CN106812168A - The novel method that pile foundation is repaired - Google Patents

The novel method that pile foundation is repaired Download PDF

Info

Publication number
CN106812168A
CN106812168A CN201710135382.2A CN201710135382A CN106812168A CN 106812168 A CN106812168 A CN 106812168A CN 201710135382 A CN201710135382 A CN 201710135382A CN 106812168 A CN106812168 A CN 106812168A
Authority
CN
China
Prior art keywords
pile foundation
crack
novel method
pile
repaired
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710135382.2A
Other languages
Chinese (zh)
Inventor
胡金雄
余振刚
龚圣勇
蒋涛鸣
李增光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Cccc Third Harbor Engineering Co Ltd Ningbo Branch
Original Assignee
Cccc Third Harbor Engineering Co Ltd Ningbo Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Cccc Third Harbor Engineering Co Ltd Ningbo Branch filed Critical Cccc Third Harbor Engineering Co Ltd Ningbo Branch
Priority to CN201710135382.2A priority Critical patent/CN106812168A/en
Publication of CN106812168A publication Critical patent/CN106812168A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D37/00Repair of damaged foundations or foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Revetment (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The present invention relates to the novel method that a kind of pile foundation is repaired, comprise the following steps:Crack in pile foundation to be repaired is processed, including after fracture carries out raked joint treatment, the glue that will have been configured by the grout nipple being arranged in the pile foundation is injected in the crack;Viscous composite fibre reinforcement material is pasted on pile foundation outer wall after treatment.The present invention not only constructs simple, it is easy to operate, and the security and economy of construction has been effectively ensured, and is conducive to saving construction cost, and can ensure that the durability in crack after repairing.

Description

The novel method that pile foundation is repaired
Technical field
The present invention relates to the technical field of Wharf Engineering, the novel method that a kind of pile foundation is repaired is referred in particular to.
Background technology
Wharf Engineering is due to place's Yu Haiyang highly corrosive environments, in long piled wharf and bridge spanning the sea structure, pile foundation Due to by long-term Chloride Attack, the more serious endurance issues of generally existing, and the reliability of pile body is directly connected to The safety and reliability of whole harbour, it is therefore desirable to which the foundation pile to there is crack is repaired.
This year, the country occurs in that the device using glass sleeve reinforcement pier stud under water, although can realize repairing for fracture It is multiple, but still there is following defect:Need that complicated strutting system is installed, the volume that glass fibre sleeve takes is larger to be caused Install and transport be inconvenient, die sinking repeatedly is difficult to standardized production and supply, the sealing of the compressive seal at top and Endurance quality is poor, especially, badly broken big to foundation pile and bearing strength consolidation of pile field high, it is difficult to which reaching construction will Ask.In addition, above-mentioned technique is applied to used when crack is larger apart from the pile foundation distance from top, for crack at the top of pile foundation When nearby, if still using such scheme, not only rehabilitation cost is high, and difficulty of construction is big.
The content of the invention
Therefore, the technical problems to be solved by the invention are that the method for overcoming prior art pile foundation to repair is complicated, and Cycle is long, causes construction cost problem high so as to provide a kind of construction relatively simple, cycle is short, and can ensure construction economy Property pile foundation repair novel method.
In order to solve the above technical problems, the novel method that the pile foundation of the invention is repaired, comprises the following steps:Step S1:Crack in pile foundation to be repaired is processed, including after fracture carries out raked joint treatment, by being arranged in the pile foundation The glue that will configure of grout nipple inject in the crack;Step S2:Viscous composite fibre is pasted on pile foundation outer wall after treatment Reinforcement material.
In one embodiment of the invention, when fracture carries out raked joint treatment, including the former material in the pile foundation is divested Material clad, and concrete surface is polishing to new concrete face, it is last to wipe clear surface along seam scope long.
In one embodiment of the invention, the glue that will have been configured by the grout nipple being arranged in the pile foundation is injected The method in the crack is:The grout nipple is arranged on grouting base, and the grouting base is pasted onto crack table along seam Face.
In one embodiment of the invention, before the grouting base is pasted onto fracture faces along seam, the mediation grouting The adhesive glue of base, and the adhesive glue after mediation is applied to around the bottom surface of the grouting base.
In one embodiment of the invention, it is right before the glue that will have been configured by the grout nipple injects the crack The crack is closed, and the crack after closing is detected, if not insertion inside crack, will be split described in glue injection In seam, fracture is otherwise needed to carry out mending envelope treatment.
In one embodiment of the invention, it is to the method that the crack after closing is detected:The crack is carried out Pour water, if thering is water to overflow in injected hole in the pile foundation, then it is assumed that crack internal run-through, otherwise it is assumed that not passed through inside crack It is logical.
In one embodiment of the invention, when pasting viscous composite fibre reinforcement material on the pile foundation outer wall after treatment, first The concrete surface of the pile foundation is polishing to new concrete face;Secondly the epoxy resin that uniform application is prepared in fiber cloth;Then will The fiber cloth is pasted onto on new concrete face;The last wrap film on new concrete face.
In one embodiment of the invention, after the completion of the step S2, the pile cover above the pile foundation and pile foundation connects After connecing the flexible caulking material of place's smearing, then the junction that composite fibre reinforcement material sector is pasted onto the pile foundation and pile cover.
In one embodiment of the invention, the composite fibre reinforcement material sector is pasted onto the pile foundation and connects with pile cover The method at the place of connecing is:Many flitches are vertically fixed in pile foundation first with iron wire, then paste multiple in pile cover top sector Condensating fiber reinforcement material, finally carries out skewed horizontal load using flitch.
In one embodiment of the invention, when smearing flexible caulking material, the flexible caulking material is applied to week Edge crack top simultaneously forms del.
Above-mentioned technical proposal of the invention has advantages below compared to existing technology:
The novel method that pile foundation of the present invention is repaired, the covered composite yarn fiber reinforcing material outside pile foundation, then described The flexible waterstop sealing glue of a circle is smeared at stake top and pile cover faying face, then stake top and pile cover are pasted onto with composite fibre reinforcement material Upper formation flexible adhesive sealant and the bilayer sealing closing of composite fibre reinforcement material, so that it is guaranteed that the crack after repairing is in validity period Durability.
Brief description of the drawings
In order that present disclosure is more likely to be clearly understood, below according to specific embodiment of the invention and combine Accompanying drawing, the present invention is further detailed explanation, wherein
Fig. 1 is the novel method flow chart that pile foundation of the present invention is repaired.
Specific embodiment
As shown in figure 1, the present embodiment provides the novel method that a kind of pile foundation is repaired, comprise the following steps:Step S1:Treat After the crack repaired in pile foundation is processed, including fracture carries out raked joint treatment, by the grouting being arranged in the pile foundation The glue that mouth will have been configured is injected in the crack;Step S2:Viscous composite fibre is pasted on pile foundation outer wall after treatment and reinforces material Material.
Above-mentioned is core technology scheme of the invention, the novel method that pile foundation of the present invention is repaired, in the step S1, Crack in pile foundation to be repaired is processed, including after fracture carries out raked joint treatment, by being arranged in the pile foundation The glue that grout nipple will have been configured is injected in the crack, makes to be full of glue in crack, is entered using chemical grouting technology fracture Row repairing treatment, for crack in pile foundation near top, not only constructs simple, it is easy to operate, and construction has been effectively ensured Security and economy, be conducive to save construction cost;Paste viscous multiple in the step S2, on pile foundation outer wall after treatment Condensating fiber reinforcement material so that it is advantageously ensured that repairing after crack validity period durability.
In the step S1, when fracture carries out raked joint treatment, including the raw material clad in the pile foundation is divested, and Concrete surface is polishing to new concrete face, it is last to wipe clear surface along seam scope long.Specifically, with hammer, chisel and angle grinder by the stake Bare glass steel in base reinforcing scope is divested, and concrete surface is polishing into new concrete face, then along works such as the seam interior hairbrush of scope long Tool wipes surface, fracture faces is kept cleaning.
In order to the glue that will have been configured is injected in the crack by the grout nipple, the grout nipple is arranged at grouting On base, and the grouting base is pasted onto fracture faces along seam.Specifically, according to the width in crack, encapsulating base is determined Spacing and position, set the grout nipple, and carry out mark at fracture tip, crack infall and crack place wider;Mediation institute The adhesive glue of grouting base is stated, and the adhesive glue after mediation is applied to around the bottom surface of the grouting base;Finally by institute Stating grouting base and be pasted onto fracture faces along seam by labeling position, and suitably firmly push the grouting base makes bottom adhesive glue Part is overflowed, and encases the grouting base edge, so as to realize being fixed on the grout nipple in the pile foundation.
In addition, the glue that will have been configured by the grout nipple is injected before the crack, it is necessary to be sealed to the crack Close, in case crack arrest seam is mutually communicated and gas leakage or leak adhesive, therefore also need to detect the crack after closing, if in crack Portion's not insertion, then inject in the crack glue, otherwise needs fracture to carry out mending envelope treatment.Specifically, after to closing The method that crack is detected is:The crack is poured water, if thering is water to overflow in injected hole in the pile foundation, then it is assumed that Crack internal run-through, otherwise it is assumed that not insertion inside crack.Deform as one kind, when fracture is detected, it is also possible to split on edge Seam brushes one layer of suds, and compressed air is passed through from the grout nipple, then checks the sealing effectiveness in crack.
For the effect for controlling the amount of slip casting to ensure reparation crack, the slurries that will have been configured need to calculate in advance, and , then be attached to the low-pressure injection container on the grout nipple by injection Special low-voltage perfusion container, is applied to press with rubber band Power, observes glue injection rate, preceding after pressurization to observe once and keep a record, if the glue in the low-pressure injection container has been noted immediately Supplement glue simultaneously judges whether whether there is any discrepancy with grouting quantity is precalculated, and the low-pressure injection container is removed in slip casting after terminating, Record final injecting glue amount.
When pasting viscous composite fibre reinforcement material on the pile foundation outer wall after treatment, the concrete surface of the pile foundation is polishing to first New concrete face;Secondly the epoxy resin that uniform application is prepared in fiber cloth;Then the fiber cloth is pasted onto on new concrete face; The last wrap film on new concrete face.Specifically, the pile foundation is processed first:Using hammer, chisel and angle grinder by institute State the fiberglass in the range of pile foundation stickup to divest, and concrete surface is polishing to new concrete face, asphalt mixtures modified by epoxy resin is used to uneven position Fat is repaired, and makes the pile foundation surface without wedge angle and thrust;Secondly special epoxy resin and wetting fibre cloth are configured:In ring Blending epoxy component A and component B in proportion at a temperature of border, and stirred with low-speed machinery, fiber is cut according to drawing size Cloth, and the fiber cloth epoxy resin that will cut is resin dedicated uniformly applies wet;Then composite reinforcing layer is constructed:To treat One layer of resin for mixing of body structure surface brushing of reinforcing does bottom, within the time of regulation, by drenched fiber cloth entirely It is attached on new concrete surface, broadwise splicing between fiber cloth, the lap position of principal fiber needs interlaced arrangement when multilayer is pasted, Must not be overlapped at one, the bubble in resin must be discharged before hardening of resin to be checked to composite reinforcing layer(With scraping Plate is struck off along primary fibre direction, and the bubble in resin is driven out of), each layer of fiber cloth must be tight with preceding layer or basic unit Close attachment;Finally, sticking film prevents tidewater from washing away so as to play safeguard measure:Composite fibre layer in the pile foundation has been pasted Cheng Hou, due to by tidal level time effects, while colloid is not fully cured, if being washed away by tidewater, the composite fibre that can be pasted Layer is washed out, therefore after the completion of composite fibre layer is pasted at the scene, need to be with fully wrapped around by its with film, and outside is entered with adhesive tape Row is fixed, it is ensured that composite fibre in the curing process will not be by seawater scouring.
In order to ensure repairing effect, after the completion of the step S2, can at pile cover the fan-shaped fiber reinforced material of covered composite yarn Material.Specifically, after flexible caulking material is smeared in the pile cover junction above the pile foundation and pile foundation, then composite fibre is reinforced Material sector is pasted onto the junction of the pile foundation and pile cover.Wherein, flexible caulking material system is applied to periphery fissure top and is formed Del, and flexible caulking material must cling it is closely knit, so as to ensure that flexible caulking material is full of whole crack, it is ensured that its is close Feng Xing;In addition, flexible caulking material and concrete binding site sanding machine first should be removed into the impurity such as the floating dust on concrete surface before construction, Until exposing new concrete face, then rinsed well with water, then smeared.The composite fibre reinforcement material sector is pasted onto institute State pile foundation is with the method for pile cover junction:Many flitches are vertically fixed in pile foundation first with iron wire, then in pile cover Top sector pastes composite fibre reinforcement material, is compressed using film and plank, finally carries out skewed horizontal load using flitch.
To sum up, technical scheme of the present invention has advantages below:
1. the novel method that pile foundation of the present invention is repaired, in the step S1, is processed the crack in pile foundation to be repaired, After carrying out raked joint treatment including fracture, by being split described in the glue injection that the grout nipple being arranged in the pile foundation will have been configured In seam, make to be full of glue in crack, repairing treatment is carried out using chemical grouting technology fracture, it is attached at the top of pile foundation for crack When near, not only construct simple, it is easy to operate, and the security and economy of construction has been effectively ensured, be conducive to saving to apply Work cost;Viscous composite fibre reinforcement material is pasted in the step S2, on pile foundation outer wall after treatment, so as to it is advantageously ensured that repair The durability of crack after benefit in validity period.
2. the novel method that pile foundation of the present invention is repaired, in order to ensure repairing effect, after the completion of the step S2, in institute After stating the flexible caulking material of pile cover junction smearing above pile foundation and pile foundation, then composite fibre reinforcement material sector is pasted onto The junction of the pile foundation and pile cover.Wherein, flexible caulking material system is applied to periphery fissure top and forms del, and flexible Caulking material must cling it is closely knit so that ensure flexible caulking material be full of whole crack, it is ensured that sealing.

Claims (10)

1. the novel method that a kind of pile foundation is repaired, it is characterised in that comprise the following steps:
Step S1:Crack in pile foundation to be repaired is processed, including after fracture carries out raked joint treatment, by being arranged on The glue that the grout nipple in pile foundation will configure is stated to inject in the crack;
Step S2:Viscous composite fibre reinforcement material is pasted on pile foundation outer wall after treatment.
2. the novel method that pile foundation is repaired according to claim 1, it is characterised in that:When fracture carries out raked joint treatment, bag The raw material clad divested in the pile foundation is included, and concrete surface is polishing to new concrete face, it is last to wipe clear surface along seam scope long.
3. the novel method that pile foundation is repaired according to claim 1, it is characterised in that:By the filling being arranged in the pile foundation The method in the glue injection crack that slurry mouth will configure is:The grout nipple is arranged on grouting base, and the filling Slurry base is pasted onto fracture faces along seam.
4. the novel method that pile foundation is repaired according to claim 3, it is characterised in that:The grouting base is pasted onto along seam and splits Before seam surface, the adhesive glue of the mediation grouting base, and the adhesive glue after mediation is applied to the bottom of the grouting base Around face.
5. the novel method that pile foundation is repaired according to claim 1, it is characterised in that:To be configured by the grout nipple Before glue injects the crack, the crack is closed, and the crack after closing is detected, if not passed through inside crack It is logical, then glue is injected in the crack, otherwise need fracture to carry out mending envelope treatment.
6. the novel method that pile foundation is repaired according to claim 4, it is characterised in that:Crack after closing is detected Method is:The crack is poured water, if thering is water to overflow in injected hole in the pile foundation, then it is assumed that crack internal run-through, Otherwise it is assumed that not insertion inside crack.
7. the novel method that pile foundation is repaired according to claim 1, it is characterised in that:Paste viscous multiple on pile foundation outer wall after treatment During condensating fiber reinforcement material, the concrete surface of the pile foundation is polishing to new concrete face first;Secondly uniform application is matched somebody with somebody in fiber cloth The epoxy resin for making;Then the fiber cloth is pasted onto on new concrete face;The last wrap film on new concrete face.
8. the novel method that pile foundation is repaired according to claim 1, it is characterised in that:After the completion of the step S2, described After flexible caulking material is smeared in pile cover junction above pile foundation and pile foundation, then composite fibre reinforcement material sector is pasted onto institute State the junction of pile foundation and pile cover.
9. the novel method that pile foundation is repaired according to claim 8, it is characterised in that:The composite fibre reinforcement material is fan-shaped Be pasted onto the pile foundation is with the method for pile cover junction:Many flitches are vertically fixed in pile foundation first with iron wire, so Composite fibre reinforcement material is pasted in pile cover top sector afterwards, finally skewed horizontal load is carried out using flitch.
10. the novel method that pile foundation is repaired according to claim 8, it is characterised in that:When smearing flexible caulking material, by institute Flexible caulking material is stated to be applied to all edge crack tops and form del.
CN201710135382.2A 2017-03-08 2017-03-08 The novel method that pile foundation is repaired Pending CN106812168A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710135382.2A CN106812168A (en) 2017-03-08 2017-03-08 The novel method that pile foundation is repaired

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710135382.2A CN106812168A (en) 2017-03-08 2017-03-08 The novel method that pile foundation is repaired

Publications (1)

Publication Number Publication Date
CN106812168A true CN106812168A (en) 2017-06-09

Family

ID=59116251

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710135382.2A Pending CN106812168A (en) 2017-03-08 2017-03-08 The novel method that pile foundation is repaired

Country Status (1)

Country Link
CN (1) CN106812168A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110144896A (en) * 2019-05-21 2019-08-20 湖南宏禹工程集团有限公司 Concrete defect leak quick blocking restorative procedure in a kind of underground space engineering

