CN106596400B - A kind of evaluating apparatus and experimental method of second contact surface bonding quality of cementing the well - Google Patents

A kind of evaluating apparatus and experimental method of second contact surface bonding quality of cementing the well Download PDF

Info

Publication number
CN106596400B
CN106596400B CN201611247445.5A CN201611247445A CN106596400B CN 106596400 B CN106596400 B CN 106596400B CN 201611247445 A CN201611247445 A CN 201611247445A CN 106596400 B CN106596400 B CN 106596400B
Authority
CN
China
Prior art keywords
pressure
gas
rock core
contact surface
channeling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611247445.5A
Other languages
Chinese (zh)
Other versions
CN106596400A (en
Inventor
杨浩
吴少诚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Geosciences Beijing
Original Assignee
China University of Geosciences Beijing
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Geosciences Beijing filed Critical China University of Geosciences Beijing
Priority to CN201611247445.5A priority Critical patent/CN106596400B/en
Publication of CN106596400A publication Critical patent/CN106596400A/en
Application granted granted Critical
Publication of CN106596400B publication Critical patent/CN106596400B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N19/00Investigating materials by mechanical methods
    • G01N19/04Measuring adhesive force between materials, e.g. of sealing tape, of coating
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N1/00Sampling; Preparing specimens for investigation
    • G01N1/28Preparing specimens for investigation including physical details of (bio-)chemical methods covered elsewhere, e.g. G01N33/50, C12Q

Abstract

The invention discloses the evaluating apparatus and experimental method of a kind of second contact surface bonding quality of cementing the well, second contact surface, that is, cement-bed boundary, since the hypotonic characteristic of underground interlayer and cement plays the role of crucial packing to the fluid in stratum, thus the basic reason of second contact surface channelling is that the bonding quality of stratum interlayer and cement is poor, so the evaluation of well cementation second contact surface bonding quality is main to consider the cementing of stratum interlayer and cement.The device is to solve the problems, such as this, but can also evaluate the cementing situation of cement Yu other stratum simultaneously.The present invention generally uses situ of drilling well true core collected to test, the cementing situation of situ interfacial is simulated to greatest extent, experimental principle is reliable, and experimental result and analysis can provide important references for the evaluation of cementing concrete second contact surface bonding quality, and important foundation is provided for engineering design.

Description

A kind of evaluating apparatus and experimental method of second contact surface bonding quality of cementing the well
Technical field
The invention belongs to the assessment technique fields on the second cementation interface of oil gas well cementing operation, that is, stratum and cement sheath interface, specifically It is related to the evaluating apparatus and experimental method of a kind of second contact surface bonding quality of cementing the well.
Background technique
The quality of cementing quality affects the progress of later period safety and stability production and the feasibility of each well stimulation.Well cementation The cementation interface of second contact surface, i.e. stratum and cement sheath makes cement sheath due to there is more loose mud cake and formation fluid It is easily peeled off after solidification, cementing strength decline is easier to alter layer compared to the first interface.Thus, the anti-has channeling of second contact surface Ability is a problem with greater need for attention.
The evaluation of situation cementing for second contact surface is the urgent problem to be solved always existed in primary cement evaluation, often Logging technique is also difficult to provide specific evaluation result.And laboratory experiment evaluation at present is mainly determined by two aspects, one It is using shearing cementing strength, second is that waterpower cementing strength.The former has more research at present, such as Yang Zhejie (Yang Zhejie, Liang Hong Army, Li Feng wait well cementation interface cementing strength tester:CN202381076U [P] .2012.), (Cheng Rongchao, step are beautiful by Cheng Rongchao Ring, Wang Rui and blast-furnace cinder improve cementing concrete interface agglutination performance study [J] gas industry, 2007,27 (2):63- Etc. 66.) research of the cementing evaluation of second contact surface has all been carried out using the principle, but carries out testing obtained knot using the principle Fruit can not directly give the stratum channelling pressure that cement plane can be born, while the size of cementing strength can not be built with anti-channeling ability Vertical relationship, if cement plane is there are crack, actual formation has occurred and that channelling, but the shearing cementing strength for testing display still may It is very big.As it can be seen that there are problems for this kind of evaluation method.The latter is evaluated using waterpower cementing strength, is substantially that evaluation the anti-of interface is altered Ability, using channelling pressure as evaluating cementing second interface anti-channeling capacity index.Meet with underground situation, evaluation method and obtains Parameter has direct directive significance.(Gu Jun, Yang Weihua, Qin Wenzheng wait well cementation second interface packing merit rating method to Gu Jun Study [J] petroleum journal, 2008,29 (3):A kind of method for evaluating second contact surface sealing ability 451-454.) is proposed, but This method fails sufficiently to simulate mud cake formation and rinse using artificial core, and model excessively idealizes.Guo little Yang is mentioned Having gone out the cementing power evaluating apparatus of one, 2 two cementation interface under high temperature and pressure a kind of, (Guo little Yang, Zhang Kai, the early member of Lee wait High temperature and pressure well cementation one, the Sichuan second interface sealing aptitude tests device and method [P]:CN104406910A,2015-03- 11.), though the device can carry out the second cementation interface of well cementation, it is using artificial core simulated formation, cementing situation There are larger differences with the truth of underground second contact surface;The device can measure one, 2 two cementation interface simultaneously, may Cause fluid to be altered in two the mutual of interface, is such as originally to measure the gas at the first interface since the cementing strength at the first interface is much larger than Second contact surface, so that phenomena such as gas is altered to second contact surface, influences experimental result, the especially fluid-channeling channel of the second cementation interface There is multiple, such as the cement plane of rock core itself, rock core and cement sheath, the gas source which cannot be distinguished has channeling is logical in which item Road, therefore there are more unreasonable places for the instrument.
In current research, simulated formation could be used without infiltrative sheet metal a bit, make the glue of well cementation second contact surface It ties quality evaluation and does not have reference value.Also have using artificial core simulated formation, but undeclared artificial core is to practically Layer analogy method and whether reach live formation physical parameters, do not meet field condition, while artificial core is wanted according to underground Ask actual size very big, compacting is difficult, and at high cost, experimental period is long, and the artificial core manufacture of use does not meet field condition, mould Quasi- result reference value is low, does not have actual reference substantially.
Summary of the invention
In order to overcome the shortcomings of described in background technique, the present invention provides a kind of evaluations of second contact surface bonding quality of cementing the well Device and experimental method, the rock core size which uses is small, overcomes the problem excessive to rock core demand, and can form mud Cake can also use artificial core, according to formation rock total rock, clay component, size distribution, infiltration directly with live rock core The data such as saturating rate, porosity, oil gas water saturation, the artificial artificial core for suppressing simulated formation.In addition, the device adopts rock core It is handled with rock core cap, the first interface, second contact surface and rock core itself is permeated into three channel separations that has channeling may occur It opens, can accurately obtain the pressure and flow of second contact surface has channeling.
The technical solution adopted by the present invention to solve the technical problems is:
A kind of evaluating apparatus for second contact surface bonding quality of cementing the well, including autoclave body, autoclave body are internally provided with rock core, rock core with Cement sheath is provided between autoclave body;It is cased with rock core cap at the top of rock core, is provided with gap between rock core cap lower edge and cement sheath;Rock core Bottom is provided with wool pad, and wool pad can fix rock core between two parties, and prevents cement slurry from flowing into the high-pressure gas pipelines on lower end cap; Cement sheath lateral surface and autoclave body medial surface closely form the first interface has channeling channel, and rock core lateral surface and cement sheath medial surface are close Form second contact surface has channeling channel.
The rock core is true core, and core diameter is between 25mm to 50mm, height 50mm, such as practically without underground The rock core that layer drills through can be suppressed using drilling cuttings, or according to formation rock total rock, clay component, size distribution, permeability, hole The data such as porosity, oil gas water saturation, the artificial artificial core for suppressing simulated formation.
