CN106760504A - A kind of build concrete column pours mould - Google Patents

A kind of build concrete column pours mould Download PDF

Info

Publication number
CN106760504A
CN106760504A CN201611138176.9A CN201611138176A CN106760504A CN 106760504 A CN106760504 A CN 106760504A CN 201611138176 A CN201611138176 A CN 201611138176A CN 106760504 A CN106760504 A CN 106760504A
Authority
CN
China
Prior art keywords
mould
lug boss
boss
fixing lug
support shuttering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611138176.9A
Other languages
Chinese (zh)
Inventor
汪希奎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Yuya Science and Technology Co Ltd
Original Assignee
Chengdu Yuya Science and Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Yuya Science and Technology Co Ltd filed Critical Chengdu Yuya Science and Technology Co Ltd
Priority to CN201611138176.9A priority Critical patent/CN106760504A/en
Publication of CN106760504A publication Critical patent/CN106760504A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • E04G13/02Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for columns or like pillars; Special tying or clamping means therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The present invention relates to concrete placing installation field, specifically related to a kind of build concrete column pours mould, it is described pour mould and mutually spliced by 2 pieces of support shutterings being symmetrically installed and 2 blocks of side plates being symmetrically installed constitute, the support shuttering is made up of the straight panel and trapezoidal plate being mutually permanently connected;The U-shaped channel-shaped of global shape of the straight panel, its inwall is symmetrically arranged with mounting groove;The both sides of the side plate are symmetrically arranged with boss, and the boss is embedded in the mounting groove Matching installation, and the outer surface and the inner surface of the support shuttering for making the side plate fit;Some contiguous blocks are symmetrically arranged with the side wall of the support shuttering, fixing lug boss is provided with the contiguous block, the through hole for being easy to fixed installation is provided with the fixing lug boss;Mould is poured when described when mounted, be fixedly connected by fixing bolt and hex nut between the corresponding fixing lug boss in position on the support shuttering being symmetrically installed.Simple structure of the present invention, with preferable application prospect and promotional value.

Description

A kind of build concrete column pours mould
Technical field
The present invention relates to concrete placing installation field, and in particular to a kind of build concrete column pours mould.
Background technology
At present, in modern construction engineering work progress, pouring for concrete column or wall is very universal.Especially the bottom of at For the building room of retail shop, in order that the shop front activity space bigger and activity of bottom retail shop is convenient, majority uses column branch to layer The mode of support solves the above problems.
But, inventor find, in most construction sites, the concreting mould for being used be typically with plank or other Steel plate carries out being assembled into required shape, is then reinforced by auxiliary components such as screw or iron nails again, and this process needs to spend A large amount of to reinforce part and manpower, the cost time is also more, and assembling process is cumbersome.Solidify completely when the column for pouring, it is necessary to When being taken apart to formwork for placing, it is necessary to extracted fixing screws or iron nail one by one, its unloading process is cumbersome, time-consuming, its Unloading process is also very difficult;Simultaneously as a large amount of of iron nail use, cause assembled formwork seriously damaged, reduce template Service life, causes mould material to waste, cost of increasing input.
Meanwhile, small part template assembly is there are now pours mould, and the splicing between its template is not firm enough, is pouring Build under the huge pressure of concrete, easily by conquassation or fall apart, casting process is caused to have a strong impact on, danger is brought to builder Danger;There is document(Chinese patent;Publication number:104290177A;Publication date:2015.01.21)Disclose a kind of coagulation for building Native column pours mould, but the mould is primarily adapted for use in large-sized concrete wall and pours, and is poured for column and is less adapted to.
Therefore, it is of the invention to disclose a kind of concreting mould poured for column based on above-mentioned, to solve prior art The formwork for placing dismounting inconvenience of presence, the deficiency such as mould material loss is big, input cost is high.
The content of the invention
The purpose of the present invention is that:For the above mentioned problem that presently, there are, there is provided a kind of coagulation poured for column Soil pours mould, and to solve the formwork for placing dismounting inconvenience of prior art presence, mould material loss is big, input cost is high etc. no Foot.
To achieve these goals, the technical solution adopted by the present invention is:
A kind of build concrete column pours mould, and the mould that pours is symmetrically installed by 2 pieces of support shutterings being symmetrically installed and 2 pieces Side plate mutually splice composition, the support shuttering is made up of the straight panel and trapezoidal plate being mutually permanently connected;The straight panel it is whole The U-shaped channel-shaped of shape, its inwall is symmetrically arranged with mounting groove;The both sides of the side plate are symmetrically arranged with boss, the boss The insertion mounting groove Matching installation, the outer surface and the inner surface of the support shuttering for making the side plate fit;The branch Some contiguous blocks are symmetrically arranged with the side wall of hold mode plate, fixing lug boss are provided with the contiguous block, in the fixing lug boss It is provided with the through hole for being easy to fixed installation;Mould is poured when described when mounted, position pair on the support shuttering being symmetrically installed It is fixedly connected by fixing bolt and hex nut between the fixing lug boss answered;The fixing lug boss and the through hole Match.
The present invention is symmetrically arranged between 2 pieces of support shutterings, so in concrete operations by by 2 blocks of side plates It is fixed by the fixing bolt and the hex nut afterwards, mould is poured described in formation, then from top casting concrete Slurries, performance pours the concrete pillar shaping effect of mould;When need to take apart it is described pour mould when, take the hexagonal spiral shell apart first Mother, then takes the fixing bolt apart, so as to release the fixation for pouring mould, then takes the support shuttering apart, then The side plate and the support shuttering are packed up, so that the later stage continues to reuse.
Preferably, it is that gap coordinates between the boss and the mounting groove, is conducive to described pouring taking apart and pacifying for mould Dress is convenient.
Preferably, the depth of groove of the mounting groove is 10~15mm, and width is 10~15mm, advantageously ensures that described pouring Build the installation fixing-stable of mould.
Preferably, the thickness of the straight panel is 20~25mm, advantageously ensures that the installation fixing-stable for pouring mould, is protected The bulk strength of mould is poured described in card.
Preferably, the trapezoidal plate is right-angled trapezium, is conducive to that the bottom for pouring mould is smooth, stabilization is installed.
Preferably, between the fixing bolt and the hex nut be threadedly coupled, be conducive to the fixing bolt and Convenient disassembly between the hex nut.
Preferably, the height dimension of the support shuttering is equal with the height dimension of the side plate.
Preferably, the supporting plate and the side plate are plank or wood composite board, advantageously reduce making and put into This.
Preferably, the inwall of the supporting plate and the side plate is shiny surface, be conducive to each template for pouring mould it Between take apart conveniently, it is to avoid the support shuttering and the side plate paste tension with concrete.
Preferably, the quantity of the contiguous block and the fixing lug boss is 2 or more than 2, outside the fixing lug boss It is arc-shaped to hold, and advantageously ensures that the fixed installation strength and stability for pouring mould.
By adopting the above-described technical solution, the beneficial effects of the invention are as follows:
Compared with traditional concrete-pouring template assembling technique, simple structure of the present invention, assembled fixing-stable between template, can Reusability is high, iron nail can be avoided to destroy the waste of material that material is caused, with preferable application prospect and promotional value; The structure of the support shuttering, advantageously ensures that stabilization is installed in the mould bottom that pours;The U-type groove structure design of the straight panel with And the side plate outer surface and the supporting plate inner surface are fitted, and are conducive to carrying out side plate stabilization by the straight panel It is assembled;The setting of the contiguous block, connection boss and the fixing bolt and the hex nut, instead of traditional iron nail Fixed form mode, makes the dismounting for pouring mould more facilitate, while also making the fixation between each template for pouring mould Firm stable, is prevented effectively from the formwork for placing when casting concrete is starched, and causes template by conquassation or the danger of rupture;It is described The cooperation mounting means of mounting groove and the boss, makes the assembly for pouring mould more facilitate, it is ensured that the spelling for pouring mould Decking can be used repeatedly, be increased operation rate, and reduce cost increase and waste of material that spillage of material is caused.
Brief description of the drawings
Fig. 1 is structural representation of the invention;
Fig. 2 is support shuttering structural representation of the invention;
Fig. 3 is fixing bolt structural representation of the invention.
In figure:1st, support shuttering;2nd, straight panel;3rd, trapezoidal plate;4th, side plate;5th, contiguous block;6th, fixing lug boss;7th, fixed spiral shell Bolt;8th, hex nut;9th, boss;10th, mounting groove;11st, through hole.
Specific embodiment
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below in conjunction with the embodiment of the present invention In accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is A part of embodiment of the present invention, rather than whole embodiments, based on the embodiment in the present invention, those of ordinary skill in the art The every other embodiment obtained under the premise of creative work is not made, belongs to the scope of protection of the invention.
Embodiment 1, as shown in Figures 1 to 3:
A kind of build concrete column pours mould, and the mould that pours is by 2 pieces of support shutterings 1 being symmetrically installed and 2 pieces of symmetrical peaces The side plate 4 of dress mutually splicing composition, the support shuttering 1 is made up of the straight panel 2 and trapezoidal plate 3 being mutually permanently connected;It is described straight The U-shaped channel-shaped of global shape of plate 2, its inwall is symmetrically arranged with mounting groove 10;The both sides of the side plate 4 are symmetrically arranged with boss 9, the boss 9 is embedded in the Matching installation of the mounting groove 10, makes the outer surface of the side plate 4 and the interior table of the support shuttering 1 Face fits;Some contiguous blocks 5 are symmetrically arranged with the side wall of the support shuttering 1, fixation are provided with the contiguous block 5 convex Platform 6, is provided with the through hole 11 for being easy to fixed installation in the fixing lug boss 6;Mould is poured when described when mounted, be symmetrically installed Pass through fixing bolt 7 and the company of being fixed of hex nut 8 on the support shuttering 1 between the corresponding fixing lug boss 6 in position Connect;The fixing lug boss 6 matches with the through hole 11.
The present invention is symmetrically arranged between 2 pieces of support shutterings 1 in concrete operations by by 2 blocks of side plates 4, Then it is fixed by the fixing bolt 7 and the hex nut 8, mould is poured described in formation, is then poured from top mixed Solidifying soil paste liquid, performance pours the concrete pillar shaping effect of mould;When need to take apart it is described pour mould when, take described six apart first Angle nut 8, then takes the fixing bolt 7 apart, so as to release the fixation for pouring mould, then tears the support shuttering 1 open Open, then pack up the side plate 4 and the support shuttering 1, so that the later stage continues to reuse.
Preferably, be that gap coordinates between the boss 9 and the mounting groove 10, be conducive to it is described pour mould take apart and It is easy for installation.
Preferably, the depth of groove of the mounting groove 10 is 10~15mm, and width is 10~15mm, is advantageously ensured that described Pour the installation fixing-stable of mould.
Preferably, the thickness of the straight panel 2 is 20~25mm, advantageously ensures that the installation fixing-stable for pouring mould, The bulk strength of mould is poured described in ensureing.
Preferably, the trapezoidal plate 3 is right-angled trapezium, is conducive to that the bottom for pouring mould is smooth, stabilization is installed.
Preferably, the fixing bolt 7 is conducive to be threadedly coupled between the fixing bolt 7 and the hex nut 8 With the convenient disassembly between the hex nut 8.
Preferably, the height dimension of the support shuttering 1 is equal with the height dimension of the side plate 4.
Preferably, the supporting plate and the side plate 4 are plank or wood composite board, advantageously reduce making and put into This.
Preferably, the inwall of the supporting plate and the side plate 4 is shiny surface, be conducive to each template for pouring mould it Between take apart conveniently, it is to avoid the support shuttering 1 and the side plate 4 paste tension with concrete.
Preferably, the contiguous block 5 and the quantity of the fixing lug boss 6 are 2 or more than 2, the fixing lug boss 6 Outer end is arc-shaped, advantageously ensures that the fixed installation strength and stability for pouring mould.
The above, specific embodiment only of the invention, but protection scope of the present invention is not limited thereto, and it is any Those familiar with the art can readily occur in change or replacement in the technical scope of present disclosure, should all contain Cover within protection scope of the present invention.Therefore, protection scope of the present invention should be defined by scope of the claims.

Claims (10)

1. a kind of build concrete column pours mould, it is characterised in that:The mould that pours is by 2 pieces of support shutterings being symmetrically installed (1)With 2 blocks of side plates being symmetrically installed(4)Mutually splicing is constituted, the support shuttering(1)By the straight panel being mutually permanently connected(2) And trapezoidal plate(3)Composition;The straight panel(2)The U-shaped channel-shaped of global shape, its inwall is symmetrically arranged with mounting groove(10);Institute State side plate(4)Both sides be symmetrically arranged with boss(9), the boss(9)The insertion mounting groove(10)Matching installation, makes described Side plate(4)Outer surface and the support shuttering(1)Inner surface fit;The support shuttering(1)Side wall on symmetrically set It is equipped with some contiguous blocks(5), the contiguous block(5)On be provided with fixing lug boss(6), the fixing lug boss(6)On be provided with just In the through hole of fixed installation(11);Mould is poured when described when mounted, the support shuttering being symmetrically installed(1)Upper position correspondence The fixing lug boss(6)Between pass through fixing bolt(7)And hex nut(8)It is fixedly connected;The fixing lug boss(6) With the through hole(11)Match.
2. concreting mould as claimed in claim 1, it is characterised in that:The boss(9)With the mounting groove(10)It Between be gap coordinate.
3. concreting mould as claimed in claim 1 or 2, it is characterised in that:The mounting groove(10)Depth of groove be 10~15mm, width is 10~15mm.
4. concreting mould as claimed in claim 1, it is characterised in that:The straight panel(2)Thickness be 20~25mm.
5. concreting mould as claimed in claim 1, it is characterised in that:The trapezoidal plate(3)It is right-angled trapezium.
6. concreting mould as claimed in claim 1, it is characterised in that:The fixing bolt(7)With the hex nut (8)Between for threaded connection.
7. concreting mould as claimed in claim 1, it is characterised in that:The support shuttering(1)Height dimension and institute State side plate(4)Height dimension it is equal.
8. the concreting mould as described in claim 1 or 7, it is characterised in that:The supporting plate(1)With the side plate(4) It is plank or wood composite board.
9. the concreting mould as described in claim 1 or 7, it is characterised in that:The supporting plate(1)With the side plate(4) Inwall be shiny surface.
10. concreting mould as claimed in claim 1, it is characterised in that:The contiguous block(5)With the fixing lug boss (6)Quantity be 2 or more than 2, the fixing lug boss(6)Outer end be arc-shaped.
CN201611138176.9A 2016-12-12 2016-12-12 A kind of build concrete column pours mould Pending CN106760504A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611138176.9A CN106760504A (en) 2016-12-12 2016-12-12 A kind of build concrete column pours mould

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611138176.9A CN106760504A (en) 2016-12-12 2016-12-12 A kind of build concrete column pours mould

Publications (1)

Publication Number Publication Date
CN106760504A true CN106760504A (en) 2017-05-31

Family

ID=58875457

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611138176.9A Pending CN106760504A (en) 2016-12-12 2016-12-12 A kind of build concrete column pours mould

Country Status (1)

Country Link
CN (1) CN106760504A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107971463A (en) * 2017-11-17 2018-05-01 重庆大安渝南重型钢结构工程有限公司 A kind of easy-to-dismount steel construction pours mould
CN108518060A (en) * 2018-04-25 2018-09-11 合肥上城信息技术有限公司 One kind being used for concrete post cast erecting device and its application method
CN111927090A (en) * 2020-08-10 2020-11-13 湖南省第六工程有限公司 Steel pipe support construction structure of beam type conversion layer of high-rise building and construction method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100516109B1 (en) * 2005-01-31 2005-09-21 주식회사 종합건축사사무소 남양 Sheeting frame of pier for building
WO2008098372A1 (en) * 2007-02-15 2008-08-21 Abzac Canada Inc. Retaining device for assembling two panels, recyclable formwork for forming a concrete structure and packaging assembly using the same
CN203080908U (en) * 2013-02-01 2013-07-24 成都缘丰科技材料有限公司 Building template assembly structure
CN204370802U (en) * 2014-12-17 2015-06-03 邱垂亮 Building clear water model of the column rack system
CN204386159U (en) * 2015-01-07 2015-06-10 中铁建设投资集团有限公司 A kind of gang form for pillar construction
CN204546729U (en) * 2015-04-30 2015-08-12 中国石油大学(华东) A kind of high pressure artificial core being easy to dismantle prepares mould

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100516109B1 (en) * 2005-01-31 2005-09-21 주식회사 종합건축사사무소 남양 Sheeting frame of pier for building
WO2008098372A1 (en) * 2007-02-15 2008-08-21 Abzac Canada Inc. Retaining device for assembling two panels, recyclable formwork for forming a concrete structure and packaging assembly using the same
CN203080908U (en) * 2013-02-01 2013-07-24 成都缘丰科技材料有限公司 Building template assembly structure
CN204370802U (en) * 2014-12-17 2015-06-03 邱垂亮 Building clear water model of the column rack system
CN204386159U (en) * 2015-01-07 2015-06-10 中铁建设投资集团有限公司 A kind of gang form for pillar construction
CN204546729U (en) * 2015-04-30 2015-08-12 中国石油大学(华东) A kind of high pressure artificial core being easy to dismantle prepares mould

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107971463A (en) * 2017-11-17 2018-05-01 重庆大安渝南重型钢结构工程有限公司 A kind of easy-to-dismount steel construction pours mould
CN108518060A (en) * 2018-04-25 2018-09-11 合肥上城信息技术有限公司 One kind being used for concrete post cast erecting device and its application method
CN108518060B (en) * 2018-04-25 2020-12-04 临沂文衡信息技术有限公司 Formwork supporting device for concrete column pouring and using method thereof
CN111927090A (en) * 2020-08-10 2020-11-13 湖南省第六工程有限公司 Steel pipe support construction structure of beam type conversion layer of high-rise building and construction method thereof
CN111927090B (en) * 2020-08-10 2021-10-22 湖南省第六工程有限公司 Steel pipe support construction structure of beam type conversion layer of high-rise building and construction method thereof

Similar Documents

Publication Publication Date Title
CN203712840U (en) Small box girder concrete pouring mold
CN106760504A (en) A kind of build concrete column pours mould
CN208072950U (en) A kind of combination set shaped steel formwork
CN105952154B (en) A kind of concrete-pouring template stent
CN204298742U (en) For the supporting and protection structure of Bridge High-pier construction
CN209482709U (en) A kind of in-situ concrete wall subsiding crack typified form
CN104612291B (en) Non-dismantling heat preservation wall module unit
CN105155838B (en) A kind of quick detachable high-strength building formwork
CN206681359U (en) One kind cheats new formwork system in hole
CN101089329B (en) Assemblied polyvinyl chloride building engineering shuttering
CN104775613B (en) External corner reinforcing system for concrete pouring in building construction
CN205976472U (en) Pour mould of building post -cast strip
CN201687199U (en) Corridor gutter formed molding board
CN206220132U (en) A kind of base plate and exterior wall junction construction typified form support
CN209429128U (en) A kind of concrete pouring structure
CN207812999U (en) Digital alloy steel framework plastic formwork
CN207920070U (en) It can prevent the hoistway formwork system of the swollen mould of inner corner trim
CN205875724U (en) Concrete placement formwork support
CN205777582U (en) Concrete pier bed-jig for assembling large steel structure
CN217760026U (en) Cast-in-place concrete slab type stair sliding support
CN207660276U (en) A kind of construction formwork for placing
CN104790658B (en) Internal corner reinforcing system for concrete pouring in building construction
CN205063328U (en) Quick detachable high strength building templates
CN201406838Y (en) Clamp for fixing side form on beam bottom
CN108360716A (en) Assembled level splices frivolous template and its construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170531