CN106828544A - A kind of movement across lines route triggering method and device - Google Patents

A kind of movement across lines route triggering method and device Download PDF

Info

Publication number
CN106828544A
CN106828544A CN201611127559.6A CN201611127559A CN106828544A CN 106828544 A CN106828544 A CN 106828544A CN 201611127559 A CN201611127559 A CN 201611127559A CN 106828544 A CN106828544 A CN 106828544A
Authority
CN
China
Prior art keywords
route
train
validity check
lines
triggering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611127559.6A
Other languages
Chinese (zh)
Other versions
CN106828544B (en
Inventor
张建明
杨旭文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Traffic Control Technology TCT Co Ltd
Original Assignee
Traffic Control Technology TCT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Traffic Control Technology TCT Co Ltd filed Critical Traffic Control Technology TCT Co Ltd
Priority to CN201611127559.6A priority Critical patent/CN106828544B/en
Publication of CN106828544A publication Critical patent/CN106828544A/en
Application granted granted Critical
Publication of CN106828544B publication Critical patent/CN106828544B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L27/00Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Train Traffic Observation, Control, And Security (AREA)

Abstract

The invention provides a kind of movement across lines route triggering method and device, methods described includes:During movement across lines, train automatic monitoring system ATS it is determined that from the current location of train to the optimal path of destination, and searches route to be triggered according to operational plan or train first code according to the optimal path;When the train reaches cross-line route triggering section, the yard state that the ATS sends according to adjacent lines carries out validity check to cross-line route;When the validity check passes through, the ATS sends route trigger command to the interface equipment of adjacent lines, to trigger cross-line route.Path planning, route validity check, route trigger command when the present invention realizes train movement across lines such as send at the process so that ATS systems possess the support to movement across lines.

