CN106593502A - 框架落地自移式前伸缩超前支护装置 - Google Patents
框架落地自移式前伸缩超前支护装置 Download PDFInfo
- Publication number
- CN106593502A CN106593502A CN201611218980.8A CN201611218980A CN106593502A CN 106593502 A CN106593502 A CN 106593502A CN 201611218980 A CN201611218980 A CN 201611218980A CN 106593502 A CN106593502 A CN 106593502A
- Authority
- CN
- China
- Prior art keywords
- lifting
- base plate
- type front
- moving type
- upper beam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims description 14
- 238000010276 construction Methods 0.000 claims description 4
- 230000001681 protective effect Effects 0.000 claims description 4
- 241001669679 Eleotris Species 0.000 description 1
- 239000003245 coal Substances 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000002093 peripheral effect Effects 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
- 238000005303 weighing Methods 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D23/00—Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor
- E21D23/04—Structural features of the supporting construction, e.g. linking members between adjacent frames or sets of props; Means for counteracting lateral sliding on inclined floor
- E21D23/0445—Extensions of the base member supporting the conveyor
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66F—HOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
- B66F11/00—Lifting devices specially adapted for particular uses not otherwise provided for
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Architecture (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Mechanical Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
一种框架落地自移式前伸缩超前支护装置,包括:升降结构和固定在升降结构上的支护结构,其特征是:升降结构包括升降底座,升降底座上设置有升降中梁,升降底座和升降中梁之间设置有稳固装置和升降油缸;升降中梁上安装有拱形上梁,拱形上梁上设置有支护结构;支护结构包括与拱形上梁固定连接的轨道管,轨道管设置有伸缩臂。所述的升降底座内设置有自移装置,自移装置包括移动油缸,移动油缸上端与升降底座连接,下端设置有底板,底板周边设置有向上的立板和侧斜齿板,底板下面设置有斜齿,移动油缸伸出后,与地面形成推力,完成升降底座的自移。
Description
技术领域
本发明涉及一种超前支护,尤其涉及一种框架落地自移式前伸缩超前支护装置。
背景技术
煤矿掘进工作面现使用的支护方式是上好吊环,穿上前探梁,在前探梁上铺网(覆盖未支护顶板,)然后用木刹、长短背板或道木将前探梁金属网固定好,作业时在支护的掩护下进行,支护完成后再卸下继续挪移作业,目前使用的超前支护安装繁琐,安全隐患高,工人劳动强度大。现使用的超前支护就成了制约和影响井下掘进面的进度的主要因素。
发明内容
本发明的目的是提供一种超前支护,能伸缩,支护框架整体能自移,自移占用空间小,安全性能高,劳动强度小的框架落地自移式前伸缩超前支护装置。
为实现上述目的,本本发明所采用的技术方案为:
一种框架落地自移式前伸缩超前支护装置,包括:升降结构和固定在升降结构上的支护结构,其特征是:升降结构包括升降底座,升降底座上设置有升降中梁,升降底座和升降中梁之间设置有稳固装置和升降油缸;升降中梁上安装有拱形上梁,拱形上梁上设置有支护结构;支护结构包括与拱形上梁固定连接的轨道管,轨道管设置有伸缩臂。
所述的升降底座内设置有自移装置,自移装置包括移动油缸,移动油缸上端与升降底座连接,下端设置有底板,底板周边设置有向上的立板和侧斜齿板,底板下面设置有斜齿,移动油缸伸出后,与地面形成推力,完成升降底座的自移。
所述的拱形上梁与轨道管通过斜刹结构固定连接,斜刹结构包括两个两块带空槽立板焊接于轨道管上,空槽内插有底板,底板与轨道管之间为拱形上梁,拱形上梁与底板之间插有斜刹。
所述的拱形上梁通过拱梁底板与升降中梁螺栓连接,轨道管内部安装伸缩油缸,伸缩油缸控制连接伸缩臂。
所述的稳固装置包括与升降中梁铰接的长臂杆,长臂杆下端与横臂杆和纵臂杆铰接。
所述的底板两侧设置有固定空槽立板的固定勾,底板内带有固定斜刹通的凹槽,所述的斜刹为楔形,斜刹的尾部设置有挡块。
所述的伸缩臂前端设置有圆套,伸缩臂之间通过圆套设置有平衡板。
所述的升降中梁前段连接前防护罩后端连接后防护罩。
本发明的优点是:本发明升降自如,支护可自由伸缩,工人可以直接将前支护降低,把金属网扑设于前支护上方,直接升起就可以完成,设置了升降式支护能减少工人爬高危险,铺设完一段护网后可以自移支护继续作业,自移占用空间小,使用该框架落地自移式前伸缩超前支护装置能大大降低顶板的事故率。
附图说明
图1为本发明结构示意图;
图2为自移装置示意图;
图3为斜刹结构剖面结构示意图;
图4为斜刹结构的结构示意图;
图5为斜刹结构的结构示意图;
图6为斜刹的结构示意图。
附图中:1、升降底座;2、升降油缸;3、稳固装置;4、前防护罩;5、拱梁底板;6、后防护罩;7、拱形上梁;8、升降中梁;9、轨道管;10、伸缩臂;11、后平衡板;12、伸缩油缸;13、圆套;14、平衡板;15、自移装置;1501、移动油缸;1502、侧斜齿板;1503、立板;1504、底板;16、斜刹结构;1601、空槽立板;1602、斜刹;1603、底板;17、横臂杆;18、纵臂杆;19、长臂杆。
具体实施方式
下面结合附图与具体实施例对本发明做进一步描述:
一种框架落地自移式前伸缩超前支护装置,如图1所示其中包括:升降底座1、升降中梁8、稳固装置3、升降油缸2、拱形上梁7、自移装置15。
在本实施例中,拱形上梁7用螺栓连接拱梁底板5与升降中梁8对接,两个拱形上梁7是由轨道管9通过斜刹结构16锁紧,轨道管9内部安装伸缩油缸12,轨道管9的连接由后平衡板11连接,伸缩油缸12控制连接伸缩臂10。
在本实施例中,伸缩臂10前段由平衡板14连接与两伸缩臂10之间,平衡板14由圆套13相互固定于伸缩臂10。升降中梁8前段连接前防护罩4后端连接后防护罩6。
在图2所示实施例中,所述的自移装置15由移动油缸1501、侧斜齿板1502、立板1503和底板1504组成,移动油缸1501上端与升降底座1连接,移动油缸1501伸出后,与地面形成推力,完成升降底座1的自移。
在图3所示实施例中,斜刹结构16由两块带空槽立板1601焊接于轨道管9上,轨道管9座于拱形上梁7上,空槽立板1601处插入斜刹1602和异状底板1603完成锁紧。
上述所述的实施例仅仅是对本发明的优选实施方式进行描述,并非对本发明的构思和保护范围进行限定,在不脱离发明的构思的前提下,本领域中普通工程技术人员对本发明的技术方案作出的各种变形和改进,均应落入本发明的保护范围。
Claims (8)
1.一种框架落地自移式前伸缩超前支护装置,包括:升降结构和固定在升降结构上的支护结构,其特征是:升降结构包括升降底座(1),升降底座(1)上设置有升降中梁(8),升降底座(1)和升降中梁(8)之间设置有稳固装置(3)和升降油缸(2);升降中梁(8)上安装有拱形上梁(7),拱形上梁(7)上设置有支护结构;支护结构包括与拱形上梁(7)固定连接的轨道管(9),轨道管(9)设置有伸缩臂(10)。
2.根据权利要求1所述的一种框架落地自移式前伸缩超前支护装置,其特征是:所述的升降底座(1)内设置有自移装置(15),自移装置(15)包括移动油缸(1501),移动油缸(1501)上端与升降底座(1)连接,下端设置有底板(1504),底板(1504)周边设置有向上的立板(1503)和侧斜齿板(1502),底板(1504)下面设置有斜齿,移动油缸(1501)伸出后,与地面形成推力,完成升降底座(1)的自移。
3.根据权利要求1所述的一种框架落地自移式前伸缩超前支护装置,其特征是:所述的拱形上梁(7)与轨道管(9)通过斜刹结构(16)固定连接,斜刹结构(16)包括两个两块带空槽立板(1601)焊接于轨道管(9)上,空槽内插有底板(1603),底板(1603)与轨道管(9)之间为拱形上梁(7),拱形上梁(7)与底板(1603)之间插有斜刹(1602)。
4.根据权利要求1所述的一种框架落地自移式前伸缩超前支护装置,其特征是:所述的拱形上梁(7)通过拱梁底板(5)与升降中梁(8)螺栓连接,轨道管(9)内部安装伸缩油缸(12),伸缩油缸(12)控制连接伸缩臂(10)。
5.根据权利要求1所述的一种框架落地自移式前伸缩超前支护装置,其特征是:所述的稳固装置(3)包括与升降中梁(8)铰接的长臂杆(19),长臂杆(19)下端与横臂杆(17)和纵臂杆(18)铰接。
6.根据权利要求3所述的框架落地自移式前伸缩超前支护装置,其特征是:所述的底板(1603)两侧设置有固定空槽立板(1601)的固定勾,底板(1603)内带有固定斜刹(1602)通的凹槽,所述的斜刹(1602)为楔形,斜刹(1602)的尾部设置有挡块。
7.根据权利要求1所述的框架落地自移式前伸缩超前支护装置,其特征在于:所述的伸缩臂(10)前端设置有圆套(13),伸缩臂(10)之间通过圆套(13)设置有平衡板(14)。
8.根据权利要求1所述的框架落地自移式前伸缩超前支护装置,其特征在于:所述的升降中梁(8)前段连接前防护罩(4)后端连接后防护罩(6)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611218980.8A CN106593502A (zh) | 2016-12-26 | 2016-12-26 | 框架落地自移式前伸缩超前支护装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611218980.8A CN106593502A (zh) | 2016-12-26 | 2016-12-26 | 框架落地自移式前伸缩超前支护装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106593502A true CN106593502A (zh) | 2017-04-26 |
Family
ID=58603948
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611218980.8A Pending CN106593502A (zh) | 2016-12-26 | 2016-12-26 | 框架落地自移式前伸缩超前支护装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106593502A (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109057820A (zh) * | 2018-08-20 | 2018-12-21 | 福建工程学院 | 一种富水软弱破碎地层隧道支护方法 |
CN111828073A (zh) * | 2020-08-06 | 2020-10-27 | 沈阳天安科技股份有限公司 | 一种新型巷道支护装置 |
Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5368369A (en) * | 1993-03-23 | 1994-11-29 | Council Of Scientific & Industrial Research | Equipment useful for winning ores particularly coal in longwall mining |
CN2204833Y (zh) * | 1994-07-04 | 1995-08-09 | 方景辉 | 模板拉杆夹具 |
RU2193665C2 (ru) * | 2001-02-08 | 2002-11-27 | Южно-Российский государственный технический университет (Новочеркасский политехнический институт) | Механизированная крепь |
CN2589680Y (zh) * | 2002-11-04 | 2003-12-03 | 神华集团有限责任公司 | 履带行走式液压支架 |
CN2735001Y (zh) * | 2004-10-17 | 2005-10-19 | 煤炭科学研究总院太原分院 | 用于煤矿综采设备搬迁的液压式巷道支架 |
CN2828315Y (zh) * | 2005-08-17 | 2006-10-18 | 煤炭科学研究总院太原分院 | 煤矿综采运输巷道跨骑式超前支护支架 |
CN2833112Y (zh) * | 2005-08-26 | 2006-11-01 | 煤炭科学研究总院太原分院 | 煤矿综采回风巷道组合式超前支护支架 |
CN101251022A (zh) * | 2008-03-26 | 2008-08-27 | 曹树祥 | 综掘机及时支护装置 |
CN102913268A (zh) * | 2012-11-16 | 2013-02-06 | 山东矿机集团股份有限公司 | 巷道掘进机移动支护支架 |
CN203962017U (zh) * | 2014-07-15 | 2014-11-26 | 沈阳天安矿山机械股份有限公司 | 回采巷道框架式超前支护支架 |
CN104612735A (zh) * | 2014-12-20 | 2015-05-13 | 曲天智 | 掘进工作面临时支护液压支架 |
CN105464683A (zh) * | 2015-12-22 | 2016-04-06 | 中国葛洲坝集团第三工程有限公司 | 一种tbm支护作业可移动保护盾及其使用方法 |
CN206468367U (zh) * | 2016-12-26 | 2017-09-05 | 枣庄联鑫实业有限责任公司 | 框架落地自移式前伸缩超前支护装置 |
-
2016
- 2016-12-26 CN CN201611218980.8A patent/CN106593502A/zh active Pending
Patent Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5368369A (en) * | 1993-03-23 | 1994-11-29 | Council Of Scientific & Industrial Research | Equipment useful for winning ores particularly coal in longwall mining |
CN2204833Y (zh) * | 1994-07-04 | 1995-08-09 | 方景辉 | 模板拉杆夹具 |
RU2193665C2 (ru) * | 2001-02-08 | 2002-11-27 | Южно-Российский государственный технический университет (Новочеркасский политехнический институт) | Механизированная крепь |
CN2589680Y (zh) * | 2002-11-04 | 2003-12-03 | 神华集团有限责任公司 | 履带行走式液压支架 |
CN2735001Y (zh) * | 2004-10-17 | 2005-10-19 | 煤炭科学研究总院太原分院 | 用于煤矿综采设备搬迁的液压式巷道支架 |
CN2828315Y (zh) * | 2005-08-17 | 2006-10-18 | 煤炭科学研究总院太原分院 | 煤矿综采运输巷道跨骑式超前支护支架 |
CN2833112Y (zh) * | 2005-08-26 | 2006-11-01 | 煤炭科学研究总院太原分院 | 煤矿综采回风巷道组合式超前支护支架 |
CN101251022A (zh) * | 2008-03-26 | 2008-08-27 | 曹树祥 | 综掘机及时支护装置 |
CN102913268A (zh) * | 2012-11-16 | 2013-02-06 | 山东矿机集团股份有限公司 | 巷道掘进机移动支护支架 |
CN203962017U (zh) * | 2014-07-15 | 2014-11-26 | 沈阳天安矿山机械股份有限公司 | 回采巷道框架式超前支护支架 |
CN104612735A (zh) * | 2014-12-20 | 2015-05-13 | 曲天智 | 掘进工作面临时支护液压支架 |
CN105464683A (zh) * | 2015-12-22 | 2016-04-06 | 中国葛洲坝集团第三工程有限公司 | 一种tbm支护作业可移动保护盾及其使用方法 |
CN206468367U (zh) * | 2016-12-26 | 2017-09-05 | 枣庄联鑫实业有限责任公司 | 框架落地自移式前伸缩超前支护装置 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109057820A (zh) * | 2018-08-20 | 2018-12-21 | 福建工程学院 | 一种富水软弱破碎地层隧道支护方法 |
CN111828073A (zh) * | 2020-08-06 | 2020-10-27 | 沈阳天安科技股份有限公司 | 一种新型巷道支护装置 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2017063370A1 (zh) | 一种基于并联机构的自移式端头液压支架及其应用 | |
CN104499417B (zh) | 一种重力自平衡式应急抢通快速自架桥 | |
US3333377A (en) | Assembly of substructure-constructing components and method of constructing tall substructures | |
US2617500A (en) | Portable drilling rig | |
CN203080894U (zh) | 建筑钢结构施工防护装置 | |
US3628223A (en) | Climbing concrete form hoist | |
CN201262093Y (zh) | 前后置式放顶煤端头支架 | |
CN109113772B (zh) | 一种大循环巷道掘进临时支护装置及其方法 | |
CN104500117B (zh) | 无反复支撑连续支护超前液压支架 | |
CN106593502A (zh) | 框架落地自移式前伸缩超前支护装置 | |
CN104314597B (zh) | 一种自移式端头液压支架 | |
CN202832574U (zh) | 大采高液压支架 | |
CN206468367U (zh) | 框架落地自移式前伸缩超前支护装置 | |
CN206655698U (zh) | 一种隧道掌子面开挖后初期支护立架操作台车 | |
CN205777428U (zh) | 电梯井自爬升平台 | |
CN107476556A (zh) | 一种可移动式自动升降操作平台 | |
CN207620384U (zh) | 顶升卸料装置 | |
AU2008323613A1 (en) | Perimeter screening system | |
CN216196742U (zh) | 一种用于高低跨位置的墙板安装装置 | |
CN113622982B (zh) | 一种煤矿复合顶板用支护装置及其使用方法 | |
CN204282371U (zh) | 一种用于基坑的预应力支撑 | |
CN204311337U (zh) | 一种重力自平衡式应急抢通快速自架桥 | |
CN208441791U (zh) | 一种用于竖井施工的多功能井架 | |
CN202831591U (zh) | 可提升超高空间异形桁架施工平台 | |
RU2495247C1 (ru) | Способ крепления горных выработок |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170426 |
|
RJ01 | Rejection of invention patent application after publication |