CN108038663A - Safety Management system - Google Patents
Safety Management system Download PDFInfo
- Publication number
- CN108038663A CN108038663A CN201711269576.8A CN201711269576A CN108038663A CN 108038663 A CN108038663 A CN 108038663A CN 201711269576 A CN201711269576 A CN 201711269576A CN 108038663 A CN108038663 A CN 108038663A
- Authority
- CN
- China
- Prior art keywords
- information
- task
- subsystem
- module
- project
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000013479 data entry Methods 0.000 claims abstract description 15
- 238000012544 monitoring process Methods 0.000 claims abstract description 14
- 238000011156 evaluation Methods 0.000 claims abstract description 10
- 238000007619 statistical method Methods 0.000 claims description 29
- 238000010276 construction Methods 0.000 claims description 15
- 238000013475 authorization Methods 0.000 claims description 6
- 230000008859 change Effects 0.000 claims description 3
- 238000012986 modification Methods 0.000 claims description 2
- 230000004048 modification Effects 0.000 claims description 2
- 230000005540 biological transmission Effects 0.000 claims 1
- 238000007726 management method Methods 0.000 description 36
- 238000000034 method Methods 0.000 description 4
- 230000000007 visual effect Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 230000004807 localization Effects 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/25—Integrating or interfacing systems involving database management systems
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
- G06Q10/063114—Status monitoring or status determination for a person or group
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Theoretical Computer Science (AREA)
- Economics (AREA)
- General Physics & Mathematics (AREA)
- Entrepreneurship & Innovation (AREA)
- Physics & Mathematics (AREA)
- Tourism & Hospitality (AREA)
- Marketing (AREA)
- General Business, Economics & Management (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Databases & Information Systems (AREA)
- Data Mining & Analysis (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Game Theory and Decision Science (AREA)
- General Engineering & Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present invention provides a kind of Safety Management system, including:Core database subsystem, task issue subsystem, project implementation subsystem and task monitoring examination subsystem;The task issues subsystem, including block is used for the information task release module of issuing project task, and at least one data entry element is equipped with task release module;Project implementation subsystem, including for obtaining task acquisition module, the task scheduling modules for allocated items mission bit stream and the tasks carrying information uploading module for uploading tasks carrying information of the project task information;Task monitoring examination subsystem, including for the tasks carrying data obtaining module from core database subsystem acquisition tasks carrying information and the evaluation module for examining the tasks carrying information;The management system can dispatch same Role Users and obtain affiliated project task information.
Description
Technical field
The present invention relates to computer software technical field, and in particular to a kind of Safety Management system.
Background technology
One engineering project is given out a contract for a project through unit of issuing contracts to, and contractor unit investigates implementing result by unit of issuing contracts to after contracting
And periodically ranking is carried out, each link of the process is directed to the performance of the engineering and completes efficiency, also concerning work
The safety and quality in journey later stage.
C/S frameworks are mostly used to the management system of construction safety in the prior art, are disposed using localization management system,
And its operation flow belongs to conventional solidified flow, can not flexibly be handled according to the practical business demand for the user that gives out a contract for a project, pin
To the user of different role, the show or hide of different function pages is limited by priority assignation, but is used for same role
The function module that family is shown is identical, is intuitively embodied in:Different contract can show that in the user interface of user and remove
Belong to and originally contract user and belong to other project task information for contracting user in addition, be so unfavorable for making for each Role Users
With.
The content of the invention
Same Role Users acquisition institute can be dispatched in order to solve the deficiencies in the prior art present invention offer one kind
User's Safety Management system of the project task information of category.
The technical solution provided according to the present invention, a kind of Safety Management system, including:Core database subsystem,
Task issue subsystem, project implementation subsystem and task monitoring examination subsystem;
The task issues subsystem, including task release module, and at least one data inputting list is equipped with task release module
Member, the task release module are used to issue project task information to core database subsystem, the project task information storage
There are in the project task information bank of core database subsystem;
Project implementation subsystem, including task acquisition module, task scheduling modules and tasks carrying information uploading module, described
Business acquisition module is used to obtain the project task information;The task scheduling modules are used to distribute task acquisition module acquisition
Project task information, the tasks carrying information uploading module are used to upload tasks carrying information to core database subsystem,
The tasks carrying information is stored in the tasks carrying information bank of core database subsystem;
Task monitoring examination subsystem, including tasks carrying data obtaining module and evaluation module, the tasks carrying information obtain
Modulus block is used to obtain tasks carrying information from core database subsystem;The evaluation module is used to examine the tasks carrying
Information, and result of appraisal information is uploaded to core database subsystem, the result of appraisal information is stored in core database
In the examination information database of subsystem;
There are customer management information storehouse and authorization administration information storehouse, the customer management information in the core database subsystem
The role of user is preserved in storehouse;Authority corresponding with user role is preserved in the authorization administration information storehouse;The construction
Safety management system further includes user management module and authority management module, and the user management module is used for the angle for changing user
Color, the role include giving out a contract for a project user and contract user;The authority management module is used to change the corresponding authority of each role.
Further, statistical analysis subsystem is further included, the statistical analysis subsystem includes statistical analysis module, described
Statistical analysis module is used to obtain the result of appraisal information in the examination information database of core database subsystem, and by described in
Result of appraisal information carries out ranking, and result of appraisal ranking information is stored in statistical analysis information bank.
Further, task issue subsystem further includes message pushing module, and the message pushing module can be to
Core database subsystem upload pushed information, project implementation subsystem can be obtained from core database subsystem described in push away
Deliver letters breath.
Further, locating module is further included in the project implementation subsystem, the locating module can be uploaded to
More specific location information of the core database subsystem on uploading tasks carrying information.
Further, the Safety Management system is installed on PC ends and/or mobile terminal.
Further, the data entry element includes construction task name data typing unit, counts to construction task
According to typing unit, contract user's name data entry element and project construction requirement data entry element.
From the above as can be seen that a kind of Safety Management system provided by the invention, has compared with prior art
Standby advantages below:
(1)Subsystem and project implementation subsystem are issued by task, the user that gives out a contract for a project can be by installed in mobile terminal or PC ends
Safety Management system remote issue project task information, contracting user can be by applying installed in mobile terminal or PC ends
Work safety management system remotely receives project task information.
(2)Data entry element in the task release module can be easy to clearly decompose project task information, favorably
In making clear for project task information, standardization, procedure.
(3)The task scheduling modules, user management module and authority management module, which coordinate, can distribute control user angle
Color and authority, favorably for user's responsibility of each role and the management and control of authority, it is each can to cease Fen Pei Give by project task Xin
Contract user, avoid it is each contract in user's user interface display and belong to other project task information for contracting user, so as to carry
High tasks carrying efficiency.
(4)The task monitoring examination subsystem can obtain tasks carrying information so that the user that gives out a contract for a project can be intuitively
The implementation status of long-range monitoring project task, it is possible to increase work efficiency.
(5)The statistical analysis subsystem can collect and analyze result of appraisal information so that the result of appraisal are directly perceived, clear
Ground shows rank order.
Brief description of the drawings
Fig. 1 is the structure diagram of the present invention.
1. core database subsystem, 101. examination information databases, 102. tasks carrying information banks, 103. rights managements
Information bank, 104. project task information banks, 105. customer management information storehouses, 2. tasks issue subsystem, 201. tasks issue mould
Block, 202. message pushing modules, 3. project implementation subsystems, 301. task acquisition modules, 302. task scheduling modules, 303.
Business execution information uploading module, 304. locating modules, 4. tasks monitoring examination subsystem, 401. tasks carrying acquisition of information moulds
Block, 402. evaluation modules, 5. statistical analysis subsystems, 501. statistical analysis modules, 502. statistical analysis information banks.
Embodiment
For the object, technical solutions and advantages of the present invention are more clearly understood, below in conjunction with specific embodiment, and reference
Attached drawing, the present invention is described in more detail.Wherein identical parts are presented with like reference characters.
