CN106601109A - Logistics laboratory - Google Patents

Logistics laboratory Download PDF

Info

Publication number
CN106601109A
CN106601109A CN201611176503.XA CN201611176503A CN106601109A CN 106601109 A CN106601109 A CN 106601109A CN 201611176503 A CN201611176503 A CN 201611176503A CN 106601109 A CN106601109 A CN 106601109A
Authority
CN
China
Prior art keywords
plate
fixedly connected
plate body
bin
logistics
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201611176503.XA
Other languages
Chinese (zh)
Inventor
罗剑英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dongguan University of Technology
Original Assignee
Dongguan University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dongguan University of Technology filed Critical Dongguan University of Technology
Priority to CN201611176503.XA priority Critical patent/CN106601109A/en
Publication of CN106601109A publication Critical patent/CN106601109A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09BEDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
    • G09B25/00Models for purposes not provided for in G09B23/00, e.g. full-sized devices for demonstration purposes
    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09BEDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
    • G09B25/00Models for purposes not provided for in G09B23/00, e.g. full-sized devices for demonstration purposes
    • G09B25/02Models for purposes not provided for in G09B23/00, e.g. full-sized devices for demonstration purposes of industrial processes; of machinery

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • Educational Administration (AREA)
  • Educational Technology (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Warehouses Or Storage Devices (AREA)

Abstract

The present invention discloses a logistics laboratory. The logistics laboratory comprises a room body; the top and bottom of one end of the inner cavity of the room body are respectively provided with a first material bin and a second material bin; the top and bottom of the other end of the inner cavity of the room body are respectively provided with a finished product bin and an intermediate inventory bin; a first small unit production line is arranged between the first material bin and the finished product bin; a second small unit production line is arranged between the second material bin and the intermediate inventory bin; a transport device is arranged in the room body; and the transport device is located between the first material bin and a first clutter chamber. With the logistics laboratory adopted, how to reduce inventory, how to link processes, how to build the production framework for logistics transport and three standard operation elements (rhythm time, operation sequence and standard products under production) are simulated in the laboratory, and therefore, improved talents with practical operation abilities can be cultivated.

Description

A kind of logistics laboratory
Technical field
The present invention relates to the technical field of logistics laboratory, specially a kind of logistics laboratory.
Background technology
Traditional manufacturing process generally includes single skilled operator, substantial amounts of execution and production in product, constant Schedule delay.These features increased restricted impact, such as inefficient output, labour force, works and fills in product in a large number Wiring operation.Initially, lean production using manufacture or assembly line flow process in avoid and conventionally manufactured related problem.Lean Production is based on Toyota manufacture systems, can write in James P.Womack, Harper Collins publishing company 1991 What year published《Change the machine in the world》Typical reality is found in (The Machine thatChanged the World) book Apply on border.The ultimate principle of lean production system be by it is possible it is most economical in the way of manufactured.Realize that this point is to pass through Be primarily focused on and meet in the requirement of client, high-quality product is such as produced while minimizing the resource and time for consuming. Lean Production refers to the foundation market demand, with various modern way to manage and means, gives full play to the effect of people, effectively ERM is reasonably used, is a kind of mode of production that enterprise seeks highest economic benefit.
Colleges and universities early have been introduced into industrial engineering management specialty at present, and Ye You colleges and universities are referred to as construction management specialty, are large, medium and small The a collection of improvement talent for understanding lean production of type enterprise cultivation, but colleges and universities are only imparted knowledge to students in theory at present, or band student The mode for entering enterprise carries out visit training, and lean production system is to aid in enterprise's solution quantity in stock and causes greatly fund overstocked, expired The waste scrapped, how to shorten operation keep under strict control cost the problems such as, and the visit maturation enterprise production car of theoretical or formula of having a glance at Between can not say there is no any teaching significance, but can not allow student graduation after just can lean production knowledge use to produce In line, the Skill Development of student is to be short of, thus logistics laboratory can be set up in terms of school, allow student set up timelyization, Production framework is carried in a small amount of various, many frequency logistics, and how personal experience lean production system shortens operation is kept under strict control the field of cost Scape and effect, become " improving the talent " that enterprise really needs by practical operation inquiry learning.
The content of the invention
(One)The technical problem of solution
For the deficiencies in the prior art, the invention provides a kind of logistics laboratory.
(Two)Technical scheme
For achieving the above object, the present invention provides following technical scheme:A kind of logistics laboratory, including room body(1), the room body (1)The top and bottom of inner chamber one end is respectively arranged with first material storehouse(2)With second material storehouse(3), the room body(1)Inner chamber The top and bottom of the other end is respectively arranged with finished bin(4)With interim stock bin(5), the first material storehouse(2)With into Product storehouse(4)Between be provided with the first small units production line(6), the second material storehouse(3)With interim stock bin(5)Between It is provided with the second small units production line(7), the room body(1)Be internally provided with conveying arrangement(8), first material storehouse(2) With second material storehouse(3)Complete material handling is respectively adopted, variable interval mode passes through conveying arrangement at regular time and quantity or quantitatively(8)It is defeated Deliver to the first small units production line(6)With the second small units production line(7), the conveying arrangement(8)Including box body(81), The box body(81)Internal activity be connected with two belt pulleys(82), two belt pulleys(82)By conveyer belt(83)Transmission connects Connect, a belt pulley(82)The back side and box body(81)Internal hard-wired clockwise and anticlockwise motor(84)Output shaft fix connect Connect, the conveyer belt(83)Lower surface and contiguous block(85)One end be fixedly connected, the contiguous block(85)The other end wear Cross box body(81)And extend to box body(81)Outside, the contiguous block(85)End be fixedly connected with suspension arrangement(9), institute State suspension arrangement(9)Including connecting plate(91), the connecting plate(91)Top and contiguous block(85)End be fixedly connected, institute State connecting plate(91)Bottom and expansion plate(92)Fixing end be fixedly connected, the expansion plate(92)Movable end be fixedly connected There is hook(94).
Preferably, the conveying arrangement(8)Positioned at room body(1)The center of width.
Preferably, the expansion plate(92)Including the first plate body(921)With the second plate body(922), second plate body (922)One end insert the first plate body(921)In the groove that bottom opens up, first plate body(921)With the second plate body(922) Side wall offer screwed hole, first plate body(921)With the second plate body(922)By screwing screw(93)It is fixed to connect Connect.
Preferably, first plate body(921)The exit of groove is connected with pulley(10), second plate body (922)Surface offer and pulley(10)The slide rail for using cooperatively.
(Three)Beneficial effect
The invention provides a kind of logistics laboratory.Possesses following beneficial effect:
1st, how student's practical operation is allowed by correct scheduling job flow process and workload by effective logistics laboratory layout structure, it is real Trample and how to allow operator and Work machine energy continuous firing, do not leave unused, how to carry out by using mechanical hand, conveying arrangement The operations such as handling, sorting, when making operating personnel be engaged in logistics handling, carrying, sorting operation, are not directly contacted with article as far as possible, with Labor intensity is reduced, is moved by the article placement location in optimization warehouse and using robot tool reduction article and personnel Distance and number of times, simulate several scenes to student.
2nd, the logistics laboratory, compact conformation are reasonable in design, practical, are easy to promote the use of.
Description of the drawings
Fig. 1 is the section of structure of present configuration conveying arrangement and suspension arrangement;
Fig. 2 is present configuration top view.
Fig. 3 is first material chamber structure figure of the present invention.
In figure:1 room body;2 first material storehouses;21st, material bulkhead;22nd, position in storehouse;23rd, detection means;24th, discharging opening; 25、 Blowing platform;26. material catching robot mechanisms;4 finished bins;3 second material storehouses;5 middle database storage;6 first small units Production line;7 second small units production lines;8 conveying arrangements;81 box bodys;82 belt pulleys;83 conveyer belts;84 clockwise and anticlockwise motors;85 Contiguous block;9 suspension arrangements;91 connecting plates;92 expansion plates;921 first plate bodys;922 second plate bodys;93 screwing screws;94 hooks; 10 pulleys.
Specific embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than the embodiment of whole.It is based on Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under the premise of creative work is not made Embodiment, belongs to the scope of protection of the invention.
As shown in Figure 1-2, the present invention provides a kind of technical scheme:A kind of logistics laboratory, including room body 1, by room body 1 Setting, the effect that room body 1 is served and protected to the device of its inside, the top and bottom of 1 inner chamber one end of room body are set respectively Be equipped with first material storehouse 2 and second material storehouse 3, the top and bottom of the 1 inner chamber other end of room body be respectively arranged with finished bin 4 and in Between stock storehouse 5, the first small units production line 6, second material storehouse 3 and centre are provided between first material storehouse 2 and finished bin 4 It is provided with the second small units production line 7 between stock storehouse 5, room body 1 is internally provided with conveying arrangement 8, and conveying arrangement 8 is located at The center of 1 width of room body, conveying arrangement 8 are located at first material storehouse 2 and second material storehouse 3, and conveying arrangement 8 includes box body 81, By the setting of box body 81, box body 81 serves the effect of protection to the device of its inside, and the internal activity of box body 81 is connected with Two belt pulleys 82, two belt pulleys 82 are connected by conveyer belt 83, inside the back side of a belt pulley 82 and box body 81 The output shaft of hard-wired clockwise and anticlockwise motor 84 is fixedly connected, and the power supply mode of clockwise and anticlockwise motor 84 is by external power supply Power supply, the lower surface of conveyer belt 83 are fixedly connected with one end of contiguous block 85, and the other end of contiguous block 85 passes through box body 81 and prolongs The outside of box body 81 is extended, the end of contiguous block 85 is fixedly connected with suspension arrangement 9, and suspension arrangement 9 includes connecting plate 91, connected The top of plate 91 is fixedly connected with the end of contiguous block 85, and the bottom of connecting plate 91 is fixedly connected with the fixing end of expansion plate 92, The movable end of expansion plate 92 is fixedly connected with hook 94, and the setting for linking up with 94 facilitates hanging up for article, and expansion plate 92 includes the One plate body 921 and the second plate body 922, one end of the second plate body 922 are inserted in the groove that 921 bottom of the first plate body opens up, and first The side wall of plate body 921 and the second plate body 922 offers screwed hole, and the first plate body 921 and the second plate body 922 pass through screwing screw 93 are fixedly connected, and the exit of 921 groove of the first plate body is connected with pulley 10, the surface of the second plate body 922 offer with The slide rail that pulley 10 is used cooperatively, slide rail open up the movement for facilitating pulley 10.
Conventional production lines cause substantial amounts of stock, management to be difficult by producing in enormous quantities, cannot also meet client's variation Demand, and easily cause Jing between station and often occur to pile up, operation is uneven, and personnel's efficiency is low, by logistics laboratory Simulate real production scene, conceive the promotion of a stream mode of production, working area reduces 40%, improving productivity 15%, Eliminate stock between station.
The promotion of the engineering that whether can finish by the foundation of few peopleization mode of production and a people is inquired in present invention simulation, is changed to little Type cellular manufacture line, first material storehouse 2 and second material storehouse 3 adopt complete material handling, at regular time and quantity by 8 points of conveying arrangement First small units production line 6 and the second small units production line 7 are not transported, using heterogenous production line, speed is especially fast. Need illustratively, the first small units production line 6 and the second small units production line 7 can manufacture the product of same style, Can wherein one production line according to customer demand small lot product customized, mainly adapt to existing market demand customized, when Need not be customized, two production lines may continue to batch production, and two Minifabs be both avoided that Jing often occurred between station Pile up, the unbalanced problem of operation, improve personnel's efficiency, while meeting the diversified demand of client.One small units production Line is produced according to factory calibration specification, and another small units production line is produced when being connected to customer personalized customized, according to need The type and quantity asked are produced, and through multiple simulated production scene, effectively reduce the accumulation of stock and problem in short supply, Product quality is obviously improved, improving productivity 25%, and working area reduces 57%.
During simulated production, find as shop order variation frequency is high processing time length and often there is variation, need Many stocks then set up middle database storage to simulate many stocks and whether be prevented effectively from and stop line risk to avoid stopping the risk of line.
Peace lamp is set on conveying arrangement 8, different abnormality alarm information is sent automatically according to different unusual conditions, and is carried out The logistics distribution of quantitative variable interval, stock are greatly reduced, improving productivity 20%, and the area for stacking stock reduces 280 squares Rice.Understand in simulating true production process and build between processing procedure and connect.
During use, the height of expansion plate 92 is adjusted as needed, and the second plate body 922 is moved in the inside of the first plate body 921, Screwing screw 93 is tightened on screwed hole, then logistic article is being hung on hook 94, is being opened clockwise and anticlockwise motor 84, it is positive and negative Rotating motor 84 drives belt pulley 82 to rotate, and conveyer belt 83 is moved with the rotation of belt pulley 82, and contiguous block 85 is with conveyer belt 83 motion and drive connecting plate 91 to move, expansion plate 92 with connecting plate 91 motion drive hook 94 move, logistic article Move with the motion of hook 94.
Existing plant produced line is individually conveyed using individual event material, and student passes through 3 mould of first material storehouse 2 and second material storehouse Intend the independent part mode of movement of existing plant produced line, it is found that Jing often occurs to pile up between station, operation is uneven, storehouse between station The problems such as depositing, behind student adopt complete material handling, the first small units are transported to respectively by conveying arrangement 8 at regular time and quantity Production line 6 and the second small units production line 7, build the production framework that logistics is carried in simulating true production process, culture is learned Raw floor improvement practice ability.
First material storehouse 2 is identical with 3 structure of second material storehouse, including multiaspect material bulkhead 21, the multiaspect material bin 21 walls surround a material bin, are provided with discharging opening 24 on the face material bulkhead 21, and being horizontally disposed with the discharging opening 24 has one Gather materials platform 25, is provided with described in a sensing platform 25 that gathers materials at the top of the discharging opening 24 above the platform 25 that gathers materials On there is the detection means 23 of material, slide rail 27 is fixed with the bottom surface in the material bin, is provided with the slide rail and is fetched and delivered The material catching robot mechanism 26 of material.Material catching robot mechanism is placed on the crawl of required material and gathers materials on platform, After it is complete material that detection means is detected, discharging opening is opened and enters conveying arrangement 8.
Finished bin 4 is identical with 5 structure of middle database storage, and is one side with first material storehouse 2 and the difference of second material storehouse 3 Feeding mouth is provided with material bulkhead, the finished product manipulator mechanism for fetching and delivering material on slide rail, is provided with.When operating personnel will wait to put in storage Finished product when being placed on the platform that gathers materials, finished product manipulator mechanism senses there is material on the platform that gathers materials, and detection means will can sense Signal transmission is to manipulator mechanism.Manipulator mechanism is taken and the finished product that gathers materials on platform is stored in position in storehouse.
By the life how lab simulation is cut down stock, how to connect, how to build logistics carrying between processing procedure tested in logistics Produce framework, how established standardses operation three elements(Pitch time, the sequence of operation, standard are in product), to cultivate with actual behaviour Make the improvement talent of ability.
It should be noted that herein, such as first and second or the like relational terms are used merely to a reality Body or operation are made a distinction with another entity or operation, and are not necessarily required or implied these entities or deposit between operating In any this actual relation or order.And, term " including ", "comprising" or its any other variant are intended to Nonexcludability is included, so that a series of process, method, article or equipment including key elements not only will including those Element, but also including other key elements being not expressly set out, or also include for this process, method, article or equipment Intrinsic key element.In the absence of more restrictions, the key element for being limited by sentence "including a ...", it is not excluded that Also there is other identical element in process, method, article or equipment including key element.
Although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with Understanding can carry out various changes, modification, replacement to these embodiments without departing from the principles and spirit of the present invention And modification, the scope of the present invention be defined by the appended.

Claims (4)

1. a kind of logistics laboratory, including room body (1), it is characterised in that:The top and bottom of described room body (1) inner chamber one end point First material storehouse (2) and second material storehouse (3) are not provided with, the top and bottom of room body (1) the inner chamber other end set respectively Finished bin (4) and interim stock bin (5) are equipped with, and first are provided between the first material storehouse (2) and finished bin (4) small-sized Cellular manufacture line (6), is provided with the second small units production line between the second material storehouse (3) and interim stock bin (5) (7), the room body (1) is internally provided with conveying arrangement (8), and first material storehouse (2) and second material storehouse (3) be respectively adopted into Cover material handling, variable interval mode is delivered to the first small units production line (6) by conveying arrangement (8) at regular time and quantity or quantitatively With the second small units production line (7), the conveying arrangement (8) includes box body (81), and the internal activity of the box body (81) connects Two belt pulleys (82) are connected to, two belt pulleys (82) are connected by conveyer belt (83), the back side of a belt pulley (82) It is fixedly connected with the output shaft of the internal hard-wired clockwise and anticlockwise motor (84) of box body (81), the lower surface of the conveyer belt (83) It is fixedly connected with one end of contiguous block (85), the other end of the contiguous block (85) passes through box body (81) and extends to box body (81) Outside, the end of the contiguous block (85) is fixedly connected with suspension arrangement (9), and the suspension arrangement (9) is including connecting plate (91), the top of the connecting plate (91) is fixedly connected with the end of contiguous block (85), the bottom of the connecting plate (91) with stretch The fixing end of contracting plate (92) is fixedly connected, and the movable end of the expansion plate (92) is fixedly connected with hook (94).
2. a kind of logistics laboratory according to claim 1, it is characterised in that:The conveying arrangement (8) is positioned at room body (1) The center of width.
3. a kind of logistics laboratory according to claim 1, it is characterised in that:The expansion plate (92) is including the first plate body (921) and the second plate body (922), one end of second plate body (922) insert the groove that the first plate body (921) bottom opens up In, the side wall of first plate body (921) and the second plate body (922) offers screwed hole, first plate body (921) and Two plate bodys (922) are fixedly connected by screwing screw (93).
4. a kind of logistics laboratory according to claim 3, it is characterised in that:First plate body (921) groove goes out Pulley (10) is connected with mouthful, the surface of second plate body (922) offers the slide rail used cooperatively with pulley (10).
CN201611176503.XA 2016-12-19 2016-12-19 Logistics laboratory Withdrawn CN106601109A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611176503.XA CN106601109A (en) 2016-12-19 2016-12-19 Logistics laboratory

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611176503.XA CN106601109A (en) 2016-12-19 2016-12-19 Logistics laboratory

Publications (1)

Publication Number Publication Date
CN106601109A true CN106601109A (en) 2017-04-26

Family

ID=58601374

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611176503.XA Withdrawn CN106601109A (en) 2016-12-19 2016-12-19 Logistics laboratory

Country Status (1)

Country Link
CN (1) CN106601109A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107161612A (en) * 2017-06-07 2017-09-15 河南师范大学 The reciprocal conveying arrangement of improved single-edge

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11255240A (en) * 1998-03-11 1999-09-21 Hiroshi Shimizu Carrying container
CN201323000Y (en) * 2008-12-16 2009-10-07 上海卡泊仓储设备有限公司 Module combined type automatic stereo warehouse for teaching
CN202615705U (en) * 2012-04-05 2012-12-19 广西柳工路创制造科技有限公司 Simulation factory assembly line hanger
CN202807805U (en) * 2012-08-07 2013-03-20 长葛市新世纪机电有限公司 Hanging type paint spraying production line
CN204223550U (en) * 2014-10-10 2015-03-25 苏州艾达特智能科技有限公司 Automatic material storehouse
CN204938127U (en) * 2015-08-12 2016-01-06 苏州弘瀚自动化科技有限公司 A kind of High-efficient Production conveyor line
CN205419651U (en) * 2016-03-22 2016-08-03 山东科技大学 Electricity - air balance ware
CN105947620A (en) * 2016-06-13 2016-09-21 东莞市华业鞋材有限公司 Production line used for automatically discharging and collecting pendants
CN106185305A (en) * 2016-08-26 2016-12-07 湖北华昌达智能装备股份有限公司 A kind of suspender and material-transporting system
CN206363654U (en) * 2016-12-19 2017-07-28 东莞理工学院 A kind of logistics laboratory

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11255240A (en) * 1998-03-11 1999-09-21 Hiroshi Shimizu Carrying container
CN201323000Y (en) * 2008-12-16 2009-10-07 上海卡泊仓储设备有限公司 Module combined type automatic stereo warehouse for teaching
CN202615705U (en) * 2012-04-05 2012-12-19 广西柳工路创制造科技有限公司 Simulation factory assembly line hanger
CN202807805U (en) * 2012-08-07 2013-03-20 长葛市新世纪机电有限公司 Hanging type paint spraying production line
CN204223550U (en) * 2014-10-10 2015-03-25 苏州艾达特智能科技有限公司 Automatic material storehouse
CN204938127U (en) * 2015-08-12 2016-01-06 苏州弘瀚自动化科技有限公司 A kind of High-efficient Production conveyor line
CN205419651U (en) * 2016-03-22 2016-08-03 山东科技大学 Electricity - air balance ware
CN105947620A (en) * 2016-06-13 2016-09-21 东莞市华业鞋材有限公司 Production line used for automatically discharging and collecting pendants
CN106185305A (en) * 2016-08-26 2016-12-07 湖北华昌达智能装备股份有限公司 A kind of suspender and material-transporting system
CN206363654U (en) * 2016-12-19 2017-07-28 东莞理工学院 A kind of logistics laboratory

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107161612A (en) * 2017-06-07 2017-09-15 河南师范大学 The reciprocal conveying arrangement of improved single-edge

Similar Documents

Publication Publication Date Title
CN106296042B (en) Teaching and production management information system oriented to college engineering training center
CA2361778A1 (en) Quilt making automatic scheduling system and method
CN109460954B (en) Supplier straight supply line side material distribution method based on JIT-VMI
CN206363654U (en) A kind of logistics laboratory
CN102637234B (en) Blast furnace under-tank simulation system based on computer and simulation method thereof
CN111538295A (en) Flexible production management system
CN106601109A (en) Logistics laboratory
CN102034142A (en) SMT (surface mount technology) intelligent management system
CN102179925B (en) OEE (overall equipment efficiency) monitoring system and method of PET (polyethylene terephthalate) bottle blowing machine
CN202071343U (en) OEE (Overall Equipment Effectiveness) monitoring system for PET (Polyethylene Terephthalate) bottle blowing machine
CN103722367B (en) Easily extensible Flexible module combined door and window fan production line
CN206032779U (en) Dustless material device of throwing of integrated batching function of weighing
CN109712509A (en) A kind of simulation production line training platform
CN117331358A (en) Warehouse material feeding control system
CN110501983B (en) Expert control system and control method based on batch-type coating machine
Lynch Economic-technological modeling and design criteria for programmable assembly machines.
Huang et al. Production process management system for production indices optimization of mineral processing
CN208538398U (en) A kind of mobile phone automatic production line training system based on industrial robot
CN105182946B (en) It is a kind of that there is the production optimization method for changing the manufacturing shop that machine is operated
Wang et al. A runtime intelligent iterative manufacturing system (RIIMS) for hot stamping
Feng et al. Design and simulation study on logistics planning in automatic plant factory based on Tecnomatix Plant Simulation
Xiong et al. Collaborative scheduling of production and transportation in the shop-floor based on digital twin
Nosko et al. Throughput analysis for order picking system with automated storage system
Yu et al. Mechanical design and key technology of automatic production line based on artificial intelligence
CN211376013U (en) Electromechanical integration and robot comprehensive training system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20170426

WW01 Invention patent application withdrawn after publication