The content of the invention
It is an object of the invention to provide a kind of dust suction of the router machine tool that can effectively solve above-mentioned technical problem
Cleaner.
To reach the purpose of the present invention, adopt the following technical scheme that:
A kind of dust suction cleaner of router machine tool, the dust suction cleaner of the router machine tool includes
First frame device, the first filter being arranged on first frame device, positioned at first filter lower section
The second filter, the drive device below second filter, below first frame device
Water storage device, the plumbing installation on the right side of first frame device, the second framework dress below the plumbing installation
The 3rd filter put, being contained in the second framework device and the 4th filtering below the 3rd filter
Device, first frame device includes the first framework, the water inlet pipe on the right side of first framework, is arranged at the water inlet
The first water pump, the first valve on pipe, the air inlet pipe on the left of first framework, the wind being arranged in the air inlet pipe
Machine, the second valve and the first fix bar being arranged on the blower fan, first filter is including the first motor, positioned at institute
State the first support of the first motor left and right sides, the first rotating shaft below first motor, positioned at the first rotating shaft
The rotating disk of lower section, the sponge ring below the rotating disk, the filter ring on the outside of the sponge ring, the second filtering dress
Put including the first transverse slat, the second transverse slat below first transverse slat, the collection center below second transverse slat, receipts
It is dissolved in first sponge block and the first plugging block below first sponge block of the concentration inframe, the drive device
Including the 3rd transverse slat, the first montant below the 3rd transverse slat, the first spring, position below first montant
The first locating rack above first spring, the second montant on the left of first locating rack, it is arranged at described
First roller of two montant upper ends, the bracing wire acted against on first roller, the first horizontal stroke above the 3rd transverse slat
Bar, the second roller positioned at the first cross bar right-hand member, the second motor on the left of first framework, it is arranged at described
Second support and output shaft on two output shafts, the water storage device include storage tank, above the storage tank first
Pipeline, the second pipe on the left of the storage tank, the 3rd valve being arranged in the second pipe, positioned at the water storage
The 3rd support on the right side of case, the plumbing installation includes the 3rd pipeline, the 4th valve being arranged on the 3rd pipeline and position
The second fix bar below the 3rd pipeline, the second framework device is including second framework, positioned at the 3rd framework
The discharge pipe in left side and the 5th valve being arranged on the discharge pipe, the 3rd filter include the 3rd framework, house
In the second sponge block in the 3rd framework, the first screen pack below second sponge block, positioned at the described 3rd
The 4th transverse slat below framework and the second screen pack below the 4th transverse slat, the 4th filter include the 5th
Transverse slat, the riser below the 5th transverse slat, the 3rd sponge block below the riser, positioned at the 3rd sponge
The 3rd screen pack on the right side of block, the second spring on the right side of the 3rd screen pack and the cam on the left of the riser.
Compared with prior art, the present invention has the advantages that:The dust suction dedusting of router machine tool of the present invention
The wood powder that equipment can be produced in plank process is sucked wherein, and the effect of purification filtering is carried out to it, is entered
And can prevent from directly being discharged to being polluted in environment, environmental protection, and the wood chip of high temperature that can be to sucking enters
Row cooling, prevents it from causing to damage to the present invention.
Specific embodiment
Clearly complete explanation is made to the dust suction cleaner of router machine tool of the present invention below in conjunction with accompanying drawing.