Description

A kind of movement across lines route triggering method and device
Technical field
The present invention relates to Train Operation Control Technology field, more particularly to a kind of movement across lines route triggering method and dress Put.
Background technology
Train automatic monitoring system (Automatic Train Supervision, abbreviation ATS), with train traffic control as core The heart, realizes the functions such as train operation monitoring, train traffic control control and the monitoring of equipment running status, operation data record. Station extension set is the nucleus equipment in ATS systems, and its major function includes:Automatically train route is handled, running number is distributed automatically, Adjust automatically Train Interval, records service data, sends yard monitoring data etc..
Movement across lines are the operation ways that a kind of train runs in a plurality of circuit.This operation way can change passenger Multiply station and need not get off and changed to, be effectively improved efficiency of operation, and greatly facilitate the trip of passenger.Route is triggered It is ATS Core Features, is the operational plan formulated according to the system same day or manually for train designated destination, automatically Be that train selects most rational path, and when train reaches triggering rail automatic trigger column front side route.And occurring During special circumstances (for example:Route accommodation, deflection path, destination change etc.), can be adjusted automatically according to system current state Train path, and trigger front route so that the features such as system possesses high fault-tolerant, intelligent.
Under the overall background that the scheme of interconnecting is carried forward vigorously in various regions, traditional ATS functions can not meet cross-line fortune Capable requirement, therefore the ATS systems with cross-line function are current development trends.Wherein cross-line triggers route and adjacent line Between adjacent concentration zones synchrodata (including train and yard information) function be to realize the Core Feature of movement across lines.
The content of the invention
For the defect of prior art, the invention provides a kind of movement across lines route triggering method and device, can solve Certainly existing ATS functions cannot meet the problem of movement across lines requirement.
In a first aspect, the invention provides a kind of movement across lines route triggering method, methods described includes:
During movement across lines, train automatic monitoring system ATS is according to operational plan or train first code, it is determined that working as from train And route to be triggered is searched according to the optimal path to the optimal path of destination in front position;
When the train reaches cross-line route triggering section, the yard state pair that the ATS sends according to adjacent lines Cross-line route carries out validity check;
When the validity check passes through, the ATS sends route trigger command to the interface equipment of adjacent lines, To trigger cross-line route.
Alternatively, the train automatic monitoring system ATS is according to operational plan or train first code, it is determined that working as from train Front position to destination optimal path, including:
If the train is first code car, or the train is when planning car and train deviation intended path, to judge Whether the destination of the train is in the concentration zones adjacent with current line;
If the destination of the train is in the concentration zones adjacent with current line, arrived according to the train current location The coordinates measurement path digraph of destination, and it is calculated optimal path;
If the destination of the train is not in the concentration zones adjacent with current line, by the adjacent concentration zones most The parking area of distal end is set to middle destination, according to the coordinates measurement road of the train current location to the middle destination Footpath digraph, and it is calculated optimal path.
Alternatively, described when the train reaches cross-line route triggering section, the ATS sends according to adjacent lines Yard state carries out validity check to cross-line route, including:
If the logic block of route first is taken by car, validity check does not pass through;
If the train is not the train nearest apart from route, validity check does not pass through;
If the train is have car to take in non-communicating car and route, validity check does not pass through;
Triggering turn back route when, if having car to take in the route, validity check does not pass through;
When triggering is by route, if being presence with the route consistent the turning back into line state of end signal machine all the time, effectively Property inspection does not pass through;
If there is track switch, section locking where the track switch and its linkage turnout junction, and switch location and route institute in route Position is needed not to be inconsistent, then validity check does not pass through.
Alternatively, methods described also includes:
When the train receiving route triggers section and the route is not cross-line route, the ATS is to the route Carry out validity check;
When the validity check passes through, the ATS sends to computer interlock system route trigger command, to touch Hair route.
Alternatively, methods described also includes:
During the train receiving route triggering section, the route for having dependence with route to be triggered is judged whether;
If in the presence of the route for having dependence with route to be triggered, triggering is relied on route;
It is described be relied in the complete locking of route or preset time period that failed triggering is described to be relied on route when, it is tactile The dependence route for sending out current.
Alternatively, methods described also includes:
When route to be triggered is searched, the flexible strategy of route is judged whether;
If there is the flexible strategy of route, the route information to be triggered is obtained according to the flexible strategy of the route.
Second aspect, the invention provides a kind of movement across lines route triggering device, described device includes:
Path determining unit, in movement across lines, according to operational plan or train first code, it is determined that working as from train And route to be triggered is searched according to the optimal path to the optimal path of destination in front position;
Validity check unit, for when the train reaches cross-line route triggering section, being sent according to adjacent lines Yard state validity check is carried out to cross-line route;
Route trigger element, for when the validity check passes through, route trigger command being sent to adjacent lines Interface equipment, to trigger cross-line route.
Alternatively, the path determining unit, specifically for:
If the train is first code car, or the train is when planning car and train deviation intended path, to judge Whether the destination of the train is in the concentration zones adjacent with current line;
If the destination of the train is in the concentration zones adjacent with current line, arrived according to the train current location The coordinates measurement path digraph of destination, and it is calculated optimal path;
If the destination of the train is not in the concentration zones adjacent with current line, by the adjacent concentration zones most The parking area of distal end is set to middle destination, according to the coordinates measurement road of the train current location to the middle destination Footpath digraph, and it is calculated optimal path.
Alternatively, the validity check unit, specifically for:
If the logic block of route first is taken by car, validity check does not pass through;
If the train is not the train nearest apart from route, validity check does not pass through;
If the train is have car to take in non-communicating car and route, validity check does not pass through;
