CN201771003U - Isolating body for reinforcing underwater piles - Google Patents

Isolating body for reinforcing underwater piles Download PDF

Info

Publication number
CN201771003U
CN201771003U CN2010202520811U CN201020252081U CN201771003U CN 201771003 U CN201771003 U CN 201771003U CN 2010202520811 U CN2010202520811 U CN 2010202520811U CN 201020252081 U CN201020252081 U CN 201020252081U CN 201771003 U CN201771003 U CN 201771003U
Authority
CN
China
Prior art keywords
underwater
pile
piles
body layer
separator layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010202520811U
Other languages
Chinese (zh)
Inventor
宋志远
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI JIUJIAN REINFORCEMENT TECHNOLOGY Co.,Ltd.
Shanghai Jiujian Reinforcing Technology Co ltd
Original Assignee
SHANGHAI DURAB RETROFIT SPECIALISTS CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI DURAB RETROFIT SPECIALISTS CO Ltd filed Critical SHANGHAI DURAB RETROFIT SPECIALISTS CO Ltd
Priority to CN2010202520811U priority Critical patent/CN201771003U/en
Application granted granted Critical
Publication of CN201771003U publication Critical patent/CN201771003U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model provides an isolating body layer for reinforcing underwater piles, relates to the maintenance and reinforcement of the underwater piles of building structures or bridges, and adopts the method which dispenses with cofferdam during water isolation and arranges an underwater insolating body layer for reinforcement by utilizing prefabricated fiber composite plates. The isolating body layer is prefabricated by fiber composite materials. In order to repair the underwater concrete piles of the bridges, quays and other underwater buildings, the surfaces of which are damaged or sufferer from erosion-corrosion, and to overcome the defects and technological disadvantages of the existing reinforcing method, the insolating body layer is adopted to wrap bodies of the underwater piles and can meet designing and operating requirements, without adopting other treatment measures.

Description

Be used to add the slider of solid water king-pile post
Technical field
The utility model relates to building structure or bridge water king-pile shaft maintenance and reinforcement, does not need to set the cofferdam isolated water, can utilize prefabricated fibrous composite plate that a kind of method that separator layer is reinforced is set under water.
Background technology
Building field to the traditional reinforcement means of water king-pile shaft is: set the cofferdam isolated water earlier, the steel casing is used in the cofferdam more, and carries out back cover with concrete; Extract the water in the casing then out, again the pile body is carried out repairing and reinforcement and handle.Conventional method takes a lot of work, time-consuming, expensive, and have certain degree of difficulty and security risk.
At present, for adopting reinforcing underwater structure by fiber-reinforced composite material grid ribs, be the patent of invention of Beijing Texida Research ﹠ Development of Technology Co., Ltd.'s application in 2009 near reinforcement means of the present utility model.Though also adopted in the method for the treatment of reinforcing underwater structure outer setting separator layer, but its shortcoming is to wrap up earlier afterwards establishing slider, slider is just as ancillary method, and spacer material do not offer some clarification on, and performances such as its intensity, anticorrosive, durability still can't effectively be ensured.
Summary of the invention
The purpose of the present utility model is: in order to repair building surface defectiveness in the water such as bridge, harbour or to be subjected to the underwater concrete pile of erosion corrosion, overcome the many shortcomings and the technologic deficiency of existing reinforcement means, the utility model adopts separator layer that water king-pile shaft is wrapped up, no longer take other treatment measures, can satisfy the requirement of design and use.
For finishing above-mentioned utility model purpose, the utility model is achieved in that
The first step: send professional diver pile body breakage to be carried out concrete knocks out, sander grinding process under water;
Second step: add quartz sand with epoxy resin under water and be configured to mortar bulk or underwater repair mortar, the diver directly spreads upon breakage with mortar, and with doctor blade until repairing the original structure size;
The 3rd the step: according to the height of pile body diameter and breakage, determine prefabricated composite panel around area and corresponding size;
The 4th step: determine the resin demand according to composite panel overlap joint bonding area;
The 5th step: the resin for preparing is evenly brushed on the lap-joint surface with cylinder;
The 6th step: the composite panel overlap joint that the diver will brush resin pastes, and guarantees to paste between lap-joint's plate and the plate closely knit;
The 7th step: back cover is carried out with epoxy mortar under water in separator layer bottom;
The 8th step: irritate epoxide-resin glue under the setting-out in the space between separator layer and pile.
Because traditional building field will set the cofferdam isolated water earlier to the reinforcement means of water king-pile shaft, and carries out back cover with concrete, and then extract the water in the casing out, could carry out repairing and reinforcement to the pile body and handle.Than traditional method, the utility model just seem more the saving of labor, save time, save money, also low relatively on operation difficulty degree, the corresponding reduction of security risk.
A kind of slider that is used to add solid water king-pile post, described separator layer is prefabricated by fibrous composite, and separator layer invests pile top layer under water.Described fibrous composite is the tough measuring fiber composite material of fragrant glass under water.Described separator layer is looped around under water around the pile.The tough cloth of virtue glass is the high-performance fiber cloth that is formed by E glass fiber (E-glass) and aramid fiber (Kevlar) braiding.
The intensity height: it is good that layer of glass aramid fiber cloth tensile strength is equivalent to 3mm steel plate ductility: elongation per unit length 〉=2.5%, the good durable crashworthiness of shock resistance: exposed not wearing out do not corroded in 50 years, and anti-collision and wash away with carbon cloth and compare elongation per unit length greater than carbon fiber, so the design tension strain greater than carbon fiber thickness greater than carbon fiber, the not enough anti-seismic performance that has remedied modulus of elasticity is better than the carbon fiber glass fiber and fragrant fiber synthetic fibre fiber is isolator, and corrosion-resistant, be applicable to the engineering item of this generic request.
Such scheme is done further refinement, and the tough cloth of fragrant glass is the high-performance fiber cloth that is formed by special glass fibre and aramid fiber braiding.The extension property of glass aramid fiber cloth is better than other cloth, can resist lateral impact.Its coefficient of thermal expansion and modulus of elasticity and steel concrete are approaching, can not produce chemical attack, high temperature resistant and working year limit for length.In light weight, the construction weight increase of construction back is quite few.
Products characteristics: 1, intensity height: the tough cloth tensile strength of one deck virtue glass is equivalent to the 3MM steel plate, same one deck fibrous material of pasting, under identical distortion, the design pulling force that the tough cloth composite fibre of fragrant glass provides is 1.3 times of carbon cloth, and ultimate tension is 1.9 times of carbon cloth.2, non-conductive more durable: the tough cloth composite fibre of fragrant glass is an isolator, can not produce electrochemical corrosion.High temperature resistant, anti-low temperature.Its accelerated aging test result shows: under normal environment (not having ultraviolet direct projection), and its working life at least 50 years (burn into is not aging).3, superior permeability: but the easy construction reduction of erection time.4, ductility is good: the elongation per unit length of the tough cloth composite fibre of fragrant glass is between 2%--4%, and is more much bigger than the elongation per unit length (1.4%--1.7%) of carbon fiber.Not only elongation per unit length is big for the tough cloth composite fibre of virtue glass, and can resist lateral impact.With parcel bridge pier post and crossbeam, not only promoted supporting capacity, and facts have proved the position that is often broken before having protected by passing ships.5, good with concrete deformation harmony: the coefficient of thermal expansion of the tough cloth composite fibre of fragrant glass and modulus of elasticity are all approaching with steel concrete, coordinate as outer subsides material and the bridge concrete malformation that difference variation is bigger in the open air.Experimental results show that: the flexural member that the tough cloth composite fibre of fragrant glass is reinforced is plastic failure.6, execution conditions require low: easy construction, concrete base layer is required low, on-the-spot volume, bundle, curved, press the tough cloth of fragrant glass all can not decrease the folding fiber.Can not influence normal traffic circulation on the bridge in the work progress.
Description of drawings
Fig. 1 is pile body wrapped strengthening facade structures figure.
Fig. 2 is the A-A profile of Fig. 1.
Fig. 3 is the B-B sectional drawing of Fig. 1.
The specific embodiment
A kind of slider that is used to add solid water king-pile post, described separator layer is prefabricated by fibrous composite, and separator layer invests pile top layer under water.Described fibrous composite is the tough measuring fiber composite material of fragrant glass under water.Described separator layer is looped around under water around the pile.The tough cloth of virtue glass is the high-performance fiber cloth that is formed by E glass fiber (E-glass) and aramid fiber (Kevlar) braiding.The intensity height: it is good that layer of glass aramid fiber cloth tensile strength is equivalent to 3mm steel plate ductility: elongation per unit length 〉=2.5%, the good durable crashworthiness of shock resistance: exposed not wearing out do not corroded in 50 years, and anti-collision and wash away with carbon cloth and compare elongation per unit length greater than carbon fiber, so the design tension strain greater than carbon fiber thickness greater than carbon fiber, the not enough anti-seismic performance that has remedied modulus of elasticity is better than the carbon fiber glass fiber and fragrant fiber synthetic fibre fiber is isolator, and corrosion-resistant, be applicable to the engineering item of this generic request.
Described separator layer is looped around under water around the pile, more clearly understands application of the present utility model for making the reader, below in conjunction with accompanying drawing application of the present utility model is further elaborated.
Specific embodiment is:
With lower part pile body 3 damaged position 5 is arranged at waterline 8, it is repaired.Earlier recover former problem pile sectional dimension with epoxy mending mortar under water; Be looped around around the pile as separator layer 1 with prefabricated fibrous composite plate, separator layer 1 interface can overlap stickup with supporting resin under water again, and W is the separator layer lap width, keeps a fixed gap between separator layer and the pile; Back cover is earlier carried out with epoxy mortar 4 under water in bottom between separator layer and the pile, and H is the thickness of back cover underwater epoxy mortar; Irritate epoxide-resin glue 2 under the setting-out in the last space between separator layer 1 and pile body 3; L is a pile body reinforcing scope, and D is the pile diameter.Be used for remedying pile body vertical reinforcement 6 and pile body stirrup 7 and decrease the damage that brings experiencing because of pile under water.
The utility model is implemented according to the following steps:
The first step: send professional diver pile body breakage to be carried out concrete knocks out, sander grinding process under water;
Second step: add quartz sand with epoxy resin under water and be configured to mortar bulk or underwater repair mortar, the diver directly spreads upon breakage with mortar, and with doctor blade until repairing the original structure size;
The 3rd the step: according to the height of pile body diameter and breakage, determine prefabricated composite panel around area and corresponding size;
The 4th step: determine the resin demand according to composite panel overlap joint bonding area;
The 5th step: the resin for preparing is evenly brushed on the lap-joint surface with cylinder;
The 6th step: the composite panel overlap joint that the diver will brush resin pastes, and guarantees to paste between lap-joint's plate and the plate closely knit;
The 7th step: back cover is carried out with epoxy mortar under water in separator layer bottom;
The 8th step: irritate epoxide-resin glue under the setting-out in the space between separator layer and pile.

Claims (3)

1. slider that is used to add solid water king-pile post, it is characterized in that: described separator layer is prefabricated by fibrous composite, and separator layer invests pile top layer under water.
2. the slider that is used to add solid water king-pile post according to claim 1 is characterized in that: described fibrous composite is the tough measuring fiber composite material of fragrant glass under water.
3. the slider that is used to add solid water king-pile post according to claim 1 is characterized in that: described separator layer is looped around under water around the pile.
CN2010202520811U 2010-07-08 2010-07-08 Isolating body for reinforcing underwater piles Expired - Fee Related CN201771003U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010202520811U CN201771003U (en) 2010-07-08 2010-07-08 Isolating body for reinforcing underwater piles

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010202520811U CN201771003U (en) 2010-07-08 2010-07-08 Isolating body for reinforcing underwater piles

Publications (1)

Publication Number Publication Date
CN201771003U true CN201771003U (en) 2011-03-23

Family

ID=43750846

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010202520811U Expired - Fee Related CN201771003U (en) 2010-07-08 2010-07-08 Isolating body for reinforcing underwater piles

Country Status (1)

Country Link
CN (1) CN201771003U (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102337743A (en) * 2011-07-26 2012-02-01 杭州固华复合材料科技有限公司 Method for repairing and reinforcing pile foundations in ocean splash zones
CN104863063A (en) * 2015-05-28 2015-08-26 北京特希达交通设施顾问有限公司 Bridge underwater structure cofferdam-free fast reinforcing method based on PVC composite formwork
CN105386475A (en) * 2014-09-03 2016-03-09 上海久坚加固科技有限公司 Anti-corrosive reinforcing method for steel pile in water
CN106812168A (en) * 2017-03-08 2017-06-09 中交第三航务工程局有限公司宁波分公司 The novel method that pile foundation is repaired
CN108824229A (en) * 2018-08-28 2018-11-16 南京林业大学 A kind of reinforcement bridge submerged structure FRP shell circumferential direction bridging method
CN109322253A (en) * 2018-11-02 2019-02-12 深圳大学 The method and device of impaired pier stud repairing and reinforcement
CN109797788A (en) * 2019-01-28 2019-05-24 上海市政工程设计研究总院(集团)有限公司 A kind of reinforcement means for reinforcing underwater concrete structure using ultra-high performance concrete
CN115305909A (en) * 2022-09-06 2022-11-08 杭州联力地空建筑科技有限公司 Stirring drilling rod for reinforcing defective pile in soft foundation construction

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102337743A (en) * 2011-07-26 2012-02-01 杭州固华复合材料科技有限公司 Method for repairing and reinforcing pile foundations in ocean splash zones
CN105386475A (en) * 2014-09-03 2016-03-09 上海久坚加固科技有限公司 Anti-corrosive reinforcing method for steel pile in water
CN104863063A (en) * 2015-05-28 2015-08-26 北京特希达交通设施顾问有限公司 Bridge underwater structure cofferdam-free fast reinforcing method based on PVC composite formwork
CN106812168A (en) * 2017-03-08 2017-06-09 中交第三航务工程局有限公司宁波分公司 The novel method that pile foundation is repaired
CN108824229A (en) * 2018-08-28 2018-11-16 南京林业大学 A kind of reinforcement bridge submerged structure FRP shell circumferential direction bridging method
CN108824229B (en) * 2018-08-28 2023-11-10 南京林业大学 Annular lapping method for FRP shell of reinforced bridge underwater structure
CN109322253A (en) * 2018-11-02 2019-02-12 深圳大学 The method and device of impaired pier stud repairing and reinforcement
CN109797788A (en) * 2019-01-28 2019-05-24 上海市政工程设计研究总院(集团)有限公司 A kind of reinforcement means for reinforcing underwater concrete structure using ultra-high performance concrete
CN115305909A (en) * 2022-09-06 2022-11-08 杭州联力地空建筑科技有限公司 Stirring drilling rod for reinforcing defective pile in soft foundation construction
CN115305909B (en) * 2022-09-06 2023-10-27 杭州联力地空建筑科技有限公司 Stirring drill rod for reinforcing defective piles in soft foundation construction

Similar Documents

Publication Publication Date Title
CN201771003U (en) Isolating body for reinforcing underwater piles
CN104675141B (en) A kind of FRP pipe constraint cement-base composite material reinforces pillarwork
Brühwiler “Structural UHPFRC”: Welcome to the post-concrete era!
CN101481930B (en) Construction structure for textile reinforced composite reinforced bar concrete and manufacturing method thereof
Meier Composite materials in bridge repair
CN109190194B (en) Reinforcement calculation method for UHPC flexural member
CN107217788A (en) Full FRP muscle enhancing ECC Combined concrete beams and preparation method thereof
CN106836622A (en) A kind of multi-functional non-dismantling formwork of fibrous composite and preparation method thereof
CN107605103A (en) A kind of FRP tendons reinforcing bar composite strengthening ECC/ concrete combination columns
Bencardino et al. Eco-friendly external strengthening system for existing reinforced concrete beams
CN104652294A (en) New technology for reinforcing box girder through adhesion of UHPC (Ultra High Performance Concrete) and steel plate
KR101104613B1 (en) Reinforcing method of concrete structures using fiber composites for reinforcing
CN102922602B (en) Process for preparing prefabricated intelligent fiber reinforce plastic (FRP)-concrete composite structure
Hasan et al. Shear behavior of reinforced concrete beams repaired using a hybrid scheme with stainless steel rebars and CFRP sheets
Vasudevan et al. Experimental investigation on the performance of RC beams strengthened with external bars at soffit
CN107724257B (en) The ruggedized construction and its method of rc beam bridge
Pelà et al. Experimental study of retrofit solutions for damaged concrete bridge slabs
CN109555270A (en) A kind of casing-FRP composite reinforcing material and preparation method thereof
CN103011741A (en) Rustproof repairing method for reinforced concrete structure
CN103643804B (en) A kind of restoring and fastening method of the Corroded Reinforced Concrete Beam based on arching
Nicolae et al. Fibre reinforced polymer composites as internal and external reinforcements for building elements
CN204571341U (en) A kind of FRP pipe constraint cement-base composite material reinforces pillarwork
CN213806705U (en) Green high tenacity cement based composite material prefabricated component reinforcing apparatus
Fayyadh et al. Impact of design parameters and cycles of damage loads on CFRP repair effectiveness of Shear-Deficient RC structures
CN215330947U (en) BFRP bar recycled concrete beam

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
DD01 Delivery of document by public notice

Addressee: Zhang Yousheng

Document name: Notification of Passing Examination on Formalities

C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 202100 Shanghai Taihe Economic Development Zone Chongming County Feng No. 77, room 352

Patentee after: SHANGHAI JIUJIAN REINFORCING TECHNOLOGY CO.,LTD.

Address before: 202100 Shanghai Taihe Economic Development Zone Chongming County Feng No. 77, room 352

Patentee before: SHANGHAI JIUJIAN REINFORCEMENT TECHNOLOGY Co.,Ltd.

Address after: 202100 Shanghai Taihe Economic Development Zone Chongming County Feng No. 77, room 352

Patentee after: SHANGHAI JIUJIAN REINFORCEMENT TECHNOLOGY Co.,Ltd.

Address before: 202100 Shanghai Taihe Economic Development Zone Chongming County Feng No. 77, room 352

Patentee before: Shanghai Durab Retrofit Engineering Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110323

Termination date: 20190708