As shown in figure 1, the dust suction cleaner of router machine tool of the present invention includes the first frame device 1, is arranged at
The first filter 2 on first frame device 1, the second filter 3 positioned at the lower section of first filter 2,
Drive device 4 positioned at the lower section of second filter 3, the water storage device 5, position positioned at the lower section of first frame device 1
Plumbing installation 6 in the right side of first frame device 1, the second framework device 7 positioned at the lower section of the plumbing installation 6, collecting
In the 3rd filter 8 in the second framework device 7 and the 4th filter positioned at the lower section of the 3rd filter 8
9。
As shown in figure 1, first frame device 1 includes the first framework 11, entering positioned at the right side of first framework 11
Water pipe 12, the first water pump 13 being arranged on the water inlet pipe 12, the first valve 14, entering positioned at the left side of first framework 11
Tracheae 15, the blower fan 16 being arranged in the air inlet pipe 15, the second valve 17 and the first fixation being arranged on the blower fan 16
Bar.First framework 11 is provided with positioned at its right surface in hollow cuboid and placement vertically, first framework 11
First through hole 111, the second through hole 112 positioned at its left surface, the third through-hole 113 positioned at its lower surface and positioned at its right surface
Fourth hole 114, the first through hole 111, the second through hole 112, third through-hole 113 and fourth hole 114 it is rounded and with
The inside of first framework 11 communicates.The left end of the water inlet pipe 12 be aligned the first through hole 111 and with first frame
The right surface of body 11 is fixedly connected so that the inside of the water inlet pipe 12 communicates with the inside of first framework 11, it is described enter
The right-hand member of water pipe 12 is placed in pond.First water pump 13 is connected with power supply, it is normally run, first water
Pump 13 is provided with switch, facilitates it to open or close, first water pump 13 can by the water in pond be pumped into it is described enter
In water pipe 12, then into first framework 11.First valve 14 is used to control water in the water inlet pipe 12
Flow.The upper end of the air inlet pipe 15 is directed at second through hole 112 and is fixedly connected with the left surface of first framework 11,
So that the inside of the air inlet pipe 15 communicates with the inside of first framework 11.The blower fan 16 is connected with power supply, makes it can
Normally to run, the blower fan 16 is provided with switch, facilitates it to open or close.Second valve 17 is described for controlling
The flow of gas in air inlet pipe 15.The left end of first fix bar is fixedly connected with the blower fan 16, first fix bar
Right-hand member be fixedly connected with first framework 11.
As shown in figure 1, first filter 2 is including the first motor 21, positioned at the left and right sides of the first motor 21
First support 22, the first rotating shaft 23 positioned at the lower section of first motor 21, the rotating disk positioned at the lower section of the first rotating shaft 23
24th, positioned at the lower section of the rotating disk 24 sponge ring 25, the filter ring 26 positioned at the outside of the sponge ring 25.First motor 21
It is connected with power supply, it is normally run, first motor 21 is provided with switch, facilitates it to open or close.It is described
First support 22 is provided with two, and the first support 22 is L-shaped, the upper end of the first support 22 and first motor 21
Side is fixedly connected, and the lower end of the first support 22 is fixedly connected with first framework 11.The first rotating shaft 23 is in circle
Cylinder and vertically placement, the upper end of the first rotating shaft 23 are connected with first motor 21 so that the band of the first motor 21
The dynamic first rotating shaft 23 rotates, the first rotating shaft 23 through first framework 11 surfaces externally and internally and with its company of slip
Connect, it is normally rotated, the lower end of the first rotating shaft 23 is fixedly connected with the upper surface of the rotating disk 24.The rotating disk
24 is in cylinder and horizontal positioned.The sponge ring 25 is the cylinder of annulus in cross section, and the sponge ring 25 is placed vertically, institute
The upper surface for stating sponge ring 25 is fixedly connected with the lower surface of the rotating disk 24.The filter ring 26 is the post of annulus in cross section
Body, the upper surface of the filter ring 26 is fixedly connected with the lower surface of the rotating disk 24, the inner surface of the filter ring 26 and institute
The outer surface for stating sponge ring 25 is fixedly connected.
