CN108301425A - Prefabricated fast-assembling lattice beam system and construction method thereof - Google Patents

Prefabricated fast-assembling lattice beam system and construction method thereof Download PDF

Info

Publication number
CN108301425A
CN108301425A CN201810346507.0A CN201810346507A CN108301425A CN 108301425 A CN108301425 A CN 108301425A CN 201810346507 A CN201810346507 A CN 201810346507A CN 108301425 A CN108301425 A CN 108301425A
Authority
CN
China
Prior art keywords
module
lattice girder
prefabricated
connector
girder system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810346507.0A
Other languages
Chinese (zh)
Inventor
李松岷
王文涛
齐冀华
师恩来
刘元元
宋福渊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction First Group Corp Ltd
Second Construction Co Ltd of China Construction First Group Co Ltd
Original Assignee
China Construction First Group Corp Ltd
Second Construction Co Ltd of China Construction First Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction First Group Corp Ltd, Second Construction Co Ltd of China Construction First Group Co Ltd filed Critical China Construction First Group Corp Ltd
Priority to CN201810346507.0A priority Critical patent/CN108301425A/en
Publication of CN108301425A publication Critical patent/CN108301425A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • E02D17/205Securing of slopes or inclines with modular blocks, e.g. pre-fabricated

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The invention discloses a prefabricated fast-assembling type lattice beam system and a construction method thereof, wherein the prefabricated fast-assembling type lattice beam system is formed by combining and connecting one or two of a first module or a second module, and adjacent modules are connected through a post-cast concrete section; the first module comprises a reinforced concrete longitudinal beam, first joints symmetrically arranged on two side faces of a beam body of the longitudinal beam and holes for penetrating anchor rods, and reinforcing steel bars in the first joints extend out of concrete; the hole is positioned at the intersection part of the first joint and the longitudinal beam and vertically penetrates through the longitudinal beam body; the second module comprises a reinforced concrete prefabricated member with a cross-shaped outer contour, holes arranged in the center of the cross-shaped reinforced concrete prefabricated member and second joints arranged at the four ends of the prefabricated member, and reinforcing steel bars in the second joints extend out of concrete. The invention has the advantages of high assembly speed, convenient construction and high efficiency, and when the invention is used in site construction, the first module, the second module and the third module can be flexibly combined and arranged as required.

Description

Prefabricated quick mounting type lattice girder system and its construction method
Technical field
The present invention relates to supporting construction technical field, especially prefabricated quick mounting type lattice girder system and its construction method.
Background technology
China plains region area is simultaneously few, and present most of civil constructions are all completed on mountainous region, plateau, hills and other places, Situations such as massif excavation, slope can be all encountered in work progress.Currently, in order to ensure the safety constructed and used, it is necessary to right Side slope takes supporting measure.When traditional building slope, highway and railway slope uses lattice girder supporting, it is generally used cast-in-place Armored concrete.
But there are problems using cast-in-place construction:First, when landform is changeable, difficulty of construction is larger, can not deal carefully with Each crossover sites, lattice girder total quality be not high;Second, after the completion of lattice girder reinforcement installation, the concreting time is longer, So causing the construction period long;Third, the supporting module on side slope inclined-plane, it is big to install difficulty, low construction efficiency.Concrete is pouring Build when vibrating easily occur beam body vibrate leakiness, run mould and other issues.As slump controls improper or concrete It vibrates cross to shake, entire cant beam slump can be caused, prodigious difficulty of construction is brought to concrete construction.4th, reinforcing bar binding, coagulation Soil, which pours, needs a large amount of workers, cannot achieve industrialization.
Invention content
The object of the present invention is to provide prefabricated quick mounting type lattice girder system and its construction methods, and it is more to solve side slope landform Become, difficulty of construction is big, and efficiency long in time limit is low and the problems such as cannot achieve industrialization.
To achieve the above object, the present invention adopts the following technical scheme that:
One aspect of the present invention provides prefabricated quick mounting type lattice girder system, by the first module 1 either the second module 2 one kind or Two kinds of combinations are formed by connecting, and are connected by rear pouring concrete section between adjacent block;
First module 1 include armored concrete longeron, be symmetricly set on longeron beam body two sides the first connector 11 and For the hole across anchor pole, the reinforcing bar in the first connector 11 stretches out outside concrete;Hole is located at the first connector 11 and longeron Crossover sites and extend vertically through be arranged with longeron beam;
Second module 2 includes that outer profile is criss-cross reinforced concrete precast member, is arranged in criss-cross reinforced concrete The hole of native prefabricated component center and the second connector 21 in four ends of prefabricated component is set, the reinforcing bar in the second connector 21 It stretches out outside concrete;
Pouring concrete section is cast in the periphery of the exposed steel bar of adjacent first connector and/or the second connector after described.
Further, longeron beam body both sides are symmetrically arranged at least three pair of first connector 11.
Further, the adjacent both sides angle of cross reinforced concrete precast member is 75 ° -105 °.
Further, lattice girder system includes at least three first modules 1, corresponding the between two neighboring first module 1 The reinforcing bar of one connector 11 is connected.
Further, lattice girder system includes at least nine the second modules 2, corresponding the between two neighboring second module 2 The reinforcing bar of two connectors 21 is connected.
Further, lattice girder system further includes the third module 3 for spreading, and third module 3 includes the reinforcing bar of linear type Concrete beam and the third connector 31 at crossbeam both ends is set, the reinforcing bar in third connector 31 stretches out outside concrete.
Further, lattice girder system includes third module 3 and at least three first modules 1, two neighboring first module 1 it Between pass through at least three third modules 3 connect.
Further, bar connecting overlaps either welding or mechanical sleeves using binding.
Further, lattice girder system is in horizontally disposed, and the both ends of lattice girder are fixedly connected with support pile.
Another aspect of the present invention provides a kind of construction method such as above-mentioned prefabricated quick mounting type lattice girder system, including walks as follows Suddenly:
Step 1, according to design drawing, by the first module 1, the prefabricated forming in factory of the second module 2 and third module 3;
Step 2, by prefabricated lattice girder modular transportation to construction site;
Prefabricated lattice girder module is deposited in stockyard by step 3;
Step 4 is required according to construction drawing, measures positioning, carries out anchor pole or anchor cable construction, side slope is carried out smooth processing;
Step 5, lattice girder module hoisting is in place;
Anchor pole or anchor cable are carried out tensioning fixation by step 6;
Anchor head is carried out sealing off and covering anchorage processing by step 7 using pea gravel concreten;
Step 8 sets up template, carries out concreting, continues anchor pole or anchor cable carries out tensioning fixation.
Beneficial effects of the present invention are embodied in:
1, prefabricated quick mounting type lattice girder system and its construction method provided by the invention, assembling speed is fast, easy for construction, efficiency It is high.When manufacturing module, it can be used repeatedly for the mold needed for production module, provides resource utilization.Simple structure, convenient for behaviour Make, system easy to control the quality, construction cost is low, and what is more important site operation is in use, the first module, the second module and third mould It can on demand be arranged with flexible combination between block.Quick mounting type lattice girder system is assembled by module, can preferably handle intersection Position.
2, prefabricated quick mounting type lattice girder system provided by the invention and its construction method, each generic module are complete in processing factory At being not take up the space and place of construction site, be advantageously implemented industrialization, reduce construction site number of workers, improve construction Speed.The difficulty for reducing traditional supporting setting, improves construction efficiency, no longer occur beam body vibrate leakiness, run asking for mould Topic.More be not in since slump controls improper or concrete vibrating cross to shake, the feelings of the entire cant beam slump brought Condition.
Other features and advantages of the present invention will be illustrated in the following description, and partly becomes from specification It is clear that understand through the implementation of the invention.The main object of the present invention and further advantage can be by specification, power Specifically noted scheme is realized and is obtained in sharp claim.
Description of the drawings
The present invention will be further described in detail below in conjunction with the accompanying drawings.
Fig. 1 a, 1b, 1c are plane, facade and the side figure of bowing of the first module successively.
Fig. 2 a, 2b, 2c are plane, facade and the side figure of bowing of the second module successively.
Fig. 3 a, 3b, 3c are plane, facade and the side figure of bowing of third module successively.
Fig. 4 is that embodiment 1 installs forming figure;
Fig. 5 is that embodiment 2 installs forming figure;
Fig. 6 is that embodiment 3 installs forming figure.
Fig. 7 is that embodiment 4 installs forming figure.
Reference numeral:The first modules of 1-, the first connectors of 11-, the second modules of 2-, the second connectors of 21-, 3- thirds module, 31- third connectors.
Specific implementation mode
Embodiment 1
As shown in figure 4, prefabricated quick mounting type lattice girder system provided by the invention and its construction method, which is in field word Shape, lattice girder system include third module 3 and three the first modules 1, pass through at least three between two neighboring first module 1 Three modules 3 connect.
Together refering to Fig. 3 a, 3b and 3c, the third module 3 includes the reinforced concrete beams of linear type and is arranged in cross The third connector 31 at beam both ends, the reinforcing bar in third connector 31 stretch out outside concrete.First module 1 includes reinforced concrete Native longeron, the first connector 11 for being symmetricly set on longeron beam body two sides and for the hole across anchor pole, the first connector 11 Interior reinforcing bar stretches out outside concrete;Hole is located at the crossover sites of the first connector 11 and longeron and through setting in longeron beam body On;Longeron beam body both sides are symmetrically arranged with three pair of first connector 11.Reinforcing bar is connected by binding overlapped mode.
Rebar junction is filled with strength grade pea gravel concreten.Lattice girder system is in horizontally disposed, and lattice girder Both ends are fixedly connected with support pile.
Concrete construction method is as follows:
Step 1, according to design drawing, the prefabricated forming in factory by the first module 1 and third module 3;
Step 2 transports the first prefabricated module 1 and third module 3 to construction site;
The first prefabricated module 1 and third module 3 are deposited in stockyard by step 3;
Step 4 is required according to construction drawing, measures positioning;Anchor pole or anchor cable construction are carried out, pore-forming, decentralization anchor are specifically included Club shaft or steel strand wires, slip casting;Side slope is subjected to smooth processing;
Step 5, lattice girder module hoisting is in place;
Anchor pole or anchor cable are carried out tensioning fixation by step 6;
Anchor head is carried out sealing off and covering anchorage processing by step 7 using pea gravel concreten;
Step 8 sets up template, carries out concreting, continues anchor pole or anchor cable carries out tensioning fixation.
Embodiment 2
As shown in figure 5, prefabricated quick mounting type lattice girder system provided by the invention and its construction method, which is in field word Shape, including three the first modules 1, as shown in Fig. 1 a, 1b and 1c, first module 1 includes armored concrete longeron, symmetrically sets It sets in the first connector 11 of longeron beam body two sides and for the hole across anchor pole, the reinforcing bar in the first connector 11 stretches out mixed Solidifying soil is outer;Hole is located at the crossover sites of the first connector 11 and longeron and through setting with longeron beam;Longeron beam body both sides It is symmetrically arranged with three pair of first connector 11.By stretching out the reinforcing bar of the first connector 11 to bind between two neighboring first module 1 Mode that overlapped is connected.Rebar junction is filled with strength grade pea gravel concreten.Lattice girder system is in horizontally disposed, and lattice The both ends of structure beam are fixedly connected with support pile.
Concrete construction method is as follows:
Step 1, according to design drawing, the prefabricated forming in factory by the first module 1;
Step 2, by prefabricated the first module 1 transport to construction site;
The first prefabricated module 1 is deposited in stockyard by step 3;
Step 4 is required according to construction drawing, measures positioning;Anchor pole or anchor cable construction are carried out, pore-forming, decentralization anchor are specifically included Club shaft or steel strand wires, slip casting;Side slope is subjected to smooth processing;
Step 5, lattice girder module hoisting is in place;
Anchor pole or anchor cable are carried out tensioning fixation by step 6;
Anchor head is carried out sealing off and covering anchorage processing by step 7 using pea gravel concreten;
Step 8 sets up template, carries out concreting, continues anchor pole or anchor cable carries out tensioning fixation.
Embodiment 3
As shown in fig. 6, prefabricated quick mounting type lattice girder system provided by the invention and its construction method, which is in field word Shape, lattice girder system include nine the second modules 2, by stretching out the reinforcing bar of the second connector 21 between two neighboring second module 2 It is connected.
Together refering to Fig. 2 a, 2b and 2c, second module 2 includes that outer profile is that criss-cross armored concrete is prefabricated Part, be arranged criss-cross reinforced concrete precast member center hole and be arranged the second of four ends of prefabricated component Connector 21, the reinforcing bar in the second connector 21 stretch out outside concrete.Reinforcing bar is connected by binding overlapped mode.Rebar junction is equal Filled with strength grade pea gravel concreten.Lattice girder system is in horizontally disposed, and the both ends of lattice girder are fixedly connected with support pile.
Concrete construction method is as follows:
Step 1, according to design drawing, the prefabricated forming in factory by the second module 2;
Step 2, by prefabricated the second module 2 transport to construction site;
The second prefabricated module 2 is deposited in stockyard by step 3;
Step 4 is required according to construction drawing, measures positioning;Anchor pole or anchor cable construction are carried out, pore-forming, decentralization anchor are specifically included Club shaft or steel strand wires, slip casting;Side slope is subjected to smooth processing;
Step 5, lattice girder module hoisting is in place;
Anchor pole or anchor cable are carried out tensioning fixation by step 6;
Anchor head is carried out sealing off and covering anchorage processing by step 7 using pea gravel concreten;
Step 8 sets up template, carries out concreting, continues anchor pole or anchor cable carries out tensioning fixation.
Embodiment 4
As shown in fig. 7, prefabricated quick mounting type lattice girder system provided by the invention and its construction method, which is in field word Shape, lattice girder system include three the second modules 2 and two the first modules 1, pass through three the between two neighboring first module 1 Two modules 2 connect.2 four end sets of the second module of cross have the second connector 21, and the reinforcing bar in the second connector 21 stretches out mixed Solidifying soil is outer, for being connected with the module of both sides.Reinforcing bar is connected by mechanical sleeves.It is thin that rebar junction is filled with strength grade Stone concrete.Lattice girder system is in horizontally disposed, and the both ends of lattice girder are fixedly connected with support pile.
Concrete construction method is with reference to embodiment 1-3.
The foregoing is merely the preferable specific implementation modes of the present invention, but scope of protection of the present invention is not limited thereto, The change or replacement that any one skilled in the art is expected in the technical scope disclosed by the present invention should all be contained Lid is within protection scope of the present invention.
Prefabricated quick mounting type lattice girder system and its construction method provided by the invention, assembling speed is fast, easy for construction, efficiency It is high.When manufacturing module, it can be used repeatedly for the mold needed for production module, provides resource utilization.Simple structure, convenient for behaviour Make, system easy to control the quality, construction cost is low, and what is more important site operation is in use, the first module 1, the second module 2 and third It can on demand be arranged with flexible combination between module 3.Quick mounting type lattice girder system is assembled by module, can preferably handle Crossover sites.

Claims (10)

1. prefabricated quick mounting type lattice girder system, it is characterised in that:By the first module(1)Or second module(2)In one kind or Two kinds of combinations of person are formed by connecting, and are connected by rear pouring concrete section between adjacent block;
First module(1)Including armored concrete longeron, it is symmetricly set on the first connector of longeron beam body two sides(11) And for the hole across anchor pole, the first connector(11)Interior reinforcing bar stretches out outside concrete;Hole is located at the first connector(11) It is arranged with longeron beam with the crossover sites of longeron and extending vertically through;
Second module(2)It is that criss-cross reinforced concrete precast member, setting are mixed in criss-cross reinforcing bar including outer profile It coagulates the hole of soil prefabricated component center and the second connector in four ends of prefabricated component is set(21), the second connector(21)It is interior Reinforcing bar stretch out concrete outside;
Pouring concrete section is cast in the periphery of the exposed steel bar of adjacent first connector and/or the second connector after described.
2. prefabricated quick mounting type lattice girder system as described in claim 1, which is characterized in that longeron beam body both sides are symmetrically arranged with At least three pair of first connector(11).
3. prefabricated quick mounting type lattice girder system as described in claim 1, which is characterized in that cross reinforced concrete precast member Adjacent both sides angle is 75 ° -105 °.
4. prefabricated quick mounting type lattice girder system as described in claim 1, which is characterized in that lattice girder system includes at least three First module(1), two neighboring first module(1)Between corresponding first connector(11)Reinforcing bar be connected.
5. prefabricated quick mounting type lattice girder system as described in claim 1, which is characterized in that lattice girder system includes at least nine Second module(2), two neighboring second module(2)Between corresponding second connector(21)Reinforcing bar be connected.
6. prefabricated quick mounting type lattice girder system as described in claim 1, which is characterized in that lattice girder system further includes for connecing Long third module(3), third module(3)Reinforced concrete beams including linear type and the third at crossbeam both ends is set Connector(31), third connector(31)Interior reinforcing bar stretches out outside concrete.
7. prefabricated quick mounting type lattice girder system as claimed in claim 6, which is characterized in that lattice girder system includes third module (3)With at least three first modules(1), two neighboring first module(1)Between pass through at least three third modules(3)Connection.
8. such as the prefabricated quick mounting type lattice girder system of claim 1-7 any one of them, which is characterized in that bar connecting is used and tied up Prick overlap joint either welding or mechanical sleeves.
9. such as the prefabricated quick mounting type lattice girder system of claim 1-7 any one of them, which is characterized in that lattice girder system is in water Flat setting, and the both ends of lattice girder are fixedly connected with support pile.
10. a kind of construction method of such as prefabricated quick mounting type lattice girder system of claim 1-7 any one of them, feature exist In including the following steps:
Step 1, according to design drawing, by the first module(1), the second module(2)With third module(3)It is prefabricated into factory Shape;
Step 2, by prefabricated lattice girder modular transportation to construction site;
Prefabricated lattice girder module is deposited in stockyard by step 3;
Step 4 is required according to construction drawing, measures positioning, carries out anchor pole or anchor cable construction, side slope is carried out smooth processing;
Step 5, lattice girder module hoisting is in place;
Anchor pole or anchor cable are carried out tensioning fixation by step 6;
Anchor head is carried out sealing off and covering anchorage processing by step 7 using pea gravel concreten;
Step 8 sets up template, carries out concreting, continues anchor pole or anchor cable carries out tensioning fixation.
CN201810346507.0A 2018-04-18 2018-04-18 Prefabricated fast-assembling lattice beam system and construction method thereof Pending CN108301425A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810346507.0A CN108301425A (en) 2018-04-18 2018-04-18 Prefabricated fast-assembling lattice beam system and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810346507.0A CN108301425A (en) 2018-04-18 2018-04-18 Prefabricated fast-assembling lattice beam system and construction method thereof

Publications (1)

Publication Number Publication Date
CN108301425A true CN108301425A (en) 2018-07-20

Family

ID=62848588

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810346507.0A Pending CN108301425A (en) 2018-04-18 2018-04-18 Prefabricated fast-assembling lattice beam system and construction method thereof

Country Status (1)

Country Link
CN (1) CN108301425A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109024632A (en) * 2018-09-14 2018-12-18 南华大学 A kind of the precast lattice beam structure and assembly monolithic construction method of slope reinforcement
CN109098195A (en) * 2018-10-25 2018-12-28 四川宏洲绿高生态科技有限公司 Protective slope structure
CN109098194A (en) * 2018-10-25 2018-12-28 四川宏洲绿高生态科技有限公司 Protective slope structure
CN109487803A (en) * 2018-11-16 2019-03-19 西南交通大学 A kind of assembled skeleton slope protection and its construction method
CN111779021A (en) * 2020-07-30 2020-10-16 山东正元建设工程有限责任公司 Assembled retaining wall

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04128424A (en) * 1990-12-28 1992-04-28 Furii Kogyo Kk Method for constructing anchor supporting beam
JPH1193174A (en) * 1997-09-24 1999-04-06 Shimizu Corp Concrete grating crib and planting slope face and its construction method
CN107119698A (en) * 2017-05-11 2017-09-01 重庆建工住宅建设有限公司 A kind of prefabricated assembling type reinforced concrete side slope protection modular assembly and its construction method
CN206503150U (en) * 2016-08-30 2017-09-19 中国建筑西南勘察设计研究院有限公司 A kind of basalt composite reinforcing material anchor lattice beam retaining structure
CN209227556U (en) * 2018-04-18 2019-08-09 中建一局集团第二建筑有限公司 Prefabricated fast-assembling type lattice beam system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04128424A (en) * 1990-12-28 1992-04-28 Furii Kogyo Kk Method for constructing anchor supporting beam
JPH1193174A (en) * 1997-09-24 1999-04-06 Shimizu Corp Concrete grating crib and planting slope face and its construction method
CN206503150U (en) * 2016-08-30 2017-09-19 中国建筑西南勘察设计研究院有限公司 A kind of basalt composite reinforcing material anchor lattice beam retaining structure
CN107119698A (en) * 2017-05-11 2017-09-01 重庆建工住宅建设有限公司 A kind of prefabricated assembling type reinforced concrete side slope protection modular assembly and its construction method
CN209227556U (en) * 2018-04-18 2019-08-09 中建一局集团第二建筑有限公司 Prefabricated fast-assembling type lattice beam system

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109024632A (en) * 2018-09-14 2018-12-18 南华大学 A kind of the precast lattice beam structure and assembly monolithic construction method of slope reinforcement
CN109098195A (en) * 2018-10-25 2018-12-28 四川宏洲绿高生态科技有限公司 Protective slope structure
CN109098194A (en) * 2018-10-25 2018-12-28 四川宏洲绿高生态科技有限公司 Protective slope structure
CN109487803A (en) * 2018-11-16 2019-03-19 西南交通大学 A kind of assembled skeleton slope protection and its construction method
CN111779021A (en) * 2020-07-30 2020-10-16 山东正元建设工程有限责任公司 Assembled retaining wall

Similar Documents

Publication Publication Date Title
CN108301425A (en) Prefabricated fast-assembling lattice beam system and construction method thereof
CN108316323A (en) Prefabricated lattice beam and construction method thereof
CN105040829B (en) A kind of precast concrete primary-secondary beam attachment structure and its construction method
CN107100290A (en) A kind of prefabricated shear wall and overlapping plate node
CN108301317A (en) A kind of assembled bridge pier structure and its construction method
CN209227556U (en) Prefabricated fast-assembling type lattice beam system
CN107090908B (en) A kind of vertical prefabricated components joint connecting method
CN108385857B (en) A kind of precast prestressed connecting structure of wall of abnormity and assembly method
CN109972519A (en) The construction method of precast hollow pier mounting structure
CN110080294A (en) A kind of lid of assembled vault greatly across no column underground structure digs half reversed construction method
CN209227836U (en) Prefabricated concrete structure wall-column all steel is keyed structure
CN110409283A (en) It is a kind of based on retarded adhesive prestressed UHPC permanent template without the rib prestressed Self-curing combination beam of abdomen and construction method
CN207919759U (en) A kind of precast prestressed connecting structure of wall of abnormity
CN207260378U (en) A kind of assembled frame-shear structure curved scissors type combines keyway connection structure
CN109281422A (en) Prefabricated concrete structure wall-column all steel key connection structure and assembling method
CN210507502U (en) Prefabricated assembled concrete slab bed structure
CN111287206A (en) Assembly type concrete strip foundation module system and construction method
CN208105293U (en) Prefabricated lattice beam
CN208039023U (en) A kind of assembled bridge pier structure
CN211849546U (en) Assembled concrete strip foundation module system
CN207525906U (en) A kind of assembled frame-shear structure wall splitlevel connection structure
CN207525938U (en) A kind of assembled frame-shear structure column splitlevel connection structure
CN206646549U (en) Underground engineering assembly concrete air channel
CN108487506B (en) A kind of construction method of the assembled integral shear wall based on SP plate
CN107558606A (en) A kind of prefabricated construction construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180720