CN106779307A - The data processing method and system of cubic management system - Google Patents

The data processing method and system of cubic management system Download PDF

Info

Publication number
CN106779307A
CN106779307A CN201611046254.2A CN201611046254A CN106779307A CN 106779307 A CN106779307 A CN 106779307A CN 201611046254 A CN201611046254 A CN 201611046254A CN 106779307 A CN106779307 A CN 106779307A
Authority
CN
China
Prior art keywords
subtask
operation flow
executor
business
candidate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611046254.2A
Other languages
Chinese (zh)
Inventor
崔岩
李劲华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201611046254.2A priority Critical patent/CN106779307A/en
Publication of CN106779307A publication Critical patent/CN106779307A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06313Resource planning in a project environment
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06393Score-carding, benchmarking or key performance indicator [KPI] analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management

Abstract

The invention provides a kind of data processing method and system of cubic management system, wherein the data processing method of cubic management system includes:Obtain the requirement description information of business to be achieved;Description information builds operation flow as desired, and operation flow includes the interactive relation of multiple subtasks and multiple subtasks;For the executor for meeting completion condition is searched in each subtask, and corresponding subtask is distributed to executor;And the completion result of subtask is obtained, and performed in incoming traffic flow, to complete business to be achieved.Using the solution of the present invention, using the subtask in the resource finishing service flow of fragmentation, the resource of fragmentation can be made full use of, on the one hand can efficiently complete task, on the other hand can also meet the mission requirements of staff.

Description

The data processing method and system of cubic management system
Technical field
The present invention relates to data processing, the more particularly to data processing method and system of cubic management system.
Background technology
The extreme refinement of the professional division of modern society, the exquisiteness to professional technique requires that the brilliance to work quality is chased after Ask so that entrepreneurs are difficult to grasp the daily routine work in company operation, such as basic accounting, tax industry and commerce The basic personal management activity such as business and recruitment, assessment, tissue.
To highly specialized personnel and the wilderness demand of technician, on the one hand cause it regional deficient.On the other hand Professional and technician do not make full use of also in the presence of some rich slack times, which results in the wave of social resources Take, bring development to perplex to the development of medium-sized and small enterprises.
Although with society development and technological progress, in the prior art substantial amounts of recruitment platform and service mass-rent business The talent is selected in platform, the former description according to enterprise to post, and the latter provides independent task and selects completion for professional person, this Two ways is required for carrying out substantial amounts of work by enterprise personnel, it is necessary to describe job responsibility in detail and carry out work thin The division of cause, is on the one hand needed to take great effort and the time of enterprise personnel, and on the other hand the performance of work cannot be obtained To sufficiently monitoring, task performance cannot ensure.
The content of the invention
It is an object of the present invention to provide a kind of data processing side of the cubic management system for improving social efficiency Method and system.
The present invention one is further objective is that will cause that operation flow is more flexible.
Especially, the invention provides a kind of data processing method of cubic management system, it includes:Obtain to be achieved The requirement description information of business;Description information builds operation flow as desired, and operation flow includes multiple subtasks and many The interactive relation of individual subtask;For the executor for meeting completion condition is searched in each subtask, and distribute corresponding to executor Subtask;And the completion result of subtask is obtained, and performed in incoming traffic flow, to complete business to be achieved.
Alternatively, the step of description information builds operation flow as desired includes:Looked into from default operation flow storehouse Look for the presence or absence of the business model being consistent with requirement description information;If in the presence of, by requirement description information input business model, with Construct operation flow;And if do not exist, as desired description information design operation flow, and by operation flow it is abstract be industry Business model, is stored in operation flow storehouse.
Alternatively, it is that the lookup of each subtask includes the step of meeting the executor of completion condition:Obtain each subtask Completion condition;Search whether there is the candidate for meeting completion condition in default mass-rent resources bank;If in the presence of to candidate Person sends task invitation, and the candidate that the task of reception is invited is used as executor;And if do not exist, according to complete condition send out Cloth calls up information, and filters out executor in the candidate information for calling up information from response.
Alternatively, also include after the step of filtering out executor according to the candidate information for calling up information from response: By candidate information Store to mass-rent resources bank, candidate is provided with for follow-up business flow.
Alternatively, also include after the step of obtaining the completion result of subtask:Default examination plug-in unit is called to complete Result is examined, and calculates the workload of subtask and to executor's feedback of subtask according to the result of appraisal.
Alternatively, the completion condition of requirement description information and subtask is retouched with the form of extensible markup language State.
According to another aspect of the present invention, a kind of data handling system of cubic management system, its bag are additionally provided Include:Demand management module, is configured to obtain the requirement description information of business to be achieved;Work organization module, is configured to according to need Description information is asked to build operation flow, operation flow includes the interactive relation of multiple subtasks and multiple subtasks;Mass-rent point With module, it is configured as each subtask and searches the executor for meeting completion condition, and corresponding subtask is distributed to executor; And flow administration module, it is configured to obtain the completion result of subtask, and performed in incoming traffic flow, to complete to treat Realize business.
Alternatively, work organization module includes:Model management submodule, is configured to be searched from default operation flow storehouse With the presence or absence of the business model being consistent with requirement description information;And flow builds submodule, if being configured to operation flow storehouse In there is business model, by requirement description information input business model, to construct operation flow;If operation flow is not deposited in storehouse In business model, description information design operation flow as desired, and by operation flow it is abstract be business model, be stored in Business Stream Cheng Ku.
Alternatively, mass-rent distribute module includes:Submodule is selected, is configured to obtain the completion condition of each subtask; Search whether there is the candidate for meeting completion condition in default mass-rent resources bank;If in the presence of sending task to candidate and invite Please, and using the task of reception the candidate invited is used as executor;If not existing, information is called up according to the issue of completion condition, and from Executor is filtered out in the candidate information for responding information of calling up, by candidate information Store to mass-rent resources bank, follow-up business is thought Flow provides candidate;And distribution sub module, it is configured to distribute corresponding subtask to executor.
Alternatively, flow administration module also includes:Examination submodule, is configured to call default examination plug-in unit to complete result Examined, and the workload of subtask is calculated and to executor's feedback of subtask according to the result of appraisal.
The data processing method and system of cubic management system of the invention, the requirement description using business to be achieved are believed Breath constructs operation flow, using the subtask in the resource finishing service flow of fragmentation, can make full use of fragmentation Resource, on the one hand can efficiently complete task, on the other hand can also meet the mission requirements of staff.
Further, the data processing method and system of cubic management system of the invention, can meet foundation virtual Change, dynamic, flexible tissue morphology, it is open high fully by means of ICT, effectively integrated on-line off-line, have Help promote the development of little Wei enterprises.
Further, the data processing method and system of cubic management system of the invention, using open architecture And modularized design, flexible configuration, meet different tissues demand, it is easy to dispose, implement, safeguard and extend.
According to the accompanying drawings to the detailed description of the specific embodiment of the invention, those skilled in the art will be brighter Of the invention above-mentioned and other purposes, advantages and features.
Brief description of the drawings
Describe some specific embodiments of the invention in detail by way of example, and not by way of limitation with reference to the accompanying drawings hereinafter. Identical reference denotes same or similar part or part in accompanying drawing.It should be appreciated by those skilled in the art that these What accompanying drawing was not necessarily drawn to scale.In accompanying drawing:
Fig. 1 is the hardware structure figure of the data handling system of cubic management system according to an embodiment of the invention;
Fig. 2 is the schematic block diagram of the data handling system of cubic management system according to an embodiment of the invention;
Fig. 3 is the schematic block diagram of the data handling system of cubic management system according to another embodiment of the present invention;
Fig. 4 is that the data handling system of cubic management system according to an embodiment of the invention builds Virtual Organization Schematic diagram;
Fig. 5 is the schematic diagram of the data processing method of cubic management system according to an embodiment of the invention;And
Fig. 6 is that the data processing method of cubic management system according to an embodiment of the invention carries out a business Schematic flow sheet.
Specific embodiment
The embodiment of the present invention provide firstly a kind of data handling system of cubic management system.Fig. 1 is according to this hair The hardware structure figure of the data handling system 100 of the cubic management system of bright one embodiment.Wherein the cubic management system Data handling system 100 can be deployed on the grade network side equipment of server 10, can for example be arranged in server cluster or In person other Cloud Servers (Elastic Compute Service, abbreviation ECS).Server 10 can respectively with various clients End is connected, and these clients can include:The demand client 20, Yi Jiyou used by the personnel or tissue of proposition business demand The task client 30 that task execution staff or tasks carrying tissue are used.These clients can be arranged in smart mobile phone, individual In people's computer and other-end equipment.Multitype database, such as operation flow storehouse, mass-rent can also be set in server 10 Resources bank etc., to provide data support.
The extreme refinement of the professional division of modern society, the exquisiteness to professional technique requires that the brilliance to work quality is chased after Ask so that an entrepreneurs or tissue, it is difficult to grasp daily routine work, such as basic accounting, tax industry and commerce The basic personal management activity such as business and recruitment, assessment, tissue.At the data of the cubic management system of the present embodiment Reason system 100 by means of the cubic management philosophy, with reference to modern IC T (Information Communications Technology, ICT) cause professional (such as accounting, Tax Executive, recruitment hunter, performance appraisal assistant director Deng), using these rich slack times it is on-line off-line complete some trifling, fragmentary professional works.During so as to shortening Empty scope so that with exchanging as face-to-face for the professional far away from a thousand li, the talent and its cross-domain a thousand li of technology turn into enterprise The available resources of industry.
The data handling system 100 of the cubic management system of the present embodiment can be according to business demand, third-party The business of outsourcing is reasonably organized together, based on internet+, the thought of the four directions management, for realize it is on-line off-line, integrate The cubic management method of various fragment resources ensures with system there is provided technology.
Fig. 2 is the schematic block diagram of the data handling system 100 of cubic management system according to an embodiment of the invention. The data handling system 100 can include with lower module in general manner:Demand management module 110, work organization module 120, crowd Bag distribute module 130, flow administration module 140.
