CN106593400A - Directional well spacing method for volume fracturing of ultra-low permeability tight oil reservoir - Google Patents

Directional well spacing method for volume fracturing of ultra-low permeability tight oil reservoir Download PDF

Info

Publication number
CN106593400A
CN106593400A CN201611246406.3A CN201611246406A CN106593400A CN 106593400 A CN106593400 A CN 106593400A CN 201611246406 A CN201611246406 A CN 201611246406A CN 106593400 A CN106593400 A CN 106593400A
Authority
CN
China
Prior art keywords
well
oil
reservoir
water injection
volume fracturing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611246406.3A
Other languages
Chinese (zh)
Inventor
薛婷
樊建明
屈雪峰
雷启鸿
谢启超
王冲
刘建
宋鹏
丁黎
王博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Petrochina Co Ltd
Original Assignee
Petrochina Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Petrochina Co Ltd filed Critical Petrochina Co Ltd
Priority to CN201611246406.3A priority Critical patent/CN106593400A/en
Publication of CN106593400A publication Critical patent/CN106593400A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/30Specific pattern of wells, e.g. optimising the spacing of wells
    • E21B43/305Specific pattern of wells, e.g. optimising the spacing of wells comprising at least one inclined or horizontal well
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The invention discloses a directional well spacing method for volume fracturing of an ultra-low permeability tight oil reservoir, which can exert the large-scale volume fracturing capability, greatly improve the initial yield of a single well and realize high proportion of oil-water wells; the method for optimizing the well pattern comprehensively applies oil reservoir engineering, numerical simulation, underground micro-seismic monitoring, mine field statistics and the like, fully considers different reservoir characteristics and transformation processes, avoids fractured flooding, and simultaneously meets the requirement of realizing long-term stable water injection and energy supplement, thereby realizing the purpose of improving the single-well yield and the development benefit of the ultra-low permeability compact oil reservoir. The invention can aim at complex geology such as longitudinal oiling layer combination development of the ultra-low permeability tight oil reservoir, large structural amplitude change on a plane and the like, has reasonable well arrangement method and can improve the development effect to the maximum extent.

Description

A kind of Oil in Super-low Permeability compact oil reservoir volume fracturing directional well well-arranging procedure
【Technical field】
The invention belongs to oil field development field, is related to a kind of Oil in Super-low Permeability compact oil reservoir volume fracturing directional well well-arranging procedure.
【Background technology】
As the oil reservoir quality employed is deteriorated year by year, Oil in Super-low Permeability compact oil reservoir progressively become oil field at home exploitation on produce and The important of stable yields takes over one of area, is the well yield for improving such oil reservoir, and engineering specialists do a lot of work, and reservoir changes The technology of making is obtained than larger breakthrough, and directional well fracturing technique develops into multistage multiple crack fracturing and volume fracturing by development fracturing, Fractured horizontal well technology is innovated to volume fracturing by conventional stage pressure break, and current horizontal well/directional well+volume fracturing has become super Hypotonic compact oil reservoir improves the important means of individual well initial production.Horizontal well+volume fracturing is primarily adapted for use in the upper oil reservoir phase in longitudinal direction To single, in plane, Structural range is less, the preferable oil reservoir of oil reservoir seriality, and advantage is that well yield is high, has the disadvantage from current From the point of view of the situation of on-site development test, under existing technological means, the management cost in horizontal well development later stage is higher.Directional well + volume fracturing is primarily adapted for use in longitudinal direction and oils to be laminated to close develops, the oil reservoir that Structural range is changed greatly in plane, in existing skill Under art means, the management cost of directional well development late stage is less.
Two ways respectively has its applicable oil reservoir, can improve the initial stage well yield of Oil in Super-low Permeability compact oil reservoir, but how Realize the stable yields of long period.From the point of view of literature survey, horizontal well+volume fracturing adopts spindle five-spot pattern substantially Raising individual well initial production is solved, the target of long period stable yields is realized.Directional well volume fracturing is developed at present also in examination Test the stage, test well pattern is also developed using more traditional five-spot pattern, anti-seven spot pattern and rhombic inverted nini-spot well pattern, from exploitation From the point of view of the effect of test, generally after raising well yield, the effect of stable yields is poor, the well yield after 6~8 months of general stable yields With regard to rapid decrease;Although rhombic inverted nini-spot well pattern recovery percent of reserves and rate of oil production are apparently higher than other three kinds of well patterns, mining site system Meter shows that volume fracturing orientation wellblock rhombic inverted nini-spot well pattern is main to the easy water breakthrough of well.As the expense of directional well volume fracturing is than normal Rule pressure break it is costly, using traditional directional well well-arranging procedure oil-water well ratio is relatively low, stable yields effect is poor, it is difficult to obtain compared with Good development benefit, it is also difficult to farthest play the advantage of directional well volume fracturing.
【The content of the invention】
Present invention aims to volume fracturing directional well well-arranging procedure effectively supplements the problem that energy is present at present, The present invention proposes a kind of Oil in Super-low Permeability compact oil reservoir volume fracturing orientation that can be reduced Fractured water logging, improve oil-water well ratio Well well-arranging procedure.
To reach above-mentioned purpose, the present invention is employed the following technical solutions and is achieved:
The present invention taken into full account the multiple zone composite stack that Oil in Super-low Permeability compact oil reservoir presents, structural relief change greatly, The features such as reservoir properties are poor, anisotropism is strong, intrinsic fracture is developed, it is proposed that a kind of water injection well wire water filling, producing well are in well Net center assumes diamond in shape and is distributed the volume fracturing directional well well-arranging procedure (accompanying drawing 1) for recovering the oil.
The method and basic principle of the well-arranging procedure optimization design be:One is the energy that can play extensive volume fracturing Power, increases substantially individual well initial production;Two is geology and process integration, well net optimization take into full account different reservoir feature and Reforming technology, it is to avoid Fractured water logging, while meeting the requirement for realizing that long term stable production water filling supplements energy;Three is integrated application oil The methods such as engineering, numerical simulation, down-hole micro-seismic monitoring, mining site statistics are hidden, while considering technical specification and economic indicator.Including Following steps:
1) carry out integrated geological interpretation first, preferred orientation Jing Jingwangbushuqu is carried out reservoir classification and evaluation, determines the main force Contribution interval.
1. Dominated Factors research, comprehensive geology and reservoir engineering are enriched with by sedimentary micro, Diagenetic Facies and high yield in plane Method, carries out reservoir classification and evaluation, determines directional well well net deployment region.
2. Production development is combined on longitudinal direction, main force's contribution interval is found using composite index law.
2) well arranges the optimization in direction
1. according to imaging logging, the test result of down-hole microseism, determine biggest principal stress direction.
2. directional well well pattern array pitch direction is determined according to biggest principal stress direction.
3) optimization of oil-water well fracture length:
In the well pattern, water injection well is changed to wire water filling by past spot flooding, on the one hand increases Water-drive control scope; On the other hand reduce water injection pressure, it is to avoid the unlatching of dynamic crack in waterflooding extraction, and due to water injection well man-made fracture band Width reduces array pitch, is more beneficial for setting up effective displacement pressure system.
Reservoir engineering method comprehensive first carries out oil-water well fracture length Optimum Matching Numerical-Mode for different type reservoir Intend, determine then in conjunction with volume fracturing down-hole micro-seismic monitoring fracture half-length scope.
4) optimization of well array pitch
The methods such as integrated application reservoir engineering, mining site statistics, numerical simulation and down-hole micro-seismic monitoring, take into full account difference Reservoir characteristic, with reference to Water-drive control area than optimization well array pitch.
1. the determination of well spacing:Rational spacing between wells is determined according to oil well man-made fracture length and Water-drive control area ratio.
2. the determination of array pitch:Different reservoir feature is taken into full account, the exploitation to 3 class reservoir of Oil in Super-low Permeability compact oil reservoir respectively is moved State carries out mining site statistical analysiss and determines that different reservoir takes effect the high array pitch scope of degree.On the basis of mining site statistics understanding, The reasonable array pitch of different reservoir is determined by numerical simulation with reference to Water-drive control ratio.
5) producing well vertically and horizontally distance optimization
Producing well assumes diamond in shape symmetrical (accompanying drawing 1) at well pattern center, with 5 points, anti-7 points, rhombic inverted nini-spot well pattern it is (attached Fig. 2) compare, it (is 4 that the well pattern oil-water well ratio is high:1);It is and producing well is lateral well, it is to avoid waterline is advanced along main line, main The ineffective problem of lateral well to well easy water logging.The cornerwise half in 1 diamond-shaped area y directions of accompanying drawing be fore-and-aft distance, x side It is lateral separation to cornerwise half.It is according to down-hole micro-seismic monitoring volume fracturing crack bandwidth, belt length monitoring result, comprehensive Numerical simulation and reservoir engineering method determine vertically and horizontally distance.
6) water injection technology policy
(1) determination of Advance Water Injection amount:Advance Water Injection amount includes two parts, the Advance Water Injection amount and oil well volume of water injection well Fracturing fluid deposits ground liquid.According to mining site creation data and the statistical analysiss for depositing ground liquid measure, and theoretical meter is carried out according to coefficient of compressibility method Calculate and determine reasonable Advance Water Injection amount.
(2) determination of water injection intensity:For different reservoir, combined using reservoir numerical simulation and theoretical calculation formula Method, sets up individual well day water injection intensity plate determining ultra-low penetration compact oil reservoir different type reservoir water injection intensity.
According to actual production present situation, if later stage aqueous rising, can switch to " water injection well cyclic waterflooding, 2., 4. oil-extracting well water injection Handle up " the supplementary energy mode of interaction.
(3) determination of cyclic waterflooding parameter:According to the mining site statistical analysiss for carrying out cyclic waterflooding test block, optimization note The water phase, stop note phase, individual well daily water-injection rate.
(4) oil-extracting well water injection is handled up the determination of parameter:Optimize ginseng of handling up according to mining site statistical analysiss and method for numerical simulation Number.
Compared with prior art, the invention has the advantages that:
The purpose of the present invention is that the Oil in Super-low Permeability changed greatly for Structural range in longitudinal stacking conjunction development that oils, plane is caused Close oil reservoir, there is provided one kind can adapt to directional well volume fracturing technology, realizes the directional well well-arranging procedure of effective water filling.The well spacing Method oil-water well ratio is high, can play the ability of extensive volume fracturing, increase substantially individual well initial production, well net optimization When the method such as integrated application reservoir engineering, numerical simulation, down-hole micro-seismic monitoring, mining site statistics, and taken into full account different storages Layer feature and reforming technology, it is to avoid Fractured water logging, while meet the requirement for realizing that long term stable production water filling supplements energy, so as to reality The purpose of the well yield of Oil in Super-low Permeability compact oil reservoir and development benefit is improved now.
【Description of the drawings】
Fig. 1 is volume fracturing directional well flooding pattern and element schematic diagram;
Fig. 2 is volume fracturing directional well routine flooding pattern and element schematic diagram;
Fig. 3 is multiple zone overlapping directional well deployment longitudinal profile schematic diagram;
Fig. 4 is HS oil fields Chang-6 oil reservoir profile;
Fig. 5 is oil-water well fracture half-length's numerical simulation of optimum comparison diagram;
Fig. 6 is volume fracturing man-made fracture down-hole micro-seismic monitoring result figure;
Fig. 7 is half long cartogram of volume fracturing man-made fracture;
Fig. 8 is that man-made fracture enters ground liquid measure and half belt length graph of a relation;
Fig. 9 is array pitch and the Degree of Accord Relation figure that takes effect under the conditions of different reservoir;
Figure 10 is array pitch and the tired oil-producing graph of a relation of the 10th year individual well under the conditions of different reservoir;
Figure 11 is volume fracturing man-made fracture bandwidth statistics figure;
Figure 12 is time and recovery percent of reserves graph of a relation under the conditions of different oil well fore-and-aft distances;
Figure 13 is different reservoir individual well day water injection intensity figure.
Wherein:1-producing well, 2-water injection well, 3-well spacing, 4-array pitch, 5-well fracture half-length, 6-oil well crack Half is long, 7-oil well fore-and-aft distance, 8- oil well lateral separations, the multiple zone of 9-composite stack.
【Specific embodiment】
Below in conjunction with the accompanying drawings the present invention is described in further detail:
Referring to Fig. 1-Figure 13, Oil in Super-low Permeability compact oil reservoir volume fracturing directional well well-arranging procedure of the present invention, comprise the following steps:
1) carry out integrated geological interpretation first, preferred orientation Jing Jingwangbushuqu is carried out reservoir classification and evaluation, determines the main force Contribution interval.
1. Dominated Factors are enriched with by sedimentary micro, Diagenetic Facies and high yield first in plane and determine advantageous deposition phase Band, then comprehensive geology and reservoir engineering method analysis reservoir properties and pore throat character feature by reservoir porosity, movable flow Body saturation, four parameters of pore constriction radius and free-boundary problem set up classification factor, according to classification factor and permeability Relation determine Reservoir Classification (subordinate list 1), and then determine directional well well net deployment region.
2. Production development is combined on longitudinal direction, main force's contribution interval is found using composite index law.
The dependency relation of oil well productivity and log parameter is analyzed by mining site creation data, impact oil well initial stage product is filtered out The major parameter of energy is permeability, interval transit time and resistivity (subordinate list 2), calculates comprehensive by below equation as independent variable Hop index is determining main layer.
1 Oil in Super-low Permeability compact reservoir classification chart of subordinate list
2 oil well productivity of subordinate list and log parameter correlation coefficient
Normalized parameter:
Proportion:
Aggregative index:I=λK·K'+λAC·AC'+λRT·RT'
In formula:K-permeability, mD;K'-normalization permeability;Kmin、Kmax- permeability limits, the upper limit, mD;AC-sound The ripple time difference, μ s/m;AC'-normalization interval transit time;ACmin、ACmax- interval transit time lower limit, the upper limit, μ s/m;RT-resistivity, Ω·m;RT'-normalized resistance rate;RTmin、RTmax- resistivity lower limit, the upper limit, Ω m;λ-proportion;λi- phase relation Number;I-aggregative index.
2) well arranges the optimization in direction
1. according to imaging logging, the test result of down-hole microseism, determine that biggest principal stress direction is NE75 °.
2. directional well well pattern array pitch direction should be perpendicular to biggest principal stress direction, to ensure on fracturing technology to directional well Optimal fracturing effect is realized, well yield is improved.
3) optimization of oil-water well fracture length:
In the well pattern, water injection well is changed to wire water filling by past spot flooding, on the one hand increases Water-drive control scope; On the other hand reduce water injection pressure, it is to avoid the unlatching of dynamic crack in waterflooding extraction, and due to water injection well man-made fracture band Width reduces array pitch, is more beneficial for setting up effective displacement pressure system.
Optimum Matching simulation is carried out to oil-water well fracture length using method for numerical simulation.Oil well level pressure is produced, shaft bottom stream Voltage-controlled system designs 5 kind schemes in 30MPa in 6.5MPa, the control of water injection well bottom pressure, is combined by stitching net, comprehensive oil reservoir work Cheng Fangfa, optimization determine the Optimum Matching value i.e. oil well fracture half-length 250m in oil-water well crack, and fracture half-length 125m is (attached for well Fig. 5).At present the fracture half-length of volume fracturing man-made fracture down-hole micro-seismic monitoring be typically in the range of between 200~300m (accompanying drawing 6, 7) accompanying drawing, can reach the requirement of optimization fracture half-length.The relation of ground liquid measure and half belt length of man-made fracture is entered according to man-made fracture (accompanying drawing 8), it is 800m that design oil well volume fracturing enters ground liquid measure3
4) optimization of well array pitch
The methods such as integrated application reservoir engineering, mining site statistics, numerical simulation and down-hole micro-seismic monitoring, take into full account difference Reservoir characteristic, with reference to Water-drive control area than optimization well array pitch.
1. the determination of well spacing:Well spacing, according to the long determination of man-made fracture seam, is to realize rational Water-drive control area ratio, reach With reference to hole pattern, the purpose for effectively employing and improving rate of oil production of seam reserves, determines that rational spacing between wells is 1000m.Well spacing is little, Energy supplement is sufficient, but while aqueous rise soon;Well spacing is big, although aqueous to rise slowly, but energy cannot be supplemented in time, yield It is low.
2. the determination of array pitch:Different reservoir feature is taken into full account, the exploitation to 3 class reservoir of Oil in Super-low Permeability compact oil reservoir respectively is moved State carries out mining site statistical analysiss and determines that different reservoir takes effect the high array pitch scope of degree and irrational array pitch scope (accompanying drawing 9).On the basis of mining site statistics understanding, with reference to Water-drive control ratio by arranging under the conditions of numerical simulation study different reservoir physical property Away from for 60~180m when technical specification, research show 3 class reservoir of Oil in Super-low Permeability compact oil reservoir array pitch be respectively I classes 150m, II Oil-producing maximum or amplification are tired out when class 120-130m, Group III 100-120m to be reduced, and is reasonable array pitch (accompanying drawing 10).
5) producing well vertically and horizontally distance optimization
Producing well assumes diamond in shape symmetrical (accompanying drawing 1) at well pattern center, with 5 points, anti-7 points, rhombic inverted nini-spot well pattern it is (attached Fig. 2) compare, it (is 4 that the well pattern oil-water well ratio is high:1);It is and producing well is lateral well, it is to avoid waterline is advanced along main line, main The ineffective problem of lateral well to well easy water logging.The cornerwise half in 1 diamond-shaped area y directions of accompanying drawing be fore-and-aft distance, x side It is lateral separation to cornerwise half.Determined vertically and horizontally according to down-hole micro-seismic monitoring, numerical simulation and reservoir engineering method Distance.
The determination of fore-and-aft distance:Down-hole micro-seismic monitoring volume fracturing crack bandwidth (accompanying drawing 11) between 40~80m, In the case where water injection technology policy, production well proration are constant, when fore-and-aft distance is respectively 40m, 60m, 80m, integrated application The method that numerical simulation and reservoir engineering combine, when determining that fore-and-aft distance is 60m, effect is preferable (accompanying drawing 12).
The determination of lateral separation:With reference to oil well volume fracturing fracture half-length and Water-drive control area ratio, lateral separation is determined For 250m.
6) water injection technology policy
1. the determination of Advance Water Injection amount:Shown with the statistical analysiss for depositing ground liquid measure according to mining site creation data, deposit ground liquid measure The ground liquid of depositing with stable production period with positive correlation, extensive volume fracturing rises the strata pressure around crack, indirectly Play a part of Advance Water Injection, therefore Advance Water Injection amount includes two parts, the Advance Water Injection amount and oil well volume fracturing of water injection well Liquid deposits ground liquid.Counted based on mining site, and Theoretical Calculation is carried out according to coefficient of compressibility method and determine reasonable Advance Water Injection amount.
Δ V=Vw+VF=Ct·A·h·φ·ΔP
In formula:Δ V-Advance Water Injection amount, m3;VwThe Advance Water Injection amount of-water injection well, m3;VF- 4 mouthfuls of oil well volume fracturings Deposit ground liquid total amount, m3;Ct- stratum system compressibility, MPa-1;A-well-pattern spacing, m2;H-core intersection, m;φ— Porosity, %;Δ P-pressure differential, MPa.
2. the determination of water injection intensity:For different reservoir and fracturing reform mode, using reservoir numerical simulation and theoretical meter The method that formula combines is calculated, individual well day water injection intensity plate (accompanying drawing 13) is established, it is determined that ultra-low penetration compact oil reservoir is not Same type reservoir water injection intensity is I 1.2~1.7m of class3/ (d.m), II 0.9~1.2m of class3/ (d.m), 0.5~0.9m of Group III3/ (d.m)。
According to actual production present situation, if later stage aqueous rising, can switch to " water injection well cyclic waterflooding, 2., 4. oil-extracting well water injection Handle up " the supplementary energy mode of interaction.
3. the determination of cyclic waterflooding parameter:According to the mining site statistical analysiss for carrying out cyclic waterflooding test block, optimization note The water phase is 20d, stops the note phase for 20d, individual well day note be 10m3/ d, specifically can be adjusted according to practical condition.
4. oil-extracting well water injection is handled up the determination of parameter:According to mining site statistics and method for numerical simulation optimization individual well day note it is 10m3/ d, continuous water filling 30d, start to recover the oil after stewing well 20d, and next round is handled up according to depending on the concrete condition of production.
The well spacing that basic well pattern is adopted by the preferred volume fracturing directional well note of above step is 1000m, and array pitch is not according to The determination of same type reservoir, I class 150m, II classes 120-130m, Group III 100-120m;4 mouthfuls of orientation oil wells are intracardiac in Pedicellus et Pericarpium Trapae in well pattern Shape is symmetrical, fore-and-aft distance 60m, lateral separation 250m;Oil well, well crack dummy joint length are respectively 250m, 125m.
The present invention on the basis of analysis and summary volume fracturing effect, by carrying out integrated geological interpretation and directional well volume The adaptation Journal of Sex Research of fracturing technology and well pattern, the Oil in Super-low Permeability compact oil reservoir volume fracturing directional well well-arranging procedure of proposition, with Lower beneficial effect:
(1) water injection well is changed to wire water filling by past spot flooding, on the one hand increases Water-drive control scope;The opposing party Face reduces water injection pressure, it is to avoid the unlatching of dynamic crack in waterflooding extraction, and as water injection well man-made fracture bandwidth reduces Array pitch, is more beneficial for setting up effective displacement pressure system.
(2) producing well assumes diamond in shape distribution at well pattern center, with 5 points, anti-7 points, rhombic inverted nini-spot well pattern (accompanying drawing 2) phase Than it (is 4 that the well pattern oil-water well ratio is high:1);It is and producing well is lateral well, it is to avoid waterline is advanced along main line, main to hold to well Easily water logging and the ineffective problem of lateral well.
(3) for overlapping development on reservoir longitudinal direction, the fine water filling of water injection well layering, producing well layering volume fracturing are fixed Whole oil reservoir is drilled to injection-production well, main force's contribution layers different on longitudinal direction are largely exploited.
(4) method such as integrated application reservoir engineering, mining site statistics, numerical simulation and down-hole micro-seismic monitoring, takes into full account Different reservoir feature, with reference to Water-drive control area than optimizing the fore-and-aft distance between well array pitch and oil well crack.
(5) it is divided into two stages in energy supplement mode:Before first stage well water rises, using water injection well and calmly To the Advance Water Injection energy supplement mode that well volume fracturing combines.In the stage well pattern, initial stage stable yields Main Basiss deposit ground hydraulic pressure Power discharges, and later stage stable yields respectively occupies leading position in different regions according to water drive and pseudo-elastic approximation dissolved gas drive, two ways, Later stage Main Basiss pseudo-elastic approximation dissolved gas drive in oil well diamond-shaped area.After second stage well water rises, with reference to Oil in Super-low Permeability The characteristics of compact oil reservoir imbibition effect is strong, can flexibly be changed into " water injection well cyclic waterflooding, 2., 4. oil-extracting well water injection is handled up " interaction The new model of the supplementary energy of development.
(6) in drilling fracturing implementation process, it is to realize Advance Water Injection and avoid engineering from disturbing, working procedure is:Bore note Well → pressure break water injection well → water injection well water filling → drilling oil well → pressure break producing well (2., 4. producing well answers concurrent fracturing).Note Being intended to bore answers pressure release to stop note with water injection well during pressure break producing well.
Using a kind of ultra-low penetration compact oil reservoir volume fracturing directional well well-arranging procedure acquired by the present invention in E Erduo This basin HS oil fields Chang-6 oil reservoir achieves preferable development effectiveness.
HS oil fields Chang-6 oil reservoir major developmental in half Shen Hu and deep lacustrine facies area, reservoir sandbody with remote source delta front with it is front Based on the turbid long-pending body in delta, sand body is big by composite stack thickness, but single sand body thickness of thin, interlayer exist obvious mud stone every Layer, plane heterogeneity is strong, oil-containing sex differernce is big, and structural relief changes greatly, belongs to typical stratiform lithological pool (Fig. 4).Should Oil reservoir length 62Average buried depth 1686m, long 63Average buried depth 1725m, long 62, it is long by 63Average effective pay thickiness is 15.9m, averagely Porosity is 11.0%, mean permeability 0.22mD.56.4 DEG C of reservoir temperature, original formation pressure is 14.5MPa, pressure coefficient For 0.79, it is low hole, hypotonic, low pressure lithological pool.
Using the well-arranging procedure of the present invention in HS oil fields Chang-6 oil reservoir finishing drilling multiple wells, long 6 are realized2, it is long by 63Multilamellar is effective Employ.Water injection well adopts extensive volume fracturing reforming mode using conventional fracturing reform mode, producing well, and yield is fixed for adjacent area To 2~3 times of well, the purpose that water filling under directional well volume fracturing supplements energy is realized, is reduced and is successively decreased.
Above content technological thought only to illustrate the invention, it is impossible to which protection scope of the present invention is limited with this, it is every to press According to technological thought proposed by the present invention, any change done on the basis of technical scheme, claims of the present invention is each fallen within Protection domain within.

Claims (6)

1. a kind of Oil in Super-low Permeability compact oil reservoir volume fracturing directional well well-arranging procedure, it is characterised in that comprise the following steps:
1) carry out integrated geological interpretation first, preferred orientation Jing Jingwangbushuqu carries out reservoir classification and evaluation, determines that the main force contributes Interval;
2) optimize well row direction:
2-1) according to imaging logging, the test result of down-hole microseism, biggest principal stress direction is determined;
2-2) directional well well pattern array pitch direction is perpendicular to biggest principal stress direction;
3) optimize oil-water well fracture length:
In well pattern, water injection well is wire water filling;Optimum Matching simulation is carried out to oil-water well fracture length using method for numerical simulation; Combined by stitching net, comprehensive reservoir engineering method, volume fracturing man-made fracture down-hole micro-seismic monitoring result, optimization determine profit The Optimum Matching value in well crack is oil well fracture half-length 250m, well fracture half-length 125m;According to man-made fracture enter ground liquid measure with The relation of half belt length of man-made fracture, it is 800m that design oil well volume fracturing enters ground liquid measure3
4) optimization of well array pitch:
Using the method for reservoir engineering, mining site statistics, numerical simulation and down-hole micro-seismic monitoring, take into full account that different reservoir is special Levy, with reference to Water-drive control area than optimization well array pitch;
5) optimize producing well vertically and horizontally distance:
Producing well assume diamond in shape at well pattern center it is symmetrical, oil-water well ratio be 4:1, and producing well is lateral well;According to well Lower micro-seismic monitoring, numerical simulation and reservoir engineering method determine vertically and horizontally distance;
6) optimization design water filling policy.
2. Oil in Super-low Permeability compact oil reservoir volume fracturing directional well well-arranging procedure according to claim 1, it is characterised in that step 1) Concrete grammar it is as follows:
Dominated Factors are enriched with by sedimentary micro, Diagenetic Facies and high yield first in plane 1-1) and determine favorable sedimentary facies belt, Then comprehensive geology and reservoir engineering method analyze reservoir properties and pore throat character feature, by reservoir porosity, movable fluid Saturation, four parameters of pore constriction radius and free-boundary problem set up classification factor, according to classification factor and permeability Relation determines Reservoir Classification, and then determines directional well well net deployment region;
Production development 1-2) is combined on longitudinal direction, main force's contribution interval is found using composite index law;
The dependency relation of oil well productivity and log parameter is analyzed by mining site creation data, filtering out affects oil well initial productivity Major parameter is permeability, interval transit time and resistivity, calculates aggregative index come really by below equation as independent variable Determine main layer;
Normalized parameter:
Proportion:
Aggregative index:I=λK·K'+λAC·AC'+λRT·RT'
In formula:K is permeability, and unit is mD;K' is normalization permeability;Kmin、KmaxFor permeability limits, the upper limit, unit is mD;AC is interval transit time, and unit is μ s/m;AC' is normalization interval transit time;ACmin、ACmaxFor interval transit time lower limit, the upper limit, Unit is μ s/m;RT is resistivity, and unit is Ω m;RT' is normalized resistance rate;RTmin、RTmaxFor resistivity lower limit, on Limit, unit are Ω m;λ is proportion;λiFor correlation coefficient;I is aggregative index.
3. Oil in Super-low Permeability compact oil reservoir volume fracturing directional well well-arranging procedure according to claim 2, it is characterised in that step 2- 1), in, biggest principal stress direction is NE75 °, and well pattern array pitch direction is perpendicular to biggest principal stress direction.
4. Oil in Super-low Permeability compact oil reservoir volume fracturing directional well well-arranging procedure according to claim 1, it is characterised in that step 4) Concrete grammar it is as follows:
4-1) the determination of well spacing:Well spacing is defined as 1000m according to man-made fracture seam length;
4-2) the determination of array pitch:Mining site statistical analysiss determination is carried out to the development behavior of 3 class reservoir of Oil in Super-low Permeability compact oil reservoir respectively Go out different reservoir to take effect the high array pitch scope of degree and irrational array pitch scope;On the basis of mining site statistics understanding, with reference to Technical specification when Water-drive control ratio is 60~180m by array pitch under the conditions of numerical simulation study different reservoir physical property, studies table The array pitch of 3 class reservoir of bright Oil in Super-low Permeability compact oil reservoir is respectively tired oil-producing when I class 150m, II classes 120-130m, Group III 100-120m Maximum or amplification is reduced, and is reasonable array pitch.
5. Oil in Super-low Permeability compact oil reservoir volume fracturing directional well well-arranging procedure according to claim 1, it is characterised in that step 5) Concrete grammar it is as follows:
5-1) the determination of fore-and-aft distance:Down-hole micro-seismic monitoring volume fracturing crack bandwidth between 40~80m, in water filling plan Slightly, in the case that production well proration is constant, when fore-and-aft distance is respectively 40m, 60m, 80m, integrated application numerical simulation and oil The method that engineering combines is hidden, determines that fore-and-aft distance is 60m;
5-2) the determination of lateral separation:With reference to oil well volume fracturing fracture half-length and Water-drive control area ratio, lateral separation is determined For 250m.
6. Oil in Super-low Permeability compact oil reservoir volume fracturing directional well well-arranging procedure according to claim 1, it is characterised in that step 6) Concrete grammar it is as follows:
6-1) the determination of Advance Water Injection amount:Advance Water Injection amount includes two parts, the Advance Water Injection amount and oil well volume pressure of water injection well Split liquid and deposit ground liquid;Counted based on mining site, and Theoretical Calculation is carried out according to coefficient of compressibility method and determine reasonable Advance Water Injection amount;
Δ V=Vw+VF=Ct·A·h·φ·ΔP
In formula:Δ V is Advance Water Injection amount, and unit is m3;VwFor the Advance Water Injection amount of water injection well, unit is m3;VFFor 4 mouthfuls of oil well bodies Overstock to split and deposit ground liquid total amount, unit is m3;CtFor stratum system compressibility, unit is MPa-1;A is well-pattern spacing, single Position is m2;H is core intersection, and unit is m;φ is porosity, and unit is %;Δ P is pressure differential, and unit is MPa;
6-2) the determination of water injection intensity:For different reservoir and fracturing reform mode, using reservoir numerical simulation and Theoretical Calculation The method that formula combines, sets up individual well day water injection intensity plate, determines ultra-low penetration compact oil reservoir different type reservoir water filling Intensity is I 1.2~1.7m of class3/ (d.m), II 0.9~1.2m of class3/ (d.m), 0.5~0.9m of Group III3/(d.m);
6-3) the determination of cyclic waterflooding parameter:According to the mining site statistical analysiss for carrying out cyclic waterflooding test block, optimal water injection Phase is 20d, stops the note phase for 20d, individual well day note be 10m3/d;
6-4) oil-extracting well water injection is handled up the determination of parameter:It is 10m according to mining site statistics and method for numerical simulation optimization individual well day note3/ D, continuous water filling 30d, start to recover the oil after stewing well 20d.
CN201611246406.3A 2016-12-29 2016-12-29 Directional well spacing method for volume fracturing of ultra-low permeability tight oil reservoir Pending CN106593400A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611246406.3A CN106593400A (en) 2016-12-29 2016-12-29 Directional well spacing method for volume fracturing of ultra-low permeability tight oil reservoir

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611246406.3A CN106593400A (en) 2016-12-29 2016-12-29 Directional well spacing method for volume fracturing of ultra-low permeability tight oil reservoir

Publications (1)

Publication Number Publication Date
CN106593400A true CN106593400A (en) 2017-04-26

Family

ID=58605100

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611246406.3A Pending CN106593400A (en) 2016-12-29 2016-12-29 Directional well spacing method for volume fracturing of ultra-low permeability tight oil reservoir

Country Status (1)

Country Link
CN (1) CN106593400A (en)

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108843291A (en) * 2017-11-28 2018-11-20 中国石油天然气股份有限公司 Exploitation method and device of low-pressure tight oil reservoir
CN109025965A (en) * 2018-08-31 2018-12-18 中国石油天然气股份有限公司 Method for determining permeability lower limit of water flooding development of ultra-low permeability tight reservoir
CN109577962A (en) * 2017-09-29 2019-04-05 中国石油化工股份有限公司 Terrestrial facies pulveryte petrographic analysis method
CN110454135A (en) * 2019-07-15 2019-11-15 中国石油天然气股份有限公司 Shale oil well spacing method for long horizontal well with small well spacing, multiple strata series and close cutting
CN110454123A (en) * 2019-08-08 2019-11-15 大港油田集团有限责任公司 A kind of more wells collaboration energizations of LOW PERMEABILITY RESERVOIR are handled up method
CN111219180A (en) * 2020-01-08 2020-06-02 中海石油(中国)有限公司 Method for screening development test area suitable for injecting oxygen-reduced air in offshore low-permeability oilfield
CN111441757A (en) * 2020-06-09 2020-07-24 陕西延长石油(集团)有限责任公司 Well arrangement method for determining directional well pattern of dense gas reservoir
CN111460647A (en) * 2020-03-30 2020-07-28 中国石油化工股份有限公司 Quantitative allocation method for horizontal well segmented targeted steam injection amount after multi-round huff and puff
CN112523736A (en) * 2021-02-09 2021-03-19 山东博赛特石油技术有限公司 Multi-well-site flow field reconstruction scale fracturing method
CN113011048A (en) * 2021-04-23 2021-06-22 西南石油大学 Repeated fracturing simulation method for horizontal well of compact conglomerate reservoir
CN113177322A (en) * 2021-05-11 2021-07-27 陕西延长石油(集团)有限责任公司 Fracturing single well control reserve calculation method
CN113803044A (en) * 2020-06-17 2021-12-17 中国石油化工股份有限公司 Method and system for integrally designing unconventional reservoir volume fracturing and well spacing scheme
CN114294046A (en) * 2021-12-31 2022-04-08 山西晋煤集团技术研究院有限责任公司 Up-down three-dimensional extraction method for full-coverage well in coal mine area
CN114991733A (en) * 2022-04-15 2022-09-02 延长油田股份有限公司南泥湾采油厂 Integral fracturing construction method for conventional well with multiple sets of shallow compact oil containing oil layers
CN115680582A (en) * 2022-10-26 2023-02-03 华美孚泰油气增产技术服务有限责任公司 Yield increasing method for improving water injection efficiency of tight oil reservoir
CN115961926A (en) * 2021-10-08 2023-04-14 中国石油天然气股份有限公司 Compact reservoir pressure injection and flooding extraction integrated reservoir transformation method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102071922A (en) * 2011-01-15 2011-05-25 胜利油田鲁明油气勘探开发有限公司 Low permeable oil deposit virtual horizontal well development method
CN104141481A (en) * 2013-05-06 2014-11-12 中国石油天然气股份有限公司 Horizontal well spacing method for ultra-low permeability tight reservoir
CN105064986A (en) * 2015-07-24 2015-11-18 中国石油天然气集团公司 Method for building reservoir four-property relationship spectrum by using conventional well detection and logging information
CN105239990A (en) * 2015-10-30 2016-01-13 中国石油天然气股份有限公司 Well spacing method for lateral displacement horizontal well of ultra-low permeability tight oil reservoir simulation local well
CN105422076A (en) * 2014-09-22 2016-03-23 中国石油大学(北京) Horizontal well spacing method and device for compact sandstone reservoir
CN105672978A (en) * 2016-03-28 2016-06-15 中国石油天然气股份有限公司 Horizontal moving type five-point horizontal well three-dimensional well pattern well spacing method
CN105822284A (en) * 2016-03-29 2016-08-03 中国石油天然气股份有限公司 Triangular horizontal well pattern well spacing method
CN105952432A (en) * 2016-05-27 2016-09-21 中国石油天然气股份有限公司 Quasi-natural energy development staggered well spacing method for ultra-low permeability tight oil reservoir volume fracturing horizontal well

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102071922A (en) * 2011-01-15 2011-05-25 胜利油田鲁明油气勘探开发有限公司 Low permeable oil deposit virtual horizontal well development method
CN104141481A (en) * 2013-05-06 2014-11-12 中国石油天然气股份有限公司 Horizontal well spacing method for ultra-low permeability tight reservoir
CN105422076A (en) * 2014-09-22 2016-03-23 中国石油大学(北京) Horizontal well spacing method and device for compact sandstone reservoir
CN105064986A (en) * 2015-07-24 2015-11-18 中国石油天然气集团公司 Method for building reservoir four-property relationship spectrum by using conventional well detection and logging information
CN105239990A (en) * 2015-10-30 2016-01-13 中国石油天然气股份有限公司 Well spacing method for lateral displacement horizontal well of ultra-low permeability tight oil reservoir simulation local well
CN105672978A (en) * 2016-03-28 2016-06-15 中国石油天然气股份有限公司 Horizontal moving type five-point horizontal well three-dimensional well pattern well spacing method
CN105822284A (en) * 2016-03-29 2016-08-03 中国石油天然气股份有限公司 Triangular horizontal well pattern well spacing method
CN105952432A (en) * 2016-05-27 2016-09-21 中国石油天然气股份有限公司 Quasi-natural energy development staggered well spacing method for ultra-low permeability tight oil reservoir volume fracturing horizontal well

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109577962A (en) * 2017-09-29 2019-04-05 中国石油化工股份有限公司 Terrestrial facies pulveryte petrographic analysis method
CN109577962B (en) * 2017-09-29 2022-02-18 中国石油化工股份有限公司 Continental facies fine sedimentary rock facies analysis method
CN108843291A (en) * 2017-11-28 2018-11-20 中国石油天然气股份有限公司 Exploitation method and device of low-pressure tight oil reservoir
CN109025965A (en) * 2018-08-31 2018-12-18 中国石油天然气股份有限公司 Method for determining permeability lower limit of water flooding development of ultra-low permeability tight reservoir
CN110454135A (en) * 2019-07-15 2019-11-15 中国石油天然气股份有限公司 Shale oil well spacing method for long horizontal well with small well spacing, multiple strata series and close cutting
CN110454135B (en) * 2019-07-15 2021-08-03 中国石油天然气股份有限公司 Shale oil well spacing method for long horizontal well with small well spacing, multiple strata series and close cutting
CN110454123A (en) * 2019-08-08 2019-11-15 大港油田集团有限责任公司 A kind of more wells collaboration energizations of LOW PERMEABILITY RESERVOIR are handled up method
CN111219180A (en) * 2020-01-08 2020-06-02 中海石油(中国)有限公司 Method for screening development test area suitable for injecting oxygen-reduced air in offshore low-permeability oilfield
CN111219180B (en) * 2020-01-08 2023-06-02 中海石油(中国)有限公司 Method for screening test areas suitable for oxygen-reduced air injection development in offshore low-permeability oil fields
CN111460647A (en) * 2020-03-30 2020-07-28 中国石油化工股份有限公司 Quantitative allocation method for horizontal well segmented targeted steam injection amount after multi-round huff and puff
CN111441757A (en) * 2020-06-09 2020-07-24 陕西延长石油(集团)有限责任公司 Well arrangement method for determining directional well pattern of dense gas reservoir
CN111441757B (en) * 2020-06-09 2022-02-11 陕西延长石油(集团)有限责任公司 Well arrangement method for determining directional well pattern of dense gas reservoir
CN113803044A (en) * 2020-06-17 2021-12-17 中国石油化工股份有限公司 Method and system for integrally designing unconventional reservoir volume fracturing and well spacing scheme
CN112523736A (en) * 2021-02-09 2021-03-19 山东博赛特石油技术有限公司 Multi-well-site flow field reconstruction scale fracturing method
CN113011048A (en) * 2021-04-23 2021-06-22 西南石油大学 Repeated fracturing simulation method for horizontal well of compact conglomerate reservoir
CN113177322A (en) * 2021-05-11 2021-07-27 陕西延长石油(集团)有限责任公司 Fracturing single well control reserve calculation method
CN113177322B (en) * 2021-05-11 2024-02-09 陕西延长石油(集团)有限责任公司 Fracturing single well control reserve calculation method
CN115961926A (en) * 2021-10-08 2023-04-14 中国石油天然气股份有限公司 Compact reservoir pressure injection and flooding extraction integrated reservoir transformation method
CN114294046A (en) * 2021-12-31 2022-04-08 山西晋煤集团技术研究院有限责任公司 Up-down three-dimensional extraction method for full-coverage well in coal mine area
CN114294046B (en) * 2021-12-31 2024-01-26 山西晋煤集团技术研究院有限责任公司 Coal mine area full-coverage underground three-dimensional extraction method
CN114991733A (en) * 2022-04-15 2022-09-02 延长油田股份有限公司南泥湾采油厂 Integral fracturing construction method for conventional well with multiple sets of shallow compact oil containing oil layers
CN115680582A (en) * 2022-10-26 2023-02-03 华美孚泰油气增产技术服务有限责任公司 Yield increasing method for improving water injection efficiency of tight oil reservoir

Similar Documents

Publication Publication Date Title
CN106593400A (en) Directional well spacing method for volume fracturing of ultra-low permeability tight oil reservoir
Li et al. Development of unconventional gas and technologies adopted in China
CN104141481B (en) Horizontal well spacing method for ultra-low permeability tight reservoir
CN107044277B (en) Low permeable and heterogeneity reservoir horizontal well refracturing yield potential evaluation method
CN105239990B (en) Well spacing method for lateral displacement horizontal well of ultra-low permeability tight oil reservoir simulation local well
CN108561106B (en) Oil and gas exploitation method for increasing recovery ratio by controlling reserves through artificial seams
Johnson et al. Hydraulic fracture water usage in northeast British Columbia: locations, volumes and trends
CN106437674B (en) Imitative water injection of horizontal well well pattern adaptation method
CN102606129B (en) Method and system for thin interbed oilfield development
CN105822284B (en) Triangular horizontal well pattern well spacing method
CN101818620B (en) Mining method for maximum reservoir contact well
CN103590799B (en) A kind of Sandstone Gas Reservoir horizontal well three-dimensional fracturing design method
CN103993862A (en) Layering development method for complex fault block thin oil reservoir
RU2439299C1 (en) Method of oil deposit development
CN107630686B (en) compact oil energy supplementing method for staggered displacement and imbibition displacement between horizontal well sections
CN105672973A (en) Coalbed methane overall volume fracturing optimization design method
CN105317407B (en) Development method of extratable reservoir with extra-high water-cut period
RU2672292C1 (en) Method for oil deposit development with horizontal wells with multi-stage fracing
CN105672978A (en) Horizontal moving type five-point horizontal well three-dimensional well pattern well spacing method
CN106014372B (en) Horizontal well spacing method based on sand body structure
Agrawal et al. A technical and economic study of completion techniques in five emerging US gas shales: A Woodford Shale example
CN110454135A (en) Shale oil well spacing method for long horizontal well with small well spacing, multiple strata series and close cutting
CN201763308U (en) Fishbone well type structure
CN109577938A (en) Fracturing method for tight oil reservoir horizontal well through stratum
CN109710965A (en) Evaluation method for effectiveness of horizontal well artificial fracturing fracture parameters

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170426