Triggering turn back route when, if having car to take in the route, validity check does not pass through;
When triggering is by route, if being presence with the route consistent the turning back into line state of end signal machine all the time, effectively Property inspection does not pass through;
If there is track switch, section locking where the track switch and its linkage turnout junction, and switch location and route institute in route Position is needed not to be inconsistent, then validity check does not pass through.
Alternatively, the validity check unit, is additionally operable to trigger section and the route in the train receiving route When not being cross-line route, validity check is carried out to the route;
Route trigger element, is additionally operable to, when the validity check passes through, route trigger command be sent to computer Interlock system, to trigger route.
As shown from the above technical solution, the present invention provides a kind of movement across lines route triggering method and device, in cross-line fortune During row, the path of adjacent line can be automatically calculated according to train operation plan or train first code;During cross-line triggering route, According to the yard state that adjacent line sends, the route for plan triggering carries out validity check;After validity check passes through, to The interface equipment of adjacent lines sends route trigger command to trigger cross-line route.In this way, the present invention realizes train cross-line fortune The processes such as path planning, route validity check, route the trigger command transmission during row so that ATS systems possess to cross-line The support of operation.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing The accompanying drawing to be used needed for having technology description is briefly described, it should be apparent that, drawings in the following description are only this Some embodiments of invention, for those of ordinary skill in the art, on the premise of not paying creative work, can be with Other accompanying drawings are obtained according to these figures.
Fig. 1 is a kind of schematic flow sheet of movement across lines route triggering method that one embodiment of the invention is provided;
Fig. 2 is the yard schematic diagram that another embodiment of the present invention is provided;
Fig. 3 is the schematic diagram of the path digraph that another embodiment of the present invention is provided;
Fig. 4 is the dependence route schematic diagram that another embodiment of the present invention is provided;
Fig. 5 is the schematic flow sheet of the determination planning driving path that another embodiment of the present invention is provided;
Fig. 6 is the schematic flow sheet of the route triggering that another embodiment of the present invention is provided;
Fig. 7 is a kind of structural representation of movement across lines route triggering device that one embodiment of the invention is provided.
Specific embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than whole embodiments.It is based on Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under the premise of creative work is not made Embodiment, belongs to the scope of protection of the invention.
Fig. 1 is a kind of schematic flow sheet of the movement across lines route triggering method in one embodiment of the invention, such as Fig. 1 institutes Show, methods described comprises the following steps:
S1:During movement across lines, train automatic monitoring system ATS according to operational plan or train first code, it is determined that from train Current location to the optimal path of destination, and route to be triggered is searched according to the optimal path.
Specifically, when train carries out the movement across lines from current line to adjacent lines, the ATS system roots of current line The parking area that destination is adjacent lines is can determine that according to train first code, the station classification of such ATS can be according to path unit number Actual yard is converted into a digraph, so as to according to the default property of path unit and by the minimum original of parking area Then, the most rational path from train current location to destination can be filtered out.
S2:When the train reaches cross-line route triggering section, the yard state that the ATS sends according to adjacent lines Validity check is carried out to cross-line route.
Specifically, the optimal path for being determined according to above-mentioned steps searches route to be triggered, and reaches cross-line in train and enter During the triggering section of road, need to carry out validity check to route according to preset rules when adjacent line route is triggered, it is current to determine Whether the route can be triggered.Wherein, cross-line route refers specifically to one end of route positioned at first line, and the other end of route is located at The top and terminal of the second circuit, i.e. route are located on different circuits.
S3:When the validity check passes through, the ATS sets the interface that route trigger command is sent to adjacent lines It is standby, to trigger cross-line route.
Specifically, due to being cross-line route, then when the validity check of above-mentioned steps passes through, then route is triggered and is ordered Order is sent to the interface equipment of adjacent lines, to trigger cross-line route.Understandably, if validity check does not pass through, will touch Hair route cancellation order is sent to the interface equipment of adjacent lines, to cancel triggering route.
In the present embodiment, in movement across lines, can automatically be calculated according to train operation plan or train first code To the path of adjacent line;During cross-line triggering route, according to the yard state that adjacent line sends, the route for plan triggering is carried out effectively Property check;After validity check passes through, send route trigger command to trigger cross-line route to the interface equipment of adjacent lines. In this way, the path planning, route validity check, route trigger command when the present invention realizes train movement across lines send and waited Journey so that ATS systems possess the support to movement across lines.
In an alternate embodiment of the present invention where, above-mentioned steps S1, specifically includes following sub-step:
S101:If the train be first code car, or the train for plan car and the train deviate intended path when, Judge the destination of the train whether in the concentration zones adjacent with current line.
S102:It is current according to the train if the destination of the train is in the concentration zones adjacent with current line Position and is calculated optimal path to the coordinates measurement path digraph of destination.
S103:If the destination of the train is not in the concentration zones adjacent with current line, by the adjacent collection The parking area of middle area's distalmost end is set to middle destination, according to the path of the train current location to the middle destination Generation path digraph, and it is calculated optimal path.
It should be noted that it is the train current location to the middle mesh that optimal path is calculated in step S103 Ground path, and after working as the middle destination that train is reached in the concentration zones adjacent with current line (as shown in Fig. 2 The concentration zones adjacent with current line 1 are the concentration zones C in adjacent lines 2), train is continued as by the ATS of adjacent lines and is searched From the optimal path of middle destination to destination, search procedure such as step S101 to S103 will not be repeated here.
Wherein, first code car has been to confer to run the unplanned car of destination and train number;And it is then to have formulated meter to plan car Draw the train in path.
In the present embodiment, need to make the basic data of the adjacent concentration zones of adjacent lines in advance during cross-line accessed path (including:Section, route, parking area, semaphore, path unit etc.).As shown in Fig. 2 train current location is in AB parking areas Domain, there is provided first code of the destination for adjacent line FC parking areas.Then now station extension set is (adjacent up to parking according to path unit Route set between region) actual yard is converted into a path digraph by data, as shown in figure 3,001 car is needed from current The parking area AB of circuit 1 is travelled to the parking area FC of adjacent lines 2, non-conterminous with circuit 1 because FC belongs to concentration zones D, So first searching AB to FA paths.All paths of AB to FA can be found out using depth-priority-searching method first, such as according to Fig. 2 AB-AD-AE-FA and the paths of AB-AE-FA two can be found out, default property according to path unit and passes through parking The minimum principle in region, filters out a most rational path, i.e. AB-AE-FA.After train enters circuit 2, by the circuit ATS continues as train and searches FA to FC paths, searches mode ibid.
When train number is drawn in design, because intended path is in service chart, therefore only need to check train whether In intended path, the unbeaten path of train is recorded.Plan the path of train again if not in intended path.
Specifically, as shown in figure 5, the step of determining optimal path in step S1, specifically may include:
S501:Judge whether train is plan car, if then going to step S502, otherwise go to step S504;
S502:Whether train is judged in intended path, if then going to step S503, otherwise goes to step S505;
S503:Generation intended path, and terminate the accessed path flow;
Specifically, when train number is drawn in design, because intended path is in service chart, therefore only need to check row Whether car records the unbeaten path of train in intended path.
S504:Judge whether train is first code car, if then going to step S505, otherwise terminate the accessed path flow;
S505:Whether destination is judged in current route or in the concentration zones adjacent with current route, if then turning To step S507, step S506 is otherwise gone to;
S506:After the parking area of distalmost end in the adjacent concentration zones of current line is set into destination, step S507 is gone to;
S507:Judge to whether there is path from train current location to destination, if step S508 is gone in the presence of if, otherwise Terminate the accessed path flow;
S508:Generation path digraph is simultaneously calculated optimal path.
In an alternate embodiment of the present invention where, above-mentioned steps S2, specifically may include:
S201:If the logic block of route first is taken by car, validity check does not pass through.
S202:If the train is not the train nearest apart from route, validity check does not pass through.
S203:If the train is have car to take in non-communicating car and route, validity check does not pass through.
S204:Triggering turn back route when, if having car to take in the route, validity check does not pass through.
S205:When triggering is by route, if being presence with the route consistent the turning back into line state of end signal machine all the time, Validity check does not pass through.
S206:If there is track switch, section locking where the track switch and its linkage turnout junction, and switch location and enter in route Position is not inconsistent needed for road, then validity check does not pass through.
It should be noted that the route in above-mentioned steps S201 to S206 is route to be triggered, based on above-mentioned steps Rule carries out validity check to route to be triggered.
Specifically, as shown in figure 1, concentration zones B stations extension set receives the train and yard of adjacent line concentration zones C periodically The data of this concentration zones are simultaneously issued concentration zones C by state, when train receiving route triggers section, in triggering adjacent line route When need to carry out validity check to route, to determine whether that the route can be triggered.The rule such as step of particular exam Shown in S201 to S206.
Further, methods described also comprises the following steps:
S4:When it is not cross-line route that the train receiving route triggers section and the route, the ATS to it is described enter Road carries out validity check.
It should be noted that when the route to being not belonging to cross-line route carries out validity check, can be using step S201 extremely The rule of S206 carries out validity check.
S5:When the validity check passes through, the ATS sends to computer interlock system route trigger command, To trigger route.
In the present embodiment, when route to be triggered is not cross-line route, need to be by route by rear in validity check Trigger command is sent to computer interlock system.
Further, in an alternate embodiment of the present invention where, route to be triggered is being searched according to the optimal path When, methods described also includes:
A01:During the train receiving route triggering section, judge whether there be entering for dependence with route to be triggered Road.
A02:If in the presence of the route for having dependence with route to be triggered, triggering is relied on route.
A03:It is relied in the complete locking of route or preset time period being relied on route described in failed triggering described When, trigger current dependence route.
Specifically, it refers to exist between two routes to rely on and be relied on relation to rely on route, if being deposited during triggering route In the route for having dependence with route to be triggered, then first triggering is relied on route, until being relied on the complete locking of route or N Second without current dependence route is triggered after triggering successfully again.For example, as shown in figure 4,001 car destination is FA, then need To trigger F1-F2 successively, F2-Z2 routes, but because F2-Z2 is relied on route for F1-F2, so F2-Z2 routes are first triggered, F1-F2 routes are triggered again after the complete lockings of F2-Z2 or N seconds are not triggered successfully.
Further, in an alternate embodiment of the present invention where, route to be triggered is being searched according to the optimal path When, methods described also includes:
B01:When route to be triggered is searched, the flexible strategy of route is judged whether.
B02:If there is the flexible strategy of route, the route information to be triggered is obtained according to the flexible strategy of the route.
Further, after the route information to be triggered is obtained, validity check is carried out to the route to be triggered, to determine Whether route is triggered.
Specifically, route accommodation refers to a kind of artificial driving strategy for setting, and the strategy can make train several etc. Select the parking area specified as planning driving path between valency parking area, need inspection to be when route to be triggered is searched It is no to there is the flexible strategy of route, if route accommodation strategy changes, need according to strategy again path planning.Such as Fig. 2 institutes Show, route accommodation button (" the only FE turns back " button in Fig. 1) is set in ATS so that all purposes ground is the train (bag of FC Include plan car and first code car) FE is changed into destination from FC, and no longer using FC as destination.Route accommodation button is set It is advantageous in that, it is not necessary to be the independent change handled from FC to FE of every train, can so avoid being manually that every train handles change (especially in the case where the train quantity to be changed is more), also solving manually cannot be for plan car handles change for error when more Problem more.
Further, in the case that train destination changes, or manual intervention causes a deviation from intended path, need Again the path of train is planned.