The gap escapes second contact surface has channeling gas, and rock core cap center has hole and pipeline and rock core body to permeate gas Channel is connected, the gas that can be separated the gas of second contact surface has channeling and penetrate from rock core itself.
The autoclave body lateral surface is closely provided with heating mantle, and heating mantle is internally provided with thermocouple, uses for heating, Heating mantle lateral surface is closely provided with insulating layer, for keeping the temperature.
Upper end cover is partially connected on the autoclave body, upper end cover lower part is provided with ceramic washer and upper plug head, upper ceramics Washer is used to be provided with sealing ring, the first interface has channeling gas collection mouth, rock core body infiltration gas on upper plug head and receive to heat-insulated Ji Kou and second contact surface has channeling gas collection mouth, sealing ring is to separate gas when has channeling occurs for the first, second interface, and the One interface has channeling gas collection mouth is used to collect the first cementation interface that cement sheath and autoclave body inner surface are formed and ease when has channeling occurs Gas out, rock core body infiltration gas collection mouth are received for collecting the gas that rock core itself penetrates, second contact surface has channeling gas Ji Kou is used to collect second boundary's cement plane that rock core and cement sheath are formed and occurs escaping gas when has channeling, in the device, first The has channeling gas that interface, second contact surface and rock core itself penetrate individually is separated, and can accurately know second contact surface Pressure and flow when has channeling.
Lower cover is partially connected under the autoclave body, lower end cap upper surface is successively closely provided with lower ceramic washer, lower envelope The gap location of head and lower end cap, lower end cap and autoclave body is provided with graphite packing, and graphite packing guarantees sealing performance, lower ceramic washer To heat-insulated, lower end cap central axes direction is provided with high-pressure gas pipelines, inputs high pressure to the device by high-pressure gas pipelines Air or high-pressure fluid;Air drain was provided between lower end cap and cement sheath, the high pressure gas inputted by high-pressure gas pipelines It is flow to rock core, cement sheath lower part with air drain is crossed by wool pad, simulates underground has channeling.
The high-pressure gas pipelines connect two pipelines:First is that connecting gas gauge, gas by special check valve Pressure maintaining valve and source nitrogen, second is that connecting the first hydraulic gage and the first hydraulic pump by the first control valve;First pipeline is used In being filled with the nitrogen with certain pressure to the device, has channeling is simulated to test the bonding quality at each interface;Article 2 pipeline For being filled with the fluid with certain pressure to the device, maintenance is formed with cleaning device inside or in cement sheath forming process Pressure.The special check valve, only could quilt when the pressure that source nitrogen is released is greater than pressure hydraulic in autoclave body It opens, and fluid can only enter autoclave body, cannot return to source nitrogen, if source nitrogen release air pressure is less than hydraulic in autoclave body, nitrogen The gas of gas source release cannot pass through the valve.
First interface has channeling gas collection mouth, rock core body infiltration gas collection mouth and the second contact surface has channeling gas is received Ji Kou connects the first interface has channeling gas collection bottle by pipeline respectively, rock core body permeates gas collection bottle and second contact surface has channeling Gas collection bottle;Along gas flow direction, back-pressure valve, pressure gauge and flowmeter are disposed on each pipeline;When gas is sent out When anger is altered, escapes on gas and escaped from nearest gas collection mouth, it is big through cmf record flow by corresponding back-pressure valve It is small and by each gas bottle collect gas.Since the gas flow that each interface passes through is smaller, it is by generating bubble, that is, observable It is no to there is gas to enter in gas bottle, i.e., known to each interface it is whether breakdown, interface occur has channeling when air pressure size can table Levy the bonding quality at the interface.
The first interface has channeling gas collection mouth also connects the second control valve, third control valve, second by pipeline Hydraulic gage and the second hydraulic pump, second contact surface has channeling gas collection mouth also pass through pipeline and are connected to the second control valve and third On pipeline between control valve, it is convenient by the first interface has channeling gas collection mouth and second contact surface has channeling gas collection mouth to this The liquid of certain pressure is inputted in device, while high-pressure gas pipelines are connected to hydraulic pump, can inject a level pressure in cement sheath lower part The liquid of power squeezes cement sheath (upper and lower pressure be equal, otherwise cement sheath may be subjected to displacement), up and down to simulate underground Cement sheath is the strata pressure being subject to and dead weight or overlying formation pressure.
Preferably, the thermocouple, pressure gauge, the second hydraulic gage, gas gauge, the first hydraulic gage and Flowmeter is electrically connected computer, is recorded by computer and analyzed data.
A kind of experimental method of the evaluating apparatus for second contact surface bonding quality of cementing the well, includes the following steps:
1) mud cake is prepared:Rock core is dried, is put into rock core vacuum saturation device, vacuumize process is vacuumizing environment Lower saturation strata drilling liquid forms mud cake, the formation of simulated formation mud cake in core outside surface;
2) it rinses:After mud cake is formed, rock core is put into the device and is fixed, it is normal to be pumped into well cementation by high-pressure gas pipelines Flushing liquor permeates gas by the first interface has channeling gas collection mouth, second contact surface has channeling gas collection mouth and rock core body Collection port outflow, and continue for some time, flushing liquor is bled off later, is changed insulating liquid into and is needed to recycle after a certain period of time according to experiment Liquid in device is discharged entirely, simulates the effect of flushing liquor and insulating liquid to bed boundary in subsequent construction;Rushing herein Washing lotion and insulating liquid determine which kind of flushing liquor or insulating liquid selected according to specific requirement of experiment or underground situation;
3) cement sheath is prepared:Removal of core covers rock core cap on rock core, wool pad is put into autoclave body, later by rock core Be put on the wool pad in autoclave body and fix, to the annular space between rock core and autoclave body at inject cement slurry, cement slurry to be implanted After, it covers plug, upper ceramic washer and upper end cover and passes through high pressure under the action of the first hydraulic pump and the second hydraulic pump Required pressure when gas pipeline, the first interface has channeling gas collection mouth and second contact surface has channeling gas collection mouth injection cement conservation Pressure fluid, simulate underground cement ring pressure situation, pressure fluid can be used directly water or neutrality hydraulic oil;Pressure Force flow body is pumped out by the first hydraulic pump, flows through the first hydraulic gage, and the first control valve enters below cement sheath;Pressure current Body also passes through the second hydraulic pump and pumps out, and flows through the second hydraulic gage, third control valve door and second contact surface has channeling gas collection Mouthful and flow through the second hydraulic gage, third control valve door, the second control valve and the first interface has channeling gas collection mouth two Approach enters above cement sheath;The purpose of injection pressure fluid:Because underground cement ring is by strata pressure, while sheet Body self weight or overlying formation pressure, thus to simulate this pressure, in this arrangement by the first and second hydraulic pumps to The top and bottom injection of cement sheath has the fluid of certain pressure (pressure is adjusted according to strata pressure), squeezes cement sheath up and down (upper and lower pressure be equal, otherwise cement sheath may be subjected to displacement), to simulate the pressure condition that underground cement ring is subject to;Together When open heating tape be heated to set temperature, according to experiment and actual needs, conserve in a certain temperature conditions, the temperature Determine that curing time is determined according to the factors such as the characteristic of cement slurry and the ground environment of simulation by the formation temperature for testing simulated It is fixed, or set according to the requirement of experiment of physical simulation;
4) the special check valve of high-pressure gas pipelines changing-over, the first interface has channeling gas collection mouth and second contact surface has channeling gas Collection port changing-over back-pressure valve, adjustment back-pressure valve until autoclave body internal pressure be cement conservation needed for pressure because inside autoclave body It is that there are pressure fluids (is injected before to simulate cement sheath maintenance pressure), so the pressure that back-pressure valve, that is, counterbalance valve is born Power is set to maintenance pressure, and when has channeling occurs, and lower part high pressure gas is altered to top, makes the pressure rise on top, at this time on The pressure in portion is just greater than the pressure of back-pressure valve, and gas will be flowed out from back-pressure valve, and autoclave body internal pressure reduces, until being equal to setting Cement sheath conserve pressure value;
5) it is passed through high pressure gas, is gradually increased air pressure, whether observation second contact surface has channeling gas collection bottle has bubble generation Show the second cementation interface if there is bubble or significant changes occurs in gas atmosphere table with the barometric pressure change of gas Place has altered logical, and air pressure obtained by gas atmosphere table at this time is that the anti-of the second cementation interface alters pressure size, can characterize the second cementing boundary The bonding quality in face.
Preferably, in step 1), the time of rock core drying is 45-50h, and the time vacuumized is 6-10h, rock core vacuum Vacuum degree is not less than 0.1MPa in saturation device, and the time of saturation strata drilling liquid is 6-10h.
It is an advantage of the invention that:
1) rock core that the present invention uses is true core, and small volume, overcomes the problem excessive to rock core demand, and Mud cake can be formed;
2) present invention separated three gases that rock core is likely to occur under pressure alter circulation passage (the first interface, Second contact surface, rock core itself), the pressure and flow of second contact surface has channeling can be accurately obtained, reaches and matter is glued to second contact surface The accurate characterization of amount;
3) present invention goes back cocoa and is changed to corrosive fluid for pressure fluid used in cement is conserved, and can be studied using the device Influence of the fluid corrosiveness to cement sheath anti-channeling ability;
4) present invention can simulate the anti-has channeling experiment of cement sheath under high temperature and pressure.
Detailed description of the invention
Fig. 1 is schematic structural view of the invention;
Fig. 2 is the structural schematic diagram at rock core cap of the present invention.
Specific embodiment
The present invention will be further explained below with reference to the accompanying drawings:
Embodiment 1:
A kind of evaluating apparatus for second contact surface bonding quality of cementing the well, including autoclave body 10, autoclave body 10 are internally provided with rock core 11, Cement sheath 12 is provided between rock core 11 and autoclave body 10;Rock core cap 13,13 lower edge of rock core cap and cement sheath are cased at the top of rock core 11 Gap 14 is provided between 12;11 bottom of rock core is provided with wool pad 15;Cement sheath 12 and autoclave body 10 form the first cementation interface 16, rock core 11 and cement sheath 12 form the second cementation interface 17.Gap 14 escapes second contact surface has channeling gas, in rock core cap 13 The heart has hole and pipeline to be connected with rock core body infiltration gas passage, can separate the gas of second contact surface has channeling and from 11, rock core The gas that body penetrates.
Influence for simulated formation temperature to 12 cementing strength of cement sheath, 10 lateral surface of autoclave body are closely provided with Heating mantle 18, heating mantle 18 are internally provided with thermocouple, and 18 lateral surface of heating mantle is closely provided with insulating layer 19.
Upper end cover 20 is partially connected on the autoclave body 10,20 lower part of upper end cover is provided with ceramic washer 50 and upper plug head 22, sealing ring 23, the first interface has channeling gas collection mouth 24, rock core body infiltration 25 and of gas collection mouth are provided on upper plug head 22 Second contact surface has channeling gas collection mouth 26;Sealing ring 23 to separate the first, second interface occur has channeling when gas, first Interface has channeling gas collection mouth 24 is used to collect the first cementation interface 16 that cement sheath 12 and autoclave body 10 are formed and ease when has channeling occurs Gas out, rock core body infiltration gas collection mouth 25 is for collecting the gas that rock core itself penetrates, second contact surface has channeling gas Collection port 26 is used to collect the second cementation interface 17 that rock core 11 and cement sheath 12 are formed and escaping gas when has channeling, the dress occurs In setting, the gas that the first interface 16, second contact surface 17 and rock core 11 penetrate in itself is individually separated, and can accurately know Pressure and flow when second interface generation has channeling.
The lower part connection lower cover 27 of the autoclave body 10,27 upper surface of lower cover is successively closely provided with lower ceramic washer 28, the gap location of lower head 29 and lower end cap 30, lower end cap 30 and autoclave body 10 is provided with graphite packing 31, and graphite packing 31 guarantees Sealing performance, for lower ceramic washer 28 to heat-insulated, 30 central axes direction of lower end cap is provided with high-pressure gas pipelines 32, passes through high pressure Gas pipeline 32 inputs pressure-air or high-pressure fluid to the device;Air drain was provided between lower end cap 30 and cement sheath 12 33, the high pressure gas inputted by high-pressure gas pipelines 32 assigns to rock core 11, cement sheath with air drain 33 is crossed by wool pad 15 Underground has channeling condition is simulated in 12 lower part.
The high-pressure gas pipelines 32 connect two pipelines:First is that connecting gas gauge by special check valve 34 35, gas pressure maintaining valve 36 and source nitrogen 37, second is that it is hydraulic to connect the first hydraulic gage 39 and first by the first control valve 38 Pump 40;First pipeline is for being filled with the nitrogen with certain pressure to the device, for testing the bonding quality at each interface; Article 2 pipeline was formed as inside cleaning device with cement sheath 12 for being filled with the fluid with certain pressure to the device It conserves and uses in journey.
First interface has channeling gas collection mouth 24, rock core body infiltration gas collection mouth 25 and the second contact surface has channeling gas Body collection port 26 connects the first interface has channeling gas collection bottle 41 by pipeline respectively, rock core body permeates gas collection bottle 42 and the Second interface has channeling gas collection bottle 43;Along gas flow direction, back-pressure valve 44,45 and of pressure gauge are disposed on each pipeline Flowmeter 46;When has channeling occurs for gas, escapes on gas and escaped from nearest gas collection mouth, pass through corresponding back-pressure valve 44, uninterrupted is recorded through flowmeter 46 and gas is collected by each gas bottle.
Pass through the first interface has channeling gas collection mouth 24 and second contact surface has channeling gas collection mouth 26 for convenience to the dress The liquid of middle input certain pressure is set, the first interface has channeling gas collection mouth 24 also connects the second control valve by pipeline 47, third control valve 48, the second hydraulic gage 49 and the second hydraulic pump 51, second contact surface has channeling gas collection mouth 26 also pass through Pipeline is connected on the pipeline between the second control valve 47 and third control valve 48.
In order to improve characterization precision, the present invention is recorded and is analyzed data, thermocouple, pressure gauge 45, second using computer Hydraulic gage 49, gas gauge 35, the first hydraulic gage 39 and flowmeter 46 are electrically connected computer.
Embodiment 2:
Using a kind of experimental method of the evaluating apparatus for second contact surface bonding quality of cementing the well described in embodiment 1, including such as Lower step:
1) mud cake is prepared:Rock core 11 is dried, is put into rock core vacuum saturation device, vacuumize process is vacuumizing ring Strata drilling liquid is saturated under border, in the formation of core outside surface simulated formation mud cake;
2) it rinses:After mud cake is formed, rock core 11 is put into the device and is fixed, is pumped by high-pressure gas pipelines 32 solid The common flushing liquor of well, by the first interface has channeling gas collection mouth 24, second contact surface has channeling gas collection mouth 26 and rock core body It permeates gas collection mouth 25 to flow out, and continues for some time, bleed off flushing liquor later, change insulating liquid into and need to recycle according to experiment The liquid in device is discharged entirely after a certain period of time, simulates in subsequent construction flushing liquor and insulating liquid to the work of bed boundary With;
3) cement sheath 12 is prepared:Removal of core 11 covers rock core cap 13 on rock core 11, is put into wool pad in autoclave body 10 15, it on wool pad 15 that rock core 11 is put into autoclave body 10 and will fix later, at the annular space between rock core 11 and autoclave body 10 It injects cement slurry (cement slurry height floods 2~4cm of sealing ring just), after cement slurry to be implanted, covers plug 20, upper pottery Porcelain washer 50 and upper end cover 22 pass through high-pressure gas pipelines 32, under the action of the first hydraulic pump 40 and the second hydraulic pump 51 One interface has channeling gas collection mouth 24 and second contact surface has channeling gas collection mouth 26 inject the pressure of required pressure when cement conservation Fluid opens simultaneously heating tape 18 and is heated to set temperature, according to experiment and actual needs, supports in a certain temperature conditions Shield;
4) the special check valve 34 of 32 changing-over of high-pressure gas pipelines, the first interface has channeling gas collection mouth 24 and second contact surface gas 26 changing-over back-pressure valve 44 of gas blowby body collection port, adjustment back-pressure valve 44 until 10 internal pressure of autoclave body be cement conservation needed for press Power;
5) it is passed through high pressure gas, is gradually increased air pressure, whether observation second contact surface has channeling gas collection bottle 43 has bubble production The raw and barometric pressure change of gas shows that second is cementing if there is bubble or significant changes occurs in gas atmosphere table 35 Interface altered it is logical, 35 gained air pressure of gas atmosphere table at this time be the anti-of the second cementation interface alter pressure size, second can be characterized The bonding quality of cementation interface.
Wherein, in step 1), the time of rock core drying is 48h, and the time vacuumized is rock core vacuum saturation dress for 24 hours Middle vacuum degree is set not less than 0.1MPa, the time of saturation strata drilling liquid is for 24 hours.
Finally it should be noted that:Obviously, the above embodiment is merely an example for clearly illustrating the present invention, and simultaneously The non-restriction to embodiment.For those of ordinary skill in the art, it can also do on the basis of the above description Other various forms of variations or variation out.There is no necessity and possibility to exhaust all the enbodiments.And thus drawn The obvious changes or variations that Shen goes out are still in the protection scope of this invention.

Claims (4)

1. a kind of evaluating apparatus for second contact surface bonding quality of cementing the well, which is characterized in that including autoclave body, autoclave body is internally provided with rock The heart is provided with cement sheath between rock core and autoclave body;It is cased with rock core cap at the top of rock core, is provided between rock core cap lower edge and cement sheath Gap;Rock core bottom is provided with wool pad;Cement sheath lateral surface and autoclave body medial surface closely form the first interface has channeling channel, rock Facies lateralis cordis and cement sheath medial surface closely form second contact surface has channeling channel;
The autoclave body lateral surface is closely provided with heating mantle, and heating mantle is internally provided with thermocouple, and heating mantle lateral surface is close It is provided with insulating layer;
Upper end cover is partially connected on the autoclave body, upper end cover lower part is provided with upper plug head and upper ceramic washer, sets on upper plug head It is equipped with sealing ring, the first interface has channeling gas collection mouth, rock core body infiltration gas collection mouth and second contact surface has channeling gas collection Mouthful;
Partially connect lower cover under the autoclave body, lower end cap upper surface be successively closely provided with lower ceramic washer, lower head and The gap location of lower end cap, lower end cap and autoclave body is provided with graphite packing, and lower end cap central axes direction is provided with high-pressure gas pipelines, Air drain was provided between lower end cap and cement sheath;
The high-pressure gas pipelines connect two pipelines:First is that connecting gas gauge, gas pressure stabilizing by special check valve Valve and source nitrogen, second is that connecting the first hydraulic gage and the first hydraulic pump by the first control valve;
First interface has channeling gas collection mouth, rock core body infiltration gas collection mouth and the second contact surface has channeling gas collection mouth The first interface has channeling gas collection bottle is connected by pipeline respectively, rock core body permeates gas collection bottle and second contact surface has channeling gas Gas bottle;Along gas flow direction, back-pressure valve, pressure gauge and flowmeter are disposed on each pipeline;
The first interface has channeling gas collection mouth also connects the second control valve, third control valve, second hydraulic by pipeline Pressure gauge and the second hydraulic pump, second contact surface has channeling gas collection mouth also pass through pipeline and are connected to the second control valve and third control On pipeline between valve.
2. a kind of evaluating apparatus of second contact surface bonding quality of cementing the well as described in claim 1, which is characterized in that the heat Galvanic couple, pressure gauge, the second hydraulic gage, gas gauge, the first hydraulic gage and flowmeter are electrically connected computer.
3. a kind of experimental method of the evaluating apparatus using well cementation second contact surface bonding quality as claimed in claim 1 or 2, It is characterized in that, described method includes following steps:
1) mud cake is prepared:Rock core is dried, is put into rock core vacuum saturation device, vacuumize process, is satisfied in the case where vacuumizing environment With strata drilling liquid, in the formation of core outside surface simulated formation mud cake;
2) it rinses:After mud cake is formed, rock core is put into the device and is fixed, it is common to be pumped into well cementation by high-pressure gas pipelines Flushing liquor permeates gas collection by the first interface has channeling gas collection mouth, second contact surface has channeling gas collection mouth and rock core body Mouth outflow, and continue for some time, flushing liquor is bled off later, is changed insulating liquid into and is needed to recycle after a certain period of time according to experiment by dress Liquid in setting discharges entirely, simulates the effect of flushing liquor and insulating liquid to bed boundary in subsequent construction;
3) cement sheath is prepared:Removal of core covers rock core cap on rock core, and wool pad is put into autoclave body, is later put into rock core On wool pad in autoclave body and fix, to the annular space between rock core and autoclave body at inject cement slurry, cement slurry to be implanted finishes Afterwards, plug, upper ceramic washer and upper end cover are covered and passes through high pressure gas under the action of the first hydraulic pump and the second hydraulic pump The pressure of required pressure when pipeline, the first interface has channeling gas collection mouth and second contact surface has channeling gas collection mouth injection cement conservation Force flow body opens simultaneously heating tape and is heated to set temperature, according to experiment and actual needs, supports in a certain temperature conditions Protect appropriate time;
4) the special check valve of high-pressure gas pipelines changing-over, the first interface has channeling gas collection mouth and second contact surface has channeling gas collection Mouthful changing-over back-pressure valve adjusts back-pressure valve, sets the pressure of back-pressure valve as autoclave body internal pressure, i.e. pressure needed for cement conservation;
5) it is passed through high pressure gas by high-pressure gas pipelines, is gradually increased air pressure, whether is observation second contact surface has channeling gas collection bottle There is bubble to generate and the barometric pressure change of gas, if there is bubble or significant changes occurs in gas atmosphere table, shows the Alter logical at two cementation interfaces, air pressure obtained by gas atmosphere table at this time is that the anti-of the second cementation interface alters pressure size, can be characterized The bonding quality of second cementation interface.
4. experimental method as claimed in claim 3, which is characterized in that in step 1)In, the time of rock core drying is 45-50h, The time vacuumized is 6-10h, and vacuum degree is not less than 0.1MPa in rock core vacuum saturation device, is saturated the time of strata drilling liquid For 6-10h.
CN201611247445.5A 2016-12-29 2016-12-29 A kind of evaluating apparatus and experimental method of second contact surface bonding quality of cementing the well Active CN106596400B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611247445.5A CN106596400B (en) 2016-12-29 2016-12-29 A kind of evaluating apparatus and experimental method of second contact surface bonding quality of cementing the well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611247445.5A CN106596400B (en) 2016-12-29 2016-12-29 A kind of evaluating apparatus and experimental method of second contact surface bonding quality of cementing the well

Publications (2)

Publication Number Publication Date
CN106596400A CN106596400A (en) 2017-04-26
CN106596400B true CN106596400B (en) 2018-11-23

Family

ID=58604065

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611247445.5A Active CN106596400B (en) 2016-12-29 2016-12-29 A kind of evaluating apparatus and experimental method of second contact surface bonding quality of cementing the well

Country Status (1)

Country Link
CN (1) CN106596400B (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107725030B (en) * 2017-11-20 2023-05-26 中国石油大学(华东) Device and method for evaluating two-interface maintenance and cementing quality of well cementation under disturbance of formation water
CN109142192B (en) * 2018-10-08 2019-12-27 成都理工大学 Visual special-shaped well cementation two-interface cementing quality testing system
CN111622743B (en) * 2018-12-19 2022-01-25 中国地质大学(北京) Tiltable and eccentric cementing second interface cementing quality evaluation method
CN112065364B (en) * 2019-06-10 2023-11-28 中国石油天然气股份有限公司 Well cementation performance determining device
CN111175208A (en) * 2019-12-24 2020-05-19 中国地质大学(北京) Drilling fluid mud cake permeability evaluation device and method
CN113310772B (en) * 2021-07-01 2022-07-01 中国科学院武汉岩土力学研究所 Sample preparation method for testing shearing strength parameter of second interface of well cementation
CN113532990B (en) * 2021-07-15 2023-11-14 西南石油大学 Preparation method of compact sandstone oil displacement core with argillaceous interlayer
CN113899889B (en) * 2021-12-10 2022-04-15 成都理工大学 Device and method for monitoring cement paste gel strength of visual retaining wall
CN116930067B (en) * 2023-09-19 2023-12-19 成都理工大学 Device and method for measuring cementing strength of polluted rock face and consolidated body

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202560207U (en) * 2012-05-17 2012-11-28 东北石油大学 Experimental device for determining cementation degree of interface of well cementation cement sheath
CN103174409A (en) * 2013-03-28 2013-06-26 中国石油大学(华东) Testing device for packing performance of deepwater cementing cement sheath
WO2014113139A1 (en) * 2013-01-18 2014-07-24 Halliburton Energy Services, Inc. Method and apparatus for characterizing fluid channeling through a cement formation interface of a subterranian wellbore
CN104406910A (en) * 2014-10-27 2015-03-11 西南石油大学 Apparatus and method for testing cementation capability of well cementation first and second interfaces under high-temperature high-pressure conditions
CN104500034A (en) * 2014-12-29 2015-04-08 西南石油大学 Device and method for evaluating influence of pressure change on completeness of cement sheath
CN205297542U (en) * 2015-12-29 2016-06-08 中国石油天然气股份有限公司 Well cementation cement knot strength test device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202560207U (en) * 2012-05-17 2012-11-28 东北石油大学 Experimental device for determining cementation degree of interface of well cementation cement sheath
WO2014113139A1 (en) * 2013-01-18 2014-07-24 Halliburton Energy Services, Inc. Method and apparatus for characterizing fluid channeling through a cement formation interface of a subterranian wellbore
CN103174409A (en) * 2013-03-28 2013-06-26 中国石油大学(华东) Testing device for packing performance of deepwater cementing cement sheath
CN104406910A (en) * 2014-10-27 2015-03-11 西南石油大学 Apparatus and method for testing cementation capability of well cementation first and second interfaces under high-temperature high-pressure conditions
CN104500034A (en) * 2014-12-29 2015-04-08 西南石油大学 Device and method for evaluating influence of pressure change on completeness of cement sheath
CN205297542U (en) * 2015-12-29 2016-06-08 中国石油天然气股份有限公司 Well cementation cement knot strength test device

Also Published As

Publication number Publication date
CN106596400A (en) 2017-04-26

Similar Documents

Publication Publication Date Title
CN106596400B (en) A kind of evaluating apparatus and experimental method of second contact surface bonding quality of cementing the well
CN104655495B (en) High temperature and high pressure coal and rock true triaxial fracturing and seepage test device and test method
CN103556993B (en) Low permeability oil field plane Five-point method pattern carbon dioxide flooding emulation experiment analogy method
CN106761679B (en) Evaluation device and method capable of eccentrically testing cementing quality of first interface of well cementation
CN104153760B (en) Oil/gas Well cement sheath sealing characteristics simulating test device and experimental technique
CN102735547B (en) Coal-rock hydraulic fracturing testing method under true triaxial state
CN106640062B (en) Cementing slurry water enchroachment (invasion) Simulation evaluation instrument and evaluation method
CN107905778A (en) Supercritical CO2The enhanced geothermal system experimental provision of fluid fracturing and method
CN111075441B (en) Three-dimensional physical simulation experiment device and method for cold recovery after thermal recovery of side-bottom water heavy oil reservoir
CN109001438A (en) A kind of joint seal gas shutoff experimental simulation device and test method
CN104406910A (en) Apparatus and method for testing cementation capability of well cementation first and second interfaces under high-temperature high-pressure conditions
CN2884196Y (en) High-temp. and high-pressure drilling fluid density testing device
CN102735548A (en) Multifunctional true triaxial flow solid coupling test system
CN109269901A (en) A kind of multiple dimensioned horizontal joint comprehensive regulation imitative experimental appliance of pressure-sensitive and method
CN110359897A (en) A kind of fracture-type reservoir cracks seam with boring leak-proof leak-stopping method in advance
CN102735600A (en) Method for testing coal sample seepage under true triaxial state
CN109030140B (en) Simulation test device and method for high-temperature water-wet curing of cement stone of thermal production well
CN205786605U (en) A kind of this coal bed gas extraction experimental simulation device
US11905812B2 (en) Intra-layer reinforcement method, and consolidation and reconstruction simulation experiment system and evaluation method for gas hydrate formation
CN102809522A (en) Method for processing double-media core and application of double-media core
CN101942997A (en) Cementing wall packer channeling checking instrument
CN112443288B (en) Experimental device for evaluating sealing capacity of two interfaces of well cementation cement sheath
CN104944903B (en) A kind of artificial coal's heart, its preparation method and its application
CN109899050A (en) Form the bed gas reservoir fracturing process of complex fracture network
CN114151041B (en) Weak-cementing hydrate reservoir simulated wellbore construction device and method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant