CN107335314A - A kind of ore workshop dust pelletizing system - Google Patents

A kind of ore workshop dust pelletizing system Download PDF

Info

Publication number
CN107335314A
CN107335314A CN201710698969.4A CN201710698969A CN107335314A CN 107335314 A CN107335314 A CN 107335314A CN 201710698969 A CN201710698969 A CN 201710698969A CN 107335314 A CN107335314 A CN 107335314A
Authority
CN
China
Prior art keywords
framework
fixedly connected
screen pack
support
pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710698969.4A
Other languages
Chinese (zh)
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Urumqi Jiupin Sesame Information Technology Co Ltd
Original Assignee
Urumqi Jiupin Sesame Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Urumqi Jiupin Sesame Information Technology Co Ltd filed Critical Urumqi Jiupin Sesame Information Technology Co Ltd
Priority to CN201710698969.4A priority Critical patent/CN107335314A/en
Publication of CN107335314A publication Critical patent/CN107335314A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D50/00Combinations of methods or devices for separating particles from gases or vapours
    • B01D50/60Combinations of devices covered by groups B01D46/00 and B01D47/00
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D2221/00Applications of separation devices
    • B01D2221/14Separation devices for workshops, car or semiconductor industry, e.g. for separating chips and other machining residues

Abstract

A kind of ore workshop dust pelletizing system,Including inlet duct,First filter,Attachment means,Second filter,3rd filter and fixing device,Inlet duct includes air inlet pipe,Air inlet bucket,First blower fan,First support,Second support,First filter includes the first framework,First pipeline,First screen pack,First sponge block,First montant,3rd support,First swash plate,Starting stave,Second pipe,First water pump,3rd pipeline and the first valve,Attachment means include the 4th pipeline,Second blower fan,5th support,First cross bar,Second montant,6th support,Second filter includes second framework,Second screen pack,Concentrate bucket,First spring,3rd screen pack,Second spring,Concentrate block,Second sponge block,3rd filter includes the 5th pipeline,Second valve,3rd framework,4th screen pack,3rd sponge block,5th screen pack,The present invention can sufficiently be filtered to dust caused by workshop.

