CN106592818A - Prefabricated shear wall and making method thereof - Google Patents

Prefabricated shear wall and making method thereof Download PDF

Info

Publication number
CN106592818A
CN106592818A CN201610928774.XA CN201610928774A CN106592818A CN 106592818 A CN106592818 A CN 106592818A CN 201610928774 A CN201610928774 A CN 201610928774A CN 106592818 A CN106592818 A CN 106592818A
Authority
CN
China
Prior art keywords
plate body
building block
reinforced mesh
fixed
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610928774.XA
Other languages
Chinese (zh)
Inventor
史世英
史炯
史炯一
濮梓闻
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610928774.XA priority Critical patent/CN106592818A/en
Publication of CN106592818A publication Critical patent/CN106592818A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/56Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Panels For Use In Building Construction (AREA)

Abstract

The invention relates to a prefabricated shear wall and a making method thereof, and belongs to the technical field of walls for fixing buildings. According to the prefabricated shear wall, a wall is prefabricated before construction of an existing bricked wall and composed of an outer formwork body, a steel bar grid and an inner formwork body sequentially from outside to inside. The inner formwork body and the outer formwork body are both fixedly provided with short pipes penetrating through the formwork bodies. The steel bar grid comprises an outer steel bar grid piece adjoining the outer formwork body and an inner steel bar grid piece adjoining the inner formwork body. Connecting steel bars are arranged in the wall at intervals and welded and fixed to the short pipes on the inner formwork body and the outer formwork body, the outer steel bar grid piece and the inner steel bar grid piece together in sequence. The outer formwork body, the steel bar grid and the inner formwork body are fixed together by pouring concrete in the steel bar grid during building construction on site. The prefabricated shear wall and the making method thereof are applicable to a high-rise building and do not need an outer support formwork.

Description

Precast shear wall and preparation method thereof
Technical field
The present invention relates to a kind of precast shear wall and preparation method thereof, belongs to the wall technology field of fixed buildings.
Background technology
Building construction is built using building industrialization mode and can be economized on resources, and reduces labour force, improves construction quality etc., root Calculate according to professional institution, water consume 79% can be reduced with reducing energy consumption 23%, lower template and consume 81%, construction site 20%.Therefore, Carry out the inevitable choice that assembled architecture is China's traditional architecture industry transition and upgrade.
Fabricated shear wall structure building mode mainly includes following four at present:
1)Assembled integral shear wall, integral prefabricated using shear wall wall body, edge member adopts cast-in-place form;
2)Two-sided overlapped shear wall, it is prefabricated using shear wall medial surface and lateral surface, it is middle cast-in-place;
3)One side overlapped shear wall, using building, peripheral shear wall lateral surface is prefabricated, and inner side is cast-in-place;
4)Inner deposited and outer hung, i.e. agent structure primary structure member adopt cast-in-place, and non-stress component adopts plug-in form.
The mode of construction of assembled integral shear wall, two-sided overlapped shear wall and one side overlapped shear wall is applied to typically to be built Build, and inner deposited and outer hung system is cast-in-place as inside subject bearing carrier is adopted, non-stress component is transported to using prefabrication In node district and agent structure component integral cast-in-situ after the plug-in installation in scene is in place, this mode does not break through code for structural design Limit, be applicable to skyscraper.
But, according to the applicant understood, inner deposited and outer hung system needs a large amount of templates of supporting, increased a large amount of engineering times and applies Work cost.
The content of the invention
The technical problem to be solved in the present invention is not enough for prior art, proposes that one kind is applied to skyscraper and is not required to Want precast shear wall of outer support template and preparation method thereof.
The present invention is to solve one of technical scheme of above-mentioned technical problem proposition to be:A kind of precast shear wall, this is prefabricated to cut Power wall is the ready-made a piece of body of wall before existing construction of building a wall, and the piece body of wall is by the exterior sheathing for setting gradually from outside to inside Body, steel grid and internal model plate body composition, the inside and outside template body are respectively and fixedly provided with the short tube of insertion plate body, the steel grid The interior reinforced mesh arranged including the outer reinforced mesh arranged close to external mold plate body and close to internal model plate body, interval in the piece body of wall Be provided with connection reinforcing bar, the connection reinforcing bar successively with internal model plate body on short tube, the short tube on external mold plate body, outer reinforced mesh and Interior reinforced mesh be welded and fixed one, the external mold plate body, steel grid and internal model plate body by construction toward reinforcing bar Cast-in-place concrete in grid is fixed as one.
The present invention using the effect of above-mentioned technical proposal is:The precast shear wall of the present invention is pre- before existing construction of building a wall A piece of body of wall made by elder generation, the piece body of wall include external mold plate body, steel grid and internal model plate body, and steel grid is before lifting construction Without casting concrete, overall structure is lighter, facilitates lifting construction, in place rear toward cast-in-place concrete in steel grid lifting, Meanwhile, inside and outside template body is formed the form boarding for exempting to support free removal, and scene is removed numerous and diverse support from, draws solid and remove mould The extensive works such as plate, meanwhile, external mold plate body, steel grid, internal model plate body and flooring collar tie beam and lower floor's shear wall top are reserved The concrete that scene pours jointly in cavity is integral structure, improves construction quality, is particularly well-suited to skyscraper.
The improvement of one of above-mentioned technical proposal is:Short tube one end in the internal model plate body stretch out internal model plate body and with interior steel Muscle mesh sheet is welded and fixed, and the short tube one end in the external mold plate body is stretched out external mold plate body and is welded and fixed with outer reinforced mesh.
The one of perfect of one of above-mentioned technical proposal be:Insulation plate body is fixed with the external mold plate body.
One of the perfect improvement of one of above-mentioned technical proposal is:The short tube other end in the external mold plate body stretches out external mold Plate body is simultaneously fixed in insulation plate body.
One of the perfect further improvement of one of above-mentioned technical proposal is:The external side of the warming plate is provided with multiple tracks to be used for The air flue hole of radiating dehumidifier, the air flue hole are closed on warming plate outside and are arranged and longitudinally through insulation plate body.
Perfect two of one of above-mentioned technical proposal are:The inside and outside reinforced mesh is by the lengthways main steel bar being welded to each other Constitute with horizontal secondary muscle, in the steel grid, be provided with reinforcement.
The present invention is to solve the two of the technical scheme that above-mentioned technical problem is proposed to be:A kind of precast shear wall, this is prefabricated to cut Power wall is a piece of body of wall for being assembled by building block from bottom to top before existing construction of building a wall in advance, and the building block is formed with high along which The cavity and little post holes of degree direction insertion block body, the cavity and little post holes in every layer of building block are adjacent with what is assembled up and down respectively Cavity and little post holes in layer building block connects, and the building block is formed with half horizontal recessed channel, every layer of building block in its top surface and bottom surface Half recessed channel between adjacent layer building block is formed with a complete installing hole to merging;Steel grid is provided with the piece body of wall, institute Stating steel grid includes inside and outside reinforced mesh and connects the connection reinforcing bar of inside and outside reinforced mesh, the inside and outside reinforced mesh And connection reinforcing bar is welded to one another and is integrally fixed, the inside and outside reinforced mesh is by the lengthways main steel bar being welded to each other and laterally Secondary muscle composition, the multi-layer building block for assembling up and down is by pouring into a mould high-strength concrete or building up and down in the little post holes that part connects Adhesive glue is laid between the building block of block and is fixed to one another integral, the lengthways main steel bar of the inside and outside reinforced mesh is by being located at cavity Interior, the horizontal secondary muscle is successively located in half recessed channel of every layer of building block, and the connection reinforcing bar is successively located in the cavity of building block.
One of two improvement of above-mentioned technical proposal is:Cast is formed respectively with the middle part of horizontal bar at the block tops and bottom Between convex tendon and groove, every layer of building block and the adjacent layer building block that assembles up and down, by convex tendon and groove, the grafting of para-position tenon closes solid one by one Determine or pass through convex tendon and groove dislocation tenon grafting is closed and fixed;The convex tendon and groove are respectively at the little post holes of the building block While muscle and while groove.
The two of the improvement of the two of above-mentioned technical proposal are:Every body of wall of the precast shear wall can be connected with neighboring walls, Every body of wall be by made by being assembled after the shape in body of wall, L-shaped, T-shaped or cross building block permutation and combination up and down a shape, L-shaped, T-shaped or cross shear wall.
The three of the improvement of the two of above-mentioned technical proposal are:The precast shear wall wall outer side is fixed with insulation plate body, described Short tube is fixed with warming plate body, described connection reinforcing bar one end is stretched out and is fixed in the short tube;The external side of the warming plate Multiple tracks is provided with for the air flue hole of dehumidifier of radiating, the air flue hole is closed on warming plate outside and arranged and longitudinally through warming plate Body.
The present invention is to solve the three of the technical scheme that above-mentioned technical problem is proposed to be:A kind of precast shear wall manufacture method, Precast shear wall as claimed in claim 1 or 2 is made, is comprised the following steps:
1)Before construction of building a wall, will pair muscle be laterally first lattice piece with reinforcement welding is connected, then lattice piece and lengthways main steel bar will mutually be welded To form the steel grid containing inside and outside reinforced mesh;
2)The external mold plate body for being fixed with insertion plate body short tube is affiliated on outer reinforced mesh, insertion plate body short tube will be fixed with Internal model plate body is affiliated on interior reinforced mesh, by connection reinforcing bar two ends be weldingly fixed in the short tube on inside and outside template body with Inside and outside template body is made to be welded and fixed one with outer reinforced mesh and interior reinforced mesh;
3)In construction, plate body is lifted it is in place, by toward cast-in-place concrete in steel grid by external mold plate body, bar-mat reinforcement Lattice and internal model plate body are fixed as one.
The present invention is to solve the four of the technical scheme that above-mentioned technical problem is proposed to be:A kind of precast shear wall manufacture method, Precast shear wall as claimed in claim 1 or 2 is made, is comprised the following steps:
1)Before construction of building a wall, the external mold plate body for being fixed with insertion plate body short tube is affiliated on outer reinforced mesh, by exterior sheathing Short tube on body is welded and fixed on outer reinforced mesh, and the internal model plate body for being fixed with insertion plate body short tube is affiliated in interior bar-mat reinforcement On piece, the short tube on internal model plate body is weldingly fixed on interior reinforced mesh;
2)Inside and outside template body is oppositely arranged, by connection reinforcing bar two ends be weldingly fixed in the short tube on inside and outside template body with Make on inside and outside template body, outer reinforced mesh and interior reinforced mesh are welded and fixed one;
3)In construction, plate body is lifted it is in place, by toward cast-in-place concrete in steel grid by external mold plate body, bar-mat reinforcement Lattice and internal model plate body are fixed as one.
The present invention is to solve the five of the technical scheme that above-mentioned technical problem is proposed to be:A kind of precast shear wall manufacture method, The precast shear wall as described in claim 5,6 or 7 is made, is comprised the following steps:
1)Before construction of building a wall, first the lengthways main steel bar of inside and outside reinforced mesh is temporarily fixed on installed base, will horizontal pair muscle Multiple lattice pieces are welded in advance with reinforcing bar is connected, and are then assembled orlop building block and are caused the lengthways main steel bar of inside and outside reinforced mesh Through the cavity of building block, lattice piece is placed on into the upper end of orlop building block then and makes laterally pair muscle be located at the half of orlop building block In recessed channel, connection reinforcing bar be located in the cavity of orlop building block, finally lattice piece is welded and fixed with each cage bar;
2)Held in the palm using a fork, the fork support is made up of located at the fork on flat board one flat plate and interval, under most The fork of fork support is inserted at the top of layer building block the lengthways main steel bar of inside and outside reinforced mesh;
3)Fork support is moved upwards up to above the lengthways main steel bar of inside and outside reinforced mesh and is located, second layer building block is fallen within into fork support then Fork on, then fork support is moved down at the top of orlop building block, and then will fork support fork extract out in, Lattice piece is then placed on second layer building block by the lengthways main steel bar of outer reinforced mesh so that second layer building block falls in orlop building block Top is simultaneously welded and fixed with cage bar, and laterally pair muscle is located in half recessed channel of second layer building block, connected reinforcing bar and be located at the second layer In the cavity of building block, finally in the longitudinal direction that the fork of fork support is inserted at the top of second layer building block inside and outside reinforced mesh Cage bar, then repeats above-mentioned steps, successively repeatedly.
Description of the drawings
The invention will be further described below in conjunction with the accompanying drawings:
Fig. 1 is the structural representation one of the precast shear wall of the embodiment of the present invention one.
Fig. 2 is the structural representation two of the precast shear wall of the embodiment of the present invention one.
Fig. 3 is the precast shear wall structural representation one that the embodiment of the present invention one installs insulation plate body additional.
Fig. 4 is the precast shear wall structural representation two that the embodiment of the present invention one installs insulation plate body additional.
Fig. 5 is the precast shear wall structural representation one that the embodiment of the present invention one installs reinforcement additional.
Fig. 6 is the precast shear wall structural representation two that the embodiment of the present invention one installs reinforcement additional.
Fig. 7 is the structural representation of the precast shear wall of the embodiment of the present invention two.
Fig. 8 is the structural representation one of the precast shear wall of the embodiment of the present invention three.
Fig. 9 is the structural representation two of the precast shear wall of the embodiment of the present invention three.
Figure 10 is the structural representation three of the precast shear wall of the embodiment of the present invention three.
Figure 11 is the building block axonometric chart one of Fig. 8.
Figure 12 is the upward view of Figure 11.
Figure 13 is the front view of Figure 11.
Figure 14 is the sectional view of Figure 11.
Figure 15 is the building block axonometric chart two of Fig. 8.
The building block axonometric chart three of Figure 16 Fig. 8.
The building block axonometric chart four of Figure 17 Fig. 8.
Specific embodiment
Embodiment one
The precast shear wall of the present embodiment, as depicted in figs. 1 and 2, the precast shear wall is to be made before existing construction of building a wall in advance Into a piece of body of wall.The piece body of wall is made up of the external mold plate body 1, steel grid 2 and internal model plate body 3 for setting gradually from outside to inside.
As shown in figure 1, internal model plate body 3 and external mold plate body 1 adopt heat insulation formwork, intermediate board body >=130mm.Such as Fig. 2 institutes Show, external mold plate body 1 is adopted exempts to tear open, exempts to support heat insulation formwork, and internal model plate body 3 is mixed using the prefabricated steel wire of use that side is welded with short tube Solidifying soil thin plate, intermediate board body >=130mm.
Internal model plate body 3 and external mold plate body 1 are respectively and fixedly provided with the short tube 2-3 of insertion plate body, and steel grid 2 is included close to exterior sheathing Outer reinforced mesh 2-1 and the interior reinforced mesh 2-2 arranged close to internal model plate body 3 that body 1 is arranged.
Connection reinforcing bar 2-4 is interval with the piece body of wall, connect reinforcing bar 2-4 successively with internal model plate body 3 on short tube 2-3, Short tube 2-3, outer reinforced mesh 2-1 and interior reinforced mesh 2-2 on external mold plate body is welded and fixed one.External mold plate body 1, bar-mat reinforcement Lattice 2 and internal model plate body 3 are by being fixed as one toward cast-in-place concrete in steel grid in construction.
As shown in Figure 3 and Figure 4, insulation plate body 4 is fixed with the external mold plate body 1 of the present embodiment.Insulation plate body 4 is along wall thickness side To horizontal through hole is provided with, the short tube 2-3 in external mold plate body stretches out and is fixed in the horizontal through hole, and connection reinforcing bar 2-4 stretches out simultaneously It is welded in short tube 2-3, and is wrapped by cast-in-place concrete.
Multiple tracks is provided with for the air flue hole 4-1 of dehumidifier of radiating on the outside of the insulation plate body 4 of the present embodiment, air flue hole 4-1 closes on Warming plate outside is arranged and longitudinally through insulation plate body.Air flue hole 4-1 includes longitudinal gas channel hole and transverse air channel hole.
Core pole hole 5 is additionally provided with insulation plate body 4, core pole hole 5 includes horizontal core pole hole and is provided with longitudinal core of stem stem reinforcing bar 6 Post holes.Connection reinforcing bar 2-4 can be lengthened makes to weld with stem stem reinforcing bar 6 outside the extended shear wall in one end and by horizontal core pole hole, When concrete is injected in steel grid 2 and stem stem longitudinal hole, being partly squeezed into transverse holes parcel wherein connection reinforcing bar 2-4 becomes Hang the little outrigger of reinforced concrete of heat-insulation layer.
Intermediate board body >=the 130mm of the present embodiment, interior reinforced mesh 2-2 and outer reinforced mesh 2-1 are by being welded to each other Lengthways main steel bar and laterally pair muscle composition, are provided with reinforcement 2-5 in steel grid(As shown in Figure 5 and Figure 6).Interior reinforced mesh 2-2 It is by the lengthways main steel bar and horizontal stroke of the muscle trade mark according to architectural design parameter determination, diameter and its centre-to-centre spacing with outer reinforced mesh 2-1 It is welded to the arrangement of secondary muscle.It is at least provided with more than 3 in per square of short tube 2-3 on internal model plate body 3 and external mold plate body 1, short Pipe diameter >=φ 26mm, short tube wall thickness >=1.5mm, length equal or exceed template body thickness.
When internal model plate body 3 and less 1 overall dimensions of external mold plate body, the precast shear wall manufacture method of the present embodiment, system Make above-mentioned precast shear wall, comprise the following steps:
1)Before construction of building a wall, horizontal secondary muscle is welded as into lattice piece with reinforcing bar 2-4 is connected first, then lattice piece and lengthways main steel bar are mutually welded Connect to form the steel grid 2 containing interior reinforced mesh 2-2 and outer reinforced mesh 2-1;
2)The external mold plate body 1 for being fixed with insertion plate body short tube is affiliated on outer reinforced mesh 2-1, insertion plate body will be fixed with short The internal model plate body 3 of pipe is affiliated on interior reinforced mesh 2-2, and the two ends of connection reinforcing bar 2-4 are weldingly fixed on internal model plate body 3 and outer In short tube 2-3 on template body 1, so that internal model plate body, external mold plate body 1 are welded with outer reinforced mesh 2-1 and interior reinforced mesh 2-2 It is fixed as one;It is outer with cement based cementitious matter filleting plug-hole in each plate body(Short tube hole)And batch scrape smooth;
3)In construction, plate body is lifted it is in place, by toward cast-in-place concrete in steel grid 2 by external mold plate body 1, reinforcing bar Grid 2 and internal model plate body 3 are fixed as one.
In order to form RC Continuous formula shear wall structure, after one piece of shear wall is installed, adjacent upper strata is lifted Shear wall, will be the lengthways main steel bar in the shear wall of upper strata wrong with the lengthways main steel bar in lower floor's shear wall after shear wall lifting in upper strata is in place Position docking makes the lengthways main steel bar that termination folding has hook stretch into through floor space in the steel grid 2 in lower floor's shear wall, and Arrange in the steel grid 2 that negative and positive angle is horizontal and the longitudinally connected reinforcing member of levels, it is cast-in-place enter concrete after.
After lifting is in place, product during in order to prevent shear wall upper end by wind-force or pour concrete compacted by jolting in steel grid 2 Raw partial center phenomenon, can be fixedly installed the non-dismantling formwork or laminated floor slab of cast-in-place walls to replace in the para-position of shear wall upper end elder generation It is conventional to position support bars by bodies of wall in a large number.
When large bay floor template is constructed, interim jacking beam in the middle part of floor template, must be set(Steel pipe), because of lower floor's flooring now Pouring concrete is not yet hardened, thus outside the part tension rib spreading during shear wall bottom or middle part steel pore can be arranged on a small quantity Stretch, to arrange a small amount of support bar by standing on metope and the interim pipe back support floor template of splayed Jing.When hollow in shear wall It is the interim joist of dismountable upper shifting and its support after the cast-in-place concrete of layer and reinforced concrete floor and the hardening of non-dismantling formwork layer Bar, and overhanging section of tension rib is wiped out, so repeatedly until top layer.
Embodiment two
The precast shear wall of the present embodiment, is the improvement on the basis of embodiment one, as shown in fig. 7, different from embodiment one It is:Due to internal model plate body 3 and 1 overall dimensions of external mold plate body it is larger and relatively thin, the internal model plate body 3 and external mold plate body 1 of the present embodiment The thin formwork structure of steel wire concrete, intermediate board body >=130mm are adopted.Stretch out internal model plate body in short tube 2-3 one end in internal model plate body 3 3 and be welded and fixed with interior reinforced mesh 2-2, the short tube 2-3 one end in external mold plate body 1 stretch out external mold plate body and with outer reinforced mesh 2-1 is welded and fixed.
The precast shear wall manufacture method of the present embodiment, makes above-mentioned precast shear wall, comprises the following steps:
1)Before construction of building a wall, the external mold plate body 1 for being fixed with insertion plate body short tube is affiliated on outer reinforced mesh 2-1, will be outer Short tube 2-3 on template body 1 is welded and fixed on outer reinforced mesh 2-1, and the internal model plate body 3 for being fixed with insertion plate body short tube is hung Lean against on interior reinforced mesh 2-2, the short tube 2-3 on internal model plate body 3 is weldingly fixed on interior reinforced mesh 2-2;
2)Internal model plate body 3 and external mold plate body 1 are oppositely arranged, the two ends of connection reinforcing bar 2-4 are weldingly fixed on into 3 He of internal model plate body In short tube 2-3 on external mold plate body 1, so that internal model plate body, external mold plate body, outer reinforced mesh 2-1 and interior reinforced mesh 2-2 welding It is fixed as one;
3)In construction, plate body is lifted it is in place, by toward cast-in-place concrete in steel grid 2 by external mold plate body 1, reinforcing bar Grid 2 and internal model plate body 3 are fixed as one.
Embodiment three
The precast shear wall of the present embodiment, is the improvement on the basis of embodiment one and embodiment two, as shown in Fig. 8 to Figure 10, The precast shear wall is the advance a piece of body of wall for being assembled by building block 7 from bottom to top before existing construction of building a wall, and building block 7 is formed with Along the cavity 7-1 and little post holes 7-2 of its short transverse insertion block body.
Building block 7 can with the industrial residue such as cement, aggregate chips or building waste, mine tailing in formwork erection on Jing anvil swage with every ㎝ To molded, building block 7 is can be in the hollow plate of mechanical hand assembling for 200 kilograms of pressure.
Cavity 7-1 and little post holes 7-2 in every layer of building block 7 respectively with the adjacent layer building block for assembling up and down in cavity 7-1 Connect with little post holes 7-2, building block 7 is formed with half horizontal recessed channel 7-3 in its top surface and bottom surface, every layer of building block 7 is built with adjacent layer Half recessed channel 7-3 between block is formed with a complete installing hole to merging.
Steel grid 2 is provided with the piece body of wall.Steel grid 2 include interior reinforced mesh 2-2, outer reinforced mesh 2-1 and Connect the connection reinforcing bar 2-4 of inside and outside reinforced mesh 2-1.Interior reinforced mesh 2-2, outer reinforced mesh 2-1 and connection reinforcing bar 2-4 It is welded to one another and is integrally fixed.
By the lengthways main steel bar being welded to each other and laterally, pair muscle is constituted interior reinforced mesh 2-2 and outer reinforced mesh 2-1, up and down The multi-layer building block 7 for assembling is by pouring into a mould high-strength concrete or in the building block for assembling up and down in little post holes 7-2 that connects of part Between lay adhesive glue and be fixed to one another integral.The lengthways main steel bar of interior reinforced mesh 2-2 and outer reinforced mesh 2-1 is by being located at sky In the 7-1 of chamber, laterally pair muscle is successively located in half recessed channel 7-3 of every layer of building block, connects the cavity 7- that reinforcing bar 2-4 is successively located at building block In 1.
Be formed respectively with cast convex tendon and groove at the top of the building block 7 of the present embodiment and bottom in the middle part of horizontal bar, every layer of building block 7 with Between the adjacent layer building block for assembling up and down, by convex tendon and groove, the grafting of para-position tenon is closed fixed or passes through convex tendon and groove mistake one by one Position tenon grafting is closed and is fixed;Convex tendon and groove be respectively positioned at building block 7 little post holes 7-2 at while muscle and while groove.
Every body of wall of the precast shear wall of the present embodiment can be connected with neighboring walls, and every body of wall is by body of wall A shape made by being assembled after one shape, L-shaped, T-shaped or cross building block permutation and combination up and down(As shown in Figure 11 to 15), L-shaped(As schemed Shown in 16), T-shaped(As shown in figure 17)Or cross shear wall.
Certainly, the wall outer side of the precast shear wall of the present embodiment can also be fixed with insulation plate body.Warming plate is external Side also is provided with multiple tracks for air flue hole for dehumidifier of radiating, etc..
The precast shear wall manufacture method of the present embodiment, makes above-mentioned precast shear wall, comprises the following steps:
1)Before construction of building a wall, the lengthways main steel bar of interior reinforced mesh 2-2 and outer reinforced mesh 2-1 is temporarily fixed at into erecting bed first On seat, horizontal secondary muscle is welded into into multiple lattice pieces in advance with reinforcing bar 2-4 is connected, then assembles orlop building block 7 and cause interior steel Lattice piece is then placed on orlop block by cavity 7-1 of the lengthways main steel bar of muscle mesh sheet 2-2 and outer reinforced mesh 2-1 through building block 7 The upper end of block 7 simultaneously makes laterally pair muscle be located in half recessed channel 7-3 of orlop building block, connects reinforcing bar 2-4 and be located at orlop building block In cavity 7-1, finally lattice piece is welded and fixed with each cage bar;
2)Held in the palm using a fork, fork support is made up of located at the fork on flat board one flat plate and interval, built near orlop By the lengthways main steel bar of reinforced mesh 2-2 and outer reinforced mesh 2-1 in the fork insertion of fork support at the top of block 7;
3)Fork support is moved upwards up to above the lengthways main steel bar of interior reinforced mesh 2-2 and outer reinforced mesh 2-1 and is located, then by second Layer building block 7 is fallen within the fork of fork support, and then fork support is moved down at the top of orlop building block 7, and then will The fork of fork support extracts the lengthways main steel bar of interior reinforced mesh 2-2 and outer reinforced mesh 2-1 out so that second layer building block 7 falls under most In layer building block, then lattice piece is placed on above second layer building block 7 and is welded and fixed with cage bar, and make laterally pair muscle be located at the second layer In half recessed channel 7-3 of building block 7, connection reinforcing bar 2-4 be located in the cavity 7-1 of second layer building block 7, finally near second layer building block By the lengthways main steel bar of reinforced mesh 2-2 and outer reinforced mesh 2-1 in the fork insertion of fork support at 7 top, then repeat Step is stated, successively repeatedly.
The present invention is not limited to above-described embodiment, for example:For solve various precast shear wall and neighboring edge Special-Shaped Column and Reinforced beam needed for filling wall top, with can synchronous cast-in-place concrete further improving quantities and efficiency.Root in the same manner According to each Special-Shaped Column and the shape of beam, external mold plate body 1 and internal model plate body 3 are prefabricated into mixed with the high-strength mixed of steel fibre or reinforcing bar piece or circle Solidifying soil Steel Thin-Wall fiber bar concrete form, short tube 2-3 are may be alternatively provided on reinforcing bar piece or circle;To solve in Special-Shaped Column or basement reinforcing bar It is easy to casting concrete when arranging overstocked, the steel grid 2 of every story height can be made the combination of multistage multi-disc, shearing can be placed in Wall body of wall upper end, both sides are arranged exempts to tear open and exempts to support thin template, and penetrate in each short tube 2-3 on plate body connection reinforcing bar 2-4 together with Steel grid 2 is welded.The technical scheme that all employing equivalents are formed, all falls within the protection domain of application claims.

Claims (13)

1. a kind of precast shear wall, it is characterised in that:The precast shear wall is ready-made a piece of before existing construction of building a wall Body of wall, the piece body of wall are made up of the external mold plate body, steel grid and internal model plate body for setting gradually from outside to inside, the inside and outside mould Plate body is respectively and fixedly provided with the short tube of insertion plate body, the steel grid include close to external mold plate body the outer reinforced mesh for arranging and close to The interior reinforced mesh that internal model plate body is arranged, is interval with connection reinforcing bar in the piece body of wall, the connection reinforcing bar successively with inner template The short tube on short tube, external mold plate body, outer reinforced mesh and interior reinforced mesh on body is welded and fixed integrally, the external mold plate body, Steel grid and internal model plate body are by being fixed as one toward cast-in-place concrete in steel grid in construction.
2. precast shear wall as claimed in claim 1, it is characterised in that:Stretch out internal model in short tube one end in the internal model plate body Plate body is simultaneously welded and fixed with interior reinforced mesh, the short tube one end in the external mold plate body stretch out external mold plate body and with outer reinforced mesh It is welded and fixed.
3. precast shear wall as claimed in claim 1 or 2, it is characterised in that:Insulation plate body is fixed with the external mold plate body.
4. precast shear wall as claimed in claim 3, it is characterised in that:The short tube other end in the external mold plate body stretches out outer Template body is simultaneously fixed in insulation plate body.
5. precast shear wall as claimed in claim 3, it is characterised in that:The external side of the warming plate is provided with multiple tracks for radiating The air flue hole of dehumidifier, the air flue hole are closed on warming plate outside and are arranged and longitudinally through insulation plate body.
6. precast shear wall as claimed in claim 1 or 2, it is characterised in that:The inside and outside reinforced mesh is by being welded to each other Lengthways main steel bar and horizontal pair muscle composition, be provided with reinforcement in the steel grid.
7. a kind of precast shear wall, it is characterised in that:The precast shear wall is in advance by building block under before existing construction of building a wall And on a piece of body of wall that assembles, the building block is formed with cavity and little post holes along its short transverse insertion block body, often Layer building block in cavity and little post holes respectively with the adjacent layer building block for assembling up and down in cavity and little post holes connect, the block Block is formed with half horizontal recessed channel in its top surface and bottom surface, and half recessed channel between every layer of building block and adjacent layer building block is formed with to merging One complete installing hole;Steel grid is provided with the piece body of wall, the steel grid includes inside and outside reinforced mesh and connection The connection reinforcing bar of inside and outside reinforced mesh, the inside and outside reinforced mesh and connection reinforcing bar are welded to one another and are integrally fixed, described By the lengthways main steel bar being welded to each other and laterally, pair muscle is constituted inside and outside reinforced mesh, and the multi-layer building block for assembling up and down is by portion High-strength concrete is poured into a mould in the little post holes of split-phase insertion or adhesive glue is laid between the building block for assembling up and down and is fixed to one another into Integrally, by being located in cavity, the horizontal secondary muscle is successively located at the half of every layer of building block to the lengthways main steel bar of the inside and outside reinforced mesh In recessed channel, the connection reinforcing bar is successively located in the cavity of building block.
8. precast shear wall as claimed in claim 7, it is characterised in that:At the block tops and bottom in the middle part of horizontal bar respectively It is formed with cast convex tendon and groove, by convex tendon and groove para-position tenon one by one between every layer of building block and the adjacent layer building block that assembles up and down Grafting is closed fixed or is closed and fixed by convex tendon and groove dislocation tenon grafting;The convex tendon and groove are to be located at the building block respectively At little post holes while muscle and while groove.
9. precast shear wall as claimed in claim 7, it is characterised in that:Every body of wall of the precast shear wall can be with adjacent wall Body connects, and every body of wall is one by made by being assembled after the shape in body of wall, L-shaped, T-shaped or cross building block permutation and combination up and down Shape, L-shaped, T-shaped or cross shear wall.
10. precast shear wall as claimed in claim 7, it is characterised in that:The precast shear wall wall outer side is fixed with insulation Plate body, is fixed with short tube in the warming plate body, described connection reinforcing bar one end is stretched out and is fixed in the short tube;The insulation Multiple tracks is provided with the outside of plate body for the air flue hole of dehumidifier of radiating, the air flue hole is closed on warming plate outside and arranges and longitudinally pass through Logical insulation plate body.
A kind of 11. precast shear wall manufacture methods, make precast shear wall as claimed in claim 1 or 2, it is characterised in that bag Include following steps:
1)Before construction of building a wall, will pair muscle be laterally first lattice piece with reinforcement welding is connected, then lattice piece and lengthways main steel bar will mutually be welded To form the steel grid containing inside and outside reinforced mesh;
2)The external mold plate body for being fixed with insertion plate body short tube is affiliated on outer reinforced mesh, insertion plate body short tube will be fixed with Internal model plate body is affiliated on interior reinforced mesh, by connection reinforcing bar two ends be weldingly fixed in the short tube on inside and outside template body with Inside and outside template body is made to be welded and fixed one with outer reinforced mesh and interior reinforced mesh;
3)In construction, plate body is lifted it is in place, by toward cast-in-place concrete in steel grid by external mold plate body, bar-mat reinforcement Lattice and internal model plate body are fixed as one.
A kind of 12. precast shear wall manufacture methods, make precast shear wall as claimed in claim 1 or 2, it is characterised in that bag Include following steps:
1)Before construction of building a wall, the external mold plate body for being fixed with insertion plate body short tube is affiliated on outer reinforced mesh, by exterior sheathing Short tube on body is welded and fixed on outer reinforced mesh, and the internal model plate body for being fixed with insertion plate body short tube is affiliated in interior bar-mat reinforcement On piece, the short tube on internal model plate body is weldingly fixed on interior reinforced mesh;
2)Inside and outside template body is oppositely arranged, by connection reinforcing bar two ends be weldingly fixed in the short tube on inside and outside template body with Make on inside and outside template body, outer reinforced mesh and interior reinforced mesh are welded and fixed one;
3)In construction, plate body is lifted it is in place, by toward cast-in-place concrete in steel grid by external mold plate body, bar-mat reinforcement Lattice and internal model plate body are fixed as one.
A kind of 13. precast shear wall manufacture methods, make the precast shear wall as described in claim 5,6 or 7, it is characterised in that Comprise the following steps:
1)Before construction of building a wall, first the lengthways main steel bar of inside and outside reinforced mesh is temporarily fixed on installed base, will horizontal pair muscle Multiple lattice pieces are welded in advance with reinforcing bar is connected, and are then assembled orlop building block and are caused the lengthways main steel bar of inside and outside reinforced mesh Through the cavity of building block, lattice piece is placed on into the upper end of orlop building block then and makes laterally pair muscle be located at the half of orlop building block In recessed channel, connection reinforcing bar be located in the cavity of orlop building block, finally lattice piece is welded and fixed with each cage bar;
2)Held in the palm using a fork, the fork support is made up of located at the fork on flat board one flat plate and interval, under most The fork of fork support is inserted at the top of layer building block the lengthways main steel bar of inside and outside reinforced mesh;
3)Fork support is moved upwards up to above the lengthways main steel bar of inside and outside reinforced mesh and is located, second layer building block is fallen within into fork support then Fork on, then fork support is moved down at the top of orlop building block, and then will fork support fork extract out in, Lattice piece is then placed on second layer building block by the lengthways main steel bar of outer reinforced mesh so that second layer building block falls in orlop building block Top is simultaneously welded and fixed with cage bar, and laterally pair muscle is located in half recessed channel of second layer building block, connected reinforcing bar and be located at the second layer In the cavity of building block, finally in the longitudinal direction that the fork of fork support is inserted at the top of second layer building block inside and outside reinforced mesh Cage bar, then repeats above-mentioned steps, successively repeatedly.
CN201610928774.XA 2016-10-31 2016-10-31 Prefabricated shear wall and making method thereof Pending CN106592818A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610928774.XA CN106592818A (en) 2016-10-31 2016-10-31 Prefabricated shear wall and making method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610928774.XA CN106592818A (en) 2016-10-31 2016-10-31 Prefabricated shear wall and making method thereof

Publications (1)

Publication Number Publication Date
CN106592818A true CN106592818A (en) 2017-04-26

Family

ID=58555798

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610928774.XA Pending CN106592818A (en) 2016-10-31 2016-10-31 Prefabricated shear wall and making method thereof

Country Status (1)

Country Link
CN (1) CN106592818A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107023161A (en) * 2017-06-06 2017-08-08 上海应用技术大学 A kind of prefabricated band reinforcing bar ribbing shear wall formwork and its construction method
CN107476468A (en) * 2017-09-08 2017-12-15 滨州盛华实业集团有限公司 A kind of building block assembled heat insulation composite wall body structure
CN108385917A (en) * 2018-02-24 2018-08-10 中十冶集团环保科技有限公司 A kind of external wall thermal insulation/decoration integration board and exempt from external mold exterior wall installation method
WO2021056256A1 (en) * 2019-09-25 2021-04-01 邹胜斌 Modularized strong-constraint combined shear wall and construction method therefor

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2388247Y (en) * 1998-12-18 2000-07-19 北京亿利达轻体房屋有限公司 Cast-in-place concrete metal lath trabs
CN2527614Y (en) * 2001-12-30 2002-12-25 北京城建耐泰安建材有限责任公司 Heat insulating bearing wall body need no removal of mould
CN102061743A (en) * 2010-11-26 2011-05-18 清华大学建筑设计研究院 Frame-shear wall structure building of dismantling-free prefabricated reinforced concrete formwork and construction method thereof
CN103255856A (en) * 2012-02-15 2013-08-21 天津三春科技有限公司 Building technology for prefabricating integral wall plate by aerated concrete
CN104018622A (en) * 2014-06-07 2014-09-03 王睿敏 Reinforcement mesh easy to automatically produce for shear wall, production method of reinforcement mesh and formed shear wall
CN104389360A (en) * 2014-12-29 2015-03-04 株洲博尔曼科技发展有限公司 Externally suspended insulation board type reinforcement brickwork shear wall system and construction method thereof
CN104674987A (en) * 2015-02-13 2015-06-03 南京工业大学 Self-heat-preservation superposed shear wall structure and construction process
CN204456534U (en) * 2015-02-13 2015-07-08 南京工业大学 Self-insulation superimposed shear wall structure
CN105317137A (en) * 2015-10-14 2016-02-10 史世英 Prefabricated wall body, wall panel and construction method thereof, and production method of prefabricated wall panel
CN205242658U (en) * 2015-11-28 2016-05-18 常化南 External wall insulation adds muscle composite sheet, Thermal insulation wall integral structure
CN105908859A (en) * 2016-05-16 2016-08-31 苏州市世好建材新技术工程有限公司 Insulated prefabricated walls and prefabricated houses
CN206220297U (en) * 2016-10-31 2017-06-06 史世英 Precast shear wall

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2388247Y (en) * 1998-12-18 2000-07-19 北京亿利达轻体房屋有限公司 Cast-in-place concrete metal lath trabs
CN2527614Y (en) * 2001-12-30 2002-12-25 北京城建耐泰安建材有限责任公司 Heat insulating bearing wall body need no removal of mould
CN102061743A (en) * 2010-11-26 2011-05-18 清华大学建筑设计研究院 Frame-shear wall structure building of dismantling-free prefabricated reinforced concrete formwork and construction method thereof
CN103255856A (en) * 2012-02-15 2013-08-21 天津三春科技有限公司 Building technology for prefabricating integral wall plate by aerated concrete
CN104018622A (en) * 2014-06-07 2014-09-03 王睿敏 Reinforcement mesh easy to automatically produce for shear wall, production method of reinforcement mesh and formed shear wall
CN104389360A (en) * 2014-12-29 2015-03-04 株洲博尔曼科技发展有限公司 Externally suspended insulation board type reinforcement brickwork shear wall system and construction method thereof
CN104674987A (en) * 2015-02-13 2015-06-03 南京工业大学 Self-heat-preservation superposed shear wall structure and construction process
CN204456534U (en) * 2015-02-13 2015-07-08 南京工业大学 Self-insulation superimposed shear wall structure
CN105317137A (en) * 2015-10-14 2016-02-10 史世英 Prefabricated wall body, wall panel and construction method thereof, and production method of prefabricated wall panel
CN205242658U (en) * 2015-11-28 2016-05-18 常化南 External wall insulation adds muscle composite sheet, Thermal insulation wall integral structure
CN105908859A (en) * 2016-05-16 2016-08-31 苏州市世好建材新技术工程有限公司 Insulated prefabricated walls and prefabricated houses
CN206220297U (en) * 2016-10-31 2017-06-06 史世英 Precast shear wall

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107023161A (en) * 2017-06-06 2017-08-08 上海应用技术大学 A kind of prefabricated band reinforcing bar ribbing shear wall formwork and its construction method
CN107476468A (en) * 2017-09-08 2017-12-15 滨州盛华实业集团有限公司 A kind of building block assembled heat insulation composite wall body structure
CN108385917A (en) * 2018-02-24 2018-08-10 中十冶集团环保科技有限公司 A kind of external wall thermal insulation/decoration integration board and exempt from external mold exterior wall installation method
WO2021056256A1 (en) * 2019-09-25 2021-04-01 邹胜斌 Modularized strong-constraint combined shear wall and construction method therefor

Similar Documents

Publication Publication Date Title
CN107313517B (en) Connection node between laminated wall and intermediate floor laminated floor
CN104847014A (en) Vertical connection structure for precast concrete shear walls and construction method
CN105317137A (en) Prefabricated wall body, wall panel and construction method thereof, and production method of prefabricated wall panel
CN105804241A (en) Single-layer prefabricated assembly type reinforced concrete beam-column joint
CN108343148B (en) A kind of frame structure system and its construction method
CN104895049A (en) Prefabrication-cast-in-situ mixed underground continuous wall and construction method thereof
CN107254933A (en) The high-rise single through hole precast shear wall of assembled and its assembling structure and construction method
CN109025064A (en) Method for manufacturing and installing prefabricated concrete column and column assembly type connecting node
CN104481031A (en) Assembly connection structure and method of coupling beams of shear walls of assembly concrete frame shear structure
CN106592818A (en) Prefabricated shear wall and making method thereof
CN108086488B (en) Assembled frame shear structure wall staggered connection structure and assembling method
CN110761443A (en) Prefabricated concrete structure wall-column concrete-filled steel tubular key connection structure and its assembling method
CN110005104A (en) A kind of fabricated heat preservation decoration integrative laminated floor slab and its construction method
CN103711232B (en) L-shaped frame component and lightweight concrete wall prefabricated type shear wall and connection construction method
CN206220297U (en) Precast shear wall
CN109024875A (en) A kind of assembled integral concrete component and construction method
CN113323262A (en) 3D printed prefabricated wall module, wall and construction method of wall
CN110984367B (en) Prefabricated building frame structure component and construction method thereof
CN205224332U (en) Prefabricated wall body and prefabricated wallboard
CN207647033U (en) A kind of precast reinforced basket structure
CN205444514U (en) Bearing light insulation intergral template
CN108104310A (en) Assembled frame-shear structure column splitlevel connection structure and assembling method
CN205224271U (en) Mortise type concrete superposed beam cross connection structure
CN116220244B (en) Construction method of thermal insulation exterior wall structure with window sill opening
CN207525938U (en) A kind of assembled frame-shear structure column splitlevel connection structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170426

RJ01 Rejection of invention patent application after publication