CN106624831B CN201710103975.0A CN201710103975A CN106624831B CN 106624831 B CN106624831 B CN 106624831B CN 201710103975 A CN201710103975 A CN 201710103975A CN 106624831 B CN106624831 B CN 106624831B
Authority
CN
China
Prior art keywords
section
air
conditioning
production line
assembling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710103975.0A
Other languages
Chinese (zh)
Other versions
CN106624831A (en
Inventor
李飞龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Keluchi Electronic Technology Co ltd
Original Assignee
Shenzhen Hongshengjia Electronics Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Hongshengjia Electronics Co ltd filed Critical Shenzhen Hongshengjia Electronics Co ltd
Priority to CN201710103975.0A priority Critical patent/CN106624831B/en
Publication of CN106624831A publication Critical patent/CN106624831A/en
Application granted granted Critical
Publication of CN106624831B publication Critical patent/CN106624831B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P23/00Machines or arrangements of machines for performing specified combinations of different metal-working operations not covered by a single other subclass
    • B23P23/06Metal-working plant comprising a number of associated machines or apparatus
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P21/00Machines for assembling a multiplicity of different parts to compose units, with or without preceding or subsequent working of such parts, e.g. with programme control

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Optics & Photonics (AREA)
  • Ventilation (AREA)
  • Automatic Assembly (AREA)

Abstract

The present invention relates to air-conditioning manufacturing fields, more particularly to a kind of air-conditioning production line, including the delivery track and workbench for haulagman's loading board, the delivery track is divided into upper layer and lower layer, upper layer delivery track is by assembling section, test section, packs section and joint sealing section is linked in sequence and constitutes, the assembly for air conditioner;Lower layer's delivery track is working plate return phase, is back to assembling section beginning by packaging section end;The assembling section includes the first assembling section and the second assembling section, and for opposition layout of turning back, it is triangle loop arrangement that the test section, which includes detection section, cleaning zone and maintenance section,.Delivery track upper layer and lower layer by that will be used for haulagman's loading board are arranged, and are reduced occupied plant area using opposition layout of turning back in assembling section, reduced production cost while can mitigate the error rate in production line.

Description

A kind of air-conditioning production line
Technical field
The present invention relates to air-conditioning manufacturing fields, and in particular to a kind of production line of air conditioner indoor unit.
Background technique
With the development of global economic integration, the household appliances manufacturing development in China is faced with huge opportunity, but also same Sample has suffered from bigger challenge, and some household appliances manufacturing need in this case in order to survive well wherein Production method etc. is improved, production cost is reduced.
In Air Conditioning Industry, it is divided into air conditioner indoor unit and outdoor unit two parts, the assembly of air conditioner indoor unit is related to a large amount of works Sequence and station, the occupied Workshop Production area of the entire production line is big, and manages trouble, and centre is easy to appear mistake, causes to give birth to Cost is produced to increase.
Summary of the invention
The technical problem to be solved in the present invention is that in view of the above drawbacks of the prior art, a kind of air-conditioning production line is provided, Overcome prior art area of mill site big, the defect of high production cost.
The technical solution adopted by the present invention to solve the technical problems is: providing a kind of air-conditioning production line, including for transporting The delivery track and workbench of defeated working plate, the delivery track include upper layer and lower layer, and the upper layer delivery track is used for air-conditioning The assembly of complete machine, including assembling section, test section, packaging section and joint sealing section, the upper layer track is by assembling section, test section, packaging Section, joint sealing section are sequentially connected;Wherein:
The assembling section assembles section, the second assembling section including first, and the first assembling section assembles section fold-back pair with second It is vertical to be laid out, steering of the First Transition area for air-conditioning by the first assembling section to the second assembling section is equipped at fold-back;
The test section is triangle loop arrangement, including detects section, cleaning zone and maintenance section, the detection section and cleaning zone It is arranged side by side, the maintenance section is equipped with the second transition between the above two opposite sides, the second assembling section end and detection section Area is used for the steering of air-conditioning, and the detection of air-conditioning is unqualified, enters maintenance section by cleaning zone, by cleaning zone end after detection is qualified End enters packaging section beginning;
The packaging section end is equipped with working plate segregation section, and the air-conditioning is after packaging section completes packaging into working plate point From the separation that section carries out working plate and air-conditioning, the air-conditioning after separation enters joint sealing section and carries out joint sealing palletization operations;
Lower layer's delivery track is working plate return phase, and for the circulation of working plate, the working plate return phase is by wrapping The working plate segregation section of dress section end is back to the first assembling section beginning.
Still more preferably scheme of the invention is: First Transition area station is automatically controlled erector at the assembling section fold-back Position and air outlet install station, and the air-conditioning production line further includes automatically controlled prepackage area and air outlet prepackage area, the automatically controlled prepackage Area and air outlet prepackage area are arranged side by side with the automatically controlled installation station and air outlet in First Transition area installation station respectively.
Still more preferably scheme of the invention is: the detection section includes safety detection station, noise measuring station and It is remotely controlled detection station, the noise measuring station and remote control detection station are set to sound insulation area.
Still more preferably scheme of the invention is: the First Transition area, the second transition region are buphthalmos platform.
Still more preferably scheme of the invention is: the upper layer delivery track dips down along production line direction of advance Tiltedly, the joint sealing section delivery track is Fluency strip roller bearing delivery track.
Still more preferably scheme of the invention is: the working plate is equipped with the bar code card slot of fixed bar code.
Still more preferably scheme of the invention is: the working plate segregation section includes that first time plate elevator and cylinder push away Lever apparatus, the cylinder push-rod device include third cylinder and are connected in the push rod moved on cylinder with Telescopic-cylinder, and described Three cylinder shrinkage directions are production line direction of advance.
Still more preferably scheme of the invention is: working plate return phase end is equipped with second time plate elevator and the One assembling section beginning connection.
Still more preferably scheme of the invention is: the pressure case that the joint sealing section is equipped with from dynamic pressure punch-out equipment for air-conditioning is grasped Make.
Still more preferably scheme of the invention is: high pressure and oil gas transmission guide rail are equipped with above the production line.
The beneficial effects of the present invention are the delivery track upper layer and lower layer for being used for haulagman's loading board are arranged, wherein lower layer Track is working plate return phase, and the return for working plate conveys, and upper layer is air conditioner assembling line, by assembling section, is surveyed Section is tried, section is packed and the sequential connection of joint sealing section is constituted, the assembling section includes the first assembling section and the second assembling section, for fold-back pair Vertical layout, the test section include detection section, cleaning zone and maintenance section, are triangle loop arrangement.It will assembling section fold-back opposition cloth Office's setting, the setting of test section triangle loop arrangement, the plant area that not only can be reduced occupancy is arranged in this, but also can reduce in production line Error rate reduces production cost.
Detailed description of the invention
Present invention will be further explained below with reference to the attached drawings and examples, in attached drawing:
Fig. 1 is air-conditioning production line top view of the present invention;
Fig. 2 is air-conditioning production line left view of the present invention;
Fig. 3 is air-conditioning production line overall structure diagram of the present invention;
Fig. 4 is working plate structural schematic diagram of the present invention;
Fig. 5 is first time plate elevator structure schematic diagram in Fig. 2.
Specific embodiment
Now in conjunction with attached drawing, elaborate to presently preferred embodiments of the present invention.
As shown in Figs 1-4, a kind of air-conditioning production line, including the delivery track and workbench for haulagman's loading board 60, In, the delivery track includes upper layer and lower layer, and the upper layer delivery track is used for the assembly of air conditioner production line, including sequence The assembling section 10 of connection, test section 20, packaging section 30 and joint sealing section 40, the assembling section 10 is opposition layout of turning back, under described Layer track is working plate return phase 70, the return for working plate 60.The production line of setting air conditioner indoor unit is laid out using this, with Other production lines are compared, and production line is concentrated in this setting, can reduce station, and employee's ranking is compact, are conducive to find in production line The station easily to go wrong, while plant area can be largely saved, reduce production cost.Further, the life High pressure and oil gas transmission rail, the use of goods and materials when facilitating production are equipped with above producing line, at the same save logistics turnover transport at This.Preferably, working plate 60 used is equipped with bar code card slot 601 in the present embodiment, and the bar code for air-conditioning workpiece is placed, convenient Antistatic belt is posted on record and verification, 60 surface of working plate, and fire-proof plate is posted in bottom, and surrounding posts T-type glue side.
In the air-conditioning production line of the present embodiment, the assembling section 10 is used for the assembly of air supply rate, including the first assembling Section 101, the second assembling section 102, the first assembling section 101 and the second assembling section 102 are turned back opposition setting, equipped with the at fold-back One transition region 103 is assembled the steering of section 102 for air-conditioning by the first assembling section 101 to the second.Using opposition layout of turning back, with ring Shape and other layouts are compared, and can save plant area to a greater extent, at the same produce station arrangement it is compact, entire route is unimpeded, Employee can mutual supervisory detection, the error rate of the entire production line can be reduced.The first assembling section 101 is fixed by the bar code at beginning Station starts, and proceeds immediately to the installation that next station carries out pedestal and axial-flow fan.When completion first assembles the automatically controlled peace of section 101 When dress, air outlet installation is carried out by the second assembling 102 station of section that First Transition area 103 is redirected into opposition setting, it is described Second assembling section 102 is mainly the operation positions such as component installation and wiring fixation.Further, first at the assembling section fold-back 103 station of transition region is respectively the automatically controlled installation station of 101 end of the first assembling section and the air outlet at the second assembling 102 beginning of section Station is installed, further, the air-conditioning production line further includes automatically controlled prepackage area 501 and air outlet prepackage area 502, the electricity Control prepackage area 501 and air outlet prepackage area 50 are set with the automatically controlled installation station in First Transition area and air outlet installation station side by side respectively It sets, this setting is integrated with main product line by pre- wiring, reduces intermediate stream conveying cost, facilitates operation.
The air-conditioning workpiece enters test section 20 by the second assembling 102 end of section after assembling section 10 is completed to assemble substantially, The test section includes detection section 202, cleaning zone 203 and maintenance section 204, is triangle loop arrangement, the detection section 202 with clearly It is arranged side by side for clean section 203, the maintenance section 204 is set on the above two opposite sides.Second assembling 102 end of section and test section 20 begin The steering that the second transition region 201 is used for air-conditioning is equipped between the detection section 202 at end.Further, the detection section 202 includes peace Full detection station, noise measuring station and remote control detection station, the noise measuring station and remote control detection station are set to sound insulation Area, to guarantee the accuracy of detection.The detection section 202 is equipped with the circuit socket conveyer belt of circulation, facilitates inspection timekeeping circuit Connection.The cleaning zone 203, maintenance section 204 is buphthalmos platform, when detection is found the problem, after tester writes problem exactly It is attached on air-conditioning workpiece, continues the detection of other function, detection of air-conditioning is unqualified to enter the cleaning completion pusher of cleaning zone 203 Enter to repair section 204 and repair to return to examination, maintenance reenters detection section 203 and is detected after returning to examination, until after detection is qualified by 203 end of cleaning zone enters packaging 30 beginning of section.
The air-conditioning workpiece carries out attachment suit, the operation such as patch nameplate, 30 end of packaging section in packaging 30 station of section Equipped with working plate segregation section, air-conditioning workpiece enters point that working plate segregation section carries out working plate 60 and air-conditioning workpiece after completing packaging From the air-conditioning workpiece after separation enters 40 beginning of joint sealing section and carries out joint sealing palletization operations;Working plate then enters lower layer's delivery track Working plate return phase 70.
The joint sealing section 40 is equipped with from dynamic pressure case apparatus, sealing device and automatic stacking machine, uses nailing with the prior art Prevent joint sealing tilting from comparing, this air-conditioning production line carries out pressure case operation using pressure case apparatus, without manually can effectively cabinet The problem of tilting, reduces production cost.The joint sealing section uses Fluency strip roller bearing delivery track, the sky carried convenient for no working plate Adjust moving ahead for workpiece.Cartoning sealing machine joint sealing is subsequently entered after the completion of pressure case, and palletization operations are then carried out by automatic stacking machine, it is entire to seal Case area 40 can realize unattended.
Further, the First Transition area 103, the second transition region 201 are buphthalmos platform, structure letter in the present embodiment It is single, it is easy to use, it is only necessary to touch working plate into the next of opposite side after the employee that transition region corresponds to station completes operation Steering can be completed in station;Steering mechanism also can be used in the First Transition area 103, the second transition region 201, also or uses Mechanical arm carries out steering transfer.
In conjunction with attached drawing 5, lower layer's delivery track is working plate return phase 70, and 70 end of working plate return phase is equipped with Second time plate elevator 702 is connect with the first assembling 101 beginning of section.The working plate segregation section of packaging 30 end of section includes the A time plate elevator 701 and cylinder push-rod device set on workbench.First time plate elevator includes rack 7010, one end With the conveyer belt 7011 being rotatablely connected above rack 7010, it is installed on the first cylinder 7012 of 7010 lower section of rack, tumbler assembly 7013, Power Component and light eye 7014, described 7013 one end of tumbler assembly are hinged with 7012 telescopic rod of the first cylinder, the other end It is hinged with conveyer belt 7011, the light eye 7014 is set to conveyer belt and connect one end with rack.The cylinder push-rod device includes Third cylinder and be connected to the push rod moved on third cylinder contraction pole with third Telescopic-cylinder, the Telescopic-cylinder direction with Production line advance rectilinear direction is consistent.When detecting that air-conditioning workpiece enters working plate segregation section and is located at conveyer belt 7011, at this time First time plate elevator 701 does not decline, and the third cylinder of cylinder push-rod device, which is shunk, drives push rod to push air-conditioning workpiece to joint sealing Section 40 is mobile, and working plate 60 then rests on first time plate elevator 701, and the air-conditioning man's part to be checked that measures removes first time plate lifting When machine 701, the first cylinder 7012 of first time plate elevator 701 is shunk, and tumbler assembly 7013 drives conveyer belt 7011 to decline, band The decline of loading board of starting building 60 is transferred on working plate return phase 70, and the first cylinder 7012 stretches out after the completion of transfer, on conveyer belt 7011 It rises to and is flushed with the packaging production track of section 30.The working plate return phase 70 includes descending branch and ascent stage, by its own weight Power and power device move forward, and are then back to 101 beginning of the first assembling section by second time plate elevator 701.
The further scheme of the present invention is that upper layer delivery track is arranged to have centainly downward along production line direction of advance Gradient, such as the first assembling section 101 assemble 102 to the second transition region 201 of section by initial station to First Transition area 103, second, The delivery track of detection section 30 to joint sealing section 40 tilts down certain angle, to can realize that the motive force to working plate 60 is 0 or motive force decline, mitigate worker's burden, only need to use small electricity on 70 ascent stage of working plate return phase and part producing line Machine is promoted, and overall structure is simply laborsaving, saves cost.
It should be understood that the above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations, to ability It for field technique personnel, can modify to technical solution illustrated in the above embodiments, or special to part of technology Sign is equivalently replaced;And all such modifications and replacement, it should all belong to the protection domain of appended claims of the present invention.

Claims (10)

1. a kind of air-conditioning production line, including the delivery track and workbench for haulagman's loading board, it is characterised in that: the conveying Track includes upper layer and lower layer, and the upper layer delivery track is used for the assembly of air conditioner, including assembling section, test section, packaging section And joint sealing section, the upper layer delivery track are sequentially connected by assembling section, test section, packaging section, joint sealing section;Wherein:
The assembling section assembles section, the second assembling section including first, and the first assembling section assembles section fold-back opposition cloth with second Innings, steering of the First Transition area for air-conditioning by the first assembling section to the second assembling section is equipped at fold-back;
The test section is triangle loop arrangement, including detects section, and cleaning zone and maintenance section, the detection section and cleaning zone are side by side Setting, the maintenance section are equipped with the second transition region between the above two opposite sides, the second assembling section end and detection section and use In the steering of air-conditioning, the detection of air-conditioning is unqualified, enters maintenance section by cleaning zone, after detection is qualified by cleaning zone end into Enter to pack section beginning;
The packaging section end is equipped with working plate segregation section, and the air-conditioning enters working plate segregation section after packaging section completes packaging The separation of working plate and air-conditioning is carried out, the air-conditioning after separation enters joint sealing section and carries out joint sealing palletization operations;
Lower layer's delivery track is working plate return phase, and for the circulation of working plate, the working plate return phase is by packaging section The working plate segregation section of end is back to the first assembling section beginning.
2. air-conditioning production line according to claim 1, it is characterised in that: First Transition area station at the assembling section fold-back Station is installed for automatically controlled installation station and air outlet, the air-conditioning production line further includes that automatically controlled prepackage area and air outlet pre-install area, Station is installed simultaneously with the automatically controlled installation station and air outlet in First Transition area respectively by the automatically controlled prepackage area and air outlet prepackage area Row's setting.
3. air-conditioning production line according to claim 2, it is characterised in that: the detection section includes safety detection station, is made an uproar Sound detection station and remote control detection station, the noise measuring station and remote control detection station are set to sound insulation area.
4. air-conditioning production line according to claim 3, it is characterised in that: the First Transition area, the second transition region are ox Eye platform.
5. air-conditioning production line according to claim 4, it is characterised in that: the upper layer delivery track advances along production line Direction tilts down, and the joint sealing section delivery track is Fluency strip roller bearing delivery track.
6. -5 any air-conditioning production line according to claim 1, it is characterised in that: the working plate is equipped with fixed bar code Bar code card slot.
7. air-conditioning production line according to claim 1, it is characterised in that: the working plate segregation section includes first time plate liter Drop machine and cylinder push-rod device, the cylinder push-rod device include that third cylinder and being connected on cylinder is moved with Telescopic-cylinder Push rod, the third cylinder shrinkage direction are production line direction of advance.
8. air-conditioning production line according to claim 7, it is characterised in that: working plate return phase end is equipped with second time Plate elevator is connect with the first assembling section beginning.
9. air-conditioning production line according to claim 1, it is characterised in that: the joint sealing section is equipped with from dynamic pressure punch-out equipment for sky The pressure case of tune operates.
10. air-conditioning production line according to claim 1, it is characterised in that: be equipped with high pressure and petroleum above the production line Gas transmission guide rail.
CN201710103975.0A 2017-02-24 2017-02-24 A kind of air-conditioning production line Active CN106624831B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710103975.0A CN106624831B (en) 2017-02-24 2017-02-24 A kind of air-conditioning production line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710103975.0A CN106624831B (en) 2017-02-24 2017-02-24 A kind of air-conditioning production line

Publications (2)

Publication Number Publication Date
CN106624831A CN106624831A (en) 2017-05-10
CN106624831B true CN106624831B (en) 2018-12-07

Family

ID=58847536

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710103975.0A Active CN106624831B (en) 2017-02-24 2017-02-24 A kind of air-conditioning production line

Country Status (1)

Country Link
CN (1) CN106624831B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107380595A (en) * 2017-07-06 2017-11-24 格力电器(郑州)有限公司 Labeling mechanism and air conditioner processing device with same
CN108861260A (en) * 2017-11-06 2018-11-23 武汉燎原模塑有限公司 High-order stereo garage premises chain conveyer system
CN109398847A (en) * 2018-11-02 2019-03-01 佛山东柳自动化科技有限公司 A kind of electrical automation packaging production line
CN109807628B (en) * 2019-03-26 2020-10-09 珠海格力智能装备有限公司 Screw gasket composite set and have its air conditioner production line
CN112388308A (en) * 2020-11-17 2021-02-23 东莞心野机电科技有限公司 Chain type automatic assembling machine for sliding support

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007216340A (en) * 2006-02-17 2007-08-30 Nissan Motor Co Ltd Parts supply system and method
CN201669551U (en) * 2010-04-29 2010-12-15 达丰(上海)电脑有限公司 Production system with a plurality of assembling lines and outputting lines sharing modified overhead travelling crane
CN103978364B (en) * 2014-04-18 2016-07-06 合肥凯邦电机有限公司 Motor production line
CN106181418B (en) * 2016-08-28 2018-01-16 嵊州市新高轮制冷设备有限公司 A kind of automatic assembly line of compressor of air conditioner liquid reservoir and the production method of production line
CN206662718U (en) * 2017-02-24 2017-11-24 深圳市宏盛佳电子设备有限公司 A kind of air-conditioning production line

Also Published As

Publication number Publication date
CN106624831A (en) 2017-05-10

Similar Documents

Publication Publication Date Title
CN106624831B (en) A kind of air-conditioning production line
CN206662718U (en) A kind of air-conditioning production line
CN105600436A (en) Automatic plate feeding and discharging system for double-faced AOI (Automated Optical Inspection) of circuit board and technological process of automatic plate feeding and discharging system
CN206146517U (en) Electronic scale collator
CN109366173A (en) A kind of middle-placed switch cabinet assembling line
CN104296938A (en) Valve pipe fitting gas tightness and machine vision comprehensive examination machine
CN207232037U (en) A kind of two-sided visual inspection platform
CN106180880A (en) Thin plate detects and cutting system automatically
CN106475714A (en) A kind of automotive plate step conveying device
CN106346235A (en) Bogie assembling device
CN206047216U (en) Thin plate automatic detection and cutting system
CN207192080U (en) A kind of vacuum servo handling device
CN205187189U (en) But transportation platform of accurate positioning
CN104362527A (en) Transit system for 10 kV switch trolley
CN208579906U (en) A kind of pre- alignment device of panel
CN206358959U (en) A kind of cassette auxiliary support apparatus
CN105004532B (en) Automatic conveying device and method for tail gas detection
CN106115405B (en) A kind of elevator beam safety tongs is to leading test fixture
CN205484588U (en) Automatic test equipment of cubical switchboard
CN103170460A (en) Automatic detector
CN107846836A (en) A kind of car antenna and circuit board screw assembly method
CN111086818B (en) Electric energy meter turnover distribution vertical warehouse and system
CN204712445U (en) A kind of flexible material mounting equipment
CN105151677B (en) Automatic charging device in bearing block pressing machine
CN114152625A (en) Deformation and leakage monitoring device for subway tunnel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20240925

Address after: Room 301, 3rd Floor, Building 9, Qingdao International Virtual Reality Industrial Park, No. 111 Xinghaitan Road, Huangdao District, Qingdao City, Shandong Province, China 266000

Patentee after: Qingdao Keluchi Electronic Technology Co.,Ltd.

Country or region after: China

Address before: 518000 Shenzhen Bao'an District, Guangdong Province, Longhua Street, Science and Technology Road, Heping Industrial Park, Building D, 1st Floor, 102

Patentee before: SHENZHEN HONGSHENGJIA ELECTRONICS CO.,LTD.