Description

A kind of ore workshop dust pelletizing system
The application is Application No.:201610370855.2, invention and created name be:A kind of ore workshop dedusting system Unite, the applying date is:The divisional application of the application for a patent for invention of on 05 28th, 2016.
Technical field
The present invention relates to environmental technology field, more particularly to a kind of ore workshop dust pelletizing system.
Background technology
First have to crush ore using disintegrating machine in ore processing technique, and screened with vibrating screener, also needed To be transported by belt conveyer, these techniques can all produce very big dust, influence environment and the periphery in workshop Air quality.
Accordingly, it is desirable to provide a kind of new technical scheme solves above-mentioned technical problem.
The content of the invention
It is an object of the invention to provide a kind of ore workshop dust pelletizing system that can effectively solve above-mentioned technical problem.
In order to solve the above-mentioned technical problem, the present invention adopts the following technical scheme that:
A kind of ore workshop dust pelletizing system, the ore workshop include inlet duct, position with dust pelletizing system The first filter on the right side of the inlet duct, the attachment means on the right side of first filter, positioned at described The second filter below attachment means, the 3rd filter below second filter and it is arranged at described Fixing device on 3rd filter, the inlet duct include air inlet pipe, the air inlet bucket above the air inlet pipe, the One blower fan, the first support on first blower fan, the second support above the first support, first mistake Filter device includes the first framework, the first pipeline being contained in first framework, first on the right side of first pipeline Screen pack, the first sponge block on the right side of first screen pack, the first montant above first pipeline, it is located at The 3rd support below first pipeline, the first swash plate on the right side of first sponge block, positioned at first swash plate The starting stave of lower section, the second pipe above first framework, the first water pump being arranged on the second pipe, The 3rd pipeline below first framework and the first valve being arranged on the 3rd pipeline, the attachment means bag Include the 4th pipeline, the second blower fan being arranged on the 4th pipeline, the 5th support below second blower fan, be located at The first cross bar below 5th support, the second montant on the left of first cross bar, under second montant 6th support of side, second filter include second framework, the second screen pack being contained in the second framework, position Bucket, the first spring at left and right sides of second screen pack are concentrated below second screen pack, positioned at described the The 3rd screen pack below one spring, the second spring below the 3rd screen pack, positioned at described second spring or so Block, the second sponge block below the second spring are concentrated in both sides, and the 3rd filter includes the 5th pipeline, set The second valve for being placed on the 5th pipeline, the 3rd framework on the left of the 5th pipeline, it is contained in the 3rd frame Internal the 4th screen pack, the 3rd sponge block on the left of the 4th screen pack, on the left of the 3rd sponge block 5th screen pack, the fixing device include the first fixed mount, the first fix bar on the right side of first fixed mount, are located at The second fix bar on the right side of first fix bar, the 3rd fix bar below second fix bar and positioned at described The second fixed mount below three fix bars.
The air inlet pipe is L-shaped, and the upper end of the air inlet pipe is fixedly connected with the lower surface of the air inlet bucket, the air inlet Bucket is in hollow round table-like, and the first support is L-shaped, and one end of the first support is fixedly connected with first blower fan, The other end of the first support is in horizontal positioned, and the second support is L-shaped, one end of the second support and described first Support is fixedly connected, and the other end of the second support is fixedly connected with the air inlet pipe.
First framework is in hollow cuboid, and first framework is placed vertically, and first framework is provided with position The first through hole on surface, the second through hole positioned at its right surface, the third through-hole positioned at its lower surface and left positioned at it thereon The fourth hole on surface, the right-hand member of the air inlet pipe are directed at the fourth hole and fix company with the left surface of first framework Connect, the right-hand member of the first support is fixedly connected with the left surface of first framework, and first pipeline is horizontal and receives Be dissolved in first framework, the left end of first pipeline be aligned the fourth hole and with the inner surface of first framework It is fixedly connected, first screen pack is in cylinder, and first screen pack is placed vertically, the left surface of first screen pack It is fixedly connected with the right surface of first pipeline, first sponge block is in cylinder, and first sponge block is placed vertically, The left surface of first sponge block is fixedly connected with the right surface of first screen pack, and first montant is in vertical shape, The upper end of first montant is fixedly connected with the inner surface of first framework, the lower end of first montant and described first Pipeline is fixedly connected, and the 3rd support is L-shaped, and one end of the 3rd support is fixedly connected with first pipeline, described The other end of 3rd support is fixedly