CN106593447A - 一种地下采矿缓倾斜中厚矿体采矿方法 - Google Patents

一种地下采矿缓倾斜中厚矿体采矿方法 Download PDF

Info

Publication number
CN106593447A
CN106593447A CN201710104191.XA CN201710104191A CN106593447A CN 106593447 A CN106593447 A CN 106593447A CN 201710104191 A CN201710104191 A CN 201710104191A CN 106593447 A CN106593447 A CN 106593447A
Authority
CN
China
Prior art keywords
ore body
stoping
ore
preparatory work
mining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710104191.XA
Other languages
English (en)
Other versions
CN106593447B (zh
Inventor
王智峰
安明炜
邹涛
叶绿
余家龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Kailin Group Co Ltd
Original Assignee
Guizhou Kailin Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Kailin Group Co Ltd filed Critical Guizhou Kailin Group Co Ltd
Priority to CN201710104191.XA priority Critical patent/CN106593447B/zh
Publication of CN106593447A publication Critical patent/CN106593447A/zh
Application granted granted Critical
Publication of CN106593447B publication Critical patent/CN106593447B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/22Methods of underground mining; Layouts therefor for ores, e.g. mining placers

Abstract

本发明公开了一种地下采矿缓倾斜中厚矿体采矿方法,该方法基于充填采矿法,具体方案包括:矿体划分→井巷工程施工→脉内采准施工→回采矿房上分层脉内采准高帮掘进→回采矿房切割槽施工→回采矿房回采→砌筑挡墙→充填等步骤。本发明对回采矿房上分层采准提前沿高帮掘进至矿体底板,有效解决了缓倾斜中厚矿体回采底板三角矿过程中施工难度大的技术性难题;避免了下分层回采过程中上分层未掘进导致的矿石冒落风险,增加了矿房回采过程中人员和设备的安全性;同时大大提高了矿石回收率,加快了矿房回采进度。

Description

一种地下采矿缓倾斜中厚矿体采矿方法
技术领域
本发明属于采矿工程领域,涉及一种地下采矿缓倾斜中厚矿体采矿方法。
背景技术
现有工艺和技术条件下,在非金属沉积矿床地下缓倾斜中厚矿体的开采活动中,底板三角矿的回收及其作业过程中面临的安全风险一直是困扰采矿行业的一大难题。由于缓倾斜中厚矿体倾角缓、矿体厚,基于自下而上充填采矿法回采的底板三角矿又受到围岩的挤压,导致该区域回采过程中凿岩爆破崩落的矿岩抛掷作用小,矿岩不易下滑,从而影响了矿山高效生产,并且在凿岩、爆破、装药等作业流程中,人员和设备通常在上分层矿石有随时冒落风险的环境中作业,安全隐患大,矿石回收率明显降低。
发明内容
本发明要解决的技术问题是:提供一种地下采矿缓倾斜中厚矿体采矿方法,避免基于充填采矿法的底板三角矿在作业过程中所存在的安全风险,达到矿房快速回采,提高矿石回收率的目的。
本发明是通过如下技术方案予以实现的:
一种地下采矿缓倾斜中厚矿体采矿方法,包括以下步骤:
(1)矿体划分:沿矿体走向将矿体划分为若干中段,每个中段划分为若干盘区,每个盘区划分为若干分层,每个分层划分为若干矿房;
(2)井巷工程施工:按上述步骤(1)规划掘进矿山井巷工程至矿体;
(3)脉内采准施工:在待开采矿房顶部和底部分别掘进上分层脉内采准巷道和下分层脉内采准巷道;
(4)回采矿房上分层脉内采准高帮掘进:利用凿岩爆破方法对上分层脉内采准高帮掘进至矿体底板;
(5)回采矿房切割槽施工:利用凿岩爆破方法在回采矿房端部施工切割槽,切割槽倾斜度与矿体相同;
(6)回采矿房回采:利用中深孔孔凿岩台车对矿体进行凿岩爆破,将矿石抛至切割槽,使用铲运机完成出矿;
(7)砌筑挡墙:在下分层采准巷道内砌筑充填挡墙;
(8)充填:利用废石和充填浆对矿房采空区进行充填;
(9)重复施工:重复步骤(2)~步骤(8)直至分层、盘区或中段内的矿房全部完成开采和回填。
本发明对回采矿房上分层脉内采准高帮提前掘进至底板,有效解决了缓倾斜中厚矿体回采底板三角矿过程中施工难度大的技术性难题;避免了下分层回采过程中上分层未掘进导致的矿石冒落风险,增加了矿房回采过程中人员和设备的安全性;同时大大提高了矿石回收率,加快了矿房回采进度。
附图说明
图1是地下采矿缓倾斜中厚矿体采矿方法矿房划分示意图;
图2是地下采矿缓倾斜中厚矿体采矿方法剖面示意图;
图3是地下采矿缓倾斜中厚矿体采矿方法采空区示意图;
图4是地下采矿缓倾斜中厚矿体采矿方法充填示意图。
具体实施方式
以下实施例进一步阐述了本发明的技术方案,但不作为对本发明保护范围的限制。
参照说明书附图1、2、3和4所示,本发明的一种地下采矿缓倾斜中厚矿体采矿方法,该方法基于充填采矿法,具体方案包括矿体划分→井巷工程施工→脉内采准施工→回采矿房上分层脉内采准高帮掘进→回采矿房切割槽施工→回采矿房回采→砌筑挡墙→充填等步骤。
具体回采步骤如下:
1、矿房划分:沿矿体走向将矿体划分为若干中段,每个中段划分为若干盘区,每个盘区划分为若干分层,每个分层划分为若干矿房,如说明书附图1所示,包括矿房1,矿房2和矿房3。
2、井巷工程施工:按上述步骤1规划掘进矿山井巷工程至矿体,便于后续的脉内采准施工及采矿。
3、脉内采准施工:在待开采矿房2顶部和底部分别掘进上分层脉内采准巷道和下分层脉内采准巷道,参照说明书附图1、2所示。
4、回采矿房上分层脉内采准高帮掘进:利用凿岩爆破方法对上分层脉内采准高帮掘进至矿体底板,参照说明书附图2所示。
5、回采矿房切割槽施工:利用凿岩爆破方法在回采矿房端部施工切割槽,切割槽倾斜度与矿体相同,参照说明书附图1所示。
6、回采矿房回采:利用中深孔孔凿岩台车对矿体进行凿岩爆破,将矿石抛至切割槽,使用铲运机完成出矿;
7、砌筑挡墙:在下分层采准巷道内砌筑充填挡墙,参照说明书附图3所示。
8、充填:利用废石和充填浆对矿房采空区进行充填,参照说明书附图3和4所示。
9、重复施工:重复步骤2~步骤8直至分层、盘区或中段内的矿房全部完成开采和回填。

Claims (1)

1.一种地下采矿缓倾斜中厚矿体采矿方法,其特征在于,包括以下步骤:
(1)矿体划分:沿矿体走向将矿体划分为若干中段,每个中段划分为若干盘区,每个盘区划分为若干分层,每个分层划分为若干矿房;
(2)井巷工程施工:按上述步骤(1)规划掘进矿山井巷工程至矿体;
(3)脉内采准施工:在待开采矿房顶部和底部分别掘进上分层脉内采准巷道和下分层脉内采准巷道;
(4)回采矿房上分层脉内采准高帮掘进:利用凿岩爆破方法沿上分层脉内采准高帮掘进至矿体底板;
(5)回采矿房切割槽施工:利用凿岩爆破方法在回采矿房端部施工切割槽,切割槽倾斜度与矿体相同;
(6)回采矿房回采:利用中深孔孔凿岩台车对矿体进行凿岩爆破,将矿石抛至切割槽,使用铲运机完成出矿;
(7)砌筑挡墙:在下分层脉内采准巷道内砌筑充填挡墙;
(8)充填:利用废石和充填浆对矿房采空区进行充填;
(9)重复施工:重复步骤(2)~步骤(8)直至分层、盘区或中段内的矿房全部完成开采和回填。
CN201710104191.XA 2017-02-24 2017-02-24 一种地下采矿缓倾斜中厚矿体采矿方法 Expired - Fee Related CN106593447B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710104191.XA CN106593447B (zh) 2017-02-24 2017-02-24 一种地下采矿缓倾斜中厚矿体采矿方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710104191.XA CN106593447B (zh) 2017-02-24 2017-02-24 一种地下采矿缓倾斜中厚矿体采矿方法

Publications (2)

Publication Number Publication Date
CN106593447A true CN106593447A (zh) 2017-04-26
CN106593447B CN106593447B (zh) 2019-03-05

Family

ID=58587965

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710104191.XA Expired - Fee Related CN106593447B (zh) 2017-02-24 2017-02-24 一种地下采矿缓倾斜中厚矿体采矿方法

Country Status (1)

Country Link
CN (1) CN106593447B (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107122925A (zh) * 2017-06-19 2017-09-01 金川集团股份有限公司 一种充填法采矿工程决策方法
CN108691544A (zh) * 2018-04-17 2018-10-23 贵州开磷集团股份有限公司 一种非金属沉积型矿山的地下采矿厚假顶薄矿体采矿方法
CN110439562A (zh) * 2019-08-22 2019-11-12 中拓均安(北京)矿山技术有限公司 一种倾斜磷矿的采准系统及开采方法
CN113107588A (zh) * 2021-05-28 2021-07-13 金川镍钴研究设计院有限责任公司 一种下向分层胶结充填采矿法分层联络道的施工方法

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1364726A1 (ru) * 1986-05-05 1988-01-07 Институт Горного Дела Ан Казсср Способ разработки пологих рудных залежей
CN103437769A (zh) * 2013-09-06 2013-12-11 中南大学 组合再造结构体中深孔落矿协同锚索支护嗣后充填采矿法
CN103590831A (zh) * 2013-11-22 2014-02-19 北京科技大学 一种缓倾斜薄-中厚矿体的新型采矿方法
CN103670418A (zh) * 2014-01-08 2014-03-26 大冶有色金属有限责任公司 一种提高缓倾斜中厚矿体技术指标的回采方法
CN103790588A (zh) * 2014-01-15 2014-05-14 贵州开磷(集团)有限责任公司 一种缓倾斜矿体自溜采矿方法
CN104632220A (zh) * 2014-12-09 2015-05-20 中南大学 缓倾斜中厚矿体条柱再造采场结构尺寸可调可控采矿方法
CN105626073A (zh) * 2016-01-28 2016-06-01 贵州开磷集团股份有限公司 一种基于充填采矿法预留切割槽的采矿方法
CN106351692A (zh) * 2016-09-22 2017-01-25 中南大学 一种缓倾斜薄矿体废石胶结条柱充填采矿法

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1364726A1 (ru) * 1986-05-05 1988-01-07 Институт Горного Дела Ан Казсср Способ разработки пологих рудных залежей
CN103437769A (zh) * 2013-09-06 2013-12-11 中南大学 组合再造结构体中深孔落矿协同锚索支护嗣后充填采矿法
CN103590831A (zh) * 2013-11-22 2014-02-19 北京科技大学 一种缓倾斜薄-中厚矿体的新型采矿方法
CN103670418A (zh) * 2014-01-08 2014-03-26 大冶有色金属有限责任公司 一种提高缓倾斜中厚矿体技术指标的回采方法
CN103790588A (zh) * 2014-01-15 2014-05-14 贵州开磷(集团)有限责任公司 一种缓倾斜矿体自溜采矿方法
CN104632220A (zh) * 2014-12-09 2015-05-20 中南大学 缓倾斜中厚矿体条柱再造采场结构尺寸可调可控采矿方法
CN105626073A (zh) * 2016-01-28 2016-06-01 贵州开磷集团股份有限公司 一种基于充填采矿法预留切割槽的采矿方法
CN106351692A (zh) * 2016-09-22 2017-01-25 中南大学 一种缓倾斜薄矿体废石胶结条柱充填采矿法

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107122925A (zh) * 2017-06-19 2017-09-01 金川集团股份有限公司 一种充填法采矿工程决策方法
CN107122925B (zh) * 2017-06-19 2020-08-04 金川集团股份有限公司 一种充填法采矿工程决策方法
CN108691544A (zh) * 2018-04-17 2018-10-23 贵州开磷集团股份有限公司 一种非金属沉积型矿山的地下采矿厚假顶薄矿体采矿方法
CN110439562A (zh) * 2019-08-22 2019-11-12 中拓均安(北京)矿山技术有限公司 一种倾斜磷矿的采准系统及开采方法
CN113107588A (zh) * 2021-05-28 2021-07-13 金川镍钴研究设计院有限责任公司 一种下向分层胶结充填采矿法分层联络道的施工方法

Also Published As

Publication number Publication date
CN106593447B (zh) 2019-03-05

Similar Documents

Publication Publication Date Title
CN105587318B (zh) 一种缓倾斜平行中厚矿体群连续回采的充填采矿法
CN105041314B (zh) 一种深部嗣后回采矿房—分层回采矿柱的联合采矿法
CN101338674B (zh) 直接装运矿石的无底柱分段崩落采矿法
CN102493806B (zh) 一种壁式缓倾斜薄矿体机械化连续采矿方法
CN103437769B (zh) 组合再造结构体中深孔落矿协同锚索支护嗣后充填采矿法
CN106761912B (zh) 一种适合于不稳定岩层的高效上向进路分层充填采矿方法
CN107339104A (zh) 保安隔离矿柱回收方法
CN106223958A (zh) 倾斜中厚矿体分区凿岩阶段落矿嗣后充填协同采矿法
CN102953732A (zh) 房柱式大直径深孔倒台阶状分段侧向崩矿嗣后充填采矿法
CN104453901A (zh) 一种薄矿体中深孔崩矿分段空场嗣后充填采矿方法
CN105952450B (zh) 一种地下矿山井下双采场协同开采的新方法
CN105927226A (zh) 一种中深孔落矿连续分段水平充填采矿法
CN104481539A (zh) 自拉槽挤压爆破崩落采矿法
CN104018836A (zh) 一种有不稳固假顶倾斜中厚矿体的分采方法
CN107829739B (zh) 一种急倾斜薄矿脉的开采方法
CN104265297B (zh) 一种多层易碎缓倾斜极薄矿脉的开采方法
CN106593447B (zh) 一种地下采矿缓倾斜中厚矿体采矿方法
CN110656939B (zh) 用于遇水泥化围岩的急倾斜中厚矿体大阶段高效采矿方法
CN111058847B (zh) 一种厚大矿体连续大孔径深孔爆破机械化开采方法
CN105422102B (zh) 一种垂直中深孔落矿小分段进路充填采矿法
CN104481543A (zh) 阶段留矿崩落采矿法
CN106640080B (zh) 一种深部高应力环境下自稳窿形采场布置采矿方法
CN108590649A (zh) 一种缓倾斜破碎薄矿脉中深孔开采方法
CN108049870B (zh) 上盘含不稳岩层的急倾斜中厚矿体的诱导冒落采矿方法
CN101285384A (zh) 大直径深孔不拉底采矿法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190305