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20000012647A (en) * 1999-12-16 2000-03-06 남궁락 A method and struture of bridge pier mould construction repair
KR20050109181A (en) * 2004-05-14 2005-11-17 주식회사 시디에스코리아 Encasement method for repairing or reinforcing structures in the water and a repairing or reinforcing member used therein
CN101929168A (en) * 2010-06-04 2010-12-29 上海久坚加固工程有限公司 Reinforcing method for wrapping water pile post by using reinforced fiber composite cloth
CN201771003U (en) * 2010-07-08 2011-03-23 上海久坚加固工程有限公司 Isolating body for reinforcing underwater piles
CN102561412A (en) * 2012-02-07 2012-07-11 山东大学 Reinforcement method for fiber reinforced composite plastic and concrete
CN103397657A (en) * 2013-08-13 2013-11-20 上海其军加固工程有限公司 Method for reinforcing underwater structure through fiber composite materials
CN203783177U (en) * 2014-04-25 2014-08-20 湖南固特邦土木技术发展有限公司 Concrete crack repairing structure

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20000012647A (en) * 1999-12-16 2000-03-06 남궁락 A method and struture of bridge pier mould construction repair
KR20050109181A (en) * 2004-05-14 2005-11-17 주식회사 시디에스코리아 Encasement method for repairing or reinforcing structures in the water and a repairing or reinforcing member used therein
CN101929168A (en) * 2010-06-04 2010-12-29 上海久坚加固工程有限公司 Reinforcing method for wrapping water pile post by using reinforced fiber composite cloth
CN201771003U (en) * 2010-07-08 2011-03-23 上海久坚加固工程有限公司 Isolating body for reinforcing underwater piles
CN102561412A (en) * 2012-02-07 2012-07-11 山东大学 Reinforcement method for fiber reinforced composite plastic and concrete
CN103397657A (en) * 2013-08-13 2013-11-20 上海其军加固工程有限公司 Method for reinforcing underwater structure through fiber composite materials
CN203783177U (en) * 2014-04-25 2014-08-20 湖南固特邦土木技术发展有限公司 Concrete crack repairing structure

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘忠友: "PHC管桩裂缝分析及处理方法", 《水运工程》 *
徐福泉等: "《既有建筑结构加固改造设计与施工技术指南》", 31 January 2013, 中国物资出版社 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110144896A (en) * 2019-05-21 2019-08-20 湖南宏禹工程集团有限公司 Concrete defect leak quick blocking restorative procedure in a kind of underground space engineering

Similar Documents

Publication Publication Date Title
CN107387123B (en) The construction method of pressure grouting leak stopping is carried out for shield duct piece piece leakage phenomenon
CN105442862B (en) A kind of distress in concrete infiltration water collision reinforcement and repair method
CN109267709A (en) A kind of deformation joint anti-seepage drain structure and its restorative procedure
CN106321121A (en) Vibration disturbance resistant crack leaking stoppage and reinforcement method applied to underground works
CN107023176A (en) A kind of low pressure concrete structural cracks method for repairing and mending and device
CN205557856U (en) Leakage structure is prevented at building expansion joint
CN109371860A (en) A kind of construction method for repairing Bridge Crack
CN105239789A (en) Construction process for plugging and consolidating concrete crack through chemical grouting
CN106958716B (en) A kind of PCCP pipe joint caulking joint construction method
CN105297782A (en) Underground concrete structure expansion joint treatment structure and construction method thereof
CN106801768A (en) PCCP pipeline socket rings and steel cylinder weld seam Micro blazed-grating handling process have been installed
CN110331716A (en) The construction method of the splicing construction of vertical splicing prefabricated pile and vertical splicing prefabricated pile
CN203684167U (en) Concrete joint waterstop device
CN102841020B (en) Test model and method for simulating capacity of resisting cracking caused by high-pressure water of flexible impermeable material
CN103452081B (en) A kind of construction method of flexible composite impermeable layer of upstream face of high arch dam
CN106812168A (en) The novel method that pile foundation is repaired
CN107345406A (en) A kind of method for the sealing of piping lane waterproofing of movement joints
CN207846696U (en) A kind of compound leak stopping system
CN106567554A (en) Reinforcing construction method of masonry structural building
CN105952070A (en) Synchronous construction method for TPZ red core molecular level bonding waterproof coiled material
CN206220135U (en) A kind of underground waterproof building structure
CN105545006A (en) HF-3 double-component polysulfide building sealant crack repairing method
CN209369199U (en) A kind of deformation joint anti-seepage drain structure
CN209958531U (en) Deformation joint leakage repairing structure
CN111472568A (en) Concrete crack repairing device and method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170609