connected with the inner surface of first framework, and first swash plate is oblique, and described first The right-hand member of swash plate is fixedly connected with the inner surface of first framework, and the left end of first swash plate acts against first sponge On the right surface of block, the starting stave is in vertical shape, and the upper end of the starting stave is fixedly connected with first swash plate, institute State first through hole described in the lower end aligned of second pipe and be fixedly connected with the upper surface of first framework, first water pump The 4th support is provided with, the 4th support is L-shaped, and one end of the 4th support is fixedly connected with first framework, institute The other end for stating the 4th support is fixedly connected with first water pump, and the 3rd pipeline is in vertical shape, the 3rd pipeline Upper end is directed at the third through-hole and is fixedly connected with the lower surface of first framework.
The upper end of 4th pipeline is directed at second through hole and is fixedly connected with the right surface of first framework, institute State that the 5th support is L-shaped, one end of the 5th support is fixedly connected with second blower fan, the other end of the 5th support It is fixedly connected with the side of first framework, second montant is in cuboid, and second montant is placed vertically, and described The upper end of two montants is fixedly connected with the lower surface of the 5th support, and the lower end of second montant is consolidated with the 6th support Fixed connection, first cross bar is horizontal, and the right-hand member of first cross bar is fixedly connected with the 4th pipeline, and described first The left end of cross bar is fixedly connected with the right surface of second montant, and the 6th support is L-shaped, the upper end of the 6th support It is fixedly connected with the lower surface of first framework.
The second framework is in hollow cuboid, and the second framework is placed vertically, and the second framework is provided with position The fifth hole on surface and the 6th through hole positioned at its lower surface thereon, the 5th is logical described in the lower end aligned of the 4th pipeline Hole and it is fixedly connected with the upper surface of the second framework, the 6th support is fixedly connected with the second framework, and described In hollow round table-like, second screen pack is contained in the second framework two screen packs, second screen pack it is upper Surface is directed at the fifth hole and is fixedly connected with the inner surface of the second framework, the lower surface of second screen pack with The upper surface for concentrating bucket is fixedly connected, and the concentration bucket is in hollow cone, and first spring is described provided with two First spring is in vertical shape, and the upper end of first spring is fixedly connected with the inner surface of the second framework, first bullet The lower end of spring is fixedly connected with the upper surface of the 3rd screen pack.
3rd screen pack is in cuboid, and the 3rd screen pack is horizontal positioned, the side of the 3rd screen pack with The inner surface of the second framework is slidably connected, and the second spring is provided with two, and the second spring is in vertical shape, and described the The upper end of two springs is fixedly connected with the lower surface of the 3rd screen pack, the lower end of the second spring and second sponge The upper surface of block is fixedly connected, described to concentrate block to be provided with two and the respectively left and right sides in the second framework, described Concentrate the cross section of block in a rectangular trapezoid, the concentration block is fixedly connected with the inner surface of the second framework, the concentration block Upper surface it is oblique, second sponge block is in cuboid, the side of second sponge block and the side of the concentration block Face is slidably connected, and second sponge block is acted against on the inner surface of the second framework, and second sponge block is positioned at described The top of 6th through hole.
The upper end of 5th pipeline is directed at the 6th through hole and is fixedly connected with the lower surface of the second framework, institute The 3rd framework is stated in hollow round table-like, the right surface of the 3rd framework is provided with the 7th through hole, the left end of the 5th pipeline It is directed at the 7th through hole and is fixedly connected with the right surface of the 3rd framework, the 4th screen pack is in bending, described 4th screen pack is fixedly connected with the inner surface of the 3rd framework, and the 5th screen pack is in cylinder, the 5th filtering Net is vertical to be placed, and the right surface of the 5th screen pack is fixedly connected with the left surface of the 3rd framework, the 3rd sponge Block is in cuboid, and the 3rd sponge block is placed vertically, the left surface of the 3rd sponge block and the right side of the 5th screen pack Surface is fixedly connected, and the right surface of the 3rd sponge block is acted against on the 4th screen pack.
First fixed mount is L-shaped, and the left surface of one end of first fixed mount and the 6th support, which is fixed, to be connected Connect, the other end of first fixed mount is fixedly connected with the 5th screen pack, and first fix bar is in vertical shape, described The lower end of first fix bar is fixedly connected with the 3rd framework, and the upper end of first fix bar is fixed with the 6th support Connection, second fix bar is horizontal, and the left end of second fix bar is fixedly connected with first fix bar, described The right-hand member of second fix bar is fixedly connected with the left surface of the second framework.
3rd fix bar is in cuboid, and the 3rd fix bar is placed vertically, the upper end of the 3rd fix bar with The lower surface of second fix bar is fixedly connected, the 5th pipeline through the 3rd fix bar left and right surface and and its It is fixedly connected, second fixed mount is L-shaped, and one end of second fixed mount is fixedly connected with the 3rd fix bar, institute The other end for stating the second fixed mount is fixedly connected with the 3rd framework.
After adopting the above technical scheme, the invention has the advantages that:
Ore workshop dust pelletizing system of the present invention is simple in construction, easy to use, and dust caused by workshop can be entered Row sufficiently filtering, the air after filtering is contacted, dispose the dust and part pernicious gas of wherein most with water first, Then air is filtered again, and the dust that can be will filter out is collected and concentrated in bucket, and then it is filtered again After discharge so that the gas of discharge meets the requirements prescribed, and reduces the pollution of environment.
Brief description of the drawings
Ore workshop of the present invention is described further with the embodiment of dust pelletizing system below in conjunction with the accompanying drawings:
Fig. 1 is the structural representation of ore workshop dust pelletizing system of the present invention;
Embodiment
As shown in figure 1, ore workshop of the present invention dust pelletizing system includes inlet duct 1, positioned at the inlet duct 1 First filter 2 on right side, the attachment means 3 positioned at the right side of first filter 2, under the attachment means 3 Second filter 4 of side, the 3rd filter 5 positioned at the lower section of second filter 4 and it is arranged at the 3rd mistake Filter the fixing device 6 on device 5.
As shown in figure 1, the inlet duct 1 includes air inlet pipe 11, the air inlet bucket 12 above the air inlet pipe 11, the One blower fan, the first support 13 on first blower fan, the second support 14 above the first support 13.It is described Air inlet pipe 11 is L-shaped, and the upper end of the air inlet pipe 11 is fixedly connected with the lower surface of the air inlet bucket 12 so that the air inlet pipe 11 inside communicates with the inside of the air inlet bucket 12.The air inlet bucket 12 is in hollow round table-like.First blower fan is used for The air in the external world is pumped into the air inlet pipe 11.The first support 13 is L-shaped, one end of the first support 13 and institute State the first blower fan to be fixedly connected, the other end of the first support 13 is in horizontal positioned.The second support 14 is L-shaped, described One end of second support 14 is fixedly connected with the first support 13, the other end of the second support 14 and the air inlet pipe 11 It is fixedly connected.
As shown in figure 1, first filter 2 includes the first framework 21, be contained in first framework 21 the One pipeline 22, the first screen pack 23 positioned at the right side of the first pipeline 22, first positioned at the right side of the first screen pack 23 Sponge block 24, the first montant above first pipeline 22, the 3rd support positioned at the lower section of the first pipeline 22, position In first swash plate 25 on the right side of the first sponge block 24, the starting stave 26 below first swash plate 25, positioned at institute State the second pipe 27 above the first framework 21, the first water pump 28 being arranged on the second pipe 27, positioned at described first 3rd pipeline 29 of the lower section of framework 21 and the first valve 20 being arranged on the 3rd pipeline 29.First framework 21 is in sky The cuboid of the heart, first framework 21 are placed vertically, and first framework 21 is provided with the first through hole on surface disposed thereon 211st, positioned at second through hole 212, the third through-hole 213 positioned at its lower surface and the four-way positioned at its left surface on its right surface Hole 214, the right-hand member of the air inlet pipe 11 are directed at the fourth hole 214 and fix company with the left surface of first framework 21 Connect so that the inside of the air inlet pipe 11 communicates with the inside of first framework 21, the right-hand member of the first support 13 and institute The left surface for stating the first framework 21 is fixedly connected.First pipeline 22 is horizontal and is contained in first framework 21, The left end of first pipeline 22 is directed at the fourth hole 214 and is fixedly connected with the inner surface of first framework 21.Institute It is in cylinder to state the first screen pack 23, and first screen pack 23 is placed vertically, the left surface of first screen pack 23 and institute The right surface for stating the first pipeline 22 is fixedly connected.First sponge block 24 is in cylinder, and first sponge block 24 is put vertically Put, the left surface of first sponge block 24 is fixedly connected with the right surface of first screen pack 23.First montant is in Vertical shape, the upper end of first montant are fixedly connected with the inner surface of first framework 21, the lower end of first montant It is fixedly connected with first pipeline 22.3rd support is L-shaped, one end and first pipeline 22 of the 3rd support It is fixedly connected, the other end of the 3rd support is fixedly connected with the inner surface of first framework 21.First swash plate 25 Obliquely, the right-hand member of first swash plate 25 is fixedly connected with the inner surface of first framework 21, first swash plate 25 Left end act against on the right surface of first sponge block 24.The starting stave 26 is in vertical shape, the starting stave 26 Upper end be fixedly connected with first swash plate 25.First through hole 211 described in the lower end aligned of the second pipe 27 and with institute The upper surface for stating the first framework 21 is fixedly connected so that the inside of the second pipe 27 and the inside phase of first framework 21 Logical, the upper end of the second pipe 27 can be placed in pond.First water pump 28 is provided with the 4th support 281, described 4th support 281 is L-shaped, and one end of the 4th support 281 is fixedly connected with first framework 21, the 4th support 281 other end is fixedly connected with first water pump 28.3rd pipeline 29 is in vertical shape, the 3rd pipeline 29 it is upper End is directed at the third through-hole 213 and is fixedly connected with the lower surface of first framework 21 so that the 3rd pipeline 29 The internal inside with first framework 21 communicates.
As shown in figure 1, the attachment means 3 include the 4th pipeline 31, the second wind being arranged on the 4th pipeline 31 Machine 32, the 5th support 33 positioned at the lower section of the second blower fan 32, the first cross bar 34 positioned at the lower section of the 5th support 33, position The second montant 35 in the left side of the first cross bar 34, the 6th support 36 positioned at the lower section of the second montant 35.Described 4th The upper end of pipeline 31 is directed at second through hole 212 and is fixedly connected with the right surface of first framework 21 so that described the The inside of four pipelines 31 communicates with the inside of first framework 21.Second blower fan 32 is used for inside the first framework 21 Air is pumped into the 4th pipeline 31.5th support 33 is L-shaped, one end and described second of the 5th support 33 Blower fan 32 is fixedly connected, and the other end of the 5th support 33 is fixedly connected with the side of first framework 21.Described second Montant 35 is in cuboid, and second montant 35 is placed vertically, the upper end of second montant 35 and the 5th support 33 Lower surface is fixedly connected, and the lower end of second montant 35 is fixedly connected with the 6th support 36.First cross bar 34 is in Horizontal, the right-hand member of first cross bar 34 is fixedly connected with the 4th pipeline 31, the left end of first cross bar 34 and institute The right surface for stating the second montant 35 is fixedly connected.6th support 36 is L-shaped, the upper end of the 6th support 36 and described the The lower surface of one framework 21 is fixedly connected.
As shown in figure 1, second filter 4 includes second framework 41, be contained in the second framework 41 the Two screen packs 42, concentrate bucket 43, positioned at the left and right sides of the second screen pack 42 below second screen pack 42 First spring 44, the 3rd screen pack 45 positioned at the lower section of first spring 44, the positioned at the lower section of the 3rd screen pack 45 Two springs 46, the concentration block 47 positioned at the left and right sides of second spring 46, the second sea below the second spring 46 Continuous block 48.The second framework 41 is in hollow cuboid, and the second framework 41 is placed vertically, is set in the second framework 41 There are the fifth hole 411 on surface disposed thereon and the 6th through hole 412 positioned at its lower surface, the lower end pair of the 4th pipeline 31 The accurate fifth hole 411 and it is fixedly connected with the upper surface of the second framework 41 so that the inside of the 4th pipeline 31 Communicated with the inside of the second framework 41, the 6th support 36 is fixedly connected with the second framework 41.Second mistake Filter screen 42 is in hollow round table-like, and second screen pack 42 is contained in the second framework 41, second screen pack 42 Upper surface be directed at the fifth hole 411 and be fixedly connected with the inner surface of the second framework 41, second screen pack 42 side can filter to air.The lower surface of second screen pack 42 is fixed with the upper surface for concentrating bucket 43 Connection.The concentration bucket 43 is in hollow cone.First spring 44 is provided with two, and first spring 44 is in vertical Shape, the upper end of first spring 44 are fixedly connected with the inner surface of the second framework 41, the lower end of first spring 44 It is fixedly connected with the upper surface of the 3rd screen pack 45.3rd screen pack 45 is in cuboid, the 3rd screen pack 45 Horizontal positioned, the side of the 3rd screen pack 45 and the inner surface of the second framework 41 are slidably connected so that the described 3rd Screen pack 45 can move up and down.The second spring 46 is provided with two, and the second spring 46 is in vertical shape, second bullet The upper end of spring 46 is fixedly connected with the lower surface of the 3rd screen pack 45, the lower end of the second spring 46 and the described second sea The upper surface of continuous block 48 is fixedly connected.It is described to concentrate block 47 to be provided with two and the respectively left and right two in the second framework 41 Side, the cross section of the concentration block 47 is in a rectangular trapezoid, described to concentrate block 47 and the inner surface of the second framework 41 to fix and connect Connect, the upper surface of the concentration block 47 is oblique.Second sponge block 48 is in cuboid, and second sponge block 48 is located at Between the concentration block 47, the side of second sponge block 48 and the side of the concentration block 47 are slidably connected, and described second Sponge block 48 is acted against on the inner surface of the second framework 41, and second sponge block 48 is located at the 6th through hole 412 Top.
As shown in figure 1, the 3rd filter 5 includes the 5th pipeline 51, be arranged on the 5th pipeline 51 the Two valves 52, the 3rd framework 53 positioned at the left side of the 5th pipeline 51, the 4th filtering being contained in the 3rd framework 53 Net 54, the 3rd sponge block 55 positioned at the left side of the 4th screen pack 54, the 5th mistake positioned at the left side of the 3rd sponge block 55 Filter screen 56.The upper end of 5th pipeline 51 is directed at the 6th through hole 412 and fixed with the lower surface of the second framework 41 Connection so that the inside of the 5th pipeline 51 communicates with the inside of the second framework 41.3rd framework 53 is in hollow It is round table-like, the right surface of the 3rd framework 53 is provided with the 7th through hole 531, the left end alignment of the 5th pipeline 51 described the Seven through holes 531 and it is fixedly connected with the right surface of the 3rd framework 53 so that the inside of the 5th pipeline 51 and described the The inside of three frameworks 53 communicates.4th screen pack 54 is in bending, the 4th screen pack 54 and the 3rd framework 53 Inner surface be fixedly connected.5th screen pack 56 is in cylinder, and the 5th screen pack 56 is placed vertically, the 5th mistake The right surface of filter screen 56 is fixedly connected with the left surface of the 3rd framework 53.3rd sponge block 55 is in cuboid, described 3rd sponge block 55 is placed vertically, and the left surface of the 3rd sponge block 55 is fixed with the right surface of the 5th screen pack 56 to be connected Connect, the right surface of the 3rd sponge block 55 is acted against on the 4th screen pack 54, so as to not only act as the effect of filtering, also 4th screen pack 54 and the 5th screen pack 56 can be played a supporting role.
As shown in figure 1, the fixing device 6 includes the first fixed mount 61, the positioned at the right side of first fixed mount 61 One fix bar 62, the second fix bar 63 positioned at the right side of first fix bar 62, positioned at the lower section of the second fix bar 63 3rd fix bar 64 and the second fixed mount 65 positioned at the lower section of the 3rd fix bar 64.First fixed mount 61 is L-shaped, institute The one end for stating the first fixed mount 61 is fixedly connected with the left surface of the 6th support 36, the other end of first fixed mount 61 It is fixedly connected with the 5th screen pack 56.First fix bar 62 is in vertical shape, the lower end of first fix bar 62 with 3rd framework 53 is fixedly connected, and the upper end of first fix bar 62 is fixedly connected with the 6th support 36.Described Two fix bars 63 are horizontal, and the left end of second fix bar 63 is fixedly connected with first fix bar 62, and described second The right-hand member of fix bar 63 is fixedly connected with the left surface of the second framework 41.3rd fix bar 64 is in cuboid, described 3rd fix bar 64 is placed vertically, and the upper end of the 3rd fix bar 64 is fixed with the lower surface of second fix bar 63 to be connected Connect, the 5th pipeline 51 is through the left and right surface of the 3rd fix bar 64 and is secured to connect, so as to described 5th pipeline 51 plays fixation.Second fixed mount 65 is L-shaped, one end of second fixed mount 65 and the described 3rd Fix bar 64 is fixedly connected, and the other end of second fixed mount 65 is fixedly connected with the 3rd framework 53.
As shown in figure 1, the ore workshop of the present invention is given birth to dust pelletizing system in use, placing it in ore first Produce in workshop.Then the first blower fan is started so that the air in workshop is drawn into the air inlet bucket 12, subsequently into Into air inlet pipe 11, then into the first framework 21, and enter in the first pipeline 22.Now start the first water pump 28, So that the water in pond is drawn into the second pipe 27, then into the first framework 21, by the first swash plate 25 Drainage flow to the left, so as to soak the first sponge block 24, while constantly flow downward.Then into first Air in pipeline 22 flows to the right, after the filtering of the first sponge block 24 after by the first screen pack 23 and soaking to the right Flowing, because waste gas contacts with water, and then it can make it that filtration, purification effect is more preferable.Then the second blower fan 32 is started so that the Air in one framework 21 is entered in the 4th pipeline 31 by the lower section of starting stave 26, then into second framework 41 It is interior.Then by being moved around backward second screen pack 42 of filtering of the second screen pack 42, filtered by the second screen pack 42 Impurity focuses in concentration bucket 43 under gravity, and then can not influence filtering of second screen pack 42 to air.Then Air after being filtered by the second screen pack 42 enters lower section after the filtering of the 3rd screen pack 45, by the second sponge block 48 Filtering after enter in the 5th pipeline 51, open the second valve 52, the air entered in the 5th pipeline 51 enters the 3rd In framework 53, then discharged after the filtering of the 4th screen pack 54, the 3rd sponge block 55 and the 5th screen pack 56.When the first frame When water in body 21 is larger, the first valve 20 can be opened and discharged it.So far, ore workshop dust pelletizing system of the present invention Finished using process description.
The foregoing is only a specific embodiment of the invention, but protection scope of the present invention is not limited thereto, any Those skilled in the art the invention discloses technical scope in, change or replacement can be readily occurred in, should all be covered Within protection scope of the present invention.Therefore, protection scope of the present invention should be based on the protection scope of the described claims.

Claims (1)

  1. A kind of 1. ore workshop dust pelletizing system, it is characterised in that:The ore workshop dust pelletizing system include into Device of air, first filter on the right side of the inlet duct, the connection on the right side of first filter Device, the second filter below the attachment means, the 3rd filtering dress below second filter The fixing device on the 3rd filter is put and is arranged at, the inlet duct includes air inlet pipe, positioned at the air inlet pipe Top air inlet bucket, the first blower fan, the first support on first blower fan, above the first support Second support, first filter include the first framework, the first pipeline being contained in first framework, positioned at described The first screen pack on the right side of first pipeline, the first sponge block on the right side of first screen pack, positioned at first pipeline It is first montant of top, the 3rd support below first pipeline, first on the right side of first sponge block oblique Plate, the starting stave below first swash plate, the second pipe above first framework, it is arranged at described The first water pump on two pipelines, the 3rd pipeline below first framework and be arranged on the 3rd pipeline first Valve, the attachment means include the 4th pipeline, the second blower fan being arranged on the 4th pipeline, positioned at second blower fan 5th support of lower section, the first cross bar below the 5th support, the second montant on the left of first cross bar, The 6th support below second montant, second filter include second framework, are contained in second frame The second internal screen pack, the concentration below second screen pack struggle against, at left and right sides of second screen pack First spring, the 3rd screen pack below first spring, the second spring below the 3rd screen pack, position Block, the second sponge block below the second spring, the 3rd filtering are concentrated at left and right sides of the second spring Device includes the 5th pipeline, the second valve being arranged on the 5th pipeline, the 3rd frame on the left of the 5th pipeline Body, the 4th screen pack being contained in the 3rd framework, the 3rd sponge block on the left of the 4th screen pack, positioned at institute The 5th screen pack on the left of the 3rd sponge block is stated, the fixing device includes the first fixed mount, positioned at first fixed mount right side First fix bar of side, the second fix bar on the right side of first fix bar, below second fix bar Three fix bars and the second fixed mount below the 3rd fix bar;The air inlet pipe is L-shaped, the upper end of the air inlet pipe It is fixedly connected with the lower surface of the air inlet bucket, for the air inlet bucket in hollow round table-like, the first support is L-shaped, described One end of first support is fixedly connected with first blower fan, and the other end of the first support is in horizontal positioned, and described second Support is L-shaped, and one end of the second support is fixedly connected with the first support, the other end of the second support with it is described Air inlet pipe is fixedly connected;First framework is in hollow cuboid, and first framework is placed vertically, in first framework First through hole provided with surface disposed thereon, the second through hole, the third through-hole positioned at its lower surface and position positioned at its right surface Fourth hole in its left surface, the right-hand member of the air inlet pipe be aligned the fourth hole and with the left surface of first framework It is fixedly connected, the right-hand member of the first support is fixedly connected with the left surface of first framework, and first pipeline is in level Shape and be contained in first framework, the left end of first pipeline be aligned the fourth hole and with first framework Inner surface is fixedly connected, and first screen pack is in cylinder, and first screen pack is placed vertically, first screen pack Left surface is fixedly connected with the right surface of first pipeline, and first sponge block is in cylinder, and first sponge block erects Straight to place, the left surface of first sponge block is fixedly connected with the right surface of first screen pack, and first montant is in Vertical shape, the upper end of first montant are fixedly connected with the inner surface of first framework, the lower end of first montant with First pipeline is fixedly connected, and the 3rd support is L-shaped, and one end of the 3rd support is fixed with first pipeline to be connected Connect, the other end of the 3rd support is fixedly connected with the inner surface of first framework, and first swash plate is oblique, institute The right-hand member for stating the first swash plate is fixedly connected with the inner surface of first framework, and the left end of first swash plate acts against described On the right surface of one sponge block, the starting stave is in vertical shape, and the upper end of the starting stave is fixed with first swash plate Connection, first through hole described in the lower end aligned of the second pipe and is fixedly connected with the upper surface of first framework, described First water pump is provided with the 4th support, and the 4th support is L-shaped, and one end and first framework of the 4th support are fixed Connection, the other end of the 4th support is fixedly connected with first water pump, and the 3rd pipeline is in vertical shape, and the described 3rd The upper end of pipeline is directed at the third through-hole and is fixedly connected with the lower surface of first framework;The upper end of 4th pipeline It is directed at second through hole and is fixedly connected with the right surface of first framework, the 5th support is L-shaped, described 5th One end of frame is fixedly connected with second blower fan, and the other end of the 5th support is fixed with the side of first framework to be connected Connect, second montant is in cuboid, and second montant is placed vertically, the upper end of second montant and the 5th support Lower surface be fixedly connected, the lower end of second montant is fixedly connected with the 6th support, first cross bar in level Shape, the right-hand member of first cross bar are fixedly connected with the 4th pipeline, the left end of first cross bar and second montant Right surface be fixedly connected, the 6th support is L-shaped, and the upper end and the lower surface of first framework of the 6th support are consolidated Fixed connection;The second framework is in hollow cuboid, and the second framework is placed vertically, and the second framework, which is provided with, to be located at The fifth hole of its upper surface and the 6th through hole positioned at its lower surface, fifth hole described in the lower end aligned of the 4th pipeline And be fixedly connected with the upper surface of the second framework, the 6th support is fixedly connected with the second framework, and described second Screen pack is in hollow round table-like, and second screen pack is contained in the second framework, the upper table of second screen pack It is fixedly connected in face of the accurate fifth hole and with the inner surface of the second framework, the lower surface of second screen pack and institute State and concentrate the upper surface of bucket to be fixedly connected, described to concentrate bucket be in hollow cone, and first spring is provided with two, and described the One spring is in vertical shape, and the upper end of first spring is fixedly connected with the inner surface of the second framework, first spring Lower end be fixedly connected with the upper surface of the 3rd screen pack;3rd screen pack is in cuboid, the 3rd screen pack Horizontal positioned, the side of the 3rd screen pack and the inner surface of the second framework are slidably connected, and the second spring is provided with Two, the second spring is in vertical shape, and the upper end of the second spring is fixedly connected with the lower surface of the 3rd screen pack, The lower end of the second spring is fixedly connected with the upper surface of second sponge block, and the concentration block is provided with two and respectively position The left and right sides in the second framework, the cross section of the concentration block is in a rectangular trapezoid, the concentration block and described second The inner surface of framework is fixedly connected, it is described concentrate block upper surface it is oblique, second sponge block is in cuboid, described the The side of two sponge blocks and the side of the concentration block are slidably connected, and second sponge block acts against the interior of the second framework On surface, second sponge block is located at the top of the 6th through hole;The upper end alignment the described 6th of 5th pipeline is logical Hole and be fixedly connected with the lower surface of the second framework, the 3rd framework in hollow round table-like, the 3rd framework Right surface is provided with the 7th through hole, the left end of the 5th pipeline be aligned the 7th through hole and with the right surface of the 3rd framework It is fixedly connected, the 4th screen pack is in bending, and the 4th screen pack is fixedly connected with the inner surface of the 3rd framework, 5th screen pack is in cylinder, and the 5th screen pack is placed vertically, the right surface of the 5th screen pack and described the The left surface of three frameworks is fixedly connected, and the 3rd sponge block is in cuboid, and the 3rd sponge block is placed vertically, and the described 3rd The left surface of sponge block is fixedly connected with the right surface of the 5th screen pack, and the right surface of the 3rd sponge block acts against institute State on the 4th screen pack.
CN201710698969.4A 2016-05-28 2016-05-28 A kind of ore workshop dust pelletizing system Pending CN107335314A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710698969.4A CN107335314A (en) 2016-05-28 2016-05-28 A kind of ore workshop dust pelletizing system

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201610370855.2A CN105771530B (en) 2016-05-28 2016-05-28 A kind of ore workshop dust pelletizing system
CN201710698969.4A CN107335314A (en) 2016-05-28 2016-05-28 A kind of ore workshop dust pelletizing system

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201610370855.2A Division CN105771530B (en) 2016-05-28 2016-05-28 A kind of ore workshop dust pelletizing system

Publications (1)

Publication Number Publication Date
CN107335314A true CN107335314A (en) 2017-11-10

Family

ID=56375395

Family Applications (3)

Application Number Title Priority Date Filing Date
CN201610370855.2A Active CN105771530B (en) 2016-05-28 2016-05-28 A kind of ore workshop dust pelletizing system
CN201710698969.4A Pending CN107335314A (en) 2016-05-28 2016-05-28 A kind of ore workshop dust pelletizing system
CN201710698967.5A Pending CN107261732A (en) 2016-05-28 2016-05-28 A kind of ore workshop dust pelletizing system

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201610370855.2A Active CN105771530B (en) 2016-05-28 2016-05-28 A kind of ore workshop dust pelletizing system

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201710698967.5A Pending CN107261732A (en) 2016-05-28 2016-05-28 A kind of ore workshop dust pelletizing system

Country Status (1)

Country Link
CN (3) CN105771530B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105999885A (en) * 2016-08-01 2016-10-12 王杨 Purifying device for asphalt flue gas
CN106194520A (en) * 2016-08-20 2016-12-07 王晓东 A kind of agro-farming oil recovery engine suction cleaner
CN106268141A (en) * 2016-09-06 2017-01-04 成都秉德科技有限公司 A kind of industrial waste gas purifying processing means
CN106310854A (en) * 2016-09-06 2017-01-11 成都秉德科技有限公司 Environmental-friendly effective exhaust gas purifying treatment system
CN106703687A (en) * 2016-11-17 2017-05-24 泉州品创知识产权服务有限公司 Environment-friendly geotechnical engineering drilling equipment with dust removal function
CN106606913A (en) * 2016-12-07 2017-05-03 南安达泰卫浴有限公司 Dust purification equipment for furniture and building material production
CN106606912A (en) * 2016-12-07 2017-05-03 长泰惠龙新材料科技有限公司 Concrete asphalt mixing and dedusting device for building
CN106725091A (en) * 2017-01-19 2017-05-31 南安市达腾商务服务有限公司 A kind of New Building Materials dust cleaning equipment of environmental protection

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105311910A (en) * 2015-11-08 2016-02-10 蔡旭东 Industrial gas purification dust-removal equipment
CN105477944A (en) * 2016-01-21 2016-04-13 金思思 Air purifying device facilitating clearing of dust
CN105536420A (en) * 2016-03-01 2016-05-04 金思思 Environment-friendly dust recovery treatment device
CN205252789U (en) * 2015-11-08 2016-05-25 蔡旭东 Industrial gas purification and dust removal equipment

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102607115A (en) * 2012-03-28 2012-07-25 雷飞 Air circulation purification air conditioner
CN104117160A (en) * 2013-04-28 2014-10-29 常州市利众环保科技有限公司 Green air breathing machine
CN104226054B (en) * 2013-06-13 2019-03-26 陈卫星 Integrated polishing movable purifier
CN203375558U (en) * 2013-07-08 2014-01-01 宁波哲恺电器有限公司 Air purifier
CN104841232A (en) * 2015-05-23 2015-08-19 王杨 Air purifier with cleaning function

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105311910A (en) * 2015-11-08 2016-02-10 蔡旭东 Industrial gas purification dust-removal equipment
CN205252789U (en) * 2015-11-08 2016-05-25 蔡旭东 Industrial gas purification and dust removal equipment
CN105477944A (en) * 2016-01-21 2016-04-13 金思思 Air purifying device facilitating clearing of dust
CN105536420A (en) * 2016-03-01 2016-05-04 金思思 Environment-friendly dust recovery treatment device

Also Published As

Publication number Publication date
CN107261732A (en) 2017-10-20
CN105771530A (en) 2016-07-20
CN105771530B (en) 2017-12-12

Similar Documents

Publication Publication Date Title
CN105771530B (en) A kind of ore workshop dust pelletizing system
CN105749682B (en) A kind of environmental-protecting and high-efficient type weaving dust exhaust apparatus
CN105879491A (en) Sewage purification treatment equipment for ore production
CN105771518B (en) Dust treatment plant in a kind of ore processing
CN105935681A (en) Dust removal device for power equipment
CN105771444B (en) A kind of efficient flue gas dust collecting system
CN106582173B (en) A kind of water-saving processing of stone dust collection processing equipment
CN107088328A (en) A kind of stone oil well drilling sullage processing equipment
CN106345212A (en) Industrial smoke purification equipment with high efficiency and environmental friendliness
CN207295674U (en) A kind of environmentally friendly sewage impurity removing equipment in hydraulic engineering field
CN206841039U (en) A kind of slabstone engraving machine base with dedusting function
CN206970326U (en) A kind of small-scale sewage clears up filter
CN106377937B (en) A kind of Treatment of Sludge cleaning system for industrial circle
CN206454444U (en) A kind of environmentally friendly flue-gas purification treatment device
CN105727671B (en) A kind of dust arrester in chemical pharmaceutical workshop
CN105536420B (en) A kind of environment-friendly type dust recycling and processing device
CN106957114A (en) A kind of wastewater purification equipment of field of machining
CN108211506A (en) A kind of impurity removing device for sewage of the environmental protection of field of environment engineering
CN207654832U (en) A kind of dust concentration filter device with multiple filtration net
CN206549378U (en) A kind of ore dust dedusting collection device
CN106606913A (en) Dust purification equipment for furniture and building material production
CN207846010U (en) Mask cleaning equipment a kind of efficient and convenient for adjusting
CN106001044B (en) A kind of novel foodstuff clears up dust arrester
CN207708740U (en) A kind of air-filtering equipment used for air compressor
CN108358337A (en) A kind of river irrigation water correction plant

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20171110