As shown in figure 1, second filter 3 includes the first transverse slat 31, positioned at the lower section of first transverse slat 31 the
Two transverse slats 32, the collection center 33 positioned at the lower section of second transverse slat 32, the first sponge block 35 being contained in the collection center 33
And positioned at the first plugging block 34 of the lower section of first sponge block 35.First transverse slat 31 is in cuboid and horizontal positioned, institute
The side for stating the first transverse slat 31 is fixedly connected with the inner surface of first framework 11, and the filter ring 26 is horizontal through described first
The upper and lower surface of plate 31 and be slidably connected with it so that the filter ring 26 can on first transverse slat 31 stabilization rotation
Turn, while playing a part of positioning to the filter ring 26.Second transverse slat 32 is in cuboid and horizontal positioned, described second
The side of transverse slat 32 is fixedly connected with the inner surface of first framework 11, and second transverse slat 32 is provided with through following table thereon
The fifth hole 321 in face, the fifth hole 321 is rounded and positioned at the lower section of the sponge ring 25, the filter ring 26 and
The lower surface of sponge ring 25 is connected with the upper surface slide of second transverse slat 32.It is described that to integrate center 33 in cross section be annulus
Cylinder, the collection center 33 is placed vertically, and the upper end of the collection center 33 is directed at the fifth hole 321 and horizontal with described second
The lower surface of plate 32 is fixedly connected so that the inside of the collection center 33 communicates with the inside of the fifth hole 321.Described
One sponge block 35 is in cylinder, first sponge block 35 be contained in the collection center 33 and with the interior table of the collection center 33
Face is slidably connected so that first sponge block 35 can be moved up and down in the collection center 33.First plugging block 34
In cylinder, the upper surface of first plugging block 34 is fixedly connected with the lower surface of first sponge block 35, and described first
Plugging block 34 can be contained in the collection center 33 when moving up and is slidably connected with the inner surface of the collection center 33, enter
And can be with the clogging collection center 33.
As shown in figure 1, the drive device 4 includes the 3rd transverse slat 41, is erected positioned at the first of the lower section of the 3rd transverse slat 41
Bar 42, the first spring 44 positioned at the lower section of first montant 42, the first locating rack 43 positioned at the top of first spring 44,
The second montant 45 positioned at the left side of first locating rack 43, the first roller 46, the top for being arranged at the upper end of the second montant 45
Lean against bracing wire 47 on first roller 46, the first cross bar 48 positioned at the top of the 3rd transverse slat 41, positioned at described first
Second roller 49 of the right-hand member of cross bar 48, the second motor 40 positioned at the left side of first framework 11, it is arranged at second output
Second support 401 and output shaft 402 on axle 40.3rd transverse slat 41 is in cuboid and horizontal positioned, the 3rd transverse slat
41 side is slidably connected with the inner surface of first framework 11 so that the 3rd transverse slat 41 can be in first framework
Moved up and down in 41, the 3rd transverse slat 41 is provided with the 6th through hole 411 through its upper and lower surface, the 6th through hole 411
It is provided with two and respectively positioned at the left and right sides of first plugging block 34, the lower surface of first plugging block 34 and described the
The upper surface of three transverse slats 41 is fixedly connected.First montant 42 in cuboid and vertically place, first montant 42 it is upper
End is fixedly connected with the lower surface of the 3rd transverse slat 41, upper following table of first montant 42 through first locating rack 43
Face and it is slidably connected with it so that what first montant 42 can be stablized move up and down.First locating rack 43 is L-shaped,
The lower end of first locating rack 43 is fixedly connected with the inner surface of first framework 11, the upper end of first locating rack 43
Horizontal, the lower end of first locating rack 43 is provided with the first groove 431, and first groove 431 is in rectangular-shape.It is described
The lower end of the first spring 44 is fixedly connected with the inner surface of first framework 11, the upper end of first spring 44 and described
One montant 42 is fixedly connected, and then first montant 42 is played a supporting role.Second montant 45 is in cuboid and erects
Straight to place, the lower end of second montant 45 is fixedly connected with the inner surface of first framework 11.First roller 46 is in
Cylinder, first roller 46 is pivotally connected with second montant 45 so that first roller 46 can be described
The upper end rotation of two montants 45.First cross bar 48 is in cuboid and horizontal positioned, the left end of first cross bar 48 and institute
The inner surface for stating the first framework 11 is fixedly connected.Second roller 49 is in cylinder, second roller 49 and described first
Cross bar 48 is pivotally connected so that second roller 49 can rotate in the right-hand member of first cross bar 48.Second motor
40 are connected with power supply, it is normally run, and second motor 40 is provided with switch, facilitate it to open or close, institute
The second motor 40 is stated to be fixedly connected with first framework 11.The second support 401 is L-shaped, under the second support 401
End is fixedly connected with first framework 11, and the upper end of the second support 401 is fixedly connected with second motor 40.It is described
Output shaft 402 is in cylinder, and one end of the output shaft 402 is connected with second motor 40 so that second motor 40
The output shaft 402 can be driven to rotate.The right-hand member of the bracing wire 47 is fixedly connected with the lower surface of the 3rd transverse slat 41, institute
State bracing wire 47 to act against on the roller 49 of first roller 46 and second, also cross the 6th through hole 411, the bracing wire 47
Through first framework 11 surfaces externally and internally and be slidably connected with it, the left end of the bracing wire 47 is solid with the output shaft 402
Fixed connection, when the output shaft 402 rotates, the bracing wire 47 can be wrapped on the output shaft 402.