In with upper-part, demand management module 110 can be configured to obtain the requirement description information of business to be achieved;Need Ask description information can including need to realize type of service, realize the content such as target, specific demand, requirement description information can be with It is described by the form of extensible markup language, takes abstract code mode so that requirement description information can intelligently be known Not, it is easy to computer system to perform.In some alternative embodiments, the party in request of business can be by filling in normative form, rule The modes such as model essay WD propose demand, and Land use models identification technology is recognized and generates requirement description information.
Work organization module 120, is configured to description information as desired and builds operation flow, and operation flow includes many height Task and the interactive relation of multiple subtasks.Operation flow includes multiple nodes, and each node can include one or many Individual subtask, the subtask of node can as needed be split or be combined.Interactive relation defines the triggering of child node Order and trigger condition, each subtask can be by one or more tissues or personal completions.Can sequentially be held between subtask Row, condition execution, executed in parallel, examination & approval are performed.
Mass-rent distribute module 130, is configured as each subtask and searches the executor for meeting completion condition, and to executor Distribute corresponding subtask.In the present embodiment, all of subtask can automatically distribute executor, and executor needs to meet The completion condition of subtask, these completion conditions include:Deadline condition (defining the deadline), technical ability condition (regulation The technical ability for needing to have), empirical condition (the defining executor of the task completes record), remuneration condition (define executor Required remuneration) or other conditions to executor.In the case where there are multiple candidates in executor, can be using distribution Or candidate competition for orders, the mode such as randomly select and determine executor.
Flow administration module 140, is configured to obtain the completion result of subtask, and is performed in incoming traffic flow, To complete business to be achieved.Flow administration module 140 is used to be responsible for the normal operation of operation flow, it is ensured that operation flow is according to setting Fixed process operating is until complete.
The data handling system 100 of the cubic management system of the present embodiment, can take door opening mechanism, using container skill Art and the software systems increased income realize operation, collaboration, the data interaction of each module.The relation of each module can be loose in system , it is distributed, dynamic.
Fig. 3 is the schematic block diagram of the data handling system 100 of cubic management system according to another embodiment of the present invention. In the data handling system 100 of the cubic management system, work organization module 120 can be provided with model management submodule 122nd, flow builds submodule 124, and mass-rent distribute module 130 can be provided with selects submodule 132, distribution sub module 134, stream Journey administration module 140 can be provided with examination submodule 142.Above-mentioned submodule can be matched somebody with somebody according to the requirement of specific implementation Put, so that the data handling system 100 of cubic management system completes more rich function.
Model management submodule 122 can be configured to:Search whether to exist from default operation flow storehouse and retouched with demand The business model that the information of stating is consistent.Operation flow storehouse is used to store miscellaneous service model, it is possible to enter Mobile state increase, it can With match preserve need realize type of service and its corresponding business model, business model as operation flow framework, Operation flow can be constructed after filling specific data.
Flow builds submodule 124 and can be configured to:If operation flow has business model in storehouse, by requirement description information Incoming traffic model, to construct operation flow;If not existing business model in operation flow storehouse, description information sets as desired Meter operation flow, and by operation flow it is abstract be business model, be stored in operation flow storehouse.Flow builds submodule 124 and builds stream Cheng Youxuan builds the resource of operation flow such that it is able to save, in Business Stream using existing business model in operation flow storehouse In the case that business model in Cheng Ku cannot meet requirement, new operation flow can be designed, on the one hand for this business The structure of flow, on the other hand can also enrich the business model in operation flow storehouse.
Select the completion condition that submodule 132 can be configured to obtain each subtask;In default mass-rent resources bank Search whether there is the candidate for meeting completion condition;If in the presence of, send task to candidate and invite, and will reception task invitation Candidate as executor;If not existing, information is called up according to the issue of completion condition, and reference is answered from what information was called up in response Executor is filtered out in breath, by candidate information Store to mass-rent resources bank, candidate is provided with for follow-up business flow.Mass-rent is provided Source storehouse can be used for preserving the information of staff or tissue, and mark that it at least includes personnel or tissue, it is competent at Job category, qualification, the historical record for completing task etc..For example these information can go out candidate with Rapid matching, if mass-rent When suitable executor can not be selected in resources bank, the mode called up can be taken to attract external resource to add.
Mass-rent resources bank is dynamically adjusted, and adds new candidate (including personnel or tissue), and to completing to appoint The information of the executor of business is updated.
Distribution sub module 134, is configured to distribute corresponding subtask to executor.Waited comprising multiple in mass-rent resources bank During the person of choosing, executor can be determined using various ways, such as broadcast notifies executor, and response is selected by executor, should Answer most fast executor and be defined as executor (similar to monotype is robbed);Or Comprehensive Assessment can be carried out to candidate, from Dynamic assigning the task to is assessed as optimal candidate (allocation model).Distribution sub module 134 can be by itself and external equipment The terminal that uses to executor of interface push various data and resource needed for completing subtask.
Examination submodule 142 can be configured to call default examination plug-in unit completion result to be examined, and according to examination Result calculates the workload of subtask and is fed back to the executor of subtask.Examination submodule 142 updates many according to the result of appraisal The data of executor in bag resources bank.Examination submodule 142 can also calculate executor's according to the performance of task in addition Remuneration, and the granting of remuneration is carried out with the interface of financial sector using it.
The data handling system 100 of the cubic management system of the present embodiment can also be built by the present information communication technology Vertical virtualization, dynamic, flexible innovative enterprises institutional framework and its fragmentation HRMS, it can be standard The fine chemical conversion of business event work can independent, parallel completion subtask, braiding, optimization perform the operation flow of work, Operating efficiency is improved in terms of Top-layer Design Method.
Subtask trigger mechanism and early warning mechanism in operation flow, can meet certain condition event occur after, The startup or compulsory execution of next subtask will be triggered, and send early warning information.It can in addition contain be converged with mass-rent mechanism High-quality social resources, set up the virtual enterprise of crewization, the micro- task segmented are competed and synergistically complete, in terms of institutional framework Ensure that efficient, cheap, flexible mode completes whole enterprise work.Subtask in operation flow is presented with card format, can Completed with by different types of employee or tissue.The subtask can continue to be refined into several subtasks, continue to be organized into work Flow, form dynamic working net, be accomplished.The decomposition of subtask and the foundation of dynamic duty net can continue, until Untill task can be completed.
Fig. 4 is that the data handling system 100 of cubic management system according to an embodiment of the invention builds virtual group The schematic diagram knitted.(such as virtual enterprise of Virtual Organization can be constructed using the data handling system 100 of cubic management system Industry), its Virtual Organization for building needs to realize following components:Business demand management, tissue construction, resource management, flow Supervision, operation container.
The operation flow 410 that the data handling system 100 of cubic management system is constructed can include multiple subtasks 412, each subtask 412 can be completed by different executors 440, and operation flow can also be formed inside subtask.Business Flow 410 uses operation flow storehouse 420 and mass-rent resources bank 430 as data basis.
For business demand management, demand can be any source with demand, including the demand that internal system is proposed, Propose that demander can also turn into personnel or the tissue of the system resource, the personnel or tissue in system can also propose to need Ask, demand is completed using the data handling system 100 of the cubic management system of the present embodiment.These demands can include but not limit In following species:Finished item, commodity are produced, intention is formed, is set up enterprise etc..
Tissue construction, can be responsible for setting up a Virtual Organization by the promoter of task or the supplier of demand, to be formed Operation flow, so as to complete the product of demand, system or service.Virtual Organization can be dynamic a job network, node Linked together by task nexus.The promoter of different tasks or the supplier of demand can be demand Task-decomposings not With subtask 412, design different operation flows 410, constitute different Virtual Organization.It utilizes mass-rent resources bank 420 Necessary resource is provided with operation flow storehouse.
Resource management undertakes the work such as the selecting of executor, role positioning, matching task, performance appraisal, distribution remuneration, The role that can be set according to virtual company when selecting executor and demand, by calling up, from mass-rent resources bank 430 and crowd Selected in machine contracting system and drawn.Can additionally set special interface for be responsible for issue with distribute subtask 412, it can be propped up Hold " competition for orders " and " distributing " mode:Candidate can be completed to the subtask 412 announced with " competition for orders ";System can also be according to task Feature (task type, urgency level, difficulty, secret degree) and candidate attribute are (role, ability grade, remuneration coefficient, credible Degree) best match is automatically selected by intelligent algorithm.Can be according to performance and pre-defined firewood after the completion of subtask 412 Reward clearing algorithm, each activity examination to performing, and mass-rent remuneration is distributed by system at regular intervals.
The structure person (promoter of task or the supplier of demand) of Virtual Organization can supervise, business to flow Flow can come from the operation flow storehouse 420 of system, it is also possible to designed, designed or structure according to demand.Each in operation flow Task has two types:Simple subtask, compound subtask.Simple subtask can be complete by any one staff of company Into.Compound subtask generally completes (itself can be as a new operation flow) by a Virtual Organization or job network. Job network is simplified Virtual Organization, and only the decomposition of responsible subtask, synthesis and business Process Design, i.e., be only responsible for subtask Completion, not responsible emolument provides etc..Each subtask is a plug-in unit in bus type operation flow, can be transported in flow Dynamically changed during row.Process flow operation engine can be responsible for communication, collaboration between subtask, it is ensured that demand is according to business Flow carries out, until completing.
Above section is required to the support of information system, the data handling system of the cubic management system of the present embodiment 100 use door opening mechanism, using the coordinated operation that whole system is realized in open source of the container technique in each network.
Module relationship in the data handling system 100 of the cubic management system of the present embodiment is loose, distributed , it is dynamic and collaboration.Virtual Organization is " two-way Producer-consumer problem " pattern with the coordination system of mass-rent resource management: When business demand (innovative service) is generated, the architectural mechanisms are issued by asking the request of candidate resource.If in resources bank The candidate for having enough satisfactions to require, is supplied to operation flow to construct Virtual Organization, otherwise just passes through mass-rent mechanism Recruit more candidates.This resources bank and the mode for attracting external resource, can the time requirement of quick response can fill again The advantage of mass-rent is waved in distribution, is cut operating costs.When the outer personnel of candidate or system in resources bank propose demand (innovation Business), so that it may the request of the company of foundation or dynamic duty network is sent, facilitates the establishment of new Virtual Organization.
The present embodiment additionally provides a kind of data processing method of cubic management system.Fig. 5 is according to of the invention one The schematic diagram of the data processing method of the cubic management system of embodiment.The data processing method one of the cubic management system As property may comprise steps of:
Step S502, obtains the requirement description information of business to be achieved;
Step S504, as desired description information build operation flow, operation flow includes multiple subtasks and multiple The interactive relation of subtask;
Step S506, is that the executor for meeting completion condition is searched in each subtask, and distribute corresponding son to executor Task;
Step S508, obtains the completion result of subtask, and is performed in incoming traffic flow, to complete industry to be achieved Business.
Step S502 can be obtained by receiving mail or obtaining the modes such as the demanding criteria form that demand provider fills in To business demand, and it is converted into requirement description information.
Step S504 preferentially builds operation flow using operation flow storehouse, such as being searched from default operation flow storehouse is It is no to there is the business model being consistent with requirement description information;If in the presence of by requirement description information input business model, to build Go out operation flow;And if do not exist, as desired description information design operation flow, and by operation flow it is abstract be business mould Type, is stored in operation flow storehouse.
Step S506 can obtain the completion condition of each subtask;Search whether exist in default mass-rent resources bank Meet the candidate of completion condition;If in the presence of, to candidate send task invite, and using receive task invite candidate as Executor;And if do not exist, call up information according to the issue of completion condition, and screened in the candidate information for calling up information from response Go out executor.
Time can also be provided after step S506 with for follow-up business flow by candidate information Store to mass-rent resources bank The person of choosing, so that mass-rent resources bank is dynamically adjusted.
Default examination plug-in unit completion result is may call upon after step s 508 to be examined, and according to the result of appraisal Calculate the workload of subtask and fed back to the executor of subtask.
Candidate information etc. that the demand description information, the completion condition of subtask, mass-rent resources bank are provided can be with It is described using the form of extensible markup language, to improve transmission and the utilization ratio of information.
Fig. 6 is that the data processing method of cubic management system according to an embodiment of the invention carries out a business Schematic flow sheet.The flow diagrams illustrate how a demand is finally completed by information processing, it includes:
Step S602, obtains business demand, carries out feasibility analysis using the application in system operation container, and use XML describes requirement description information, or requirement description information is converted into XML format, be analyzed in order to computer system, Retrieval, editor, checking, storage and transmission;
Step S604, business is decomposed, and forms multiple subtasks;
Step S606, as desired description information build operation flow, the node in operation flow is exactly subtask, if In the case of the complexity of subtask, can proceed to decompose.Each subtask has clearly to be realized target and completes the son The condition of task.
Step S608, builds the Virtual Organization for completing the operation flow;
Step S610, according to the framework of Virtual Organization, starts mass-rent resource management, selects the candidate of subtask;For Lack the situation of eligible candidates, the information of calling up can be sent, so that external staff or tissue are responded to a call for recruits or candidates;
Step S612, professional knowledge, experience, experience, achievement, technical ability of foundation candidate etc. perform matching algorithm, matching The executor for going out subtask;
Step S614, is executor's distribution subtask, and according to the performance of subtask to executor in mass-rent resource Information in storehouse is updated;
Step S616, executor completes the subtask of distribution on line or under line, and in this step, executor can also be by Operation flow is constructed in the subtask of distribution as requirement description information, using the subtask as complete the need for the operation flow Into task;
Step S618, operation flow records the work achievement of executor, the related subtask node of triggering, according to work achievement Examination is estimated, the deserved remuneration of executor is calculated.
As a example by making a sample, the realization to above-mentioned flow is introduced.The demander of sample by the specification of sample, It is required that, quantity as the treating outer completion of the task, transfer the sample making flow in operation flow storehouse, decomposite mold design, mould The subtasks such as tool making, material purchase, sample production, financial payments, sample examination, in the Virtual Organization for realizing the flow, The demander of sample can exercise supervision as overseer to design sample manuscript, quality, progress, and the personnel with skill in design hold Row mold design subtask, the sons such as Mold Making, material purchase, sample production are carried out by the tissue with the resources of production or personnel Task, has financial accountant to carry out cost accounting etc..In the operation flow, an executor can complete many height and appoint Business, each subtask can also be completed by multiple executor's cooperations.
The data processing method of the cubic management system of the present embodiment, by the social professional resources for integrating fragmentation (personnel, knowledge, experience, technology, instrument), sets up virtual, flexibility, dynamic, innovative organization structure, optimizing tissue structure and work Make flow, reduce the operation and management link of non-increasing value, improve operating efficiency, improve the flexibility of company, contribute to enterprise It is absorbed in core business field, improves industrial integration degree, pursue being outstanding, realize cooperative innovation, lifts core competitiveness.Execution task The working method of worker, working time, job site there is sufficient flexibility, be favorably improved staff's satisfaction And work quality.By the social resources and the market opportunity of excavation debris, it is possible to achieve masses' innovation, millions of people are started an undertaking, convenient The operation and management of small minuscule-type-enterprise.
The data handling system 100 and method of the cubic management system of the present embodiment have redesigned design organization industry Business, by its fragmentation, miniaturization, procedure, and completes the business task of fragmentation by following mechanism.The business of fragmentation is appointed Business turns into workflow, realizes whole task according to bus mechanism.Each business task node is configurable working net plug-in unit Complete.The trigger mechanism of node flow of work has the area of computer aided workflow of business-driven, by the good industry for pre-defining Business flow, the node for completing task starts the task of successor node.
Working net is dynamic, configurable, recursive structure the net set up by the subtask of membership credentials and fragmentation Network.The data handling system 100 and method of the cubic management system of other the present embodiment can also be to staff and groups Knit type to be defined, staff's (or job engineering) is divided into five types:Full-time personnel, strong relation, middle relation, weak pass System and fragmentary personnel.Full-time personnel are the promoters of operation flow, by managing and distributing subtask and other staff (or job engineering) sets up Virtual Organization, completes assigning for task.Strong relation, middle relation, weak relation personnel are socialization, specialty The mass-rent personnel (or mass-rent tissue) of change, are familiar with related service, contact more close with virtual enterprise;Fragmentary personnel are to every height The completion of task is required for being exchanged with other staff.
It is that business is resolved into becoming more meticulous can be with profit as the major responsibility of the responsible party (full-time personnel) of operation flow The subtask completed with the fragmentation time, sets up bus type workflow, and assessment, selection, tissue part-time staff simultaneously distribute sub appointing Business, constitutes job network.Part-time staff sets up next stage job network as autonomous working personnel or as full-time personnel, Once as plug-in unit, a node task in workflow is completed.The staff of five types is according to responsibility, reward ratio Personnel's graph of a relation is reconstructed into, personnel can be changed in the role of operation flow when condition is met.One job network The complete winner of node can be 5 type staff, and full-time personnel can complete the task of node as an operating plug-in, Can continue to constitute job network, complete the subtask of this node, with the change of task, working net and its subnet can also be moved Ground changes:The subnet of node quantity, node identification (micro- task), node role, topological structure and fission.
So far, although those skilled in the art will appreciate that detailed herein have shown and described multiple of the invention and show Example property embodiment, but, without departing from the spirit and scope of the present invention, still can be direct according to present disclosure It is determined that or deriving many other variations or modifications for meeting the principle of the invention.Therefore, the scope of the present invention is understood that and recognizes It is set to and covers all these other variations or modifications.

Claims (10)

1. the data processing method of a kind of the cubic management system, including:
Obtain the requirement description information of business to be achieved;
According to the requirement description information architecture operation flow, the operation flow includes multiple subtasks and the multiple son The interactive relation of task;
For subtask lookup meets the executor of completion condition each described, and appoint to the corresponding son of executor distribution Business;And
The completion result of the subtask is obtained, and is input into the operation flow and is performed, to complete the industry to be achieved Business.
2. data processing method according to claim 1, wherein, according to the requirement description information architecture operation flow Step includes:
Search whether there is the business model being consistent with the requirement description information from default operation flow storehouse;
If in the presence of by business model described in the requirement description information input, to construct the operation flow;And
If not existing, according to operation flow described in the requirement description information design, and by the operation flow it is abstract be business Model, is stored in the operation flow storehouse.
3. data processing method according to claim 1, wherein, it is that each described subtask is searched and meets completion condition The step of executor, includes:
Obtain the completion condition of each subtask;
Search whether there is the candidate for meeting the completion condition in default mass-rent resources bank;
If in the presence of sending task to the candidate and invite, and candidate that the task invites as the execution will be received Person;And
If not existing, information is called up according to completion condition issue, and sieved from the candidate information of information is called up described in response Select the executor.
4. data processing method according to claim 3, wherein, according to from the candidate information that information is called up described in response In the step of filter out the executor after also include:
By the candidate information Store to the mass-rent resources bank, candidate is provided with for follow-up business flow.
5. data processing method according to claim 1, wherein, the step of the completion result of the subtask is obtained it Also include afterwards:
Completion result described in calling default examination plug-in unit is examined, and the work of the subtask is calculated according to the result of appraisal Measure and fed back to the executor of the subtask.
6. data processing method according to any one of claim 1 to 5, wherein
The completion condition of the requirement description information and the subtask is described with the form of extensible markup language.
7. the data handling system of a kind of the cubic management system, including:
Demand management module, is configured to obtain the requirement description information of business to be achieved;
Work organization module, is configured to according to the requirement description information architecture operation flow, and the operation flow includes multiple Subtask and the interactive relation of the multiple subtask;
Mass-rent distribute module, is configured as each described subtask and searches the executor for meeting completion condition, and to the execution Person distributes the corresponding subtask;And
Flow administration module, is configured to obtain the completion result of the subtask, and is input into the operation flow and is performed, To complete the business to be achieved.
8. data handling system according to claim 7, wherein the work organization module includes:
Model management submodule, is configured to search whether exist and the requirement description information phase from default operation flow storehouse The business model for meeting;And
Flow builds submodule, if being configured to there is the business model in the operation flow storehouse, by requirement description letter The breath input business model, to construct the operation flow;If not existing the business model in the operation flow storehouse, According to operation flow described in the requirement description information design, and by the operation flow it is abstract be business model, be stored in described Operation flow storehouse.
9. data handling system according to claim 7, wherein the mass-rent distribute module includes:
Submodule is selected, is configured to obtain the completion condition of each subtask;Being searched in default mass-rent resources bank is It is no to there is the candidate for meeting the completion condition;If in the presence of, send task to the candidate and invite, and will described of reception The candidate invited be engaged in as the executor;If not existing, information is called up according to completion condition issue, and from response institute The executor is filtered out in the candidate information for stating the information of calling up, by the candidate information Store to the mass-rent resources bank, with For follow-up business flow provides candidate;And
Distribution sub module, is configured to distribute the corresponding subtask to the executor.
10. data handling system according to claim 7, wherein the flow administration module also includes:
Examination submodule, is configured to call default examination completed described in plug-in unit result to be examined, and according to result of appraisal meter Calculate the workload of the subtask and fed back to the executor of the subtask.
CN201611046254.2A 2016-11-22 2016-11-22 The data processing method and system of cubic management system Pending CN106779307A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611046254.2A CN106779307A (en) 2016-11-22 2016-11-22 The data processing method and system of cubic management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611046254.2A CN106779307A (en) 2016-11-22 2016-11-22 The data processing method and system of cubic management system

Publications (1)

Publication Number Publication Date
CN106779307A true CN106779307A (en) 2017-05-31

Family

ID=58975280

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611046254.2A Pending CN106779307A (en) 2016-11-22 2016-11-22 The data processing method and system of cubic management system

Country Status (1)

Country Link
CN (1) CN106779307A (en)

Cited By (40)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107230044A (en) * 2017-06-14 2017-10-03 深圳象和动漫网络有限公司 The online collaboration data processing implementation method of Digital Media, device and storage device
CN107682068A (en) * 2017-09-06 2018-02-09 西安电子科技大学 The restructural Information Network resource management architecture and method of a kind of task-driven
CN107742183A (en) * 2017-10-10 2018-02-27 海尔集团公司 task scheduling system, method and storage medium
CN108038663A (en) * 2017-12-05 2018-05-15 国网江苏省电力有限公司常熟市供电分公司 Safety Management system
CN108053144A (en) * 2017-12-29 2018-05-18 厦门市美亚柏科信息股份有限公司 Open operation flow implementation method and workflow engine
CN108876173A (en) * 2018-06-28 2018-11-23 魏代利 A kind of implementation method and device of event
CN108920132A (en) * 2018-06-28 2018-11-30 魏代利 A kind of event construction method and storage medium
CN109034610A (en) * 2018-07-24 2018-12-18 武汉空心科技有限公司 Software development cloud platform based on different periods difference distribution mechanism
CN109101222A (en) * 2018-04-16 2018-12-28 武汉空心科技有限公司 A kind of 24 hours front end development platforms quickly delivered
CN109118063A (en) * 2018-07-24 2019-01-01 武汉空心科技有限公司 Task based on unit time distribution develops cloud platform
CN109118062A (en) * 2018-07-24 2019-01-01 武汉空心科技有限公司 Based on the development approach and system for robbing single-unit
CN109146251A (en) * 2018-07-24 2019-01-04 武汉空心科技有限公司 Component- based development method and system
CN109242240A (en) * 2018-07-24 2019-01-18 武汉空心科技有限公司 Task based on unit time distribution and timeliness control develops cloud platform
CN109242298A (en) * 2018-08-31 2019-01-18 苏宁易购集团股份有限公司 Work order distribution method and device during a kind of Intelligent worker assigning
CN109325615A (en) * 2018-08-31 2019-02-12 苏宁易购集团股份有限公司 A kind of Intelligent worker assigning method and device
CN109447656A (en) * 2018-08-30 2019-03-08 深圳市汇邦企业服务有限公司 Group of enterprises method of servicing, device, system and storage medium based on cloud
CN109447585A (en) * 2018-10-26 2019-03-08 长沙通诺信息科技有限责任公司 The personnel of handling determine method and device, computer equipment and storage medium in workflow
CN109447435A (en) * 2018-10-16 2019-03-08 武汉佰钧成技术有限责任公司 Service outsourcing system and method
CN109460980A (en) * 2018-09-27 2019-03-12 深圳市汇邦企业服务有限公司 A kind of management platform, enterprises service management system and management method
CN109711910A (en) * 2018-12-27 2019-05-03 税友软件集团股份有限公司 A kind of construction method of the linked data structure of electronic bill, device and system
CN109767198A (en) * 2018-10-25 2019-05-17 绍兴大明电力建设有限公司 Operation system intelligent management and device
CN109816259A (en) * 2019-01-30 2019-05-28 翟红鹰 Task distribution method, terminal device and storage medium based on block chain
CN109902903A (en) * 2017-12-11 2019-06-18 华东师范大学 A kind of crowdsourcing execution method and crowdsourcing system based on wechat
CN109993497A (en) * 2019-02-20 2019-07-09 深圳大维理文科技有限公司 Project management method
CN110310095A (en) * 2019-07-03 2019-10-08 广东倍智测聘网络科技股份有限公司 Management-control method and device, the electronic equipment of human resource data
CN110458523A (en) * 2019-08-05 2019-11-15 广州影子科技有限公司 Business management method and business management system
WO2020029431A1 (en) * 2018-08-06 2020-02-13 深圳市嘀哒知经科技有限责任公司 Method and device for combining multiple service demands
CN111178650A (en) * 2018-11-12 2020-05-19 程宇章 Task interaction method, device and terminal
CN111310967A (en) * 2019-12-17 2020-06-19 武汉空心科技有限公司 Working platform service resource pre-scheduling method
CN111311053A (en) * 2019-12-17 2020-06-19 武汉空心科技有限公司 Pre-allocation method for potential tasks of working platform
CN111311052A (en) * 2019-12-17 2020-06-19 武汉空心科技有限公司 Service resource allocation system for working platform
CN111339068A (en) * 2018-12-18 2020-06-26 北京奇虎科技有限公司 Crowdsourcing quality control method, apparatus, computer storage medium and computing device
CN111507558A (en) * 2019-12-17 2020-08-07 武汉空心科技有限公司 Predefined scheduling system for service resources of working platform
WO2020204811A1 (en) * 2019-04-02 2020-10-08 Hitachi, Ltd. Method and system for workflow assignment
CN112001615A (en) * 2020-08-13 2020-11-27 苏州艾特律宝智能科技有限公司 Process creation method, system, computer device, and storage medium
CN112101897A (en) * 2020-08-25 2020-12-18 华能国际电力股份有限公司浙江清洁能源分公司 Intelligent management method, device and system for offshore wind power
CN112766750A (en) * 2021-01-25 2021-05-07 中国原子能科学研究院 Task model construction method and system
CN113689172A (en) * 2021-04-06 2021-11-23 鼎捷软件股份有限公司 Business process management system and business process management method
CN115576999A (en) * 2022-12-09 2023-01-06 矩阵起源(深圳)信息科技有限公司 Task data processing method, device and equipment based on cloud platform and storage medium
CN111339068B (en) * 2018-12-18 2024-04-19 北京奇虎科技有限公司 Crowd-sourced quality control method, device, computer storage medium and computing equipment

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060143611A1 (en) * 2004-12-28 2006-06-29 Wasim Sadiq Distribution of integrated business process models
CN101226612A (en) * 2007-12-29 2008-07-23 中国建设银行股份有限公司 Data processing management system facing to process flow
CN104142970A (en) * 2013-11-26 2014-11-12 深圳市雁联计算系统有限公司 Operation control system and method
CN104200334A (en) * 2014-09-16 2014-12-10 张文铸 Crowdsourcing project management control system and method based on SaaS mode
CN104616118A (en) * 2015-02-16 2015-05-13 浪潮集团有限公司 Business request processing method, device and system
CN105930989A (en) * 2016-06-24 2016-09-07 平安科技(深圳)有限公司 Crowdsourcing-based house survey method and server
CN105976119A (en) * 2016-05-12 2016-09-28 崔岩 O2O mode cloud accounting method and system for converging fragmentized resources

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060143611A1 (en) * 2004-12-28 2006-06-29 Wasim Sadiq Distribution of integrated business process models
CN101226612A (en) * 2007-12-29 2008-07-23 中国建设银行股份有限公司 Data processing management system facing to process flow
CN104142970A (en) * 2013-11-26 2014-11-12 深圳市雁联计算系统有限公司 Operation control system and method
CN104200334A (en) * 2014-09-16 2014-12-10 张文铸 Crowdsourcing project management control system and method based on SaaS mode
CN104616118A (en) * 2015-02-16 2015-05-13 浪潮集团有限公司 Business request processing method, device and system
CN105976119A (en) * 2016-05-12 2016-09-28 崔岩 O2O mode cloud accounting method and system for converging fragmentized resources
CN105930989A (en) * 2016-06-24 2016-09-07 平安科技(深圳)有限公司 Crowdsourcing-based house survey method and server

Cited By (47)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107230044A (en) * 2017-06-14 2017-10-03 深圳象和动漫网络有限公司 The online collaboration data processing implementation method of Digital Media, device and storage device
CN107682068A (en) * 2017-09-06 2018-02-09 西安电子科技大学 The restructural Information Network resource management architecture and method of a kind of task-driven
CN107742183A (en) * 2017-10-10 2018-02-27 海尔集团公司 task scheduling system, method and storage medium
CN108038663A (en) * 2017-12-05 2018-05-15 国网江苏省电力有限公司常熟市供电分公司 Safety Management system
CN109902903A (en) * 2017-12-11 2019-06-18 华东师范大学 A kind of crowdsourcing execution method and crowdsourcing system based on wechat
CN108053144A (en) * 2017-12-29 2018-05-18 厦门市美亚柏科信息股份有限公司 Open operation flow implementation method and workflow engine
CN109101222A (en) * 2018-04-16 2018-12-28 武汉空心科技有限公司 A kind of 24 hours front end development platforms quickly delivered
CN108876173A (en) * 2018-06-28 2018-11-23 魏代利 A kind of implementation method and device of event
CN108920132A (en) * 2018-06-28 2018-11-30 魏代利 A kind of event construction method and storage medium
CN108876173B (en) * 2018-06-28 2022-04-01 魏代利 Event realization method and device
CN109146251A (en) * 2018-07-24 2019-01-04 武汉空心科技有限公司 Component- based development method and system
CN109118063A (en) * 2018-07-24 2019-01-01 武汉空心科技有限公司 Task based on unit time distribution develops cloud platform
CN109242240A (en) * 2018-07-24 2019-01-18 武汉空心科技有限公司 Task based on unit time distribution and timeliness control develops cloud platform
CN109034610A (en) * 2018-07-24 2018-12-18 武汉空心科技有限公司 Software development cloud platform based on different periods difference distribution mechanism
CN109118062A (en) * 2018-07-24 2019-01-01 武汉空心科技有限公司 Based on the development approach and system for robbing single-unit
WO2020029431A1 (en) * 2018-08-06 2020-02-13 深圳市嘀哒知经科技有限责任公司 Method and device for combining multiple service demands
CN109447656A (en) * 2018-08-30 2019-03-08 深圳市汇邦企业服务有限公司 Group of enterprises method of servicing, device, system and storage medium based on cloud
CN109447656B (en) * 2018-08-30 2021-03-19 深圳市汇邦企业服务有限公司 Enterprise group service method, device and system based on cloud technology and storage medium
CN109242298A (en) * 2018-08-31 2019-01-18 苏宁易购集团股份有限公司 Work order distribution method and device during a kind of Intelligent worker assigning
CN109325615A (en) * 2018-08-31 2019-02-12 苏宁易购集团股份有限公司 A kind of Intelligent worker assigning method and device
CN109460980A (en) * 2018-09-27 2019-03-12 深圳市汇邦企业服务有限公司 A kind of management platform, enterprises service management system and management method
CN109447435A (en) * 2018-10-16 2019-03-08 武汉佰钧成技术有限责任公司 Service outsourcing system and method
CN109767198A (en) * 2018-10-25 2019-05-17 绍兴大明电力建设有限公司 Operation system intelligent management and device
CN109447585A (en) * 2018-10-26 2019-03-08 长沙通诺信息科技有限责任公司 The personnel of handling determine method and device, computer equipment and storage medium in workflow
CN111178650A (en) * 2018-11-12 2020-05-19 程宇章 Task interaction method, device and terminal
CN111339068A (en) * 2018-12-18 2020-06-26 北京奇虎科技有限公司 Crowdsourcing quality control method, apparatus, computer storage medium and computing device
CN111339068B (en) * 2018-12-18 2024-04-19 北京奇虎科技有限公司 Crowd-sourced quality control method, device, computer storage medium and computing equipment
CN109711910A (en) * 2018-12-27 2019-05-03 税友软件集团股份有限公司 A kind of construction method of the linked data structure of electronic bill, device and system
CN109816259A (en) * 2019-01-30 2019-05-28 翟红鹰 Task distribution method, terminal device and storage medium based on block chain
CN109993497A (en) * 2019-02-20 2019-07-09 深圳大维理文科技有限公司 Project management method
JP7219353B2 (en) 2019-04-02 2023-02-07 株式会社日立製作所 Workflow assignment method and system
JP2022527961A (en) * 2019-04-02 2022-06-07 株式会社日立製作所 Workflow allocation method and system
WO2020204811A1 (en) * 2019-04-02 2020-10-08 Hitachi, Ltd. Method and system for workflow assignment
CN110310095A (en) * 2019-07-03 2019-10-08 广东倍智测聘网络科技股份有限公司 Management-control method and device, the electronic equipment of human resource data
CN110458523A (en) * 2019-08-05 2019-11-15 广州影子科技有限公司 Business management method and business management system
CN111311053A (en) * 2019-12-17 2020-06-19 武汉空心科技有限公司 Pre-allocation method for potential tasks of working platform
CN111507558A (en) * 2019-12-17 2020-08-07 武汉空心科技有限公司 Predefined scheduling system for service resources of working platform
CN111311052A (en) * 2019-12-17 2020-06-19 武汉空心科技有限公司 Service resource allocation system for working platform
CN111310967A (en) * 2019-12-17 2020-06-19 武汉空心科技有限公司 Working platform service resource pre-scheduling method
CN112001615A (en) * 2020-08-13 2020-11-27 苏州艾特律宝智能科技有限公司 Process creation method, system, computer device, and storage medium
CN112101897A (en) * 2020-08-25 2020-12-18 华能国际电力股份有限公司浙江清洁能源分公司 Intelligent management method, device and system for offshore wind power
CN112101897B (en) * 2020-08-25 2022-03-22 华能(浙江)能源开发有限公司清洁能源分公司 Intelligent management method, device and system for offshore wind power
CN112766750A (en) * 2021-01-25 2021-05-07 中国原子能科学研究院 Task model construction method and system
CN113689172A (en) * 2021-04-06 2021-11-23 鼎捷软件股份有限公司 Business process management system and business process management method
CN113689172B (en) * 2021-04-06 2023-11-28 鼎捷软件股份有限公司 Business process management system and business process management method
CN115576999A (en) * 2022-12-09 2023-01-06 矩阵起源(深圳)信息科技有限公司 Task data processing method, device and equipment based on cloud platform and storage medium
CN115576999B (en) * 2022-12-09 2023-03-10 矩阵起源(深圳)信息科技有限公司 Task data processing method, device and equipment based on cloud platform and storage medium

Similar Documents

Publication Publication Date Title
CN106779307A (en) The data processing method and system of cubic management system
Stohr et al. Workflow automation: Overview and research issues
Muscatello et al. Implementing enterprise resource planning (ERP) systems in small and midsize manufacturing firms
Galbraith The evolution of enterprise organization designs
CN109740851A (en) Design for Automatic Control Engineering work management method, platform and the system quickly delivered
US20150149257A1 (en) Systems and methods for enterprise profit optimization
CN111582728A (en) Multichannel complex building engineering dynamic management system
Otieno Enterprise resource planning systems implementation and upgrade (a Kenyan study)
CN109767198A (en) Operation system intelligent management and device
Imgrund et al. Managing the long tail of business processes
Trąpczyński et al. From going international to being international-strategies for international competitiveness
Prasetyo et al. Usability evaluation of ERP systems: A comparison between SAP S/4 Hana & Oracle Cloud
CN110880077B (en) Enterprise intelligent consultation cloud platform
CN112508644A (en) Linkage supply intelligent cooperative scheduling system based on cloud platform
Piwowar-Sulej Types of organizational culture in the context of project management methodologies
Cesaroni et al. Implementing a lean accounting system in a lean enterprise
Śliwczyński The reference model of supply chain operational controlling in value management
Serbia SME technology capacity building for competitiveness and exportevidence from Balkan countries
CN113362102B (en) Client cable distribution method, system and storage medium
Kozhevnikov et al. Smart enterprise: Multi-agent solution for holonic enterprise resource management
Limburg et al. Performance management for teleworking: the role of workflow management systems
Zoiopoulos Organizational configurations and project capability development: Lessons from construction
Ragin-Skorecka et al. Auxiliary management methods supporting process maturity: has the pandemic changed anything?
Juarez et al. The Viable System Model as an Instrument to Manage the Creation of Value in Smart Cities
Kituu Strategic planning practices by firms in the telecommunication sector in Kenya

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170531