Specifically, as shown in fig. 6, it is determined that the process of the laggard traveling road triggering of optimal path, specifically may include following step Suddenly:
S601:Train enters route and triggers section;
S602:Judge whether to rely on route, if then going to step S603, otherwise go to step S606;
S603:Whether judgement is relied on the complete locking of route, if then going to step S604, otherwise goes to step S605;
S604:Continue former route triggering to check, and go to step S606;
S605:Acquisition is relied on route information, and first triggering is relied on route, and goes to step S601;
S606:The flexible strategy of route is judged whether, if then going to step S607, step S608 is otherwise gone to;
S607:After obtaining the route information to be triggered according to the flexible strategy of route, step S608 is gone to;
S608:Validity check is carried out to route and judges whether validity check passes through, if then going to step S609, Otherwise terminate the route trigger flow;
S609:Determine whether cross-line route, if then going to step S610, otherwise go to step S611;
S610:Route trigger command is sent to the interface message processor (IMP) of adjacent lines;
S611:Route trigger command is sent to computer interlock system.
Fig. 7 is a kind of structural representation of the movement across lines route triggering device in one embodiment of the invention, such as Fig. 7 institutes Show, described device includes:Path determining unit 701, validity check unit 702 and route trigger element 703.Wherein:
Path determining unit 701, in movement across lines, according to operational plan or train first code, it is determined that from train Current location to the optimal path of destination, and route to be triggered is searched according to the optimal path;
Validity check unit 702, for when the train reaches cross-line route triggering section, being sent out according to adjacent lines The yard state sent carries out validity check to cross-line route;
Route trigger element 701, for when the validity check passes through, route trigger command being sent to adjacent lines The interface equipment on road, to trigger cross-line route.
In an alternate embodiment of the present invention where, the path determining unit 701, specifically for:
If the train is first code car, or the train is when planning car and train deviation intended path, to judge Whether the destination of the train is in the concentration zones adjacent with current line;
If the destination of the train is in the concentration zones adjacent with current line, arrived according to the train current location The coordinates measurement path digraph of destination, and it is calculated optimal path;
If the destination of the train is not in the concentration zones adjacent with current line, by the adjacent concentration zones most The parking area of distal end is set to middle destination, according to the coordinates measurement road of the train current location to the middle destination Footpath digraph, and it is calculated optimal path.
In an alternate embodiment of the present invention where, the validity check unit 703, specifically for:
If the logic block of route first is taken by car, validity check does not pass through;
If the train is not the train nearest apart from route, validity check does not pass through;
If the train is have car to take in non-communicating car and route, validity check does not pass through;
Triggering turn back route when, if having car to take in the route, validity check does not pass through;
When triggering is by route, if being presence with the route consistent the turning back into line state of end signal machine all the time, effectively Property inspection does not pass through;
If there is track switch, section locking where the track switch and its linkage turnout junction, and switch location and route institute in route Position is needed not to be inconsistent, then validity check does not pass through.
In an alternate embodiment of the present invention where, the validity check unit 702, is additionally operable to be reached in the train Route triggers section and the route when not being cross-line route, and validity check is carried out to the route;
Route trigger element 703, is additionally operable to, when the validity check passes through, route trigger command be sent to calculating Machine interlock system, to trigger route.
In an alternate embodiment of the present invention where, described device also includes:Route trigger element is relied on, specifically for:
During the train receiving route triggering section, the route for having dependence with route to be triggered is judged whether;
If in the presence of the route for having dependence with route to be triggered, triggering is relied on route;
It is described be relied in the complete locking of route or preset time period that failed triggering is described to be relied on route when, it is tactile The dependence route for sending out current.
In an alternate embodiment of the present invention where, described device also includes:Route accommodation unit, specifically for:
When route to be triggered is searched, the flexible strategy of route is judged whether;
If there is the flexible strategy of route, the route information to be triggered is obtained according to the flexible strategy of the route.
For device embodiment, because it is substantially similar to embodiment of the method, so description is fairly simple, it is related Part is illustrated referring to the part of embodiment of the method.
In the description of the invention, it is necessary to explanation, term " on ", the orientation of the instruction such as D score or position relationship be base In orientation shown in the drawings or position relationship, it is for only for ease of and describes of the invention and simplify description, rather than instruction or hint Signified device or element must have specific orientation, with specific azimuth configuration and operation, therefore it is not intended that to this The limitation of invention.Unless otherwise clearly defined and limited, term " installation ", " connected ", " connection " should be interpreted broadly, example Such as, can be fixedly connected, or be detachably connected, or be integrally connected;Can mechanically connect, or be electrically connected Connect;Can be joined directly together, it is also possible to be indirectly connected to by intermediary, can be two connections of element internal.For this For the those of ordinary skill in field, above-mentioned term concrete meaning in the present invention can be as the case may be understood.
Also, it should be noted that herein, such as first and second or the like relational terms are used merely to one Entity or operation make a distinction with another entity or operation, and between not necessarily requiring or implying these entities or operate There is any this actual relation or order.And, term " including ", "comprising" or its any other variant be intended to contain Lid nonexcludability is included, so that process, method, article or equipment including a series of key elements not only will including those Element, but also other key elements including being not expressly set out, or also include being this process, method, article or equipment Intrinsic key element.In the absence of more restrictions, the key element limited by sentence "including a ...", it is not excluded that Also there is other identical element in process, method, article or equipment including the key element.
The above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although with reference to the foregoing embodiments The present invention has been described in detail, it will be understood by those within the art that:It still can be to foregoing each implementation Technical scheme described in example is modified, or carries out equivalent to which part technical characteristic;And these modification or Replace, do not make the spirit and scope of the essence disengaging various embodiments of the present invention technical scheme of appropriate technical solution.

Claims (10)

1. a kind of movement across lines route triggering method, it is characterised in that methods described includes:
During movement across lines, train automatic monitoring system ATS according to operational plan or train first code, it is determined that from the present bit of train The optimal path to destination is put, and route to be triggered is searched according to the optimal path;
When the train reaches cross-line route triggering section, the yard state that the ATS is sent according to adjacent lines is to cross-line Route carries out validity check;
When the validity check passes through, the ATS sends route trigger command to the interface equipment of adjacent lines, to touch Hair cross-line route.
2. movement across lines route triggering method according to claim 1, it is characterised in that the train automatic monitoring system ATS according to operational plan or train first code, it is determined that from the current location of train to the optimal path of destination, including:
If the train is first code car, or the train is when planning car and train deviation intended path, to judge described Whether the destination of train is in the concentration zones adjacent with current line;
If the destination of the train is in the concentration zones adjacent with current line, according to the train current location to purpose The coordinates measurement path digraph on ground, and it is calculated optimal path;
If the destination of the train is not in the concentration zones adjacent with current line, by the adjacent concentration zones distalmost end Parking area be set to middle destination, had to the coordinates measurement path of the middle destination according to the train current location Xiang Tu, and it is calculated optimal path.
3. movement across lines route triggering method according to claim 1, it is characterised in that it is described the train reach across During line route triggering section, the yard state that the ATS sends according to adjacent lines carries out validity check to cross-line route, bag Include:
If the logic block of route first is taken by car, validity check does not pass through;
If the train is not the train nearest apart from route, validity check does not pass through;
If the train is have car to take in non-communicating car and route, validity check does not pass through;
Triggering turn back route when, if having car to take in the route, validity check does not pass through;
When triggering is by route, if being presence, validity inspection with the route consistent the turning back into line state of end signal machine all the time Look into and do not pass through;
If there is track switch, section locking where the track switch and its linkage turnout junction, and switch location and position needed for route in route Put and be not inconsistent, then validity check does not pass through.
4. movement across lines route triggering method according to claim 1, it is characterised in that methods described also includes:
When the train receiving route triggers section and the route is not cross-line route, the ATS is carried out to the route Validity check;
When the validity check passes through, the ATS sends to computer interlock system route trigger command, with trigger into Road.
5. the movement across lines route triggering method according to any one of Claims 1 to 4, it is characterised in that methods described Also include:
During the train receiving route triggering section, the route for having dependence with route to be triggered is judged whether;
If in the presence of the route for having dependence with route to be triggered, triggering is relied on route;
It is described be relied in the complete locking of route or preset time period that failed triggering is described to be relied on route when, triggering ought Preceding dependence route.
6. the movement across lines route triggering method according to any one of Claims 1 to 4, it is characterised in that methods described Also include:
When route to be triggered is searched, the flexible strategy of route is judged whether;
If there is the flexible strategy of route, the route information to be triggered is obtained according to the flexible strategy of the route.
7. a kind of movement across lines route triggering device, it is characterised in that described device includes:
Path determining unit, in movement across lines, according to operational plan or train first code, it is determined that from the present bit of train The optimal path to destination is put, and route to be triggered is searched according to the optimal path;
Validity check unit, for when the train reaches cross-line route triggering section, according to the station that adjacent lines sends Field state carries out validity check to cross-line route;
Route trigger element, for when the validity check passes through, route trigger command being sent into connecing to adjacent lines Jaws equipment, to trigger cross-line route.
8. movement across lines route triggering device according to claim 7, it is characterised in that the path determining unit, tool Body is used for:
If the train is first code car, or the train is when planning car and train deviation intended path, to judge described Whether the destination of train is in the concentration zones adjacent with current line;
If the destination of the train is in the concentration zones adjacent with current line, according to the train current location to purpose The coordinates measurement path digraph on ground, and it is calculated optimal path;
If the destination of the train is not in the concentration zones adjacent with current line, by the adjacent concentration zones distalmost end Parking area be set to middle destination, had to the coordinates measurement path of the middle destination according to the train current location Xiang Tu, and it is calculated optimal path.
9. movement across lines route triggering device according to claim 7, it is characterised in that the validity check unit, Specifically for:
If the logic block of route first is taken by car, validity check does not pass through;
If the train is not the train nearest apart from route, validity check does not pass through;
If the train is have car to take in non-communicating car and route, validity check does not pass through;
Triggering turn back route when, if having car to take in the route, validity check does not pass through;
When triggering is by route, if being presence, validity inspection with the route consistent the turning back into line state of end signal machine all the time Look into and do not pass through;
If there is track switch, section locking where the track switch and its linkage turnout junction, and switch location and position needed for route in route Put and be not inconsistent, then validity check does not pass through.
10. movement across lines route triggering device according to claim 7, it is characterised in that
The validity check unit, is additionally operable to trigger section in the train receiving route and the route is not cross-line route When, validity check is carried out to the route;
Route trigger element, is additionally operable to, when the validity check passes through, route trigger command be sent to computer interlock System, to trigger route.
CN201611127559.6A 2016-12-09 2016-12-09 A kind of movement across lines route triggering method and device Active CN106828544B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611127559.6A CN106828544B (en) 2016-12-09 2016-12-09 A kind of movement across lines route triggering method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611127559.6A CN106828544B (en) 2016-12-09 2016-12-09 A kind of movement across lines route triggering method and device