As shown in figure 1, the water storage device 5 include storage tank 51, the first pipeline 52 positioned at the top of the storage tank 51,
Second pipe 53 positioned at the left side of the storage tank 51, the 3rd valve 54 being arranged in the second pipe 53, positioned at described
3rd support 55 on the right side of storage tank 51.The storage tank 51 is in hollow cuboid, and the storage tank 51 is provided with positioned at it
7th through hole 511 and the 8th through hole 512 on surface disposed thereon of left surface, the 7th through hole 511 and the 8th through hole 512 are in
It is circular and communicated with the inside of the storage tank 51.The upper end of first pipeline 52 be aligned the third through-hole 113 and with institute
The lower surface for stating the first framework 11 is fixedly connected so that the inside phase of the inside of first pipeline 52 and first framework 11
It is logical, the 8th through hole 512 described in the lower end aligned of first pipeline 52 and it is fixedly connected with the upper surface of the storage tank 51, make
The inside for obtaining first pipeline 52 communicates with the inside of the storage tank 51.The right-hand member alignment described the of the second pipe 53
Seven through holes 511 and it is fixedly connected with the left surface of the storage tank 51 so that the inside of the second pipe 53 and the water storage
The inside of case 51 communicates.3rd valve 54 is used to control the flow of water in the second pipe 53.3rd support 55
L-shaped, the upper end of the 3rd support 55 is fixedly connected with first framework 11, the lower end of the 3rd support 55 with it is described
The right surface of storage tank 51 is fixedly connected.
As shown in figure 1, the plumbing installation 6 includes the 3rd pipeline 61, the 4th valve being arranged on the 3rd pipeline 61
Door 62 and the second fix bar 63 positioned at the lower section of the 3rd pipeline 61.The upper end of the 3rd pipeline 61 is directed at the four-way
Hole 114 and it is fixedly connected with the right surface of first framework 11 so that the inside of the 3rd pipeline 61 and first frame
The inside of body 11 communicates.4th valve 62 is used to control the flow of gas in the 3rd pipeline 61.Described second fixes
Bar 63 is in cuboid and horizontal positioned, and the left end of second fix bar 63 is fixedly connected with the 3rd support 55.
As shown in figure 1, the second framework device 7 includes second framework 71, the row positioned at the left side of the 3rd framework 71
Outlet pipe 73 and the 5th valve 74 being arranged on the discharge pipe 73.The second framework 71 is in hollow cuboid and puts vertically
Put, the second framework 71 is provided with the 9th through hole 711 and the tenth through hole 712 positioned at its left surface on surface disposed thereon,
9th through hole 711 and the tenth through hole 712 are rounded and communicated with the inside of the second framework 71, the 3rd pipeline 61
Lower end aligned described in the 9th through hole 711 and be fixedly connected with the upper surface of the second framework 71 so that the 3rd pipeline
61 inside communicates with the inside of the second framework 71, the right-hand member of second fix bar 63 and a left side for the second framework 71
Surface is fixedly connected.The right-hand member of the discharge pipe 73 be aligned the tenth through hole 712 and with the left surface of the second framework 71
It is fixedly connected so that the inside of the discharge pipe 73 communicates with the inside of the second framework 71.5th valve 74 is used for
Control the flow of gas in the discharge pipe 73.
As shown in figure 1, the 3rd filter 8 includes the 3rd framework 81, be contained in the 3rd framework 81 the
Two sponge blocks 82, the first screen pack 83 positioned at the lower section of second sponge block 82, positioned at the lower section of the 3rd framework 81 the
Four transverse slats 84 and the second screen pack 85 positioned at the lower section of the 4th transverse slat 84.3rd framework 81 in hollow cuboid and
Place vertically, the upper and lower surface of the 3rd framework 81 is communicated, the upper end of the 3rd framework 81 is directed at the 9th through hole 711
And be fixedly connected with the inner surface of the second framework 71 so that the inside of the 9th through hole 711 and the 3rd framework 81
Communicate.Second sponge block 82 is in cuboid and horizontal positioned, the side of second sponge block 82 and the 3rd framework
81 inner surface is fixedly connected.First screen pack 83 is in cuboid, the side of first screen pack 83 and the described 3rd
The inner surface of framework 81 is fixedly connected, and drier is placed between first screen pack 83 and second sponge block 82.Institute
The 4th transverse slat 84 is stated in cuboid and horizontal positioned, the left surface of the 4th transverse slat 84 and the inner surface of the second framework 71
It is fixedly connected, the front and rear surfaces of the 4th transverse slat 84 are fixedly connected with the inner surface of the second framework 71, the described 4th is horizontal
Plate 84 is provided with the first circular hole 841 through its upper and lower surface, and first circular hole 841 is rounded, first circular hole 841
In the lower section of the 3rd framework 81.Second screen pack 85 is in cuboid and places vertically, second screen pack 85
Upper surface is fixedly connected with the lower surface of the 4th transverse slat 84, the front and rear surfaces of second screen pack 85 and second frame
The inner surface of body 71 is fixedly connected.
As shown in figure 1, the 4th filter 9 includes the 5th transverse slat 91, erecting positioned at the lower section of the 5th transverse slat 91
Plate 92, the 3rd sponge block 93 positioned at the lower section of the riser 92, the 3rd screen pack 94 positioned at the right side of the 3rd sponge block 93,
Positioned at the second spring 95 and the cam 96 positioned at the left side of the riser 92 on the right side of the 3rd screen pack 94.5th transverse slat
91 is in cuboid and horizontal positioned, and the side of the 5th transverse slat 91 is fixedly connected with the inner surface of the second framework 71, institute
The lower surface for stating the second screen pack 85 is fixedly connected with the upper surface of the 5th transverse slat 91, and the 5th transverse slat 91 is provided with and passes through
The second circular hole 911 of its upper and lower surface is worn, second circular hole 911 is located at the right side of second screen pack 85.The riser
92 in cuboid and placement vertically, and the upper end of the riser 92 is fixedly connected with the 5th transverse slat 91, before the riser 92
Surface is fixedly connected with the inner surface of the second framework 71 afterwards.3rd sponge block 93 is in cuboid, the 3rd sponge
The lower surface of block 93 is slidably connected with the inner surface of the second framework 71, the lower surface of the riser 92 and the 3rd sponge
The upper surface slide connection of block 93, the front and rear surfaces of the 3rd sponge block 93 are slided with the inner surface of the second framework 71 and connected
Connect.3rd screen pack 94 is in cuboid and places vertically, left surface and the 3rd sponge of the 3rd screen pack 94
The right surface of block 93 is fixedly connected, and the lower surface of the 3rd screen pack 94 is slided with the inner surface of the second framework 71 and connected
Connect.The second spring 95 is provided with two, and the second spring 95 is horizontal, the right-hand member of the second spring 95 and described
The inner surface of two frameworks 71 is fixedly connected, and the left end of the second spring 95 is fixedly connected with the 3rd screen pack 94, and then
It is played a supporting role.The cam 96 is pivotally connected with the second framework 71 so that the cam 96 can be described
Rotation, the cam 96 and motor connection in second framework 71, drive its active rotation, and the cam 96 can be tapped when rotating
Onto the 3rd sponge block 93, promote the vibration of the 3rd sponge block 93 and the 3rd screen pack 94, tremble the dust for filtering thereon
Fall, prevent clogging.
