CN106638548A - 一种沉管碎石桩机 - Google Patents
一种沉管碎石桩机 Download PDFInfo
- Publication number
- CN106638548A CN106638548A CN201610928355.6A CN201610928355A CN106638548A CN 106638548 A CN106638548 A CN 106638548A CN 201610928355 A CN201610928355 A CN 201610928355A CN 106638548 A CN106638548 A CN 106638548A
- Authority
- CN
- China
- Prior art keywords
- rope
- main body
- unit head
- pulley
- pile machine
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- DMBHHRLKUKUOEG-UHFFFAOYSA-N diphenylamine Chemical compound C=1C=CC=CC=1NC1=CC=CC=C1 DMBHHRLKUKUOEG-UHFFFAOYSA-N 0.000 claims description 19
- 238000005553 drilling Methods 0.000 claims description 17
- 239000000696 magnetic material Substances 0.000 claims description 3
- 238000005303 weighing Methods 0.000 claims 1
- 239000004575 stone Substances 0.000 abstract description 8
- 238000010276 construction Methods 0.000 abstract description 6
- 238000000034 method Methods 0.000 abstract description 4
- 241001074085 Scophthalmus aquosus Species 0.000 description 2
- 238000001514 detection method Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000007596 consolidation process Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
- E02D3/02—Improving by compacting
- E02D3/08—Improving by compacting by inserting stones or lost bodies, e.g. compaction piles
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Soil Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- Agronomy & Crop Science (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Earth Drilling (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
本发明公开了一种沉管碎石桩机,包括主体,所述主体的左端设有立柱,主体上依次安装有电流采集器、控制器和北斗GPS模块,主体的中部安装有电机,立柱的上端设有支架,支架的两端分别安装有第一滑轮和第二滑轮,所述电机的主轴上安装有绳辊,且绳辊上缠绕有绳索,所述绳索的一端与绳辊连接,所述动力头的一侧与立柱滑动连接,该沉管碎石桩机通过在尖端内侧设置称重计计算添加石料的多少,避免了因人工估算添加过多或过少而影响施工进程,通过设置北斗定位天线检测动力头的动力电机的电流,可以清楚的知道钻杆的转动是否正常,避免了因电流过大而损坏动力头,通过安装北斗GPS模块对沉管碎石桩机进行定位,有利于施工过程的顺利进行。
Description
技术领域
本发明涉及碎石桩机技术领域,具体为一种沉管碎石桩机。
背景技术
沉管碎石桩加固地基的主要目的是提高地基土承载力、减少变形和增强抗液化性。沉管碎石成桩法具有施工简单、加固效果好、工效快等优点。现有的沉管碎石桩机添加石料是通过人工估算方式计算添加石料的多少,容易出现添加过多或过少的情况,影响施工进程,现有的沉管碎石桩机不具有安全防护措施,打洞时可能打到岩石层卡着钻杆,电流过大损坏动力头,为此,我们提出一种沉管碎石桩机。
发明内容
本发明的目的在于提供一种沉管碎石桩机,以解决上述背景技术中提出的问题。