Publications (2)

Publication Number Publication Date
CN106828544A true CN106828544A (en) 2017-06-13
CN106828544B CN106828544B (en) 2018-11-23

Family

ID=59139776

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611127559.6A Active CN106828544B (en) 2016-12-09 2016-12-09 A kind of movement across lines route triggering method and device

Country Status (1)

Country Link
CN (1) CN106828544B (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107444432A (en) * 2017-08-14 2017-12-08 北京全路通信信号研究设计院集团有限公司 Control method
CN107499336A (en) * 2017-08-14 2017-12-22 北京全路通信信号研究设计院集团有限公司 Control method
CN109278811A (en) * 2018-09-27 2019-01-29 北京全路通信信号研究设计院集团有限公司 A kind of comprehensive automation realization system and method for railway passenger station Transportation Organization
CN109383564A (en) * 2017-08-02 2019-02-26 比亚迪股份有限公司 Train control vehicle method and device
CN109421769A (en) * 2017-09-01 2019-03-05 阿尔斯通运输科技公司 The method for controlling the passage of vehicle in a network
CN109572753A (en) * 2018-12-13 2019-04-05 交控科技股份有限公司 The overline train VOBC configuration file processing method suitable for interconnecting
CN110962889A (en) * 2019-11-11 2020-04-07 通号城市轨道交通技术有限公司 Automatic route selection and arrangement method and device for head yard vehicle
CN112026853A (en) * 2020-08-31 2020-12-04 青岛海信微联信号有限公司 Train route access method, device, equipment and medium
CN112172872A (en) * 2020-08-25 2021-01-05 通号城市轨道交通技术有限公司 Method and device for detecting train conflict, electronic equipment and storage medium
CN112208590A (en) * 2020-09-25 2021-01-12 通号城市轨道交通技术有限公司 Train route control method and device based on static route table
CN114074695A (en) * 2020-08-12 2022-02-22 比亚迪股份有限公司 Train route handling method, device, equipment and storage medium
CN114368417A (en) * 2022-01-18 2022-04-19 连云港职业技术学院 Intelligent train route arrangement method and system based on machine learning

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5475597A (en) * 1993-02-24 1995-12-12 Amsc Subsidiary Corporation System for mapping occurrences of predetermined conditions in a transport route
CN101513891A (en) * 2008-12-29 2009-08-26 卡斯柯信号有限公司 Method for automatic route processing in train running control
CN101804823A (en) * 2009-02-17 2010-08-18 宝山钢铁股份有限公司 Method and device for automatically controlling railway route entry
CN101898568A (en) * 2010-07-16 2010-12-01 北京全路通信信号研究设计院 Minizone train route transaction method and system
CN101898569A (en) * 2010-07-16 2010-12-01 北京全路通信信号研究设计院 Method and system for controlling train route
CN102874279A (en) * 2012-09-26 2013-01-16 北京交控科技有限公司 Train route handling method
CN103738359A (en) * 2013-12-16 2014-04-23 北京交控科技有限公司 Control method and system of route trigger order

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5475597A (en) * 1993-02-24 1995-12-12 Amsc Subsidiary Corporation System for mapping occurrences of predetermined conditions in a transport route
CN101513891A (en) * 2008-12-29 2009-08-26 卡斯柯信号有限公司 Method for automatic route processing in train running control
CN101804823A (en) * 2009-02-17 2010-08-18 宝山钢铁股份有限公司 Method and device for automatically controlling railway route entry
CN101898568A (en) * 2010-07-16 2010-12-01 北京全路通信信号研究设计院 Minizone train route transaction method and system
CN101898569A (en) * 2010-07-16 2010-12-01 北京全路通信信号研究设计院 Method and system for controlling train route
CN102874279A (en) * 2012-09-26 2013-01-16 北京交控科技有限公司 Train route handling method
CN103738359A (en) * 2013-12-16 2014-04-23 北京交控科技有限公司 Control method and system of route trigger order