As shown in figure 1, when the dust suction cleaner of the router machine tool of the present invention is used, placing it in first
In plank job shop.Then the right-hand member of water inlet pipe 12 is placed in pond, then opens the first valve 14, while opening the
The switch of one water pump 13 so that the water in pond is entered into the water inlet pipe 12, then into first framework 11,
The filter ring 26 and sponge ring 25 are soaked in the upper surface of the upper surface and the first transverse slat 31 that are then slid over the rotating disk 24, then
The first sponge block 25 is flowed downward and soaked, the switch of the second motor 40 is now opened so that the output shaft 402 rotates, so
Back guy 47 pulls downward on the 3rd transverse slat 41 so that first plugging block 34 is moved down under the collection center 33
Side, then the first sponge block of water-soaked 35 is flowed down on the 3rd transverse slat 41, is entered into by the 6th through hole 411 described
The lower section of the 3rd transverse slat 41, then enters into the storage tank 51 by third through-hole 113.Then the second valve 17 is opened,
The switch of blower fan 16 is opened simultaneously, while so that the lower end aligned router machine tool of air inlet pipe 15 so that the wood that processing is produced
Bits dust is entered into the air inlet pipe 15, then into first framework 21, now opens opening for the first motor 21
Close so that the first rotating shaft 23 rotates, and then cause the rotating disk 24 rotate, the rotating disk 24 drive the filter ring 26 and
Sponge ring 25 rotates, such that it is able to the water speckled with filter ring 26 and sponge ring 25 is thrown out of, and then can be to entering into
State temperature wood chip higher in the first framework 11 to be lowered the temperature, prevent it from causing to damage to the present invention, and the air warp for entering
Lower section is moved to after the filtering of the filter ring 26 and sponge ring 25 of crossing rotation and through fifth hole 321, then passes through what is soaked
Flowed out from its both sides after the filtering of the first sponge block 35, then entered under the 3rd transverse slat 41 by the 6th through hole 411
Side.The filter ring 26 and sponge ring 25 rotated after soaking to the filter effect of air more preferably, in can significantly disposing air
Wood powder.Then air is entered into the 3rd pipeline 61, now opens the 4th valve 62 so that air enters into institute
State in second framework 71, entered into the 3rd framework 81 through the 9th through hole 711, then by the mistake of the second sponge block 82
After filter after the drying of drying agent, the described 4th is moved to by first circular hole 841 that is filtered through of the second sponge block 83
The lower section of transverse slat 84, then enters into the 5th transverse slat by being then passed through the second circular hole 911 after the filtering of the second screen pack 85
95 lower section, then enters into the discharge pipe 73 by after the filtering of the 3rd screen pack 94 and the 3rd sponge block 93, opens
5th valve 74 is discharged it.The motor being connected with cam 96 is opened simultaneously so that the cam 96 rotates, and then cause
3rd sponge block 93 and the 3rd screen pack 94 are shaken, and the dust impurity shake that will be speckled with thereon is fallen, and prevents clogging
Occur.It is to be filtered finish after, open the 3rd valve 54 so that the water in storage tank 51 is discharged from second pipe 53, is then shut off
First motor 21 and the second motor 40, the 3rd transverse slat 41 are moved up under the elastic force effect of first spring 44, are made
Obtain first plugging block 34 to be contained in the collection center 33, such that it is able to clogging collection center 33.So far, plank of the present invention
The dust suction cleaner of processing equipment is finished using process description.