CN106677536A - Manufacturing method of precast roof slab joint connection structure - Google Patents

Manufacturing method of precast roof slab joint connection structure Download PDF

Info

Publication number
CN106677536A
CN106677536A CN201710120601.XA CN201710120601A CN106677536A CN 106677536 A CN106677536 A CN 106677536A CN 201710120601 A CN201710120601 A CN 201710120601A CN 106677536 A CN106677536 A CN 106677536A
Authority
CN
China
Prior art keywords
concrete
template
roof slab
precast
preparation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710120601.XA
Other languages
Chinese (zh)
Inventor
吕齐林
管仁彪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Crystal Building Polytron Technologies Inc
Original Assignee
Hebei Crystal Building Polytron Technologies Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Crystal Building Polytron Technologies Inc filed Critical Hebei Crystal Building Polytron Technologies Inc
Priority to CN201710120601.XA priority Critical patent/CN106677536A/en
Publication of CN106677536A publication Critical patent/CN106677536A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a manufacturing method of a precast roof slab joint connection structure and relates to the technical field of concrete precasting and connection. The method comprises the following steps that (1) a concrete pouring formwork is manufactured, and U-shaped bends are arranged on the formwork; (2) steel bars are arranged in the formwork, and steel bar cut-off ends are reserved at the U-shaped bends; (3) concrete is poured into a frame of the formwork, and lock rings are welded to the steel bar cut-off ends; (4) precast top plates are conveyed to the top of a bearing wall, specifically, the two precast top plates are connected to the top face of the same bearing wall in a lap joint mode and are spaced, and relative alignment of the lock rings is maintained; and (5) a steel bar rod which penetrates through all the lock rings are inserted into all the lock rings aligned in the same length direction, and then concrete is poured to the gap between the two precast top plates. Through the structure, the effect that the whole top plates maintain high integration and stability is achieved, and construction is convenient and feasible.

Description

A kind of preparation method of precast roof slab node connecting structure
Technical field
The present invention relates to concrete prefabricated interconnection technique field.
Background technology
Present board house or the Roofing slab of concrete prefabricated structure are usually that, using two kinds of forms, one kind is prefabricated in advance With roof structure identical plate body, covered on roof when binding, this way is convenient and simple, but a disadvantage is that whole Body effect is bad, is not sufficiently stable, and another form is to carry out integral cast-in-situ to floor to build, and this way can be good at ensureing The resistance to overturning of floor, but the operation that operates is too complicated, labor intensive material resources, is also very big waste to material, it is whole Body effect is not easy control, so now in order to solve the above problems, now providing a kind of precast roof slab node connecting structure Preparation method.
The content of the invention
The technical problem to be solved in the present invention is to provide a kind of preparation method of precast roof slab node connecting structure, the party Method easy construction is feasible, construction precast construction has been reached the effect for making whole top board keep high integrity and stability.
To solve the above problems, the present invention adopts the technical scheme that a kind of making of precast roof slab node connecting structure Method, the method is comprised the following steps,(1)The big little makings concrete-pouring template of the walls shape of caping, makes mould as needed Plate is surrounded and is provided with frame-shaped construction, and template to the recessed U-bend in inner side;
(2)Reinforcing bar is laid in framework to template composition, and the reinforcing bar outside stretching out in template is provided with the U-bend and broken Head;
(3)To casting concrete in pattern plate bolster body, until the upper surface of concrete flushes with the top surface of template, concrete is then treated It is conserved after solidification, then the reinforcing bar broken end welding lock ring that will expose;
(4)Template framework is removed, the prefabricated top board that will be made is transported to the top of bearing wall, by two prefabricated top boards Side lap and makes to leave certain space between two prefabricated top boards in the top surface of same bearing wall, makes long herein Lock ring on degree direction is aligned;
(5)While being inserted through the reinforcing rod of all lock rings, Ran Hou on all lock rings that will be aligned on same length direction Casting concrete in space between two prefabricated top boards.
Preferably, step(1)Middle concrete-pouring template is rectangle or square, and the concrete-pouring template is Wooden square plate, the quantity of U-bend is at least three on single concrete-pouring template.
Preferably, the step(2)In stretch out in outside template reinforcing bar broken end length be 8 centimetres to 10 centimetres.
Preferably, the step(3)In lock ring be cyclic structure or tubular structure.
Preferably, the step(4)In between two prefabricated top boards the width in space be 5 centimetres to 15 centimetres.
Preferably, the step(5)Middle poured concrete is flush with the upper surface of prefabricated top board.
The beneficial effects of the present invention are the method effect is good, and operating process is easy, and the structure can either effectively keep The globality and stability of whole top surface, serve good technique effect, and simple and convenient during operation, save The inconvenience of one-piece casting is just carried out to whole top board, substantial amounts of material has been saved.
Brief description of the drawings
Fig. 1 is the structural representation of the precast roof slab node connecting structure obtained by invention;
Fig. 2 is that prefabricated top board is placed on structural representation on bearing wall in Fig. 1.
Specific embodiment
The present invention is further detailed explanation with reference to the accompanying drawings and detailed description:A kind of precast roof slab section The preparation method of point attachment structure, the method is comprised the following steps,(1)The big little makings coagulation of the walls shape of caping as needed Native formwork for placing, surrounds template and is provided with frame-shaped construction, and template to the recessed U-bend in inner side;Concrete-pouring template It is rectangle or square, the concrete-pouring template is wooden square plate, U-bend on single concrete-pouring template Quantity is at least three.
(2)Reinforcing bar is laid in framework to template composition, and the steel outside stretching out in template is provided with the U-bend Breaking of muscle and tendon head;The length for stretching out in the reinforcing bar broken end outside template is 8 centimetres to 10 centimetres.
(3)To casting concrete in pattern plate bolster body, until the upper surface of concrete flushes with the top surface of template, then wait to mix It is conserved after solidifying soil solidification, then the reinforcing bar broken end welding lock ring that will expose;
(4)Template framework is removed, the prefabricated top board that will be made is transported to the top of bearing wall, by two prefabricated top boards Side lap and makes to leave certain space between two prefabricated top boards in the top surface of same bearing wall, makes long herein Lock ring on degree direction is aligned;Lock ring is cyclic structure or tubular structure.The width in space is 5 between two prefabricated top boards Centimetre to 15 centimetres.
(5)While being inserted through the reinforcing rod of all lock rings on all lock rings that will be aligned on same length direction, so Casting concrete in space between two prefabricated top boards afterwards.The concrete for pouring is flush with the upper surface of prefabricated top board.
A kind of precast roof slab node connecting structure, the structure includes the multiple prefabricated top board on bearing wall, phase Bindiny mechanism is provided between two adjacent prefabricated top boards, described prefabricated top board 2 is the concrete slab for pouring in advance, described The reinforcing bar of booster action is provided with prefabricated top board, bindiny mechanism includes being provided with multiple U-shaped breach at the edges of boards of prefabricated top board, The upper and lower surface for distinguishing the prefabricated top board of insertion up and down of U-shaped breach, two adjacent the two of prefabricated top board adjacent panels U-shaped breach between side is oppositely arranged, and a reinforcing bar with lock ring is provided with each U-shaped breach and is breaked end, in same side plate All lock rings in the same direction of side are aligned and are installed with and are adapted reinforcing rod, are also poured between two adjacent prefabricated top boards There is concrete.
Prefabricated top board is rectangle or square, and the quantity of U-shaped breach is at least three on the unilateral prefabricated top board of edges of boards. Lock ring is closed ring body.The relative edges of boards of two adjacent prefabricated top boards are overlapped on the top surface of same bearing wall. The thickness of prefabricated unit top board is 5 centimetres to 10 centimetres, and the length of the prefabricated top board is 2 meters to 5 meters, and width is 1 meter to 4 Rice.
The device by split type prefabricated top board as building body or the top of room body, first by the prefabricated top board according to chi It is very little prefabricated, framework is surrounded by template, reinforcing bar, that is, reinforcement are then laid in the frame, reach the journey arranged in length and breadth Degree, then by maintenance aftershaping, with U-bend in template, so meeting forms U-shaped and lacks casting concrete when pouring Mouthful, the prefabricated top board of each two is overlapped on a bearing wall top, reinforcing rod is then passed through, then between two prefabricated top boards Space, that is, where reinforcing rod at by reinforcing rod, lock ring, pour together, its prefabricated top board with both sides is formed one Individual overall structure, so just produces a desired effect.
The beneficial effects of the present invention are the method effect is good, and operating process is easy, and the structure can either effectively keep The globality and stability of whole top surface, serve good technique effect, and simple and convenient during operation, save The inconvenience of one-piece casting is just carried out to whole top board, substantial amounts of material has been saved.

Claims (6)

1. a kind of preparation method of precast roof slab node connecting structure, it is characterized in that:The method is comprised the following steps,(1)Root According to the big little makings concrete-pouring template of walls shape for needing caping, template is surrounded on frame-shaped construction, and template and set The recessed U-bend in oriented inner side;
(2)Reinforcing bar is laid in framework to template composition, and the reinforcing bar outside stretching out in template is provided with the U-bend and broken Head;
(3)To casting concrete in pattern plate bolster body, until the upper surface of concrete flushes with the top surface of template, concrete is then treated It is conserved after solidification, then the reinforcing bar broken end welding lock ring that will expose;
(4)Template framework is removed, the prefabricated top board that will be made is transported to the top of bearing wall, by two prefabricated top boards Side lap and makes to leave certain space between two prefabricated top boards in the top surface of same bearing wall, makes long herein Lock ring on degree direction is aligned;
(5)While being inserted through the reinforcing rod of all lock rings, Ran Hou on all lock rings that will be aligned on same length direction Casting concrete in space between two prefabricated top boards.
2. the preparation method of a kind of precast roof slab node connecting structure according to claim 1, it is characterized in that:
The step(1)Middle concrete-pouring template is rectangle or square, and the concrete-pouring template is wooden side Shape plate, the quantity of U-bend is at least three on single concrete-pouring template.
3. the preparation method of a kind of precast roof slab node connecting structure according to claim 2, it is characterized in that:The step Suddenly(2)In stretch out in outside template reinforcing bar broken end length be 8 centimetres to 10 centimetres.
4. the preparation method of a kind of precast roof slab node connecting structure according to claim 3, it is characterized in that:The step Suddenly(3)In lock ring be cyclic structure or tubular structure.
5. the preparation method of a kind of precast roof slab node connecting structure according to claim 4, it is characterized in that:The step Suddenly(4)In between two prefabricated top boards the width in space be 5 centimetres to 15 centimetres.
6. the preparation method of a kind of precast roof slab node connecting structure according to claim 5, it is characterized in that:The step Suddenly(5)Middle poured concrete is flush with the upper surface of prefabricated top board.
CN201710120601.XA 2017-03-02 2017-03-02 Manufacturing method of precast roof slab joint connection structure Pending CN106677536A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710120601.XA CN106677536A (en) 2017-03-02 2017-03-02 Manufacturing method of precast roof slab joint connection structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710120601.XA CN106677536A (en) 2017-03-02 2017-03-02 Manufacturing method of precast roof slab joint connection structure

Publications (1)

Publication Number Publication Date
CN106677536A true CN106677536A (en) 2017-05-17

Family

ID=58861852

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710120601.XA Pending CN106677536A (en) 2017-03-02 2017-03-02 Manufacturing method of precast roof slab joint connection structure

Country Status (1)

Country Link
CN (1) CN106677536A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10299002A (en) * 1997-04-25 1998-11-10 Sekisui Chem Co Ltd Form fixing structure for precast reinforced concrete footing
CN202131679U (en) * 2011-05-13 2012-02-01 中国航空规划建设发展有限公司 Connecting structure capable of enhancing integrity of precast slabs
CN104018614A (en) * 2014-06-23 2014-09-03 付佩茹 Precast concrete assembling plate and preparation and monolithic architecture construction method thereof
CN105220794A (en) * 2015-10-23 2016-01-06 招商局地产控股股份有限公司 The vertical main muscle quick connecting method of a kind of prefabricated assembled shear wall

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10299002A (en) * 1997-04-25 1998-11-10 Sekisui Chem Co Ltd Form fixing structure for precast reinforced concrete footing
CN202131679U (en) * 2011-05-13 2012-02-01 中国航空规划建设发展有限公司 Connecting structure capable of enhancing integrity of precast slabs
CN104018614A (en) * 2014-06-23 2014-09-03 付佩茹 Precast concrete assembling plate and preparation and monolithic architecture construction method thereof
CN105220794A (en) * 2015-10-23 2016-01-06 招商局地产控股股份有限公司 The vertical main muscle quick connecting method of a kind of prefabricated assembled shear wall

Similar Documents

Publication Publication Date Title
CN106677049B (en) Assembled steel-concrete combined structure bridge and construction method
CN207616844U (en) Foundation platform precast concrete side form and molding machine
CN105839836B (en) A kind of precast concrete shear wall component and its construction method
CN207660136U (en) A kind of assembly concrete frame-shear wall keyway connection structure
CN207841654U (en) A kind of concrete 3D printing building structure
CN108316522A (en) The prefabricated double board wall units of one kind, assembly concrete shear wall and preparation method thereof
CN107642179A (en) Assembled frame-shear structure steel plate keyway attachment structure and assembling method
CN105863140A (en) Precast hollow floor's component for stress island based hollow floor system
CN108104284B (en) Wallboard connecting structure of shear wall steel arm embedded floor slab and assembly method
CN108301425A (en) Prefabricated quick mounting type lattice girder system and its construction method
CN105839822A (en) Assembly type prefabricated part for cavity floor system
CN209227556U (en) Prefabricated quick mounting type lattice girder system
CN205224332U (en) Prefabricated wall body and prefabricated wallboard
CN106592818A (en) Prefabricated shear wall and making method thereof
CN107083840A (en) A kind of anti-bank one-shot forming formwork erection method in toilet
CN206844444U (en) A kind of steel bar girder concrete hollow building roof based on non-dismantling formwork
CN206220297U (en) Precast shear wall
CN107012986A (en) Multilayer steel-enclosed concrete members composite coupling beams
CN208347063U (en) The prefabricated double board wall units of one kind, shear-wall element and assembly concrete shear wall
CN207919848U (en) Top plate of underground parking garage is combined the unit with plastics diaphragm capsule
CN106677536A (en) Manufacturing method of precast roof slab joint connection structure
CN105971174A (en) Building method for assembly type cast-in-place cavity building cover
CN207739390U (en) Overlap wall and horizontal member connecting node
CN113235798B (en) Method for mounting assembled laminated slab
CN106836641A (en) Side sticking steel plate formula Combined concrete coupling beam

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170517