CN209429128U - A kind of concrete pouring structure - Google Patents

A kind of concrete pouring structure Download PDF

Info

Publication number
CN209429128U
CN209429128U CN201821980737.4U CN201821980737U CN209429128U CN 209429128 U CN209429128 U CN 209429128U CN 201821980737 U CN201821980737 U CN 201821980737U CN 209429128 U CN209429128 U CN 209429128U
Authority
CN
China
Prior art keywords
scaffold
chute
concrete pouring
pouring structure
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821980737.4U
Other languages
Chinese (zh)
Inventor
张治博
蔡昭辉
张安
占进军
李夫强
户志鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China State Construction Engineering Corp Ltd CSCEC
China Construction Sixth Engineering Division Co Ltd
CSCEC City Construction Development Co Ltd
Original Assignee
China State Construction Engineering Corp Ltd CSCEC
China Construction Sixth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China State Construction Engineering Corp Ltd CSCEC, China Construction Sixth Engineering Division Co Ltd filed Critical China State Construction Engineering Corp Ltd CSCEC
Priority to CN201821980737.4U priority Critical patent/CN209429128U/en
Application granted granted Critical
Publication of CN209429128U publication Critical patent/CN209429128U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model discloses a kind of concrete pouring structure.Concrete pouring structure is used for bottom raft plate casting concrete, it includes support component, chute and scaffold board, support component includes scaffold, diagonal brace and bridging, scaffold is fixed on the raft plate of bottom, the two opposite sides of scaffold are respectively equipped with diagonal brace, and one end of diagonal brace is fixed on the raft plate of bottom, the other end is fixed on scaffold, and bridging is fixed on scaffold;Chute is fixed on scaffold, and chute is horizontal by 30 °~60 ° of angle;Scaffold board is fixedly arranged on the two sides of the chute.Compared with the relevant technologies, the entity quality and presentation quality of concreting is not only can be improved in concrete pouring structure provided by the utility model, but also reduces concreting and change plumber's sequence, is reduced labor intensity, has been saved and poured the time.Meanwhile the Technology of Mass Concrete for Base Plate of narrow space is poured, it not will cause tank car congestion, convenient for pouring the management and construction at scene.

Description

A kind of concrete pouring structure
Technical field
The utility model relates to the realm of building construction, and in particular to a kind of concrete pouring structure.
Background technique
Currently, the bottom raft plate of the super high-rise building in China is more and more thicker, held in face of road transport, construction site basis In the restricted situation such as loading capability, difficulty of construction is increasing.Instantly, sole plate pour mass concrete the most commonly used is Ground pump or automotive pump pour mode, and this mode that pours belongs to pump concrete, higher for the performance requirement of concrete, Otherwise easily there is plugging, influence going on smoothly for concreting.And whether the methods of concreting use correctly, The speed for pouring rate directly affects concrete impression quality and entity quality.
In view of the above circumstances, present building engineering construction progress and construction quality require higher and higher, and construction site It is narrow more and more narrower, side that Massive Concrete Foundation Slab pour higher to the presentation quality and entity quality requirement of concrete The progress and quality requirement that method needs to take new process to meet architectural engineering.
Utility model content
The purpose of this utility model is to provide a kind of concrete pouring structure, which can not only be mentioned The entity quality and presentation quality that high concrete pours, and reduce concreting and change plumber's sequence, labor intensity is reduced, It has saved and has poured the time.Meanwhile the Technology of Mass Concrete for Base Plate of narrow space is poured, it not will cause tank car congestion, convenient for pouring The management and construction at scene.
The technical solution of the utility model is as follows,
A kind of concrete pouring structure is used for bottom raft plate casting concrete, comprising:
Support component, including scaffold, diagonal brace and bridging, the scaffold is fixed on the bottom raft plate, described The two opposite sides of scaffold are respectively equipped with the diagonal brace, and one end of the diagonal brace is fixed on the bottom raft plate, the other end It is fixed on the scaffold, the bridging is fixed on the scaffold;
Chute is fixed on the scaffold, and the chute is horizontal by 30 °~60 ° of angle;
Scaffold board is fixedly arranged on the two sides of the chute.
Preferably, the concrete pouring structure further includes the chute branch being connected to the chute, the chute branch Perpendicular to the chute and positioned at the lower section of the chute.
Preferably, the angle of the chute and horizontal plane is 45 °.
Preferably, the scaffold board is China fir scaffold board or pine scaffold board.
Preferably, the quality of the scaffold board is not more than 0.35kN/m2, thickness be not less than 50mm, width be 200mm~ 250mm, and the width of the scaffold board is not less than the height of the lateral wall of the chute.
Preferably, the zinc-coated wire hoop that twice diameter is not less than 4mm is respectively set in the both ends of the scaffold board.
Preferably, the scaffold and the diagonal brace are steel pipe.
Preferably, the scaffold and the diagonal brace are detachably connected with the bottom raft plate respectively.
Preferably, the scaffold and the diagonal brace pass through fastener respectively and are detachably connected with the bottom raft plate.
Preferably, the bolt of the fastener tightens torsional moment not less than 65Nm.
The utility model embodiment provides a kind of concrete pouring structure, is poured and is replaced by using concrete pouring structure It is poured for part pump concrete, molding temperature and the heat of hydration is not only reduced in casting process, improve raft board concrete The entity quality and presentation quality poured, and reduce concreting and change plumber's sequence, labor intensity is reduced, has saved and has poured Build the time.Meanwhile chute system is economic and practical, execute-in-place is simple and convenient, and worker is easy to receive, and for the bottom of narrow space Plate prevention of mass concrete pours, and not will cause tank car congestion, convenient for pouring the management and construction at scene.
Detailed description of the invention
Fig. 1 is the side view of concrete pouring structure provided by the utility model;
Fig. 2 is the front view of concrete pouring structure provided by the utility model.
Specific embodiment
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below in conjunction with this reality With the attached drawing in new embodiment, the technical scheme in the utility model embodiment is clearly and completely described, it is clear that The described embodiments are only a part of the embodiments of the utility model, instead of all the embodiments.Based on the utility model In embodiment, those of ordinary skill in the art's every other implementation obtained without making creative work Example, fall within the protection scope of the utility model.
Fig. 1 and Fig. 2 are please referred to, concrete pouring structure 100 is used for 200 casting concrete of bottom raft plate.
The bottom raft plate 200 includes plate top reinforcing bar 201 and reinforcement 203.
The concrete pouring structure 100 includes support component 1, chute 3 and scaffold board 5, and the support component 1 is fixedly arranged on On the bottom raft plate 200, the chute 3 is fixed in the support component 1, and the chute 3 horizontal by 30 °~ 60 ° of angle, the scaffold board 5 are fixedly arranged on the two sides of the chute 3.
The support component 1 includes scaffold 11, diagonal brace 13 and bridging 15, and the scaffold 11 is fixed on the bottom On raft plate 200, the two opposite sides of the scaffold 11 are respectively equipped with the diagonal brace 13, and one end of the diagonal brace 13 is fixed on institute It states on bottom raft plate 200, the other end is fixed on the scaffold 11, and the bridging 15 is fixed on the scaffold 11. Wherein, the chute 3 is fixed on the scaffold 11, and the diagonal brace 13 and the bridging 15 are for increasing the scaffold 11 stability.
In use, concrete is poured into the chute 3, under the action of gravitional force, concrete is suitable along the chute 3 Benefit slides, and falls after the completion of ash point pours at one and adjust 3 direction of chute in time, carries out next place and pours.It needs to illustrate , before pouring, the chute 3 can be moistened with mortar, in order to be not in stifled slot phenomenon when concreting;It pours When, in 3 two sides of chute, arrangement personnel are responsible for the maintenance of chute 3 need to clear up in time if concrete splashes out, so as not to it is mixed Solidifying soil condensation is difficult to clean off.
In the present embodiment, the concrete pouring structure 100 further includes the chute branch 7 being connected to the chute 3, institute Chute branch 7 is stated perpendicular to the chute 3 and is located at the lower section of the chute 3.It can solve the chute 3 in this way and poured model Enclose smaller, the chute 3 is difficult to mobile drawback, increases concreting efficiency.
In this embodiment, it is preferred that the angle of the chute 3 and horizontal plane is 45 °.
In the present embodiment, the scaffold board 5 selects China fir scaffold board or pine scaffold board.Its material should meet existing state The regulation of II grades of materials in family standard " Code for design of timber structures " (GB50005), and it is rotten, cleave, have active section, inclined rib and change The serious scaffold board of shape must not use.
Wherein, the quality of the scaffold board 5 is not more than 0.35kN/m2, thickness be not less than 50mm, width be 200mm~ 250mm, for example, the scaffold board for being 3m~4m for length, self weight is no more than 30kg;The width of the scaffold board 5 is not Less than the height of the lateral wall of the chute 3.The width for being typically chosen the chute 3 is 800mm, and lateral wall height is 200mm.
In the present embodiment, the zinc-coated wire hoop that twice diameter is not less than 4mm is respectively set in the both ends of the scaffold board 3.
In the present embodiment, the scaffold 11 and the diagonal brace 13 are steel pipe.Steel pipe can select 48.3*3.6 to advise The steel pipe of lattice, and it is forbidden to use obvious deformation, crackle and the steel pipe seriously corroded, and forbid aperture on steel pipe.
In the present embodiment, the scaffold 11 and the diagonal brace 13 are detachably connected with the bottom raft plate 200 respectively. Still optionally further, the scaffold 11 and the diagonal brace 13 respectively can by fastener (not shown) and the bottom raft plate 200 Dismantling connection.
Wherein, the bolt of the fastener tightens torsional moment not less than 65Nm.Specifically, the fastener can be selected malleable Cast iron fastener or cast steel fastener, for example, the fastener can select steel pipe hoop etc..
Concrete pouring structure provided by the utility model pours substitution part by using concrete pouring structure and pumps Concreting not only reduces molding temperature and the heat of hydration in casting process, improves the entity that raft board concrete pours Quality and presentation quality, and reduce concreting and change plumber's sequence, labor intensity is reduced, has saved and has poured the time.Together When, chute system is economic and practical, and execute-in-place is simple and convenient, and worker is easy to receive, and for the bottom plate large volume of narrow space Concrete placings not will cause tank car congestion, convenient for pouring the management and construction at scene.
Above description is only a specific implementation of the present invention, but the protection scope of the utility model is not limited to In this, anyone skilled in the art within the technical scope disclosed by the utility model, the change that can be readily occurred in Change or replace, should be covered within the scope of the utility model.Therefore, the protection scope of the utility model should be with described Subject to scope of protection of the claims.

Claims (10)

1. a kind of concrete pouring structure is used for bottom raft plate casting concrete characterized by comprising
Support component, including scaffold, diagonal brace and bridging, the scaffold are fixed on the bottom raft plate, the foot hand The two opposite sides of frame are respectively equipped with the diagonal brace, and one end of the diagonal brace is fixed on the bottom raft plate, and the other end is fixed On the scaffold, the bridging is fixed on the scaffold;
Chute is fixed on the scaffold, and the chute is horizontal by 30 °~60 ° of angle;
Scaffold board is fixedly arranged on the two sides of the chute.
2. concrete pouring structure according to claim 1, which is characterized in that the concrete pouring structure further include with The chute branch of the chute connection, the chute branch is perpendicular to the chute and positioned at the lower section of the chute.
3. concrete pouring structure according to claim 1, which is characterized in that the angle of the chute and horizontal plane is 45°。
4. concrete pouring structure according to claim 1, which is characterized in that the scaffold board is China fir scaffold board or pine The wooden scaffold board.
5. concrete pouring structure according to claim 4, which is characterized in that the quality of the scaffold board is not more than 0.35kN/m2, thickness is not less than 50mm, and width is 200mm~250mm, and the width of the scaffold board is not less than the chute Lateral wall height.
6. concrete pouring structure according to claim 5, which is characterized in that the both ends of the scaffold board are respectively set two Road diameter is not less than the zinc-coated wire hoop of 4mm.
7. concrete pouring structure according to claim 1, which is characterized in that the scaffold and the diagonal brace are steel Pipe.
8. concrete pouring structure according to claim 1, which is characterized in that the scaffold and the diagonal brace respectively with The bottom raft plate is detachably connected.
9. concrete pouring structure according to claim 8, which is characterized in that the scaffold and the diagonal brace lead to respectively Fastener is crossed to be detachably connected with the bottom raft plate.
10. concrete pouring structure according to claim 9, which is characterized in that the bolt of the fastener tightens torsional moment Not less than 65Nm.
CN201821980737.4U 2018-11-29 2018-11-29 A kind of concrete pouring structure Active CN209429128U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821980737.4U CN209429128U (en) 2018-11-29 2018-11-29 A kind of concrete pouring structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821980737.4U CN209429128U (en) 2018-11-29 2018-11-29 A kind of concrete pouring structure

Publications (1)

Publication Number Publication Date
CN209429128U true CN209429128U (en) 2019-09-24

Family

ID=67969826

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821980737.4U Active CN209429128U (en) 2018-11-29 2018-11-29 A kind of concrete pouring structure

Country Status (1)

Country Link
CN (1) CN209429128U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112832245A (en) * 2021-01-18 2021-05-25 中国建筑第二工程局有限公司 Small-angle overlong chute pouring raft foundation large-volume concrete construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112832245A (en) * 2021-01-18 2021-05-25 中国建筑第二工程局有限公司 Small-angle overlong chute pouring raft foundation large-volume concrete construction method

Similar Documents

Publication Publication Date Title
CN201661009U (en) Concrete-filled square steel tubular column
CN206428968U (en) A kind of steel bar girder formula is without supporting template system
CN105952154B (en) A kind of concrete-pouring template stent
CN104060760B (en) High Rise Building Transfer Floor Structure concrete super large beam construction in layer method
CN206438529U (en) Beam and slab type raft foundation formwork support structure
CN209429128U (en) A kind of concrete pouring structure
CN209482709U (en) A kind of in-situ concrete wall subsiding crack typified form
CN109577492B (en) Connecting structure for section steel part wrapped concrete column and reinforced concrete beam node
CN105064502B (en) Using the regeneration concrete bean column node and construction method of cross-shaped profile steel plate weld edge of a wing stiffener
CN113846746A (en) Basement structure beneficial to efficient construction and construction method
CN107965139A (en) The plate face drop readily removable combined type of plate difference of height hangs die body system and construction method
CN105804396B (en) A kind of non-type, template system precast stair bench and construction can be had enough to meet the need
CN215977664U (en) Basement structure beneficial to efficient construction
CN211286650U (en) Foot-supported split heads for suspending high and large wall formworks
CN104948004B (en) A kind of site safety manages revolving enclosure wall
CN205530324U (en) Miniature stake of thin -walled cold -formed steel
CN211850773U (en) Outer wall scaffold even wall spare
CN207672849U (en) A kind of sand aerated concrete plank of built-in line box line pipe
CN207392752U (en) For preventing the constructing device of grout leakage of formwork root
CN208148158U (en) It is a kind of live with strength mortar preparation facilities
CN207700688U (en) A kind of linking beam formwork structure
CN207538506U (en) The independent supporting rack of efficient construction of precast floorslab
CN105019656A (en) Construction method for floor system concrete post-cast strip suspended formwork
CN206359993U (en) Stud structure for main transformer fire wall
CN205444891U (en) Building carrier plate cast in situ concrete truss support system