CN106759522A - A kind of the ground-connecting-wall G type joints and method of pre-buried repeatable Grouting Pipe - Google Patents

A kind of the ground-connecting-wall G type joints and method of pre-buried repeatable Grouting Pipe Download PDF

Info

Publication number
CN106759522A
CN106759522A CN201710064634.7A CN201710064634A CN106759522A CN 106759522 A CN106759522 A CN 106759522A CN 201710064634 A CN201710064634 A CN 201710064634A CN 106759522 A CN106759522 A CN 106759522A
Authority
CN
China
Prior art keywords
steel plate
groove
wall
grouting pipe
ground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710064634.7A
Other languages
Chinese (zh)
Inventor
郭晓刚
郑立平
董志超
朱敏
陈飞
陈容文
向功兴
罗伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changjiang Institute of Survey Planning Design and Research Co Ltd
Original Assignee
Changjiang Institute of Survey Planning Design and Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changjiang Institute of Survey Planning Design and Research Co Ltd filed Critical Changjiang Institute of Survey Planning Design and Research Co Ltd
Priority to CN201710064634.7A priority Critical patent/CN106759522A/en
Publication of CN106759522A publication Critical patent/CN106759522A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/16Arrangement or construction of joints in foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/18Bulkheads or similar walls made solely of concrete in situ
    • E02D5/182Bulkheads or similar walls made solely of concrete in situ using formworks to separate sections
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0007Production methods using a mold
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0026Metals
    • E02D2300/0029Steel; Iron

Abstract

The invention discloses a kind of the ground-connecting-wall G type joints and method of pre-buried repeatable Grouting Pipe, it is characterised in that:It includes the cross steel plate of a phase groove (1) and the second stage of U-shaped steel plate of groove (2), and it is interior and between connecting wall positioned at two adjacent concrete that the described cross steel plate of a phase groove (1) and the second phase U-shaped steel plate of groove (2) is pre-installed in steel reinforcement cage (3);It is provided with concrete between the described cross steel plate of a phase groove (1) and the second stage of U-shaped steel plate of groove (2) and is provided with sealing steel plate (6);Changeover portion between described flange plate (2.1) and described U-shaped steel plate (2.2) is provided with Grouting Pipe (7);It is overcome in the prior art using the shortcoming that ground-connecting-wall seam percolating water is serious, and good with water-stagnating effect, engineering cost is few, and construction quality is easy to check and judges, the simple advantage of construction technology.

Description

A kind of the ground-connecting-wall G type joints and method of pre-buried repeatable Grouting Pipe
Technical field
It is more specifically a kind of pre-buried repeatable note the present invention relates to subway engineering, construction engineering technical field Starch the ground-connecting-wall G type joints and method of pipe.
Background technology
With underground engineering fast development, design and construction ultra-deep foundation pit turns under various complicated geologicals with environmental condition New normality.The outstanding feature that diaphram wall is big with its rigidity, good water-proof effect, construction technology are ripe, difficulty of construction is small, gradually First-selected structural shape as Extra-Deep Foundation Pit scheme under complex geological condition.
What Deep Foundation Pit of Metro Stations ground-connecting-wall joint seal was more common at present is I-shaped steel joint, and minority uses cross steel plate Joint geometry.
When excavating ultra-deep foundation pit process in pressure-bearing aquifer water-bearing stratum high, often there is ground-connecting-wall seam Sand dangerous situation, Strong influence is produced to engineering construction and surrounding enviroment, often economic loss and social influence are huge.Such as, in the Wuhan mayor River I grades of terrace regional Construction F3/B3 subway station (foundation depth is generally 24~30m), due to ground-connecting-wall seam construction matter Amount is poor, and leak leakage sand easily occurs under high artesian head, and dangerous situation is happened occasionally, and the considerable safety as puzzlement subway construction is asked Topic.
In order to strengthen ground-connecting-wall joint seal effect, typically take and increase at ground-connecting-wall outer side seam high-pressure rotary jet grouting pile to stop Water, or continuous water-stop curtain (such as three axes agitating pile, plain ground-connecting-wall) is set, considerably increase construction investment.But due to working as The limitation of preceding construction technology and construction level, the following high-pressure rotary jet grouting piles of ground 20m or three axes agitating pile construction quality are difficult to protect Barrier, can not well solve ground-connecting-wall seam leakage problem, though anti-seepage effect is preferable when using plain ground-connecting-wall, engineering Investment cost is high.
The content of the invention
Weak point it is an object of the invention to overcome above-mentioned background technology, and propose a kind of pre-buried repeatable Grouting Pipe Ground-connecting-wall G type joints and method.
The first object of the present invention technical scheme is implemented by following measure:A kind of ground of pre-buried repeatable Grouting Pipe connects Wall G type joints, it includes a cross steel plate of phase groove and the U-shaped steel plate of the second stage of groove, a described cross steel plate of phase groove and second phase Between the U-shaped steel plate of groove is pre-installed in steel reinforcement cage and connects wall positioned at two adjacent concrete;In a described phase groove ten Excavation side seal steel plate between font steel plate and the U-shaped steel plate of the second stage of groove;Described the second stage of groove U steel plates are located at a described phase groove The side of cross steel plate, a described cross steel plate of phase groove includes horizontal steel plate and vertical steel plate, and described the second stage of groove is U-shaped Steel plate includes the flange plate and U-shaped steel plate at two ends, and the changeover portion between described flange plate and described U-shaped steel plate is provided with Grouting Pipe;One end of described horizontal steel plate is extend into the notch of described U-shaped steel plate, in described horizontal steel plate and U-shaped Equidistantly concrete pod apertures are provided with steel plate;It is provided with the inside and outside both sides of described steel reinforcement cage and only starches iron sheet.
In the above-mentioned technical solutions:The distance between described vertical steel plate and described flange plate are 10-15 centimetres.
In the above-mentioned technical solutions:The distance between described vertical steel plate and described flange plate are 15 centimetres.
In the above-mentioned technical solutions:Described vertical steel plate and flange plate stretch out steel reinforcement cage and meet each 5 centimetres of pitted surface.
In the above-mentioned technical solutions:The thickness of described only slurry iron sheet is 0.5 millimeter.
The invention allows for a kind of construction method:A kind of method of the ground-connecting-wall G type joints of pre-buried repeatable Grouting Pipe, Comprise the following steps;
1. situation, including segmentation packer permeability test or acoustic wave measurement over holes, are checked according to seam construction quality, is divided from bottom to top Section high-pressure slip-casting;
2., according to design drawing requirement banding steel cage, and a described phase groove cross is installed in described steel reinforcement cage Shape steel plate and the U-shaped steel plate of the second stage of groove;First pour the steel reinforcement cage of the cross steel plate side of a phase groove;
3., again in the U-shaped steel plate of the second stage of groove of construction to the residual sandbag and coagulation of a described phase groove cross steel plate side Soil caking is cleaned with water, is poured positioned at a described cross steel plate 1 of phase groove) the second stage of U-shaped steel plate of side, while ensureing groove Perpendicularity is not more than 1/300;
4., complete step 1. with step 2. after, the slip casting set in Grouting Pipe is drawn by hole is entered after ground-connecting-wall is formed Row grouting cleaning bottom of hole, high-pressure injected water mud is segmented every 5 meters;
5., from after the completion of step seam strengthening grouting 4., protection Grouting Pipe is covered with band screw socket.
In the above-mentioned technical solutions:When the seam for finding diaphragm wall has infiltration sign, by a phase groove of joint The concrete chisel removal of cross frid and the U-shaped surface of steel plate of the second stage of groove, in described seam crossing welded closure steel plate, and fills fast Dry cement or leak stopping king.
In the above-mentioned technical solutions:A described cross steel plate of phase groove includes horizontal steel plate and vertical steel plate;Described The second stage of U-shaped steel plate of groove includes the flange plate and U-shaped steel plate at two ends, the mistake between described flange plate and described U-shaped steel plate Cross section and Grouting Pipe is installed;Described horizontal steel plate is oppositely arranged with the notch of described U-shaped steel plate, in described horizontal steel plate Equidistantly concrete pod apertures are provided with U-shaped steel plate.
In the above-mentioned technical solutions:It is provided with inside and outside described steel reinforcement cage and only starches iron sheet.
In the above-mentioned technical solutions:The distance between described vertical steel plate and described flange plate are 10-15 centimetres.
The invention has the advantages that:1st, easy construction of the present invention, as long as by design requirement to a phase groove cross steel plate side Residual sand pocket and concrete caking are cleaned with water, preset space between U-shaped steel plate and a phase groove cross steel plate on the second stage of steel reinforcement cage There is rational permission to construction error, can be mutually twisted again, adapt to the deformation of ground-connecting-wall side direction horizontal.
2nd, the present invention is bigger than traditional cross steel plate joint stiffness, and water-stagnating effect more preferably, can be when excavating from foundation ditch side Welding steel quick closure seam percolating water, and ultra-deep can effectively be reduced by the reserved injected hole dynamic advanced reinforcement of slip casting Foundation pit construction risk.
3rd, the present invention moves in wall seam seam anti-leakage grouting reinforcing measure from wall seam is outer, and water-stagnating effect is good, engineering cost With less, construction quality is easy to check and judges, construction technology is simple, ripe, is not limited by subterranean depth, can solve well Ground-connecting-wall seam leakage problem.
4th, the present invention compared with prior art, can greatly reduce the construction ultra-deep foundation pit engineering in pressure-bearing aquifer water-bearing stratum high Risk, it is to avoid because speedily carry out rescue work and caused by a large amount of engineering costs and bad social influence, with significant economic benefit and society Benefit.
Brief description of the drawings
Fig. 1 is structure connection diagram of the invention.
Fig. 2 is a phase groove cross-shaped steel plate structure schematic diagram in the present invention.
Fig. 3 is the U-shaped steel plate structure schematic diagram of the second stage of groove in the present invention.
In figure:The cross steel plate 1 of one phase groove, horizontal steel plate 1.1, vertical steel plate 1.2, the U-shaped steel plate 2, flange plate of the second stage of groove 2.1st, U-shaped steel plate 2.2, only steel reinforcement cage 3, slurry iron sheet 4, concrete pod apertures 5, sealing steel plate 6, Grouting Pipe 7.
Specific embodiment
The performance that the invention will now be described in detail with reference to the accompanying drawings, but they do not constitute limitation of the invention, only It is for example, while will become clearer and be readily appreciated that by illustrating advantages of the present invention.
Shown in reference picture 1-3:A kind of ground-connecting-wall G type joints of pre-buried repeatable Grouting Pipe, it is characterised in that:It includes one The cross steel plate 1 of phase groove and the U-shaped steel plate 2 of the second stage of groove, the described cross steel plate 1 of a phase groove and the U-shaped steel plate 2 of the second stage of groove are advance Between connecting wall in the steel reinforcement cage 3 and positioned at two adjacent concrete;In the described cross steel plate 1 of a phase groove and second phase Excavation side between the U-shaped steel plate 2 of groove is provided with sealing steel plate 6;Described the second stage of groove U steel plates 2 are located at a described phase groove cross The side of shape steel plate 1, the described cross steel plate 1 of a phase groove includes horizontal steel plate 1.1 and vertical steel plate 1.2, described second phase The U-shaped steel plate 2 of groove includes the flange plate 2.1 and U-shaped steel plate 2.2 at two ends, in described flange plate 2.1 and described U-shaped steel plate 2.2 Between changeover portion Grouting Pipe 7 is installed;One end of described horizontal steel plate 1.1 extend into the notch of described U-shaped steel plate 2.2 It is interior,
Equidistantly hole 5 is provided with described horizontal steel plate 1.1 and U-shaped steel plate 2.2;In described steel reinforcement cage 3 Outer both sides are provided with only slurry iron sheet 4;The distance between described vertical steel plate 1.2 and described flange plate 2.1 are 10-15 lis Rice.Described vertical steel plate 1.2 and flange plate 2.1 stretches out steel reinforcement cage 3 and meets each 5 centimetres of pitted surface.The described thickness for only starching iron sheet 4 Spend is 0.5 millimeter.
A kind of method of the ground-connecting-wall G type joints of pre-buried repeatable Grouting Pipe of the invention, comprises the following steps;
1. situation, including segmentation packer permeability test or acoustic wave measurement over holes, are checked according to seam construction quality, is divided from bottom to top Section high-pressure slip-casting;
2., according to design drawing requirement banding steel cage 3, and a described phase groove ten is installed in described steel reinforcement cage 3 Font steel plate 1 and the U-shaped steel plate 2 of the second stage of groove;First pour the steel reinforcement cage 3 of the cross side of steel plate 1 of a phase groove;
3. residual sandbag, again in the U-shaped steel plate 2 of the second stage of groove of construction to the described side of a phase groove cross steel plate 1 and mixed Solidifying soil caking is cleaned with water, pours the second stage of U-shaped steel plate 2 positioned at the described cross side of steel plate 1 of a phase groove, while ensureing groove Perpendicularity be not more than 1/300;
4., complete step 1. with step 2. after, the slip casting set in Grouting Pipe 7 is drawn by hole is entered after ground-connecting-wall is formed Row grouting cleaning bottom of hole, high-pressure injected water mud is segmented every 5 meters;
5., from after the completion of step seam strengthening grouting 4., protection Grouting Pipe 7 is covered with band screw socket.
When the seam of discovery diaphragm wall has infiltration sign, the reason for seeping water is analyzed in time, and can be by reserved note Slurry hole carries out reinforcement slip casting in advance to the ground-connecting-wall seam below excavation face, prevents trouble before it happens.
By the cross frid 1 of a phase groove of joint and the concrete chisel removal on the second stage of U-shaped surface of steel plate 2 of groove, described Welded closure steel plate 6 in seam, and fill quick hardening cement or leak stopping king;Described sealing steel plate 6 is located at a phase groove cross-shaped steel The bottom surface in seam between plate 1 and the second stage of U-shaped steel plate 2 of groove arranges from upper bottom edge, the height and thickness of described sealing steel plate 6 Degree determines that the depth also according to the foundation ditch at scene is determined according to live seepage sand and head size.
The described cross steel plate 1 of a phase groove includes horizontal steel plate 1.1 and vertical steel plate 1.2, described horizontal steel plate 1.1 It is orthogonal with described vertical steel plate 1.2;
The U-shaped steel plate 2 of described the second stage of groove includes the flange plate 2.1 and U-shaped steel plate 2.2 at two ends, in described flange plate 2.1 Grouting Pipe 7 is installed with the changeover portion between described U-shaped steel plate 2.2;Described horizontal steel plate 1.1 and described U-shaped steel plate 2.2 notch is oppositely arranged, and equidistantly hole 5, described transverse direction are provided with described horizontal steel plate 1.1 and U-shaped steel plate 2.2 Steel plate 1.1 is made up of two pieces of small steel plate, and two blocks of described small steel plates are located at the both sides of described vertical steel plate 2.2 respectively;Often The concrete pod apertures 5 with formed objects on described U-shaped steel plate 2.2, described coagulation are equidistantly provided with individual small steel plate Native pod apertures 5 are easy to the flowing of the concrete mortar between the cross steel plate 1 of a phase groove and the U-shaped steel plate 2 of the second stage of groove.
Above-mentioned unspecified part is prior art.

Claims (10)

1. a kind of ground-connecting-wall G type joints of pre-buried repeatable Grouting Pipe, it is characterised in that:It includes a cross steel plate of phase groove (1) and the second stage of U-shaped steel plate of groove (2), the described cross steel plate of a phase groove (1) and the second phase U-shaped steel plate of groove (2) is pre-installed in Between connecting wall in steel reinforcement cage (3) and positioned at two adjacent concrete;In the described cross steel plate of a phase groove (1) and the second stage of groove Side is excavated between U-shaped steel plate (2) sealing steel plate (6);Described the second stage of groove U steel plates (2) are cross positioned at a described phase groove The side of steel plate (1), the described cross steel plate of a phase groove (1) includes horizontal steel plate (1.1) and vertical steel plate (1.2), described Flange plate (2.1) and U-shaped steel plate (2.2) of the U-shaped steel plate of the second stage of groove (2) including two ends, in described flange plate (2.1) and institute Changeover portion between the U-shaped steel plate (2.2) stated is provided with Grouting Pipe (7);One end of described horizontal steel plate (1.1) extend into institute In the notch of the U-shaped steel plate (2.2) stated, equidistantly it is provided with described horizontal steel plate (1.1) and U-shaped steel plate (2.2) mixed Solidifying soil pod apertures (5);Only slurry iron sheet (4) is provided with inside and outside described steel reinforcement cage (3).
2. ground-connecting-wall G type joints of a kind of pre-buried repeatable Grouting Pipe according to claim 1, it is characterised in that:It is described The distance between vertical steel plate (1.2) and described flange plate (2.1) be 10-15 centimetres.
3. ground-connecting-wall G type joints of a kind of pre-buried repeatable Grouting Pipe according to claim 1 and 2, it is characterised in that:Institute The distance between the vertical steel plate (1.2) stated and described flange plate (2.1) are 15 centimetres.
4. ground-connecting-wall G type joints of a kind of pre-buried repeatable Grouting Pipe according to claim 3, it is characterised in that:It is described Vertical steel plate (1.2) and flange plate (2.1) stretch out steel reinforcement cage (3) and meet each 5 centimetres of pitted surface.
5. ground-connecting-wall G type joints of a kind of pre-buried repeatable Grouting Pipe according to claim 4, it is characterised in that:It is described Only slurry iron sheet (4) thickness be 0.5 millimeter.
6. ground-connecting-wall G type joints of a kind of pre-buried repeatable Grouting Pipe according to any claim in claim 1-5 Method, it is characterised in that:Comprise the following steps;
1. situation, including segmentation packer permeability test or acoustic wave measurement over holes, are checked according to seam construction quality, is segmented from bottom to top high Pressure grouting;
2., according to design drawing requirement banding steel cage (3), and a described phase groove ten is installed in described steel reinforcement cage (3) Font steel plate (1) and the second stage of U-shaped steel plate of groove (2);First pour the steel reinforcement cage (3) of a phase groove cross steel plate (1) side;
3. residual sandbag, again at the second stage of groove U-shaped steel plate (2) of construction to described phase groove cross steel plate (1) side and mixed Solidifying soil caking is cleaned with water, is poured positioned at a described cross steel plate 1 of phase groove) the second stage of U-shaped steel plate (2) of side, while protecting The perpendicularity for demonstrate,proving groove is not more than 1/300;
4., complete step 1. with step 2. after, the slip casting set in Grouting Pipe (7) is drawn by hole is carried out after ground-connecting-wall is formed Grouting cleaning bottom of hole, high-pressure injected water mud is segmented every 5 meters;
5., from after the completion of step seam strengthening grouting 4., protection Grouting Pipe (7) is covered with band screw socket.
7. a kind of method of the ground-connecting-wall G type joints of pre-buried repeatable Grouting Pipe according to claim 6, its feature exists In:When the seam for finding diaphragm wall has infiltration sign, by the cross frid of a phase groove (1) of joint and the second stage of groove U The concrete chisel removal on shape steel plate (2) surface, in described seam crossing welded closure steel plate (6), and fills quick hardening cement or leak stopping King.
8. a kind of method of the ground-connecting-wall G type joints of pre-buried repeatable Grouting Pipe according to claim 7, its feature exists In:The described cross steel plate of a phase groove (1) includes horizontal steel plate (1.1) and vertical steel plate (1.2);Described the second stage of groove is U-shaped Flange plate (2.1) and U-shaped steel plate (2.2) of the steel plate (2) including two ends, in described flange plate (2.1) and described U-shaped steel plate (2.2) changeover portion between is provided with Grouting Pipe (7);The groove of described horizontal steel plate (1.1) and described U-shaped steel plate (2.2) Mouth is oppositely arranged, and equidistantly concrete pod apertures (5) are provided with described horizontal steel plate (1.1) and U-shaped steel plate (2.2).
9. a kind of method of the ground-connecting-wall G type joints of pre-buried repeatable Grouting Pipe according to claim 8, its feature exists In:Only slurry iron sheet (4) is provided with inside and outside described steel reinforcement cage (3).
10. a kind of method of the ground-connecting-wall G type joints of pre-buried repeatable Grouting Pipe according to claim 9, its feature exists In:The distance between described vertical steel plate (1.2) and described flange plate (2.1) are 10-15 centimetres.
CN201710064634.7A 2017-02-04 2017-02-04 A kind of the ground-connecting-wall G type joints and method of pre-buried repeatable Grouting Pipe Pending CN106759522A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710064634.7A CN106759522A (en) 2017-02-04 2017-02-04 A kind of the ground-connecting-wall G type joints and method of pre-buried repeatable Grouting Pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710064634.7A CN106759522A (en) 2017-02-04 2017-02-04 A kind of the ground-connecting-wall G type joints and method of pre-buried repeatable Grouting Pipe

Publications (1)

Publication Number Publication Date
CN106759522A true CN106759522A (en) 2017-05-31

Family

ID=58955117

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710064634.7A Pending CN106759522A (en) 2017-02-04 2017-02-04 A kind of the ground-connecting-wall G type joints and method of pre-buried repeatable Grouting Pipe

Country Status (1)

Country Link
CN (1) CN106759522A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11384501B2 (en) * 2020-05-06 2022-07-12 Qingdao Tianyuan Weiye Thermal Insulation And Waterproof Engineering Co., Ltd. Method for sealing post-cast strip in foundation with no gap
CN115217092A (en) * 2022-07-25 2022-10-21 上海市基础工程集团有限公司 Reinforcement cage structure for treating leakage of joint or wall body and construction method

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB9304531D0 (en) * 1992-03-06 1993-04-21 Finic Bv Process for forming water-tight joint
CN201187056Y (en) * 2008-04-25 2009-01-28 中船第九设计研究院工程有限公司 Cross plate joint for rigid connection of underground continuous wall
CN101608447A (en) * 2009-07-10 2009-12-23 上海隧道工程股份有限公司 A kind of cross steel plate water-stopping joint continuous concrete wall and joint construction method thereof
CN202131618U (en) * 2011-06-13 2012-02-01 华南理工大学 Seepage-prevention joint device for underground diaphragm wall
CN204456225U (en) * 2015-02-09 2015-07-08 中铁十八局集团有限公司 A kind of T-shaped welds immersed tube tunnel underground continuous wall connector entirely
CN104878741A (en) * 2015-05-12 2015-09-02 安徽省建筑科学研究设计院 Post-grouting waterproof structure for wall joint of underground diaphragm wall and waterproof method thereof
CN204690731U (en) * 2015-05-12 2015-10-07 安徽省建筑科学研究设计院 A kind of ground-connecting-wall width wall seam post jacking waterproof construction
CN205444167U (en) * 2015-12-24 2016-08-10 上海远方基础工程有限公司 Underground continuous wall
CN206512759U (en) * 2017-02-04 2017-09-22 长江勘测规划设计研究有限责任公司 A kind of ground-connecting-wall G type joints of pre-buried repeatable Grouting Pipe

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB9304531D0 (en) * 1992-03-06 1993-04-21 Finic Bv Process for forming water-tight joint
CN201187056Y (en) * 2008-04-25 2009-01-28 中船第九设计研究院工程有限公司 Cross plate joint for rigid connection of underground continuous wall
CN101608447A (en) * 2009-07-10 2009-12-23 上海隧道工程股份有限公司 A kind of cross steel plate water-stopping joint continuous concrete wall and joint construction method thereof
CN202131618U (en) * 2011-06-13 2012-02-01 华南理工大学 Seepage-prevention joint device for underground diaphragm wall
CN204456225U (en) * 2015-02-09 2015-07-08 中铁十八局集团有限公司 A kind of T-shaped welds immersed tube tunnel underground continuous wall connector entirely
CN104878741A (en) * 2015-05-12 2015-09-02 安徽省建筑科学研究设计院 Post-grouting waterproof structure for wall joint of underground diaphragm wall and waterproof method thereof
CN204690731U (en) * 2015-05-12 2015-10-07 安徽省建筑科学研究设计院 A kind of ground-connecting-wall width wall seam post jacking waterproof construction
CN205444167U (en) * 2015-12-24 2016-08-10 上海远方基础工程有限公司 Underground continuous wall
CN206512759U (en) * 2017-02-04 2017-09-22 长江勘测规划设计研究有限责任公司 A kind of ground-connecting-wall G type joints of pre-buried repeatable Grouting Pipe

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11384501B2 (en) * 2020-05-06 2022-07-12 Qingdao Tianyuan Weiye Thermal Insulation And Waterproof Engineering Co., Ltd. Method for sealing post-cast strip in foundation with no gap
CN115217092A (en) * 2022-07-25 2022-10-21 上海市基础工程集团有限公司 Reinforcement cage structure for treating leakage of joint or wall body and construction method

Similar Documents

Publication Publication Date Title
CN101429764B (en) Infiltration water detection and plugging renovation devices and methods for underground continuous wall groove segment seam
US8974152B2 (en) Polymer grouting method for constructing vertical supporting system
CN107268636A (en) The diaphragm wall foundation ditch that the steel cylinder or steel sheet pile of a kind of seal groove and occlusion structure are constituted is with going along with sb. to guard him and construction method
CN102061710B (en) Diaphragm wall joint and manufacturing method of diaphragm wall
CN105002913A (en) Strongly-permeable stratum deep foundation pit bottom sealing water stopping structure and construction method thereof
CN102286985A (en) Method for constructing dual high-pressure jet grouting pile waterproof curtain
CN104631475A (en) Safe and fast construction method of down-traversing river shallow depth bored tunnel
CN110258658A (en) The leakage anticipation of diaphram wall and the construction method of processing
CN103114599A (en) Deep foundation pit sealed precipitation device and construction method thereof
CN103114609A (en) Connection device of new and old underground diaphragm walls and construction method
CN113090068B (en) Vacuum pouring process for rush-repairing deep-buried building top concrete structure under limited conditions
CN104895118A (en) Underground diaphragm wall internal corner position piping plug structure and grouting processing method thereof
CN201424658Y (en) Water leakage detection of underground continuous wall groove seams and block repair device
CN206512759U (en) A kind of ground-connecting-wall G type joints of pre-buried repeatable Grouting Pipe
CN106759522A (en) A kind of the ground-connecting-wall G type joints and method of pre-buried repeatable Grouting Pipe
CN110241837A (en) A kind of construction method for preventing basement bottom board from cracking under high artesian geological conditions
CN203939036U (en) A kind of steel sheet pile cofferdam structure that is applicable to river course
CN113373962A (en) Combined leaking stoppage construction method for deep foundation pit
CN101886384A (en) Vacuum and dynamic compaction synchronization method
CN107268603A (en) The karst cave treatment structure and processing method of a kind of diaphram wall
CN104532867B (en) Multiple chamber steel-pipe pile continuous wall water-stop effect detection method
CN204456228U (en) A kind of diaphragm wall fast plugging device
CN204370461U (en) Multiple chamber steel pipe pile diaphragm wall
CN112627212B (en) Water-faced cofferdam inner tube well dewatering dry excavation construction method
CN106013198B (en) Foundation pit enclosure structure gap pre-processes construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170531

RJ01 Rejection of invention patent application after publication