As shown in Figure 1, a kind of Safety Management system includes:Core database subsystem 1, task issue subsystem 2,
Project implementation subsystem 3, task monitoring examination subsystem 4 and statistical analysis subsystem 5.
The core database subsystem 1 includes examination information database 101, tasks carrying information bank 102, project task
Information bank 104, customer management information storehouse 105 and authorization administration information storehouse 103;It is stored with the examination information database 101
Result of appraisal information, stores tasks carrying information, the project task information bank 104 in the tasks carrying information bank 102
In store project task information, the role of user, the authorization administration information are stored in the customer management information storehouse 105
Authority corresponding with the role of user, the authority are preserved in storehouse 103, the authority can allow for user different according to its
The different subsystem of role access, the present invention in user role include:Give out a contract for a project and user and contract user, the use of giving out a contract for a project
The authority of this role of family is to be able to access that core database subsystem 1, task issue subsystem 2, task monitoring examination
System 4 and statistical analysis subsystem 5;The authority for contracting user this role is to be able to access that core database subsystem
System 1, project implementation subsystem 3 and statistical analysis subsystem 5.
The task issues subsystem 2, including task release module 201 and message pushing module 202, the task issue
Module 201 is used to issue project task information to core database subsystem 1, is equipped with task release module 201 at least one
Data entry element;The message pushing module 202 can upload pushed information, the project implementation to core database subsystem 1
Subsystem 3 can obtain the pushed information from core database subsystem 1;The data entry element includes construction task
Name data typing unit, construction task locality data typing unit, contract user's name data entry element and project construction
It is required that data entry element.
Project implementation subsystem 3, including task acquisition module 301, task scheduling modules 302, tasks carrying information upload
Module 303 and locating module 304;The task acquisition module 301 is used for the project task letter for obtaining core database subsystem 1
Cease the project task information in storehouse 104;The project that the task scheduling modules 302 are used to obtain task acquisition module 301 is appointed
Business information, which is distributed to, different contracts user;The tasks carrying information uploading module 303 is used to upload tasks carrying information extremely
Core database subsystem 1, the content of the tasks carrying information include contracting user according in corresponding project task information
What is passed performs the information of state and result on project task, can be visual form, graphic form or audio form;It is described fixed
The more specific location information for uploading tasks carrying information can be sent to core database subsystem 1 by position module 304 so that be given out a contract for a project
User can obtain in inspection item implementation status contracts the more specific location information that user uploads tasks carrying information.
The Safety Management system further includes user management module and authority management module, the user management module
For changing the role of user, the role includes giving out a contract for a project user and contracts user;The authority management module is used to change each
The corresponding authority of a role
The task monitoring examination subsystem 4, including tasks carrying data obtaining module 401 and evaluation module 402, the task
Execution information acquisition module 401 is used to obtain tasks carrying information from core database subsystem 1, and the evaluation module 402 is used
From the tasks carrying information of the acquisition of tasks carrying data obtaining module 401 and result of appraisal information is uploaded to core number in examination
According to storehouse subsystem 1.
The statistical analysis subsystem 5, including statistical analysis module 501, the statistical analysis module 501 are used to obtain core
Result of appraisal information in the examination information database 101 of heart database subsystem 1, and the result of appraisal information is arranged
Name, result of appraisal ranking information is stored in statistical analysis information bank 502.
A kind of construction safety wire examination method based on Safety Management system, comprises the following steps:
Step 1:The task release module 201 that user is issued by the task on mobile terminal in subsystem 2 of giving out a contract for a project appoints project
Business information is distributed in the project task information bank 104 of core database subsystem 1, successively into task release module 201
Data entry element typing project mission bit stream, the project task information include construction task title, construction task place, hold
Bag user's name and project construction requirement.
Step 2:The task acquisition module 301 of project implementation subsystem 3 obtains project from project task information bank 104
Mission bit stream, the task scheduling modules 302 of project implementation subsystem 3 contracting user's name and will appoint in project task information
The project task information that business acquisition module 301 obtains, which is distributed to, different contracts user.
Step 3:It is described to contract tasks carrying information upload mould of the user by project executive subsystem 3 in mobile terminal
Block 303, the project construction in project task information require to complete to construct and upload tasks carrying information to core database
Subsystem 1, when uploading tasks carrying letter, the geographical location where uploading tasks carrying information can also be performed by information task
Information uploading module 303 is uploaded in core database subsystem 1, the tasks carrying information bank 102 of core database subsystem 1
The tasks carrying information is stored, the tasks carrying information can be information, the information of graphic form or the sound of visual form
The information of frequency form.
Step 4:The tasks carrying data obtaining module 401 that the user that gives out a contract for a project monitors examination subsystem 4 by task obtains core
Tasks carrying information in the tasks carrying information bank 102 of heart database subsystem 1, and task is held by evaluation module 402
Row information carries out examination scoring, and result of appraisal information is uploaded to the examination information of core database subsystem 1 by evaluation module 402
In database 101.
Step 5:The statistical analysis module 501 of statistical analysis subsystem 5 is periodically obtained in examination information database 101
Result of appraisal information, and the result of appraisal information is subjected to ranking by sequence, statistical analysis module 501 is by the result of appraisal
Ranking information is stored in statistical analysis information bank 502, and the information of the statistical analysis information bank 502 can be uploaded to core number
According to storehouse subsystem 1.
The user that gives out a contract for a project monitors examination subsystem 4 by task can obtain result of appraisal row from core database subsystem 1
Name information.Result of appraisal ranking information can be obtained by project implementation subsystem 3 by contracting user.
The message pushing module 202 that user can also be issued in subsystem 2 by task of giving out a contract for a project sends pushed information to core
Heart database subsystem 1, the pushed information can be obtained by project implementation subsystem 3 by contracting user.
The give out a contract for a project authority of user this role of the above is to be able to access that core database subsystem 1, task issue
Subsystem 2, task monitoring examination subsystem 4 and statistical analysis subsystem 5;The authority for contracting user this role is
It is able to access that core database subsystem 1, project implementation subsystem 3 and statistical analysis subsystem 5.
The beneficial effects of the present invention are:
First, issue subsystem 2 and project implementation subsystem 3 by task, give out a contract for a project user can by installed in mobile terminal or
The Safety Management system remote issue project task information at PC ends, contracting user can be by installed in mobile terminal or PC end
Safety Management system remote receive project task information.
Second, the data entry element in the task release module 201 can be easy to clearly decompose project task information,
Be conducive to making clear for project task information, standardize, procedure.
Third, the task scheduling modules 302, user management module and authority management module, which coordinate, can distribute control use
Family role and authority, favorably for user's responsibility of each role and the management and control of authority, can cease Fen Pei Give by project task Xin
It is each to contract user, avoid it is each contract in user's user interface display and belong to other project task information for contracting user, from
And improve tasks carrying efficiency.
Fourth, the task monitoring examination subsystem 4 can obtain tasks carrying information so that the user that gives out a contract for a project can be directly perceived
The implementation status of the long-range monitoring project task in ground, it is possible to increase work efficiency.
Fifth, the statistical analysis subsystem 5 can collect and analyze result of appraisal information so that the result of appraisal are directly perceived,
Clearly show rank order.
Those of ordinary skills in the art should understand that:The foregoing is merely the specific embodiment of the present invention, and
The limitation present invention is not used in, all any modification, equivalent substitution, improvement and etc. within the purport of the present invention, done, should all include
Within protection scope of the present invention.
Claims (6)
- A kind of 1. Safety Management system, it is characterised in that including:Core database subsystem(1), task issue subsystem (2), project implementation subsystem(3)Examination subsystem is monitored with task(4);The task issues subsystem(2), including task release module(201), task release module(201)In be equipped with least one A data entry element, the task release module(201)For issuing project task information to core database subsystem (1), the project task information is stored in core database subsystem(1)Project task information bank(104)In;Project implementation subsystem(3), including task acquisition module(301), task scheduling modules(302)In tasks carrying information Transmission module(303), the task acquisition module(301)For obtaining the project task information;The task scheduling modules (302)For distributing task acquisition module(301)The project task information of acquisition, the tasks carrying information uploading module (303)For uploading tasks carrying information to core database subsystem(1), the tasks carrying information is stored in core data Storehouse subsystem(1)Tasks carrying information bank(102);Task monitoring examination subsystem(4), including tasks carrying data obtaining module(401)And evaluation module(402), described Business execution information acquisition module(401)For from core database subsystem(1)Obtain tasks carrying information;The evaluation module (402)Core database subsystem is uploaded to for examining the tasks carrying information, and by result of appraisal information(1), it is described Result of appraisal information is stored in core database subsystem(1)Examination information database(101)In;The core database subsystem(1)In also have customer management information storehouse(105)With authorization administration information storehouse(103), institute State customer management information storehouse(105)In preserve the role of user;The authorization administration information storehouse(103)In preserve and user Safety Management system described in the corresponding authority of role further includes user management module and authority management module, user's pipe Reason module is used to change customer management information storehouse(105)The role of the user of middle storage, the role include giving out a contract for a project user and holding Wrap user;The authority management module is used for modification authority management information bank(103)The corresponding authority of each role of middle storage.
- 2. Safety Management system as claimed in claim 1, it is characterised in that further include statistical analysis subsystem(5), institute State statistical analysis subsystem(5)Including statistical analysis module(501), the statistical analysis module(501)For obtaining core number According to storehouse subsystem(1)Examination information database(101)In result of appraisal information, and the result of appraisal information is arranged Name, statistical analysis information bank is stored in by result of appraisal ranking information(502)In.
- 3. Safety Management system as claimed in claim 1, it is characterised in that the task issues subsystem(2)Also wrap Include message pushing module(202), the message pushing module(202)Can be to core database subsystem(1)Upload push letter Breath, project implementation subsystem(3)Can be from core database subsystem(1)It is middle to obtain the pushed information.
- 4. Safety Management system as claimed in claim 1, it is characterised in that the project implementation subsystem(3)In also Including locating module(304), the locating module(304)Core database subsystem can be uploaded to(1)Appoint on uploading The more specific location information for execution information of being engaged in.
- 5. Safety Management system as claimed in claim 1, it is characterised in that the Safety Management system is installed on PC ends and/or mobile terminal.
- 6. Safety Management system as claimed in claim 1, it is characterised in that the data entry element includes construction and appoints Business name data typing unit, construction task locality data typing unit, contract user's name data entry element and project is applied Work requires data entry element.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711269576.8A CN108038663A (en) | 2017-12-05 | 2017-12-05 | Safety Management system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711269576.8A CN108038663A (en) | 2017-12-05 | 2017-12-05 | Safety Management system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108038663A true CN108038663A (en) | 2018-05-15 |
Family
ID=62095627
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711269576.8A Pending CN108038663A (en) | 2017-12-05 | 2017-12-05 | Safety Management system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108038663A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111932113A (en) * | 2020-08-10 | 2020-11-13 | 深圳博沃智慧科技有限公司 | Environment supervision and management method, platform and storage medium |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104794592A (en) * | 2015-05-11 | 2015-07-22 | 杭州节点科技有限公司 | Task evaluation method for mobile terminal |
CN104933495A (en) * | 2014-03-18 | 2015-09-23 | 苏州市伏泰信息科技有限公司 | Work task assessment system on Android-based mobile terminal |
CN105868926A (en) * | 2016-04-28 | 2016-08-17 | 国网福建省电力有限公司 | Management platform for achieving task decomposition and automated distribution and performance assessment of power supply station |
CN106296124A (en) * | 2016-08-10 | 2017-01-04 | 宋太纪 | A kind of work plan management method and system |
CN106570642A (en) * | 2016-11-07 | 2017-04-19 | 成都科曦科技有限公司 | Task distribution system and method based on personnel location and automatic work identification |
CN106779307A (en) * | 2016-11-22 | 2017-05-31 | 崔岩 | The data processing method and system of cubic management system |
CN107330771A (en) * | 2017-07-24 | 2017-11-07 | 杨润丁 | Task management method and device |
-
2017
- 2017-12-05 CN CN201711269576.8A patent/CN108038663A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104933495A (en) * | 2014-03-18 | 2015-09-23 | 苏州市伏泰信息科技有限公司 | Work task assessment system on Android-based mobile terminal |
CN104794592A (en) * | 2015-05-11 | 2015-07-22 | 杭州节点科技有限公司 | Task evaluation method for mobile terminal |
CN105868926A (en) * | 2016-04-28 | 2016-08-17 | 国网福建省电力有限公司 | Management platform for achieving task decomposition and automated distribution and performance assessment of power supply station |
CN106296124A (en) * | 2016-08-10 | 2017-01-04 | 宋太纪 | A kind of work plan management method and system |
CN106570642A (en) * | 2016-11-07 | 2017-04-19 | 成都科曦科技有限公司 | Task distribution system and method based on personnel location and automatic work identification |
CN106779307A (en) * | 2016-11-22 | 2017-05-31 | 崔岩 | The data processing method and system of cubic management system |
CN107330771A (en) * | 2017-07-24 | 2017-11-07 | 杨润丁 | Task management method and device |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111932113A (en) * | 2020-08-10 | 2020-11-13 | 深圳博沃智慧科技有限公司 | Environment supervision and management method, platform and storage medium |
CN111932113B (en) * | 2020-08-10 | 2023-12-05 | 深圳博沃智慧科技有限公司 | Environment supervision and management method, platform and storage medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3317158B1 (en) | Monitoring and controlling of distributed machines | |
CN103999077B (en) | Comprise manageability subsystem to monitor in real time and the method for management data center resource | |
KR101775494B1 (en) | System and method for monitoring tooling activities | |
CN108320069A (en) | A kind of manufacturing execution system | |
CN112084385B (en) | Part-process-equipment association relationship topological view generation method based on digital twinning | |
KR20150112357A (en) | Sensor data processing system and method thereof | |
CN106960292A (en) | A kind of operation flow monitoring system and method applied to Utilities Electric Co. | |
CN105574593B (en) | Track state static detection and control system and method based on cloud computing and big data | |
CN105023200A (en) | Power emergency drilling system and emergency drilling method thereof | |
CN105303306A (en) | Electric power material dispatching platform system | |
US20060112139A1 (en) | Methods and systems for modeling processes in airlines and other industries, and for simulating and valuing the effects of various products and services on those processes | |
CN107609987A (en) | A kind of intelligent power transformation operational system of equipment oriented owner | |
CN110348821A (en) | A kind of the intelligence manufacture management system and method for combination Internet of Things | |
CN104424348B (en) | Service analysis device and method | |
US20080307010A1 (en) | Method and System for Sending Changes in Information to a Central System | |
CN108319638A (en) | A kind of application holds the dangerous material manufacturing execution system of inspection device | |
CN108038663A (en) | Safety Management system | |
Dotoli et al. | An integrated technique for the internal logistics analysis and management in discrete manufacturing systems | |
CN104793570A (en) | Portable motor train unit fault processing support equipment and portable motor train unit fault processing support system | |
CN113888126A (en) | Oil gas pipeline inspection management system | |
CN102541539B (en) | Method for designing intelligent panel of supply chain based on M2M (Machine to Machine) | |
JP4958129B1 (en) | Information collection system, information collection method, information collection program | |
CN110827172A (en) | Wisdom water affairs cloud service platform | |
CN110390466A (en) | Multi-dimensional visual operation and maintenance management device based on cloud SOA framework | |
Lu | [Retracted] Data Protection Software for Civil Aviation Control Flight Information System Based on FPE Algorithm |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180515 |