为实现上述目的,本发明提供如下技术方案:一种沉管碎石桩机,包括主体,所述主体的左端设有立柱,主体上依次安装有电流采集器、控制器和北斗GPS模块,主体的中部安装有电机,立柱的上端设有支架,支架的两端分别安装有第一滑轮和第二滑轮,所述第二滑轮上设有旋转编码器,所述电机的主轴上安装有绳辊,且绳辊上缠绕有绳索,所述绳索的一端与绳辊连接,绳索的另一端依次从第一滑轮和第二滑轮上绕过并与支架下方的动力头连接,绳索与动力头连接的一端安装有拉力传感器,所述动力头的一侧与立柱滑动连接,电机、动力头分别与电流采集器电连接,所述动力头的进料仓上安装有北斗定位天线,北斗定位天线与北斗GPS模块电连接,所述动力头的下端与钻杆连接,钻杆上安装有振动器,钻杆的下端设有尖端,所述电机、旋转编码器、动力头、北斗GPS模块、振动器和拉力传感器分别与控制器电连接。
优选的,所述尖端由四片组成,且四片尖端分别通过铰链与钻杆的下端连接,四片尖端内侧均安装有称重计,且称重计与控制器电连接。
优选的,所述尖端是由磁性材料制成。
优选的,所述主体与立柱之间设有连接杆。
与现有技术相比,本发明的有益效果是:该沉管碎石桩机通过在尖端内侧设置称重计计算添加石料的多少,避免了因人工估算添加过多或过少而影响施工进程,通过设置北斗定位天线检测动力头的动力电机的电流,可以清楚的知道钻杆的转动是否正常,避免了因电流过大而损坏动力头,通过安装北斗GPS模块对沉管碎石桩机进行定位,有利于施工过程的顺利进行。
附图说明
图1为本发明结构示意图。
图中:1主体、2电流采集器、3控制器、4电机、5绳索、6立柱、7第一滑轮、8第二滑轮、9动力头、10北斗定位天线、11北斗GPS模块、12振动器、13钻杆、14尖端、15拉力传感器。
具体实施方式
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。
请参阅图1,本发明提供一种技术方案:一种沉管碎石桩机,包括主体1,主体1的左端设有立柱6,主体1与立柱6之间设有连接杆,主体1上依次安装有电流采集器2、控制器3和北斗GPS模块11,主体1的中部安装有电机4,立柱6的上端设有支架,支架的两端分别安装有第一滑轮7和第二滑轮8,第二滑轮8上设有旋转编码器,电机4的主轴上安装有绳辊,且绳辊上缠绕有绳索5,绳索5的一端与绳辊连接,绳索5的另一端依次从第一滑轮7和第二滑轮8上绕过并与支架下方的动力头9连接,绳索5与动力头9连接的一端安装有拉力传感器15,通过拉力传感器15检测引导钻杆13向下入钻的绳索5的拉力值,动力头9的一侧与立柱6滑动连接,动力头9上设有滑块,滑块设置在立柱6侧面的滑槽内,动力头9、电机4分别与电流采集器2电连接,通过设置电流采集器2检测电机4和动力头9的电流,可以清楚的知道钻杆13的转动是否正常,避免了因电流过大而损坏动力头9,沉桩电流范围为50-70A,平均值为65A,沉桩电流上限范围为80-100A,此时可能到达基岩,无法继续下钻,拔桩时电流范围为30-40A,空拔桩时电流范围为20-30A,流振时电流值范围为40-50A,动力头9的进料仓上安装有北斗定位天线10,北斗定位天线10与北斗GPS模块11电连接,动力头9的下端与钻杆13连接,钻杆13上安装有振动器12,钻杆13的下端设有尖端14,尖端14是由磁性材料制成,尖端14由四片组成,且四片尖端14分别通过铰链与钻杆13的下端连接,四片尖端14内侧均安装有称重计,且称重计与控制器3电连接,通过在尖端14内侧设置称重计计算添加石料的多少,避免了因人工估算添加过多或过少而影响施工进程,电机4、旋转编码器、动力头9、北斗GPS模块11、振动器12和拉力传感器15分别与控制器3电连接,在打桩时,通过开始沉桩和沉桩结束时的明显电流限值,作为沉桩的开始和结束判断条件,同时,结合旋转编码器等实时采集的钻桩下沉距离,北斗/GPS模块11的授时时间,从而可以计算出沉桩距离,以及沉桩的开始和结束时间。
尽管已经示出和描述了本发明的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本发明的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本发明的范围由所附权利要求及其等同物限定。
Claims (4)
1.一种沉管碎石桩机,包括主体(1),其特征在于:所述主体(1)的左端设有立柱(6),主体(1)上依次安装有电流采集器(2)、控制器(3)和北斗GPS模块(11),主体(1)的中部安装有电机(4),立柱(6)的上端设有支架,支架的两端分别安装有第一滑轮(7)和第二滑轮(8),所述第二滑轮(8)上设有旋转编码器,所述电机(4)的主轴上安装有绳辊,且绳辊上缠绕有绳索(5),所述绳索(5)的一端与绳辊连接,绳索(5)的另一端依次从第一滑轮(7)和第二滑轮(8)上绕过并与支架下方的动力头(9)连接,绳索(5)与动力头(9)连接的一端安装有拉力传感器(15),所述动力头(9)的一侧与立柱(6)滑动连接,电机(4)、和动力头(9)分别与电流采集器(2)电连接,所述动力头(9)的进料仓上安装有北斗定位天线(10),北斗定位天线(10)与北斗GPS模块(11)电连接,所述动力头(9)的下端与钻杆(13)连接,钻杆(13)上安装有振动器(12),钻杆(13)的下端设有尖端(14),所述电机(4)、旋转编码器、动力头(9)、北斗GPS模块(11)、振动器(12)和拉力传感器(15)分别与控制器(3)电连接。
2.根据权利要求1所述的一种沉管碎石桩机,其特征在于:所述尖端(14)由四片组成,且四片尖端(14)分别通过铰链与钻杆(13)的下端连接,四片尖端(14)内侧均安装有称重计,且称重计与控制器(3)电连接。
3.根据权利要求1所述的一种沉管碎石桩机,其特征在于:所述尖端(14)是由磁性材料制成。
4.根据权利要求1所述的一种沉管碎石桩机,其特征在于:所述主体(1)与立柱(6)之间设有连接杆。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610928355.6A CN106638548A (zh) | 2016-10-24 | 2016-10-24 | 一种沉管碎石桩机 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610928355.6A CN106638548A (zh) | 2016-10-24 | 2016-10-24 | 一种沉管碎石桩机 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106638548A true CN106638548A (zh) | 2017-05-10 |
Family
ID=58820258
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610928355.6A Pending CN106638548A (zh) | 2016-10-24 | 2016-10-24 | 一种沉管碎石桩机 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106638548A (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110904947A (zh) * | 2019-12-23 | 2020-03-24 | 哈尔滨工业大学 | 基于北斗定位的自动化加筋碎石桩施工机具 |
CN111101518A (zh) * | 2019-12-17 | 2020-05-05 | 中交路桥建设有限公司 | 用于锤击沉管碎石桩的上料装置、碎石桩机和上料方法 |
CN113026714A (zh) * | 2021-03-29 | 2021-06-25 | 江西省地质工程(集团)公司 | 一种振动沉管桩机挤密预投置换料强夯置换的施工方法 |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU1705994A1 (ru) * | 1989-12-11 | 1992-01-15 | Карагандинский политехнический институт | Способ управл ющей электродвигателем буровой лебедки и устройство дл его осуществлени |
CN1973091A (zh) * | 2004-07-26 | 2007-05-30 | 约翰·M·冈瑟 | 在粘土中制备原位桩的方法 |
WO2009076648A2 (en) * | 2007-12-12 | 2009-06-18 | Weatherford/Lamb, Inc. | Top drive system |
KR20100039008A (ko) * | 2008-10-07 | 2010-04-15 | 윤재근 | 관입 깊이 자동 계측 시스템 및 계측 방법 |
KR20110012476A (ko) * | 2009-07-30 | 2011-02-09 | 지에스건설 주식회사 | 일정주기의 수직 임팩트 다짐 쇄석말뚝 시공 장비 및 이를 이용한 쇄석말뚝 시공 방법 |
CN102031929A (zh) * | 2010-11-20 | 2011-04-27 | 威海市海泰起重机械有限公司 | Plc控制变频桩机 |
CN102383428A (zh) * | 2011-02-23 | 2012-03-21 | 上海城地建设发展有限公司 | 中掘反拉法预应力离心管桩(方桩)沉桩装置及其沉桩方法 |
CN104088271A (zh) * | 2014-06-12 | 2014-10-08 | 广东长大海外工程有限公司 | 一种用于深软基施工的砂桩机 |
CN203977401U (zh) * | 2014-06-12 | 2014-12-03 | 广东长大海外工程有限公司 | 一种用于深软基施工的砂桩机 |
CN106013149A (zh) * | 2016-06-20 | 2016-10-12 | 中汇建筑集团有限公司 | 基于gps技术的全自动静力压桩机定位控制系统 |
CN206289617U (zh) * | 2016-10-24 | 2017-06-30 | 中国民航机场建设集团公司 | 一种沉管碎石桩机 |
-
2016
- 2016-10-24 CN CN201610928355.6A patent/CN106638548A/zh active Pending
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU1705994A1 (ru) * | 1989-12-11 | 1992-01-15 | Карагандинский политехнический институт | Способ управл ющей электродвигателем буровой лебедки и устройство дл его осуществлени |
CN1973091A (zh) * | 2004-07-26 | 2007-05-30 | 约翰·M·冈瑟 | 在粘土中制备原位桩的方法 |
WO2009076648A2 (en) * | 2007-12-12 | 2009-06-18 | Weatherford/Lamb, Inc. | Top drive system |
KR20100039008A (ko) * | 2008-10-07 | 2010-04-15 | 윤재근 | 관입 깊이 자동 계측 시스템 및 계측 방법 |
KR20110012476A (ko) * | 2009-07-30 | 2011-02-09 | 지에스건설 주식회사 | 일정주기의 수직 임팩트 다짐 쇄석말뚝 시공 장비 및 이를 이용한 쇄석말뚝 시공 방법 |
CN102031929A (zh) * | 2010-11-20 | 2011-04-27 | 威海市海泰起重机械有限公司 | Plc控制变频桩机 |
CN102383428A (zh) * | 2011-02-23 | 2012-03-21 | 上海城地建设发展有限公司 | 中掘反拉法预应力离心管桩(方桩)沉桩装置及其沉桩方法 |
CN104088271A (zh) * | 2014-06-12 | 2014-10-08 | 广东长大海外工程有限公司 | 一种用于深软基施工的砂桩机 |
CN203977401U (zh) * | 2014-06-12 | 2014-12-03 | 广东长大海外工程有限公司 | 一种用于深软基施工的砂桩机 |
CN106013149A (zh) * | 2016-06-20 | 2016-10-12 | 中汇建筑集团有限公司 | 基于gps技术的全自动静力压桩机定位控制系统 |
CN206289617U (zh) * | 2016-10-24 | 2017-06-30 | 中国民航机场建设集团公司 | 一种沉管碎石桩机 |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111101518A (zh) * | 2019-12-17 | 2020-05-05 | 中交路桥建设有限公司 | 用于锤击沉管碎石桩的上料装置、碎石桩机和上料方法 |
CN110904947A (zh) * | 2019-12-23 | 2020-03-24 | 哈尔滨工业大学 | 基于北斗定位的自动化加筋碎石桩施工机具 |
CN113026714A (zh) * | 2021-03-29 | 2021-06-25 | 江西省地质工程(集团)公司 | 一种振动沉管桩机挤密预投置换料强夯置换的施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106638548A (zh) | 一种沉管碎石桩机 | |
CN108149720B (zh) | 一种对倾斜模型桩基进行纠偏的试验纠偏装置及方法 | |
CN206289617U (zh) | 一种沉管碎石桩机 | |
CN107288161A (zh) | 一种用于灌注桩的能自动检测混凝土超灌的装置及其方法 | |
CN112813967A (zh) | 一种智能化控制水泥土搅拌桩施工桩长操作方法 | |
CN101319500A (zh) | 静压挤密桩的施工方法 | |
CN210134427U (zh) | 一种复合钢管桩振打精调导向系统 | |
CN202788805U (zh) | 地下深孔检测装置 | |
CN116892910B (zh) | 一种用于桩基顶面倾斜度的检测系统及方法 | |
CN111677470B (zh) | 一种水利水电工程大体积混凝土大孔径取芯施工方法 | |
CN107338802A (zh) | 一种滩涂围堰施工装置及施工方法 | |
CN204457426U (zh) | 一种对既有建筑物下大直径灌注桩进行钻芯检测的成套设备 | |
CN113417324B (zh) | 一种水泥土插芯组合桩的芯桩垂直度检测装置 | |
CN214121027U (zh) | 监理用桩孔孔径检测装置 | |
CN109944283B (zh) | 一种模拟长螺旋钻孔压灌注桩成桩的室内模型试验装置及方法 | |
CN208997466U (zh) | 一种可调节高度的顶管机 | |
CN207714396U (zh) | 桩基承载力检测用可移动压重平台反力装置 | |
CN215930847U (zh) | 一种多工况建筑基桩桩孔检测设备 | |
CN207211169U (zh) | 一种滩涂围堰施工装置 | |
CN216713129U (zh) | 振冲碎石桩密实度评价装置 | |
CN206298899U (zh) | 一种载体桩的施工设备 | |
CN220768193U (zh) | 一种桥梁桩基取芯用水平调节装置 | |
CN216379672U (zh) | 一种桩基底部沉渣厚度检测工具 | |
CN210375061U (zh) | 一种密实地基拉线位移传感器的固定装置 | |
CN216275866U (zh) | 一种建筑工程检测用工程基桩检测固定装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |