁模板位于一下弦杆上表面上,且梁模板与下弦杆之间可拆卸连接。
进一步的,作为一种具体的结构形式,本发明所述支模本体高度在两至五厘米之间。
进一步的,作为一种具体的结构形式,本发明所述支模板采用防水材料板。
进一步的,作为一种具体的结构形式,本发明所述竖腹杆穿插在上弦杆内。
进一步的,作为一种具体的结构形式,本发明所述钢箍上设有调节旋钮。
进一步的,作为一种具体的结构形式,本发明所述下弦杆与梁模板之间安装有螺钉。
与现有技术相比,本发明的优点在于:本支模体系可有效解决施工超高层的支模技术难题,且支模结构良好,不会出现塌陷现象,另外方便进行拆卸及安装,而且具有良好的固定性。
附图说明
下面结合附图和实施例对本发明进一步说明。
图1为本发明的结构示意图;
图中:1.支模本体;2.支模板;3.上弦杆;4.竖腹杆;5.拉杆端头;6.梁模板;7.钢箍;8.下弦杆。
具体实施方式
现在结合附图对本发明作进一步详细的说明。这些附图均为简化的示意图,仅以示意方式说明本发明的基本结构,因此其仅显示与本发明有关的构成。
如图1所示的本发明支模体系的优选实施例,包括支模本体1,支模本体1高度在五至十厘米之间,支模本体1下表面设有支模板2,支模板2与支模本体1之间内置销钉,支模板2下表面设有上弦杆3,上弦杆3下表面设有竖腹杆4,竖腹杆4为两个,两竖腹杆4顶部与上弦杆3之间固定连接,其底部位于一拉杆端头5上,拉杆端头5通过球头与竖腹杆4连接,拉杆端头5位于一梁模板6上,梁模板6内设有钢箍7,梁模板6位于一下弦杆8上表面上,且梁模板6与下弦杆8之间可拆卸连接,所述支模本体1高度在两至五厘米之间,所述支模板2采用防水材料板,所述竖腹杆4穿插在上弦杆3内,所述钢箍7上设有调节旋钮,所述下弦杆8与梁模板6之间安装有螺钉。
本发明的支模体系可有效解决施工超高层的支模技术难题,且支模结构良好,不会出现塌陷现象,另外方便进行拆卸及安装,而且具有良好的固定性。所述支模本体1高度在两至五厘米之间,所述支模板2采用防水材料板,提高了支撑性能,且具有良好的防水性;所述竖腹杆4穿插在上弦杆3内,使其竖腹杆4与上弦杆3之间连接更加稳固;所述钢箍7上设有调节旋钮,方便对钢箍7进行调节;所述下弦杆8与梁模板6之间安装有螺钉,提高了紧固性能。
以上述依据本发明的理想实施例为启示,通过上述的说明内容,相关工作人员完全可以在不偏离本项发明技术思想的范围内,进行多样的变更以及修改。本项发明的技术性范围并不局限于说明书上的内容,必须要根据权利要求范围来确定其技术性范围。

Claims (6)

1.一种支模体系,包括支模本体,其特征在于:支模本体高度在五至十厘米之间,支模本体下表面设有支模板,支模板与支模本体之间内置销钉,支模板下表面设有上弦杆,上弦杆下表面设有竖腹杆,竖腹杆为两个,两竖腹杆顶部与上弦杆之间固定连接,其底部位于一拉杆端头上,拉杆端头通过球头与竖腹杆连接,拉杆端头位于一梁模板上,梁模板内设有钢箍,梁模板位于一下弦杆上表面上,且梁模板与下弦杆之间可拆卸连接。
2.根据权利要求1所述的支模体系,其特征在于:所述支模本体高度在两至五厘米之间。
3.根据权利要求1所述的支模体系,其特征在于:所述支模板采用防水材料板。
4.根据权利要求1所述的支模体系,其特征在于:所述竖腹杆穿插在上弦杆内。
5.根据权利要求1所述的支模体系,其特征在于:所述钢箍上设有调节旋钮。
6.根据权利要求1所述的支模体系,其特征在于:所述下弦杆与梁模板之间安装有螺钉。
CN201510045796.7A 2015-01-29 2015-01-29 支模体系 Expired - Fee Related CN104652808B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510045796.7A CN104652808B (zh) 2015-01-29 2015-01-29 支模体系

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510045796.7A CN104652808B (zh) 2015-01-29 2015-01-29 支模体系

Publications (2)

Publication Number Publication Date
CN104652808A true CN104652808A (zh) 2015-05-27
CN104652808B CN104652808B (zh) 2017-02-22

Family

ID=53244392

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510045796.7A Expired - Fee Related CN104652808B (zh) 2015-01-29 2015-01-29 支模体系

Country Status (1)

Country Link
CN (1) CN104652808B (zh)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6480637A (en) * 1987-09-22 1989-03-27 Fudo Technical Kk Method of forming beam of building
CN201011127Y (zh) * 2007-03-16 2008-01-23 朱卫国 悬空式钢木组合模板
CN101787796A (zh) * 2010-01-25 2010-07-28 郑蓉军 钢结构混凝土楼板施工用悬挂模板支撑系统
CN103061501A (zh) * 2012-12-29 2013-04-24 中建八局第二建设有限公司 建筑物的组合梁和楼板结构的模板支撑体系及施工方法
CN203961281U (zh) * 2014-06-24 2014-11-26 中建八局大连建设工程有限公司 钢筋桁架梁模架及h型钢梁-现浇混凝土楼板支模体系
CN204609291U (zh) * 2015-01-29 2015-09-02 成都迅德科技有限公司 支模体系

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6480637A (en) * 1987-09-22 1989-03-27 Fudo Technical Kk Method of forming beam of building
CN201011127Y (zh) * 2007-03-16 2008-01-23 朱卫国 悬空式钢木组合模板
CN101787796A (zh) * 2010-01-25 2010-07-28 郑蓉军 钢结构混凝土楼板施工用悬挂模板支撑系统
CN103061501A (zh) * 2012-12-29 2013-04-24 中建八局第二建设有限公司 建筑物的组合梁和楼板结构的模板支撑体系及施工方法
CN203961281U (zh) * 2014-06-24 2014-11-26 中建八局大连建设工程有限公司 钢筋桁架梁模架及h型钢梁-现浇混凝土楼板支模体系
CN204609291U (zh) * 2015-01-29 2015-09-02 成都迅德科技有限公司 支模体系

Also Published As

Publication number Publication date
CN104652808B (zh) 2017-02-22

Similar Documents

Publication Publication Date Title
CN201826525U (zh) 建筑爬升模板体系装置
CN104453197B (zh) 高空大悬挑砼结构型钢支撑平台
CN201158933Y (zh) 一种高层外挑结构维修脚手架装置
CN102146731B (zh) 一种钢结构房屋楼层模板支撑结构及施工方法
CN106150087B (zh) 一种组合式框架柱模板及其施工方法
CN105275203B (zh) 伸缩梁及利用其制作的可调模架体系和该模架的施工方法
CN103352428A (zh) 悬索桥索塔横梁无支架施工方法
CN105862602A (zh) 空心混凝土斜塔的翻转式模板系统及其施工方法
CN103061501A (zh) 建筑物的组合梁和楼板结构的模板支撑体系及施工方法
CN203834926U (zh) 清水混凝土地下室外墙模板支模结构
CN205636516U (zh) 空心混凝土斜塔的翻转式模板系统
CN202509765U (zh) 悬挑平台模板
CN202125061U (zh) 大空间混凝土结构脚手架
CN207700680U (zh) 一种屋面板吊模
CN202047592U (zh) 一种钢结构房屋楼层模板支撑结构
CN109457814A (zh) 基于贝雷架结构的高耸及大直径建筑物顶盖施工方法
CN102312563A (zh) 大跨度、超层高结构外脚手架连墙方法
CN203034799U (zh) 塔吊标准节支承高空支模钢平台结构
CN204609291U (zh) 支模体系
CN105625732B (zh) 超高悬挑钢结构桁架无支撑施工方法
CN201730330U (zh) 一种建筑用梁模板
CN208380049U (zh) 悬挑外脚手架可拆装式三角形组合型钢悬挑支撑
CN110453916A (zh) 借助可调节圆弧梁定型化支模结构的弧形梁施工方法
CN104652808B (zh) 支模体系
CN202831628U (zh) 浇筑大跨度混凝土梁用组合式贝雷架承重排架

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Liang Bei

Inventor before: Gong Suhua

COR Change of bibliographic data
TA01 Transfer of patent application right

Effective date of registration: 20170110

Address after: 315046 Zhejiang Province, Ningbo City Jiangdong District Xingning Lane No. 83 room 622

Applicant after: Liang Bei

Address before: Jinjiang District Jinhua Road Chengdu City, Sichuan province 610000 section of No. 8 Building 1 11 unit 18 floor No. 1846

Applicant before: CHENGDU XUNDE TECHNOLOGY CO., LTD.

C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20190514

Address after: 317000 Jinmao Center, Jiaojiang District, Taizhou City, Zhejiang Province 1107

Patentee after: Zhejiang Lihe Intellectual Property Agency Co., Ltd.

Address before: Room 622, 83 Xingning Lane, Jiangdong District, Ningbo City, Zhejiang Province

Patentee before: Liang Bei

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190708

Address after: 323400 No. 19 Changhong West Road, Xiping Street, Songyang County, Lishui City, Zhejiang Province

Patentee after: Zhejiang Jobon Construction Engineering Co., Ltd.

Address before: 317000 Jinmao Center, Jiaojiang District, Taizhou City, Zhejiang Province 1107

Patentee before: Zhejiang Lihe Intellectual Property Agency Co., Ltd.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170222

Termination date: 20200129

CF01 Termination of patent right due to non-payment of annual fee