CN106759415A - 一种砼结构集水坑模板抗浮控制技术 - Google Patents

一种砼结构集水坑模板抗浮控制技术 Download PDF

Info

Publication number
CN106759415A
CN106759415A CN201710149044.4A CN201710149044A CN106759415A CN 106759415 A CN106759415 A CN 106759415A CN 201710149044 A CN201710149044 A CN 201710149044A CN 106759415 A CN106759415 A CN 106759415A
Authority
CN
China
Prior art keywords
catch pit
screw rod
concrete
control technology
concrete structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710149044.4A
Other languages
English (en)
Inventor
张勋来
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201710149044.4A priority Critical patent/CN106759415A/zh
Publication of CN106759415A publication Critical patent/CN106759415A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/22Lining sumps in trenches or other foundation pits

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

本发明公开了一种砼结构集水坑模板抗浮控制技术,依据设计图纸中集水坑的尺寸制作一个长方体形的定型木模板安放在指定位置,在定型木模板的上方设置钢管,辅助以管卡、螺杆及螺帽进行固定,每个螺杆的下端与集水坑内的钢筋骨架焊接连接,再将集水坑内的钢筋骨架相互焊接牢固定后,采取四周循环分层浇筑,对集水坑进行混凝土浇施工。使用本发明能有效的控制地下室集水坑施工质量,使集水坑定型模板不因混凝土浇筑时产生的不均匀浮力而变形移位,从而保证了集水坑的混凝土质量。不仅简单实用,施工方便,还能节约工时,降低施工成本,避免模板变形移位现象发生,同时也不会因集水坑移位变形而制定处理方案后,采取处理时有一系列额外费用的发生。

Description

一种砼结构集水坑模板抗浮控制技术
技术领域:
本发明是涉及建筑领域,特别涉及一种砼结构集水坑模板抗浮控制技术。
背景技术:
在地下室砼结构集水坑施工前,通常会依据设计图纸上的集水坑尺寸,加工制作成一个定型木模板,在地下室底板及集水坑钢筋安装结束后,将此定型木模板安装在预留的集水坑位置上,再进行混凝土浇筑。采用定型木模板做法以其施工便利、经济实惠而普遍被使用,常规做法为:依据图纸集水坑尺寸,制作成一个定型木模板,安装在图纸标注的位置上,然后用成件钢材压在定型木模板上,以此来抵抗混凝土浇筑时的浮力。而此种安装方法往往会因混凝土浇筑时的不均匀压力,而造成模板变形、移位,甚至损坏,进而造成成型后的集水坑变形,直接影响集水坑的施工质量。
在集水坑模板安装施工中,为保证其能抵抗混凝土浇筑时产生的不均匀浮力,兼顾后期模板拆除等因素,需要一种能在集水坑混凝土浇筑施工时抵抗混凝土浇筑时的浮力的技术。
发明内容:
本发明要解决的技术问题是:提供一种砼结构集水坑模板抗浮控制技术,使用本发明能有效的控制地下室集水坑施工质量,使集水坑定型模板不因混凝土浇筑时产生的不均匀浮力而变形移位,从而保证了集水坑的混凝土质量。不仅简单实用,施工方便,还能节约工时,降低施工成本,避免了模板变形移位现象发生,并避免了因集水坑移位变形而制定处理方案后,采取处理时一系列额外费用的发生。
一种砼结构集水坑模板抗浮控制技术,包含如下步骤:
步骤一:依据设计图纸中集水坑的尺寸制作一个长方体形的定型木模板安放在设计图纸中指定位置;
步骤二:在定型木模板的上方任意相对两边上每边放置两根钢管,两根钢管之间留有间距;
步骤三:在每边的两根钢管中间依次设置多个螺杆并从两根钢管空隙间穿过,每个螺杆的下端与集水坑内的钢筋骨架焊接连接;
步骤四:在每根螺杆的上方设置管卡穿在螺杆上,然后在每个管卡的上方使用两个内径与螺杆直径一致的螺帽与螺杆进行牢固连接;
步骤五:将集水坑内的钢筋骨架相互焊接牢固定;
步骤六:对集水坑进行混凝土浇筑,采取四周循环分层浇筑,每次浇筑的混凝土的厚度不超过500mm,待上一层混凝土初凝前再进行下层混凝土的浇筑,如此循环,直至集水坑的混凝土全部浇筑结束。
进一步地,所述钢管的直径为48mm,厚度为3mm。
进一步地,所述步骤二中两根钢管之间的间距为15mm。
进一步地,所述螺杆的直径与螺帽的内径均为14mm。
进一步地,所述螺杆与相临螺杆之间的间距为200mm~300mm。
进一步地,所述步骤六中每层浇筑厚度为400mm。
本发明具有以下优点:(1)施工方便、简单实用、效果明显;(2)有效解决了集水坑混凝土浇筑时模板因其不均匀浮力而变形的问题;(3)本发明中所述定型木模板可拆除并循环使用,降低施工成本;(4)避免因发生混凝土变形现象而制定处理方案后,采取处理措施时一系列额外费用的发生。
附图说明
图1是本发明施工示意图。
图中:1.定型木模板 2.钢筋骨架 3.螺杆 4.螺帽 5.管卡 6.钢管。
具体实施方式
为了更好的解释本发明,下面结合附图和具体实施例来进一步阐明本发明的内容,但本发明的内容并不仅仅局限于以下实施例。
如图1所示,一种砼结构集水坑模板抗浮控制技术,包含如下步骤:
步骤一:依据设计图纸中集水坑的尺寸制作一个长方体形的定型木模板1安放在设计图纸中指定位置;
步骤二:在定型木模板1的上方任意相对两边上每边放置两根钢管6,两根钢管6之间留有间距;
步骤三:在每边的两根钢管6中间依次设置多个螺杆3并从两根钢管6空隙间穿过,每个螺杆3的下端与集水坑内的钢筋骨架2焊接连接;
步骤四:在每根螺杆3的上方设置管卡5穿在螺杆3上,然后在每个管卡5的上方使用两个内径与螺杆3直径一致的螺帽4与螺杆3进行牢固连接;
步骤五:将集水坑内的钢筋骨架2相互焊接牢固定;
步骤六:对集水坑进行混凝土浇筑,采取四周循环分层浇筑,每次浇筑的混凝土的厚度不超过500mm,待上一层混凝土初凝前再进行下层混凝土的浇筑,如此循环,直至集水坑的混凝土全部浇筑结束。
本发明所述钢管6的直径可以为48mm,厚度可以为3mm。
本发明所述步骤二中两根钢管6之间的间距可以为15mm。
本发明所述螺杆3的直径与螺帽4的内径可以均为14mm。
本发明所述螺杆3与相临螺杆3之间的间距可为200mm~300mm。
本发明所述步骤六中每层浇筑厚度可以为400mm。
本发明能有效的控制地下室集水坑施工质量,使集水坑定型模板不因混凝土浇筑时产生的不均匀浮力而变形移位,从而保证了集水坑的混凝土质量。不仅简单实用,施工方便,还能节约工时,降低施工成本,避免了模板变形移位现象发生,并避免了因集水坑移位变形而制定处理方案后,采取处理时一系列额外费用的发生。

Claims (6)

1.一种砼结构集水坑模板抗浮控制技术,其特征在于:包含如下步骤:
步骤一:依据设计图纸中集水坑的尺寸制作一个长方体形的定型木模板(1)安放在设计图纸中指定位置;
步骤二:在定型木模板(1)的上方任意相对两边上每边放置两根钢管(6),两根钢管(6)之间留有间距;
步骤三:在每边的两根钢管(6)中间依次设置多个螺杆(3)并从两根钢管(6)空隙间穿过,每个螺杆(3)的下端与集水坑内的钢筋骨架(2)焊接连接;
步骤四:在每根螺杆(3)的上方设置管卡(5)穿在螺杆(3)上,然后在每个管卡(5)的上方使用两个内径与螺杆(3)直径一致的螺帽(4)与螺杆(3)进行牢固连接;
步骤五:将集水坑内的钢筋骨架(2)相互焊接牢固定;
步骤六:对集水坑进行混凝土浇筑,采取四周循环分层浇筑,每次浇筑的混凝土的厚度不超过500mm,待上一层混凝土初凝前再进行下层混凝土的浇筑,如此循环,直至集水坑的混凝土全部浇筑结束。
2.根据权利要求1所述一种砼结构集水坑模板抗浮控制技术,其特征在于:所述钢管(6)的直径为48mm,厚度为3mm。
3.根据权利要求1所述一种砼结构集水坑模板抗浮控制技术,其特征在于:所述步骤二中两根钢管(6)之间的间距为15mm。
4.根据权利要求1所述一种砼结构集水坑模板抗浮控制技术,其特征在于:所述螺杆(3)的直径与螺帽(4)的内径均为14mm。
5.根据权利要求1所述一种砼结构集水坑模板抗浮控制技术,其特征在于:所述螺杆(3)与相临螺杆(3)之间的间距为200mm~300mm。
6.根据权利要求1所述一种砼结构集水坑模板抗浮控制技术,其特征在于:所述步骤六中每层浇筑厚度为400mm。
CN201710149044.4A 2017-03-14 2017-03-14 一种砼结构集水坑模板抗浮控制技术 Pending CN106759415A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710149044.4A CN106759415A (zh) 2017-03-14 2017-03-14 一种砼结构集水坑模板抗浮控制技术

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710149044.4A CN106759415A (zh) 2017-03-14 2017-03-14 一种砼结构集水坑模板抗浮控制技术

Publications (1)

Publication Number Publication Date
CN106759415A true CN106759415A (zh) 2017-05-31

Family

ID=58962679

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710149044.4A Pending CN106759415A (zh) 2017-03-14 2017-03-14 一种砼结构集水坑模板抗浮控制技术

Country Status (1)

Country Link
CN (1) CN106759415A (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107313588A (zh) * 2017-08-30 2017-11-03 云南工程建设总承包公司 集水坑底板工具式模板及其施工使用方法
CN111561155A (zh) * 2020-05-28 2020-08-21 中冶天工集团有限公司 一种集水坑或电梯井定型模板用加固件及用其的施工方法

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010050810A1 (en) * 2008-10-29 2010-05-06 Technische Universiteit Eindhoven Formwork module and method of constructing a foundation
RU2009105230A (ru) * 2009-02-17 2010-08-27 Вячеслав Алексеевич Киселев (RU) Способ блок-модульного строительства гидротехнических сооружений в подводных котлованах
CN202430997U (zh) * 2011-12-27 2012-09-12 中建七局第四建筑有限公司 一种电梯井或集水坑模板的加固装置
CN204266590U (zh) * 2014-11-19 2015-04-15 大同泰瑞集团建设有限公司 集水坑、电梯井模板底模抗浮装置
CN204754219U (zh) * 2015-06-25 2015-11-11 上海宝冶集团有限公司 一种坑中坑内模专业固定工具
CN204940860U (zh) * 2015-08-28 2016-01-06 平煤神马建工集团有限公司土建处 一种防止模板上浮件
CN105862894A (zh) * 2016-04-06 2016-08-17 中国十七冶集团有限公司 一种集水坑抗浮整体模板的安装方法

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010050810A1 (en) * 2008-10-29 2010-05-06 Technische Universiteit Eindhoven Formwork module and method of constructing a foundation
RU2009105230A (ru) * 2009-02-17 2010-08-27 Вячеслав Алексеевич Киселев (RU) Способ блок-модульного строительства гидротехнических сооружений в подводных котлованах
CN202430997U (zh) * 2011-12-27 2012-09-12 中建七局第四建筑有限公司 一种电梯井或集水坑模板的加固装置
CN204266590U (zh) * 2014-11-19 2015-04-15 大同泰瑞集团建设有限公司 集水坑、电梯井模板底模抗浮装置
CN204754219U (zh) * 2015-06-25 2015-11-11 上海宝冶集团有限公司 一种坑中坑内模专业固定工具
CN204940860U (zh) * 2015-08-28 2016-01-06 平煤神马建工集团有限公司土建处 一种防止模板上浮件
CN105862894A (zh) * 2016-04-06 2016-08-17 中国十七冶集团有限公司 一种集水坑抗浮整体模板的安装方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘海清9: "第三循环水厂扩量改造工程——泵房过滤间及配电室、凉水塔基础工程", 《百度文库》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107313588A (zh) * 2017-08-30 2017-11-03 云南工程建设总承包公司 集水坑底板工具式模板及其施工使用方法
CN111561155A (zh) * 2020-05-28 2020-08-21 中冶天工集团有限公司 一种集水坑或电梯井定型模板用加固件及用其的施工方法

Similar Documents

Publication Publication Date Title
CN103669655B (zh) 变形缝两侧墙体混凝土浇筑施工工艺
CN105908864B (zh) 填充砌体与框架剪力墙预防界面裂缝结构的施工方法
CN204920990U (zh) 一种隧道二衬钢筋定位卡具
CN107327050A (zh) 一种免拆式地下室外墙翻边单侧支模装置及施工方法
CN206616862U (zh) 模板根部加固装置
CN106930523A (zh) 一种砼结构集水坑可拆卸模板加固技术
CN107524156A (zh) 一种杯口柱基础芯模抗浮方法
CN106759415A (zh) 一种砼结构集水坑模板抗浮控制技术
CN105500510B (zh) 建筑构件蒸汽养护系统
CN206053139U (zh) 马镫钢筋
CN107503460A (zh) 一种给水管预留槽施工方法
CN215395892U (zh) 预制箱梁内模上浮防治结构
CN104727546A (zh) 采用铝合金模板浇筑混凝土楼板的方法及其传输孔模具
CN107514141A (zh) 一种预制叠合板止水反梁一次预制技术施工工艺
CN107762053A (zh) 预制地下室管道模块及其制作方法
CN212478558U (zh) 一种集水坑或电梯井定型模板用加固件
CN104908150B (zh) 一种管道井制作模板及基于工厂化生产管道井的方法
CN104746521B (zh) 超大断截面斜坡垫层施工结构的应用
CN207131070U (zh) 一种混凝土双墙支模工艺改进构造
CN107237436A (zh) 一种空腔楼板施工时的临时固定方法
CN206205429U (zh) 狭窄变形缝内易拆式铝模板支撑体系
CN207620379U (zh) 一种边模固定装置
CN108019038A (zh) 一种边模固定装置及边摸固定施工方法
CN207392530U (zh) 一种免拆式地下室外墙翻边单侧支模装置
CN206016254U (zh) 建筑用预制构造柱免支模u型壳

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170531