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109383564A (en) * 2017-08-02 2019-02-26 比亚迪股份有限公司 Train control vehicle method and device
CN107444432A (en) * 2017-08-14 2017-12-08 北京全路通信信号研究设计院集团有限公司 Control method
CN107499336A (en) * 2017-08-14 2017-12-22 北京全路通信信号研究设计院集团有限公司 Control method
CN107444432B (en) * 2017-08-14 2021-03-16 北京全路通信信号研究设计院集团有限公司 Control method for improving train cross-line route access efficiency
CN109421769A (en) * 2017-09-01 2019-03-05 阿尔斯通运输科技公司 The method for controlling the passage of vehicle in a network
CN109421769B (en) * 2017-09-01 2022-06-17 阿尔斯通运输科技公司 Method for controlling the passage of a vehicle in a network
CN109278811B (en) * 2018-09-27 2020-11-24 北京全路通信信号研究设计院集团有限公司 Comprehensive automatic implementation system and method for transportation organization of railway passenger station
CN109278811A (en) * 2018-09-27 2019-01-29 北京全路通信信号研究设计院集团有限公司 A kind of comprehensive automation realization system and method for railway passenger station Transportation Organization
CN109572753A (en) * 2018-12-13 2019-04-05 交控科技股份有限公司 The overline train VOBC configuration file processing method suitable for interconnecting
CN109572753B (en) * 2018-12-13 2021-03-12 交控科技股份有限公司 Cross-line train VOBC configuration file processing method suitable for interconnection and interworking
CN110962889A (en) * 2019-11-11 2020-04-07 通号城市轨道交通技术有限公司 Automatic route selection and arrangement method and device for head yard vehicle
CN114074695A (en) * 2020-08-12 2022-02-22 比亚迪股份有限公司 Train route handling method, device, equipment and storage medium
CN112172872A (en) * 2020-08-25 2021-01-05 通号城市轨道交通技术有限公司 Method and device for detecting train conflict, electronic equipment and storage medium
CN112172872B (en) * 2020-08-25 2022-11-29 通号城市轨道交通技术有限公司 Method, device, electronic equipment and storage medium for detecting train conflict
CN112026853A (en) * 2020-08-31 2020-12-04 青岛海信微联信号有限公司 Train route access method, device, equipment and medium
CN112208590A (en) * 2020-09-25 2021-01-12 通号城市轨道交通技术有限公司 Train route control method and device based on static route table
CN114368417A (en) * 2022-01-18 2022-04-19 连云港职业技术学院 Intelligent train route arrangement method and system based on machine learning
CN114368417B (en) * 2022-01-18 2022-07-19 连云港职业技术学院 Intelligent train route arrangement method and system based on machine learning

Also Published As

Publication number Publication date
CN106828544B (en) 2018-11-23

Similar Documents

Publication Publication Date Title
CN106828544A (en) A kind of movement across lines route triggering method and device
CN101210825B (en) Map information generating systems
CN102374868B (en) Route search device, route search method
CN100580735C (en) Real-time dynamic traffic information processing method based on car detecting technique
CN100515845C (en) Train locating method adapted for different obturation modes
US8073617B2 (en) Map information generating systems, methods, and programs
JP4793703B2 (en) Center device for route guidance system
CN102192749B (en) Route line transformation method, road information providing device and road information providing system
DE602004003434T2 (en) Device for storing the traffic condition and recording medium, system, method and program storing the program
CN1936999A (en) City area-traffic cooperative control method based wireless sensor network
CN107241512A (en) Intercity Transportation trip mode determination methods and equipment based on data in mobile phone
CN102096702B (en) Process system of vehicle travel mileage and process method thereof
CN101308029A (en) Road network grid matching, road status messages and introduction route information acquisition method
KR20060044719A (en) Traffic information providing system
CN104471350A (en) In-vehicle traffic information notification device
CN106032986A (en) Navigation method, terminal and system
CN108871354A (en) Road information processing method and processing system
CN107272689A (en) A kind of Transport route planning and monitoring system and its path planning and monitoring method
EP2873586A1 (en) Method for selecting alternate operating route for train, and system therefor
CN103426298A (en) Bus rapid transit arrival information release system and method accurate to second
JP2008164821A (en) Map information generation system
CN103426302B (en) Transfer station bus rapid transit compartment transfer information release system and release method
CN108562296B (en) Road matching method and device based on vehicle satellite positioning data
CN107403550A (en) Transit network collecting method, device and terminal device
CN108009203A (en) A kind of method that railway mileage is mutually changed with coordinate

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant