CN106677536A - Manufacturing method of precast roof slab joint connection structure - Google Patents
Manufacturing method of precast roof slab joint connection structure Download PDFInfo
- Publication number
- CN106677536A CN106677536A CN201710120601.XA CN201710120601A CN106677536A CN 106677536 A CN106677536 A CN 106677536A CN 201710120601 A CN201710120601 A CN 201710120601A CN 106677536 A CN106677536 A CN 106677536A
- Authority
- CN
- China
- Prior art keywords
- concrete
- template
- roof slab
- precast
- preparation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention discloses a manufacturing method of a precast roof slab joint connection structure and relates to the technical field of concrete precasting and connection. The method comprises the following steps that (1) a concrete pouring formwork is manufactured, and U-shaped bends are arranged on the formwork; (2) steel bars are arranged in the formwork, and steel bar cut-off ends are reserved at the U-shaped bends; (3) concrete is poured into a frame of the formwork, and lock rings are welded to the steel bar cut-off ends; (4) precast top plates are conveyed to the top of a bearing wall, specifically, the two precast top plates are connected to the top face of the same bearing wall in a lap joint mode and are spaced, and relative alignment of the lock rings is maintained; and (5) a steel bar rod which penetrates through all the lock rings are inserted into all the lock rings aligned in the same length direction, and then concrete is poured to the gap between the two precast top plates. Through the structure, the effect that the whole top plates maintain high integration and stability is achieved, and construction is convenient and feasible.
Description
Technical field
The present invention relates to concrete prefabricated interconnection technique field.
Background technology
Present board house or the Roofing slab of concrete prefabricated structure are usually that, using two kinds of forms, one kind is prefabricated in advance
With roof structure identical plate body, covered on roof when binding, this way is convenient and simple, but a disadvantage is that whole
Body effect is bad, is not sufficiently stable, and another form is to carry out integral cast-in-situ to floor to build, and this way can be good at ensureing
The resistance to overturning of floor, but the operation that operates is too complicated, labor intensive material resources, is also very big waste to material, it is whole
Body effect is not easy control, so now in order to solve the above problems, now providing a kind of precast roof slab node connecting structure
Preparation method.
The content of the invention
The technical problem to be solved in the present invention is to provide a kind of preparation method of precast roof slab node connecting structure, the party
Method easy construction is feasible, construction precast construction has been reached the effect for making whole top board keep high integrity and stability.
To solve the above problems, the present invention adopts the technical scheme that a kind of making of precast roof slab node connecting structure
Method, the method is comprised the following steps,(1)The big little makings concrete-pouring template of the walls shape of caping, makes mould as needed
Plate is surrounded and is provided with frame-shaped construction, and template to the recessed U-bend in inner side;
(2)Reinforcing bar is laid in framework to template composition, and the reinforcing bar outside stretching out in template is provided with the U-bend and broken
Head;
(3)To casting concrete in pattern plate bolster body, until the upper surface of concrete flushes with the top surface of template, concrete is then treated
It is conserved after solidification, then the reinforcing bar broken end welding lock ring that will expose;
(4)Template framework is removed, the prefabricated top board that will be made is transported to the top of bearing wall, by two prefabricated top boards
Side lap and makes to leave certain space between two prefabricated top boards in the top surface of same bearing wall, makes long herein
Lock ring on degree direction is aligned;
(5)While being inserted through the reinforcing rod of all lock rings, Ran Hou on all lock rings that will be aligned on same length direction
Casting concrete in space between two prefabricated top boards.
Preferably, step(1)Middle concrete-pouring template is rectangle or square, and the concrete-pouring template is
Wooden square plate, the quantity of U-bend is at least three on single concrete-pouring template.
Preferably, the step(2)In stretch out in outside template reinforcing bar broken end length be 8 centimetres to 10 centimetres.
Preferably, the step(3)In lock ring be cyclic structure or tubular structure.
Preferably, the step(4)In between two prefabricated top boards the width in space be 5 centimetres to 15 centimetres.
Preferably, the step(5)Middle poured concrete is flush with the upper surface of prefabricated top board.
The beneficial effects of the present invention are the method effect is good, and operating process is easy, and the structure can either effectively keep
The globality and stability of whole top surface, serve good technique effect, and simple and convenient during operation, save
The inconvenience of one-piece casting is just carried out to whole top board, substantial amounts of material has been saved.
Brief description of the drawings
Fig. 1 is the structural representation of the precast roof slab node connecting structure obtained by invention;
Fig. 2 is that prefabricated top board is placed on structural representation on bearing wall in Fig. 1.
Specific embodiment
The present invention is further detailed explanation with reference to the accompanying drawings and detailed description:A kind of precast roof slab section
The preparation method of point attachment structure, the method is comprised the following steps,(1)The big little makings coagulation of the walls shape of caping as needed
Native formwork for placing, surrounds template and is provided with frame-shaped construction, and template to the recessed U-bend in inner side;Concrete-pouring template
It is rectangle or square, the concrete-pouring template is wooden square plate, U-bend on single concrete-pouring template
Quantity is at least three.
(2)Reinforcing bar is laid in framework to template composition, and the steel outside stretching out in template is provided with the U-bend
Breaking of muscle and tendon head;The length for stretching out in the reinforcing bar broken end outside template is 8 centimetres to 10 centimetres.
(3)To casting concrete in pattern plate bolster body, until the upper surface of concrete flushes with the top surface of template, then wait to mix
It is conserved after solidifying soil solidification, then the reinforcing bar broken end welding lock ring that will expose;
(4)Template framework is removed, the prefabricated top board that will be made is transported to the top of bearing wall, by two prefabricated top boards
Side lap and makes to leave certain space between two prefabricated top boards in the top surface of same bearing wall, makes long herein
Lock ring on degree direction is aligned;Lock ring is cyclic structure or tubular structure.The width in space is 5 between two prefabricated top boards
Centimetre to 15 centimetres.
(5)While being inserted through the reinforcing rod of all lock rings on all lock rings that will be aligned on same length direction, so
Casting concrete in space between two prefabricated top boards afterwards.The concrete for pouring is flush with the upper surface of prefabricated top board.
A kind of precast roof slab node connecting structure, the structure includes the multiple prefabricated top board on bearing wall, phase
Bindiny mechanism is provided between two adjacent prefabricated top boards, described prefabricated top board 2 is the concrete slab for pouring in advance, described
The reinforcing bar of booster action is provided with prefabricated top board, bindiny mechanism includes being provided with multiple U-shaped breach at the edges of boards of prefabricated top board,
The upper and lower surface for distinguishing the prefabricated top board of insertion up and down of U-shaped breach, two adjacent the two of prefabricated top board adjacent panels
U-shaped breach between side is oppositely arranged, and a reinforcing bar with lock ring is provided with each U-shaped breach and is breaked end, in same side plate
All lock rings in the same direction of side are aligned and are installed with and are adapted reinforcing rod, are also poured between two adjacent prefabricated top boards
There is concrete.
Prefabricated top board is rectangle or square, and the quantity of U-shaped breach is at least three on the unilateral prefabricated top board of edges of boards.
Lock ring is closed ring body.The relative edges of boards of two adjacent prefabricated top boards are overlapped on the top surface of same bearing wall.
The thickness of prefabricated unit top board is 5 centimetres to 10 centimetres, and the length of the prefabricated top board is 2 meters to 5 meters, and width is 1 meter to 4
Rice.
The device by split type prefabricated top board as building body or the top of room body, first by the prefabricated top board according to chi
It is very little prefabricated, framework is surrounded by template, reinforcing bar, that is, reinforcement are then laid in the frame, reach the journey arranged in length and breadth
Degree, then by maintenance aftershaping, with U-bend in template, so meeting forms U-shaped and lacks casting concrete when pouring
Mouthful, the prefabricated top board of each two is overlapped on a bearing wall top, reinforcing rod is then passed through, then between two prefabricated top boards
Space, that is, where reinforcing rod at by reinforcing rod, lock ring, pour together, its prefabricated top board with both sides is formed one
Individual overall structure, so just produces a desired effect.
The beneficial effects of the present invention are the method effect is good, and operating process is easy, and the structure can either effectively keep
The globality and stability of whole top surface, serve good technique effect, and simple and convenient during operation, save
The inconvenience of one-piece casting is just carried out to whole top board, substantial amounts of material has been saved.
Claims (6)
1. a kind of preparation method of precast roof slab node connecting structure, it is characterized in that:The method is comprised the following steps,(1)Root
According to the big little makings concrete-pouring template of walls shape for needing caping, template is surrounded on frame-shaped construction, and template and set
The recessed U-bend in oriented inner side;
(2)Reinforcing bar is laid in framework to template composition, and the reinforcing bar outside stretching out in template is provided with the U-bend and broken
Head;
(3)To casting concrete in pattern plate bolster body, until the upper surface of concrete flushes with the top surface of template, concrete is then treated
It is conserved after solidification, then the reinforcing bar broken end welding lock ring that will expose;
(4)Template framework is removed, the prefabricated top board that will be made is transported to the top of bearing wall, by two prefabricated top boards
Side lap and makes to leave certain space between two prefabricated top boards in the top surface of same bearing wall, makes long herein
Lock ring on degree direction is aligned;
(5)While being inserted through the reinforcing rod of all lock rings, Ran Hou on all lock rings that will be aligned on same length direction
Casting concrete in space between two prefabricated top boards.
2. the preparation method of a kind of precast roof slab node connecting structure according to claim 1, it is characterized in that:
The step(1)Middle concrete-pouring template is rectangle or square, and the concrete-pouring template is wooden side
Shape plate, the quantity of U-bend is at least three on single concrete-pouring template.
3. the preparation method of a kind of precast roof slab node connecting structure according to claim 2, it is characterized in that:The step
Suddenly(2)In stretch out in outside template reinforcing bar broken end length be 8 centimetres to 10 centimetres.
4. the preparation method of a kind of precast roof slab node connecting structure according to claim 3, it is characterized in that:The step
Suddenly(3)In lock ring be cyclic structure or tubular structure.
5. the preparation method of a kind of precast roof slab node connecting structure according to claim 4, it is characterized in that:The step
Suddenly(4)In between two prefabricated top boards the width in space be 5 centimetres to 15 centimetres.
6. the preparation method of a kind of precast roof slab node connecting structure according to claim 5, it is characterized in that:The step
Suddenly(5)Middle poured concrete is flush with the upper surface of prefabricated top board.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710120601.XA CN106677536A (en) | 2017-03-02 | 2017-03-02 | Manufacturing method of precast roof slab joint connection structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710120601.XA CN106677536A (en) | 2017-03-02 | 2017-03-02 | Manufacturing method of precast roof slab joint connection structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106677536A true CN106677536A (en) | 2017-05-17 |
Family
ID=58861852
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710120601.XA Pending CN106677536A (en) | 2017-03-02 | 2017-03-02 | Manufacturing method of precast roof slab joint connection structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106677536A (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10299002A (en) * | 1997-04-25 | 1998-11-10 | Sekisui Chem Co Ltd | Form fixing structure for precast reinforced concrete footing |
CN202131679U (en) * | 2011-05-13 | 2012-02-01 | 中国航空规划建设发展有限公司 | Connecting structure capable of enhancing integrity of precast slabs |
CN104018614A (en) * | 2014-06-23 | 2014-09-03 | 付佩茹 | Precast concrete assembling plate and preparation and monolithic architecture construction method thereof |
CN105220794A (en) * | 2015-10-23 | 2016-01-06 | 招商局地产控股股份有限公司 | The vertical main muscle quick connecting method of a kind of prefabricated assembled shear wall |
-
2017
- 2017-03-02 CN CN201710120601.XA patent/CN106677536A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10299002A (en) * | 1997-04-25 | 1998-11-10 | Sekisui Chem Co Ltd | Form fixing structure for precast reinforced concrete footing |
CN202131679U (en) * | 2011-05-13 | 2012-02-01 | 中国航空规划建设发展有限公司 | Connecting structure capable of enhancing integrity of precast slabs |
CN104018614A (en) * | 2014-06-23 | 2014-09-03 | 付佩茹 | Precast concrete assembling plate and preparation and monolithic architecture construction method thereof |
CN105220794A (en) * | 2015-10-23 | 2016-01-06 | 招商局地产控股股份有限公司 | The vertical main muscle quick connecting method of a kind of prefabricated assembled shear wall |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106677049B (en) | Assembled steel-concrete combined structure bridge and construction method | |
CN207616844U (en) | Foundation platform precast concrete side form and molding machine | |
CN207660136U (en) | A kind of assembly concrete frame-shear wall keyway connection structure | |
CN108316522A (en) | The prefabricated double board wall units of one kind, assembly concrete shear wall and preparation method thereof | |
CN207841654U (en) | A kind of concrete 3D printing building structure | |
CN108301425A (en) | Prefabricated fast-assembling lattice beam system and construction method thereof | |
CN107642179A (en) | Assembled frame-shear structure steel plate keyway attachment structure and assembling method | |
CN105839822A (en) | Assembly type prefabricated part for cavity floor system | |
CN105863140A (en) | Precast hollow floor's component for stress island based hollow floor system | |
CN205224332U (en) | Prefabricated wall body and prefabricated wallboard | |
CN106592818A (en) | Prefabricated shear wall and making method thereof | |
CN107083840A (en) | A kind of anti-bank one-shot forming formwork erection method in toilet | |
CN110409283A (en) | It is a kind of based on retarded adhesive prestressed UHPC permanent template without the rib prestressed Self-curing combination beam of abdomen and construction method | |
CN206844444U (en) | A kind of steel bar girder concrete hollow building roof based on non-dismantling formwork | |
CN206220297U (en) | Precast shear wall | |
CN107012986A (en) | Multilayer steel-enclosed concrete members composite coupling beams | |
CN208347063U (en) | The prefabricated double board wall units of one kind, shear-wall element and assembly concrete shear wall | |
CN106836641A (en) | Side sticking steel plate formula Combined concrete coupling beam | |
CN207919848U (en) | Top plate of underground parking garage is combined the unit with plastics diaphragm capsule | |
CN106968366A (en) | A kind of construction method for pouring constructional column free removal template | |
CN110374228A (en) | A kind of cast-in-place sleeper steel bar arrangement of shear wall and its construction technology | |
CN106677536A (en) | Manufacturing method of precast roof slab joint connection structure | |
CN207525906U (en) | A kind of assembled frame-shear structure wall splitlevel connection structure | |
CN206956978U (en) | Prefabricated load bearing concrete wall panel combining structure | |
CN105971174A (en) | Building method for assembly type cast-in-place cavity building cover |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170517 |