CN204456225U - A kind of T-shaped welds immersed tube tunnel underground continuous wall connector entirely - Google Patents
A kind of T-shaped welds immersed tube tunnel underground continuous wall connector entirely Download PDFInfo
- Publication number
- CN204456225U CN204456225U CN201520090187.9U CN201520090187U CN204456225U CN 204456225 U CN204456225 U CN 204456225U CN 201520090187 U CN201520090187 U CN 201520090187U CN 204456225 U CN204456225 U CN 204456225U
- Authority
- CN
- China
- Prior art keywords
- steel plate
- fixation
- diaphragm wall
- plate
- cornerite
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 103
- 239000010959 steel Substances 0.000 claims abstract description 103
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 24
- 210000003205 muscle Anatomy 0.000 claims abstract description 5
- 238000003466 welding Methods 0.000 claims description 9
- 238000005452 bending Methods 0.000 claims description 3
- 238000010276 construction Methods 0.000 description 10
- 239000002002 slurry Substances 0.000 description 8
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 239000004576 sand Substances 0.000 description 2
- 230000004888 barrier function Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 210000002421 cell wall Anatomy 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 230000015271 coagulation Effects 0.000 description 1
- 238000005345 coagulation Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000009826 distribution Methods 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000003032 molecular docking Methods 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
Landscapes
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
A kind of T-shaped welds immersed tube tunnel underground continuous wall connector entirely, the cross steel plate joint that steel plate a and steel plate b is welded into, the main muscle of diaphragm wall and diaphragm wall level frame stud place are provided with a cornerite reinforcing bar respectively, two cornerite reinforcing bars are two concave character type reinforcing bars be arranged in juxtaposition, steel plate a is arranged in the crack of two cornerite reinforcing bars, fixation steel plate is parallel with the outline of diaphragm wall, and fixation steel plate vertically inserts in steel plate b and 1/3rd places of fixation steel plate and welds with one end of steel plate b; One end and the fixation steel plate of described choked flow bent plate are fixed, and the foundation trench Tu Bi side of choked flow bent plate remainder and diaphragm wall is closely connected, and described choked flow bent plate surrounds filling concrete region, joint just; Stop that steel plate is perpendicular to fixation steel plate and one side of closely connected steel plate b, stop that steel plate and fixation steel plate are by being welded to connect, the closely connected place of stop steel plate and steel plate b3 is also fixing by being welded to connect.
Description
Technical field
The utility model relates to immersed tube tunnel underground continuous wall connector, belongs to ultra-deep underground continuous wall technical field of construction.
Background technology
The advantages such as in recent years, China's engineering construction develops rapidly, and ultra-deep underground continuous wall is large with its wall stiffness, barrier performance is good, become the preferred version of Design of Supporting Engineering of Deep Foundations.Diaphragm wall utilizes various grooving machinery exactly, by mud off, digs out narrow and dark groove in underground, and inside concreting and being formed has the continuous print underground wall body of antiseepage, gear soil and weight-bearing function together.Underground continuous wall connector is divided into soft joint and rigid joint, for rigid joint usually adopt cross steel plate and H profile steel joint in the majority.But in construction of diaphragm wall in the past, the streaming of joint concrete slurry become one commonplace, and unmanageable problem.As coagulation slurries stream from joint location, easily the grooving quality of the next groove section of impact, brings very large difficulty to the cleaning of next groove section and grooving.
During this construction of tunnel is built; bulkhead wall operator guards diaphragm wall; its degree of depth reaches more than 50 meter deeply; and need to pass through 25m thick sand bed; joint adopts cross steel plate rigid joint, and construction quality requires high, and difficulty is large; therefore in order to ensure construction of diaphragm wall quality, need to take to prevent concrete slurry from streaming measure.
Summary of the invention
For above-mentioned prior art, the utility model provides a kind of immersed tube tunnel underground continuous wall connector with Concrete Anti by-pass means.Can prevent ultra-deep underground continuous wall cross steel plate joint concrete slurry from occurring streaming.
Because this wall operator guards is in linkage section both sides, immersed tube tunnel bank; the space enclosing structure of digging is dredged as dry-docking, immersed tube linkage section, riverbed; stable protection is played a part to bank line; anti-by-pass means of the present utility model can ensure construction of diaphragm wall quality, strengthens the resistance to overturning of bulkhead wall operator guards.
In order to solve the problems of the technologies described above, a kind of T-shaped of the utility model welds immersed tube tunnel underground continuous wall connector entirely, the cross steel plate joint that steel plate a4 and steel plate b3 is welded into, the main muscle 2 of diaphragm wall and diaphragm wall level frame stud 1 place are provided with a cornerite reinforcing bar 5 respectively, two cornerite reinforcing bars are two concave character type reinforcing bars be arranged in juxtaposition, described steel plate a4 is arranged in the crack of two cornerite reinforcing bars 5, the two ends of described steel plate b3 are bending and weld with the outside of two cornerite reinforcing bars 5, the full welding point of T-shaped is welded with between the both sides of described steel plate b3 and the outline of diaphragm wall.
The full welding point of T-shaped comprises fixation steel plate 6, choked flow bent plate 7, stops steel plate 8; Described fixation steel plate 6 is parallel with the outline of diaphragm wall, and fixation steel plate 6 vertically inserts in steel plate b3 and 1/3rd places of fixation steel plate 6 and welds with one end of steel plate b3; One end and the fixation steel plate 6 of described choked flow bent plate 7 are fixed, and the foundation trench Tu Bi side of choked flow bent plate 7 remainder and diaphragm wall is closely connected, and described choked flow bent plate 7 surrounds filling concrete region, joint just; Stop that steel plate 8 is perpendicular to fixation steel plate 6 and one side of closely connected steel plate b3, stopping that steel plate 8 and fixation steel plate 6 are by being welded to connect, stopping that steel plate 8 is also fixing by being welded to connect with the closely connected place of steel plate b3.
Compared with prior art, the beneficial effects of the utility model are:
By adopting joint Concrete Anti by-pass means, effectively decrease diaphragm wall the streaming of slurries in filling concrete process, reduce next groove section trenching construction difficulty and risk, ensure that wall quality and resistance to overturning, thus ensure construction safety.
Accompanying drawing explanation
Fig. 1 the utility model T-shaped welds immersed tube tunnel underground continuous wall connector schematic diagram entirely;
Fig. 2 is A place partial enlarged drawing in Fig. 1.
In figure: 1-diaphragm wall level frame stud, the main muscle of 2-diaphragm wall, 3-steel plate b, 4-steel plate a, 5-cornerite reinforcing bar, 6-fixation steel plate, 7-choked flow bent plate, 8-stops steel plate.
Detailed description of the invention
Below in conjunction with detailed description of the invention, the utility model is described in further detail.
As described in Figure 1, a kind of T-shaped welds immersed tube tunnel underground continuous wall connector entirely, the cross steel plate joint that steel plate a4 and steel plate b3 is welded into, the main muscle 2 of diaphragm wall and diaphragm wall level frame stud 1 place are provided with a cornerite reinforcing bar 5 respectively, two cornerite reinforcing bars are two concave character type reinforcing bars be arranged in juxtaposition, described steel plate a4 is arranged in the crack of two cornerite reinforcing bars 5, the two ends of described steel plate b3 are bending and weld with the outside of two cornerite reinforcing bars 5, are welded with the full welding point of T-shaped between the both sides of described steel plate b3 and the outline of diaphragm wall.
The full welding point of T-shaped comprises fixation steel plate 6, choked flow bent plate 7, stops steel plate 8; Described fixation steel plate 6 is parallel with the outline of diaphragm wall, and fixation steel plate 6 vertically inserts in steel plate b3 and 1/3rd places of fixation steel plate 6 and welds with one end of steel plate b3; One end and the fixation steel plate 6 of described choked flow bent plate 7 are fixed, and the foundation trench Tu Bi side of choked flow bent plate 7 remainder and diaphragm wall is closely connected, and described choked flow bent plate 7 surrounds filling concrete region, joint just; Stop that steel plate 8 is perpendicular to fixation steel plate 6 and one side of closely connected steel plate b3, stopping that steel plate 8 and fixation steel plate 6 are by being welded to connect, stopping that steel plate 8 is also fixing by being welded to connect with the closely connected place of steel plate b3.
Embodiment
Diaphragm wall is lattice form, the degree of depth is 52.5m the most deeply, and pass through the construction of 25m thick sand bed, underground continuous wall connector adopts rigid joint cross steel plate, for the Plate Welding being respectively 20mm and 10mm by two pieces of thickness forms, middle 120mm carries out the hole of 100mm × 120mm, to ensure that concrete passes cross steel plate, is formed closely connected.Stream to prevent concrete slurry, the full welding point of T-shaped is provided with between cross steel plate and cell wall, the choked flow bent plate 7 thick by 1mm, the stop steel plate 8 that 6mm is thick, the fixation steel plate 6 that 6mm is thick, the full welding point of this T-shaped is adopted at underground continuous wall connector place, can effectively prevent in concreting process choked flow bent plate 7, stop steel plate 8, the axial impact of fixation steel plate 6, by stopping that steel plate 8 is also fixing by being welded to connect with the closely connected place of steel plate b3, greatly can strengthen the stability of the full welding point of T-shaped, the bent plate of choked flow simultaneously 7, stop steel plate 8, the seal joint structure that fixation steel plate 6 and diaphragm wall form can effectively prevent streaming of concrete slurry.
Diaphragm wall fabrication of reinforcing cage, wherein cornerite reinforcing bar 5 and the steel plate a4 in cross steel plate joint, adopt overlap joint full weld, makes the steel plate a4 of cross steel plate joint connect in aggregates with the reinforcing cage having diaphragm wall reinforcing bar and underground distribution reinforcement to form.
When diaphragm wall filling concrete, because concrete tension force causes iron sheet to be close to foundation trench Tu Bi, described choked flow bent plate 7 surrounds the region of joint filling concrete just, thus reaches prevention concrete slurry detour flow.
Claims (1)
1. a T-shaped welds immersed tube tunnel underground continuous wall connector entirely, it is characterized in that: the cross steel plate joint that steel plate a (4) and steel plate b (3) is welded into, the main muscle of diaphragm wall (2) and diaphragm wall level frame stud (1) place are provided with a cornerite reinforcing bar (5) respectively, two cornerite reinforcing bars are two concave character type reinforcing bars be arranged in juxtaposition, described steel plate a (4) is arranged in the crack of two cornerite reinforcing bars (5), the two ends of described steel plate b (3) are bending and weld with the outside of two cornerite reinforcing bars (5), the full welding point of T-shaped is welded with between the both sides of described steel plate b (3) and the outline of diaphragm wall,
The full welding point of T-shaped comprises fixation steel plate (6), choked flow bent plate (7), stops steel plate (8); Described fixation steel plate (6) is parallel with the outline of diaphragm wall, and fixation steel plate (6) vertically inserts in steel plate b (3) and 1/3rd places of fixation steel plate (6) and welds with one end of steel plate b (3); One end of described choked flow bent plate (7) and fixation steel plate (6) are fixed, the foundation trench Tu Bi side of choked flow bent plate (7) remainder and diaphragm wall is closely connected, and described choked flow bent plate (7) surrounds filling concrete region, joint just; Stop that steel plate (8) is perpendicular to fixation steel plate (6) and one side of closely connected steel plate b (3), stopping that steel plate (8) and fixation steel plate (6) are by being welded to connect, stopping that steel plate (8) is also fixing by being welded to connect with the closely connected place of steel plate b (3).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520090187.9U CN204456225U (en) | 2015-02-09 | 2015-02-09 | A kind of T-shaped welds immersed tube tunnel underground continuous wall connector entirely |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520090187.9U CN204456225U (en) | 2015-02-09 | 2015-02-09 | A kind of T-shaped welds immersed tube tunnel underground continuous wall connector entirely |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204456225U true CN204456225U (en) | 2015-07-08 |
Family
ID=53663134
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520090187.9U Expired - Fee Related CN204456225U (en) | 2015-02-09 | 2015-02-09 | A kind of T-shaped welds immersed tube tunnel underground continuous wall connector entirely |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204456225U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106759522A (en) * | 2017-02-04 | 2017-05-31 | 长江勘测规划设计研究有限责任公司 | A kind of the ground-connecting-wall G type joints and method of pre-buried repeatable Grouting Pipe |
CN111235966A (en) * | 2020-01-20 | 2020-06-05 | 王军 | Vacuum pipeline and installation assembly for high-speed train |
-
2015
- 2015-02-09 CN CN201520090187.9U patent/CN204456225U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106759522A (en) * | 2017-02-04 | 2017-05-31 | 长江勘测规划设计研究有限责任公司 | A kind of the ground-connecting-wall G type joints and method of pre-buried repeatable Grouting Pipe |
CN111235966A (en) * | 2020-01-20 | 2020-06-05 | 王军 | Vacuum pipeline and installation assembly for high-speed train |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206874310U (en) | One kind is applied to high pressure water enrichment tunnel decompression drainage arrangement | |
CN201981532U (en) | Bearing type super deep underground continuous wall adaptor | |
JP5347898B2 (en) | Strengthening structure and method of existing sheet pile quay | |
CN204456225U (en) | A kind of T-shaped welds immersed tube tunnel underground continuous wall connector entirely | |
CN205207907U (en) | Novel pipeline bracket of tape base plinth | |
CN204457798U (en) | A kind of weight concrete section of jurisdiction for the shallow earthing section of shield structure | |
CN206477326U (en) | A kind of combined type shaped steel building enclosure | |
CN105386441A (en) | PVC pipe wrapped inner supporting cross prestress recycled concrete tubular pile | |
CN208105923U (en) | A kind of existing pond increases the connecting joint structure of water string | |
JP2017180047A (en) | Reinforcement structure and reinforcement method for existing steel pile wall | |
CN115341552A (en) | Underground continuous wall joint water seepage prevention structure, underground continuous wall and construction method | |
JP2019163687A (en) | Reinforcing structure for existing steel sheet pile wall | |
CN206204768U (en) | A kind of stainless steel reinforced concrete bridge pier for being cladded with CFRP cloth | |
JP6489055B2 (en) | Reinforcement structure and reinforcement method for existing steel sheet pile wall | |
CN211922599U (en) | CFG pile end post-grouting device | |
CN212336244U (en) | Ductile cast iron pipe water-carrying connection device | |
CN211113669U (en) | Prestressed reinforced concrete breast wall pile | |
CN202577368U (en) | Immersed tube tunnel underground continuous wall joint with concrete streaming preventing device | |
CN205046549U (en) | Prefabricated diaphragm wall unit and underground continuous wall | |
CN210194690U (en) | Novel I-steel joint structure of underground continuous wall | |
CN202830924U (en) | Steel and concrete structure for repairing drill cast-in-place pile with concrete fault | |
CN209669861U (en) | Prestressed reinforced concrete screw thread tubular pole | |
CN107700438B (en) | Assembled steel pipe concrete radial gate support gate pier structure | |
CN206752417U (en) | A kind of stainless steel reinforced concrete dam | |
CN209179027U (en) | Bracing formula pile beam slab props up fender system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150708 |