CN106760559B - 半球形球冠网壳的安装方法 - Google Patents
半球形球冠网壳的安装方法 Download PDFInfo
- Publication number
- CN106760559B CN106760559B CN201710056214.4A CN201710056214A CN106760559B CN 106760559 B CN106760559 B CN 106760559B CN 201710056214 A CN201710056214 A CN 201710056214A CN 106760559 B CN106760559 B CN 106760559B
- Authority
- CN
- China
- Prior art keywords
- spherical shell
- installation
- shell beam
- curved spherical
- longitudinal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/32—Arched structures; Vaulted structures; Folded structures
- E04B1/3211—Structures with a vertical rotation axis or the like, e.g. semi-spherical structures
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/35—Extraordinary methods of construction, e.g. lift-slab, jack-block
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Mechanical Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
本发明涉及异形钢结构搭建领域,具体是一种半球形球冠网壳的安装方法;其特征是:包括将半球形网壳钢结构划分为纵向主曲面球壳梁、横向主曲面球壳梁、纵向次曲面球壳梁、横向次曲面球壳梁,纵向主曲面球壳梁安装;横向主曲面球壳梁安装;水平环向球壳梁安装;纵向次曲面球壳梁安装;横向次曲面球壳梁安装;拆撑卸载,将受力点逐步转移到主体结构上。本发明采用将曲面球壳梁人为划分为纵向主结构、纵向次结构、水平环向加固结构、横向主结构、横向次结构的方法,将空间构件拼装精度控制难度大的问题限制在了主结构安装阶段,将精度控制难度大的构件减少了一半以上,从而使工作效率提高,施工精度更便于控制。
Description
技术领域
本发明涉及异形钢结构搭建领域,具体是一种半球形球冠网壳的安装方法。
背景技术
随着钢结构行业日新月异的发展,各种大跨度、大空间会展中心、体育场馆的建筑设计脱颖而出,给钢结构工程安装带来了新的机遇和挑战。由于半球形球冠网壳结构的空间构件拼装精度控制难度大、成型前稳定性差,传统的施工方法有高空散装(满堂脚手架)法、整体吊装、拔杆提升安装法、将球壳分成几瓣地面拼装起吊施工方法。不论采取何种施工方法,均存在安装精度控制困难、施工周期较长的问题。
发明内容
本发明的目的在于,提供一种安装作业方便,能够克服空间构件拼装精度控制难度大,结构成型前稳定性差等问题。
为了达到上述目的,本发明是这样实现的:
一种半球形球冠网壳的安装方法,包括
步骤1、将半球形网壳钢结构划分为纵向主曲面球壳梁、横向主曲面球壳梁、纵向次曲面球壳梁、横向次曲面球壳梁,
步骤2、纵向主曲面球壳梁安装:根据纵向主曲面球壳梁节点位置,按固定间距布置支撑,把纵向主曲面球壳梁安装就位;
步骤3、横向主曲面球壳梁安装:布置横向主曲面球壳梁支撑,将横向主曲面球壳梁安装就位,与纵向主曲面球壳梁形成简单半球形球冠网壳框架;
步骤4、水平环向球壳梁安装:在横向和纵向主曲面球壳梁基础上安装水平环向球壳梁,加强简单半球形网壳框架稳定性;
步骤5、纵向次曲面球壳梁安装:在简单半球形球冠网壳框架上补充安装纵向次曲面球壳梁;
步骤6、横向次曲面球壳梁安装:安装横向次曲面球壳梁,整个半球形球冠网壳安装完成;
步骤7、拆撑卸载:对纵向和横向主曲面球壳梁下的支撑逐点进行卸载,将受力点逐步转移到主体结构上。
所述的半球形球冠网壳的安装方法,步骤2~ 步骤6中,曲面球壳梁单元根据吊装设备性能和节点位置进行分段。
所述的半球形球冠网壳的安装方法,在实施安装工程前采用全过程安装及卸载模拟。
所述的半球形球冠网壳的安装方法,步骤2和步骤3中支撑结构与主体结构相连部分采用法兰盘连接,所述支撑结构包括立柱和斜撑组成,所述斜撑与立柱以铰接方式释放节点弯矩。
本发明采用将曲面球壳梁人为划分为纵向主结构、纵向次结构、水平环向加固结构、横向主结构、横向次结构的方法,将空间构件拼装精度控制难度大的问题限制在了主结构安装阶段,将精度控制难度大的构件减少了一半以上,从而使工作效率提高,施工精度更便于控制。在划分的主结构安装完成后,结构的稳定性问题提前得到解决,减少了支撑结构的用量,有利于工程成本控制。同时本发明针对半球形球冠网壳结构安装就位后变形量大的特点,提出了一种主曲面球壳梁支撑结构,该支撑结构具有材料用量少,卸载操作方便的特点。
附图说明
图1是半球形球冠网壳示意图。
图2是半球形球冠网壳的主结构曲面球壳梁示意图。
图3是本发明的施工方法流程图。
图4是本发明的安装流程示意图。
图5是本发明中临时支撑布置示意图。
图6是本发明中临时支撑的结构示意图。
图7是本发明中临时支撑的拆卸流程示意图。
具体实施方式
以下通过具体实施例进一步说明本发明。
图1为半球形球冠网壳示意图,主体结构构件多为弧形方管,相邻方管间用连接板连接,结构跨度为63m,球壳结构内最大高差为20m。由于球壳结构拼接精度控制难度大,安装完毕前结构不稳定,决定采用将曲面球壳梁人为划分为纵向主结构、纵向次结构、横向主结构、横向次结构以及水平环向加固结构的方法,把安装难度控制在主结构范围内。在主结构施工完毕后,整个半球形球冠网壳结构稳定性问题基本解决,后续空间构件拼接精度更易于控制。
图2为主结构曲面球壳梁示意图,该主结构曲面球壳梁由横向和纵向空间构件共同组成,在相交节点下方设有可调节标高的支撑结构,在安装过程中便于对精度的调节。
如图3、图4、图5所示,一种半球形球冠网壳的安装方法,包括:
步骤401:根据纵向主曲面球壳梁节点位置,按一定间距布置支撑,把纵向主曲面球壳梁安装就位;
步骤402:布置横向主曲面球壳梁支撑,将横向主曲面球壳梁安装就位,与纵向主曲面球壳梁形成简单半球形球冠网壳框架;
步骤403:在横向和纵向主曲面球壳梁基础上安装水平环向球壳梁,加强简单半球形网壳框架稳定性;
步骤404:在简单半球形球冠网壳框架上补充安装纵向次曲面球壳梁;
步骤405:安装横向次曲面球壳梁,整个半球形球冠网壳安装完成。
如图6和图7所示,临时支撑可以按下述步骤拆卸:
步骤601:在卸载牛腿上均匀布置四个千斤顶,顶升,由千斤顶代替支撑柱端头受力;
步骤602:切割牛腿与上部结构间的支撑柱;
步骤603:千斤顶下降,支撑结构不再对上部结构传力。
本发明采用计算机进行全过程动态模拟分析跟踪,根据计算机的模拟数据,半球形球冠网壳安装全过程的数据均未出现异常情况,整个钢结构拼装质量合格率达到100%,各项指标均满足设计要求。
Claims (4)
1.一种半球形球冠网壳的安装方法,其特征是:包括
步骤1、将半球形网壳钢结构划分为纵向主曲面球壳梁、横向主曲面球壳梁、纵向次曲面球壳梁、横向次曲面球壳梁,
步骤2、纵向主曲面球壳梁安装:根据纵向主曲面球壳梁节点位置,按固定间距布置支撑,把纵向主曲面球壳梁安装就位;
步骤3、横向主曲面球壳梁安装:布置横向主曲面球壳梁支撑,将横向主曲面球壳梁安装就位,与纵向主曲面球壳梁形成简单半球形球冠网壳框架;
步骤4、水平环向球壳梁安装:在横向和纵向主曲面球壳梁基础上安装水平环向球壳梁,加强简单半球形网壳框架稳定性;
步骤5、纵向次曲面球壳梁安装:在简单半球形球冠网壳框架上补充安装纵向次曲面球壳梁;
步骤6、横向次曲面球壳梁安装:安装横向次曲面球壳梁,整个半球形球冠网壳安装完成;
步骤7、拆撑卸载:对纵向和横向主曲面球壳梁下的支撑逐点进行卸载,将受力点逐步转移到主体结构上。
2.根据权利要求1所述的半球形球冠网壳的安装方法,其特征是:步骤2~ 步骤6中,曲面球壳梁单元根据吊装设备性能和节点位置进行分段。
3.根据权利要求1所述的半球形球冠网壳的安装方法,其特征是:在实施安装工程前采用全过程安装及卸载模拟。
4.根据权利要求1所述的半球形球冠网壳的安装方法,其特征是:步骤2和步骤3中支撑结构与主体结构相连部分采用法兰盘连接,所述支撑结构包括立柱和斜撑组成,所述斜撑与立柱以铰接方式释放节点弯矩。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710056214.4A CN106760559B (zh) | 2017-01-25 | 2017-01-25 | 半球形球冠网壳的安装方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710056214.4A CN106760559B (zh) | 2017-01-25 | 2017-01-25 | 半球形球冠网壳的安装方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106760559A CN106760559A (zh) | 2017-05-31 |
CN106760559B true CN106760559B (zh) | 2019-06-14 |
Family
ID=58942889
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710056214.4A Active CN106760559B (zh) | 2017-01-25 | 2017-01-25 | 半球形球冠网壳的安装方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106760559B (zh) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107327026B (zh) * | 2017-08-28 | 2020-01-24 | 广东港重绿建科技有限公司 | 球形空间结构预装方法 |
CN108281082B (zh) * | 2018-03-30 | 2023-06-16 | 安徽工业大学 | 一种肋环形加劲浅球壳试验缩尺模型制作方法 |
CN112746747B (zh) * | 2020-12-31 | 2022-07-29 | 中建科工集团有限公司 | 一种倒挂式双曲面立面网壳安装方法 |
CN113107091B (zh) * | 2021-04-16 | 2022-08-30 | 孟艳 | 一种弹性结构 |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH05287811A (ja) * | 1992-04-08 | 1993-11-02 | Mamoru Kawaguchi | ドーム式屋根構造 |
CN102635162A (zh) * | 2012-04-09 | 2012-08-15 | 浙江东南网架股份有限公司 | 一种组合扭网壳及其施工方法 |
CN103075017A (zh) * | 2013-02-01 | 2013-05-01 | 徐州中煤百甲重钢科技有限公司 | 超大跨度筒壳网格结构施工方法 |
CN103556836A (zh) * | 2013-07-30 | 2014-02-05 | 永升建设集团有限公司 | 受限空间条件下球形网壳拼装施工方法 |
CN103821228A (zh) * | 2014-03-21 | 2014-05-28 | 周丰峻 | 适用于野外装备维修的大空间金属网壳结构及其构建方法 |
CN103938720A (zh) * | 2014-05-13 | 2014-07-23 | 周丰峻 | 装备储运用的大空间金属球冠形网壳结构及构建方法 |
CN104265001A (zh) * | 2014-09-15 | 2015-01-07 | 浙江精工钢结构集团有限公司 | 一种钢结构无胎架接装施工方法 |
WO2016141038A1 (en) * | 2015-03-02 | 2016-09-09 | Eric Snell | A deck and hoist for use in construction |
-
2017
- 2017-01-25 CN CN201710056214.4A patent/CN106760559B/zh active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH05287811A (ja) * | 1992-04-08 | 1993-11-02 | Mamoru Kawaguchi | ドーム式屋根構造 |
CN102635162A (zh) * | 2012-04-09 | 2012-08-15 | 浙江东南网架股份有限公司 | 一种组合扭网壳及其施工方法 |
CN103075017A (zh) * | 2013-02-01 | 2013-05-01 | 徐州中煤百甲重钢科技有限公司 | 超大跨度筒壳网格结构施工方法 |
CN103556836A (zh) * | 2013-07-30 | 2014-02-05 | 永升建设集团有限公司 | 受限空间条件下球形网壳拼装施工方法 |
CN103821228A (zh) * | 2014-03-21 | 2014-05-28 | 周丰峻 | 适用于野外装备维修的大空间金属网壳结构及其构建方法 |
CN103938720A (zh) * | 2014-05-13 | 2014-07-23 | 周丰峻 | 装备储运用的大空间金属球冠形网壳结构及构建方法 |
CN104265001A (zh) * | 2014-09-15 | 2015-01-07 | 浙江精工钢结构集团有限公司 | 一种钢结构无胎架接装施工方法 |
WO2016141038A1 (en) * | 2015-03-02 | 2016-09-09 | Eric Snell | A deck and hoist for use in construction |
Also Published As
Publication number | Publication date |
---|---|
CN106760559A (zh) | 2017-05-31 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106760559B (zh) | 半球形球冠网壳的安装方法 | |
CN105649325B (zh) | 装配式混凝土剪力墙结构可调节式三角架支撑体系及方法 | |
CN102936962A (zh) | 采用临时钢架支撑的倾斜悬挑钢结构施工方法 | |
CN105178609A (zh) | 钢结构网架高空散装施工方法 | |
CN106499193A (zh) | 一种仿生态伞状单层网壳钢结构的安装方法 | |
CN110206144B (zh) | 一种钢骨柱梁柱节点的施工方法 | |
CN104695715A (zh) | 一种屋面张弦梁结构施工方法 | |
CN109235902A (zh) | 正四角锥螺栓球网架多点支撑高空散拼方法 | |
CN107491619A (zh) | 一种基于bim技术的旧改项目钢结构定位吊装施工方法 | |
CN203939225U (zh) | 房建楼板混凝土浇筑作业台架 | |
CN111691681A (zh) | 斜交钢管网格柱外框筒体结构安装方法 | |
CN105780995A (zh) | 一种曲面空间管桁架结构及其安装方法 | |
CN111382538B (zh) | 一种球形网架悬挂拼装整体提升施工方法 | |
CN107869195A (zh) | 一种型钢钢柱及柱头定型钢模施工方法 | |
CN206513015U (zh) | 基于bim技术用于建筑物楼板施工的铝合金模板机构 | |
CN107939141A (zh) | 一种钢结构塔及其施工方法 | |
CN205636516U (zh) | 空心混凝土斜塔的翻转式模板系统 | |
CN108755439B (zh) | 适用于v型桥墩的万向可伸缩支撑架及安装方法 | |
CN105781126B (zh) | 一种张弦结构被动建立预应力施工方法 | |
CN208734102U (zh) | 一种大跨度桁架高空组装滑移施工用临时支架 | |
CN204401995U (zh) | 一种用于穹顶结构安装的中心悬挑支撑系统 | |
CN103615118A (zh) | 一种大型拱形结构的提升安装方法 | |
CN104060841A (zh) | 大跨度钢梁安装施工方法 | |
CN207793886U (zh) | 一种高度可调节装配式支架 | |
CN104389348B (zh) | 一种带蒙皮拱结构的安装方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |