CN108843291A - Exploitation method and device of low-pressure tight oil reservoir - Google Patents
Exploitation method and device of low-pressure tight oil reservoir Download PDFInfo
- Publication number
- CN108843291A CN108843291A CN201810506716.7A CN201810506716A CN108843291A CN 108843291 A CN108843291 A CN 108843291A CN 201810506716 A CN201810506716 A CN 201810506716A CN 108843291 A CN108843291 A CN 108843291A
- Authority
- CN
- China
- Prior art keywords
- well
- oil
- handling
- water
- recovery
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 101
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 146
- 238000011084 recovery Methods 0.000 claims abstract description 135
- 238000006073 displacement reaction Methods 0.000 claims abstract description 94
- 238000005213 imbibition Methods 0.000 claims abstract description 70
- 230000000694 effects Effects 0.000 claims abstract description 42
- 238000004519 manufacturing process Methods 0.000 claims abstract description 35
- 238000009826 distribution Methods 0.000 claims abstract description 10
- 238000000280 densification Methods 0.000 claims description 65
- 238000003860 storage Methods 0.000 claims description 18
- 238000004590 computer program Methods 0.000 claims description 11
- 230000015572 biosynthetic process Effects 0.000 claims description 9
- 238000002347 injection Methods 0.000 abstract description 19
- 239000007924 injection Substances 0.000 abstract description 19
- 238000000605 extraction Methods 0.000 abstract description 14
- 230000008901 benefit Effects 0.000 abstract description 10
- 239000003921 oil Substances 0.000 description 268
- 230000018109 developmental process Effects 0.000 description 36
- 238000011161 development Methods 0.000 description 35
- 238000010586 diagram Methods 0.000 description 22
- 239000012530 fluid Substances 0.000 description 15
- 230000035515 penetration Effects 0.000 description 15
- 230000006870 function Effects 0.000 description 13
- 230000008569 process Effects 0.000 description 13
- 230000035699 permeability Effects 0.000 description 12
- 238000012545 processing Methods 0.000 description 12
- 230000001186 cumulative effect Effects 0.000 description 11
- 239000011159 matrix material Substances 0.000 description 10
- 208000010392 Bone Fractures Diseases 0.000 description 9
- 206010017076 Fracture Diseases 0.000 description 9
- 238000005516 engineering process Methods 0.000 description 9
- 238000005065 mining Methods 0.000 description 9
- 230000006872 improvement Effects 0.000 description 8
- 125000004122 cyclic group Chemical group 0.000 description 7
- 239000007788 liquid Substances 0.000 description 7
- 230000000638 stimulation Effects 0.000 description 7
- 238000012360 testing method Methods 0.000 description 6
- 235000020681 well water Nutrition 0.000 description 6
- 239000002349 well water Substances 0.000 description 6
- 238000004891 communication Methods 0.000 description 5
- 239000011148 porous material Substances 0.000 description 5
- 238000004458 analytical method Methods 0.000 description 4
- 239000000463 material Substances 0.000 description 4
- 239000003129 oil well Substances 0.000 description 4
- 239000000047 product Substances 0.000 description 4
- 238000004088 simulation Methods 0.000 description 4
- 230000008859 change Effects 0.000 description 3
- 239000009096 changqing Substances 0.000 description 3
- 238000010168 coupling process Methods 0.000 description 3
- 238000005859 coupling reaction Methods 0.000 description 3
- 239000010779 crude oil Substances 0.000 description 3
- 239000004519 grease Substances 0.000 description 3
- 238000005649 metathesis reaction Methods 0.000 description 3
- 239000003208 petroleum Substances 0.000 description 3
- 239000004576 sand Substances 0.000 description 3
- 239000013589 supplement Substances 0.000 description 3
- ZRALSGWEFCBTJO-UHFFFAOYSA-N Guanidine Chemical compound NC(N)=N ZRALSGWEFCBTJO-UHFFFAOYSA-N 0.000 description 2
- 238000009825 accumulation Methods 0.000 description 2
- 238000013459 approach Methods 0.000 description 2
- CUZMQPZYCDIHQL-VCTVXEGHSA-L calcium;(2s)-1-[(2s)-3-[(2r)-2-(cyclohexanecarbonylamino)propanoyl]sulfanyl-2-methylpropanoyl]pyrrolidine-2-carboxylate Chemical compound [Ca+2].N([C@H](C)C(=O)SC[C@@H](C)C(=O)N1[C@@H](CCC1)C([O-])=O)C(=O)C1CCCCC1.N([C@H](C)C(=O)SC[C@@H](C)C(=O)N1[C@@H](CCC1)C([O-])=O)C(=O)C1CCCCC1 CUZMQPZYCDIHQL-VCTVXEGHSA-L 0.000 description 2
- 238000004364 calculation method Methods 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 230000008878 coupling Effects 0.000 description 2
- 238000013461 design Methods 0.000 description 2
- 238000009792 diffusion process Methods 0.000 description 2
- 238000011010 flushing procedure Methods 0.000 description 2
- 230000008595 infiltration Effects 0.000 description 2
- 238000001764 infiltration Methods 0.000 description 2
- 238000003780 insertion Methods 0.000 description 2
- 230000037431 insertion Effects 0.000 description 2
- 230000033001 locomotion Effects 0.000 description 2
- 230000007246 mechanism Effects 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 238000011017 operating method Methods 0.000 description 2
- 230000003287 optical effect Effects 0.000 description 2
- 230000000750 progressive effect Effects 0.000 description 2
- 238000011160 research Methods 0.000 description 2
- 238000009738 saturating Methods 0.000 description 2
- 239000000243 solution Substances 0.000 description 2
- OKTJSMMVPCPJKN-UHFFFAOYSA-N Carbon Chemical compound [C] OKTJSMMVPCPJKN-UHFFFAOYSA-N 0.000 description 1
- 241001269238 Data Species 0.000 description 1
- CHJJGSNFBQVOTG-UHFFFAOYSA-N N-methyl-guanidine Natural products CNC(N)=N CHJJGSNFBQVOTG-UHFFFAOYSA-N 0.000 description 1
- 208000009989 Posterior Leukoencephalopathy Syndrome Diseases 0.000 description 1
- 230000009471 action Effects 0.000 description 1
- 230000003466 anti-cipated effect Effects 0.000 description 1
- 230000006399 behavior Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 230000001413 cellular effect Effects 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 239000007795 chemical reaction product Substances 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- SWSQBOPZIKWTGO-UHFFFAOYSA-N dimethylaminoamidine Natural products CN(C)C(N)=N SWSQBOPZIKWTGO-UHFFFAOYSA-N 0.000 description 1
- 238000007599 discharging Methods 0.000 description 1
- 229910021389 graphene Inorganic materials 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000003993 interaction Effects 0.000 description 1
- 239000010410 layer Substances 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 244000005700 microbiome Species 0.000 description 1
- 238000005192 partition Methods 0.000 description 1
- 229920001296 polysiloxane Polymers 0.000 description 1
- 238000013139 quantization Methods 0.000 description 1
- 239000010979 ruby Substances 0.000 description 1
- 229910001750 ruby Inorganic materials 0.000 description 1
- 230000011218 segmentation Effects 0.000 description 1
- 239000002356 single layer Substances 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 230000001360 synchronised effect Effects 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
- 238000009736 wetting Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
- E21B43/17—Interconnecting two or more wells by fracturing or otherwise attacking the formation
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
- E21B43/20—Displacing by water
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/30—Specific pattern of wells, e.g. optimising the spacing of wells
- E21B43/305—Specific pattern of wells, e.g. optimising the spacing of wells comprising at least one inclined or horizontal well
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Fats And Perfumes (AREA)
- Removal Of Floating Material (AREA)
Abstract
The application provides a method and a device for exploiting a low-pressure tight oil reservoir. The method comprises the steps of setting a horizontal well bank according to the geological pressure distribution condition of an area where an oil reservoir to be exploited is located, wherein the horizontal well bank comprises a throughput well and an oil production well, and the throughput well and the oil production well are arranged at intervals; performing volume fracturing reservoir reformation on the huff-and-puff well and the production well; and performing water injection and imbibition oil extraction by using the huff-and-puff well, and displacing the adjacent oil production wells of the huff-and-puff well by using an interwell displacement effect to perform displacement oil extraction. By utilizing the embodiments in the application, the advantages of the imbibition oil extraction technology are brought into play, the exploitation of the low-permeability or ultra-low-permeability oil reservoir is accelerated by utilizing the interwell displacement to the maximum extent, and the overall extraction degree and the recovery ratio of the low-pressure tight oil reservoir are improved.
Description
Technical field
The application belongs to oil-gas mining technical field more particularly to a kind of recovery method and device of low pressure densification oil reservoir.
Background technique
Low pressure densification oil reservoir resource very abundant, distribution is extensive, and each oil-producing country has been substantially all such oil field.China
Ultralow pressure compact oil reservoir heterogeneity is stronger, low with intrinsic fracture development, reservoir pressure coefficient, and horizontal well development is caused to be passed
Subtract that fast, cumulative production is low, is difficult to effective exploitation under low oil price.It is capable of effective exploitation low pressure densification oil reservoir it would therefore be highly desirable to find
Method.
Horizontal well volume fracturing reservoir reconstruction means can be used, the exploitation of low pressure densification oil reservoir is carried out.In the prior art,
Horizontal well volume fracturing reservoir reconstruction carries out the exploitation of petroleum, the implementation of recovery scheme is usually carried out just for individual well, to individual well
The only single development approach for considering cyclic water stimulation imbibition or displacement.This method, which will lead to stratum energy and reduce fast, yield, passs
The problems such as deceleration is fast, ultimate recovery is low, the scope of application is small.Also, it is directed to the development approach of individual well, does not account for entire oil
The long-term exploitation effect of hiding, can not form the whole development scheme suitable for ultra-low penetration compact oil reservoir, cannot improve Oil in Super-low Permeability
The whole recovery ratio of saturating compact oil reservoir.Therefore, a kind of recovery method suitable for low pressure densification oil reservoir is needed in the industry, improves low pressure
The embodiment of compact oil reservoir recovery ratio.
Summary of the invention
The application is designed to provide the recovery method and device of a kind of low pressure densification oil reservoir, has both played imbibition oil recovery skill
The advantage of art, while hypotonic or Oil in Super-low Permeability oil reservoir exploitation utmostly is accelerated using displacement between well, improve low pressure densification
The whole recovery ratio of oil reservoir.
On the one hand this application provides a kind of recovery methods of low pressure densification oil reservoir, including:
According to the geology pressure distribution situation of oil reservoir location to be exploited, Horizontal Well is set and is arranged, the Horizontal Well
It include handle up well and producing well, handle up well and the producing well interval setting in row;
To well and the producing well progress volume fracturing reservoir reconstruction handled up;
It carries out water filling imbibition using the well of handling up to recover the oil, and adjacent using well of handling up described in displacement effect displacement between well
Producing well carries out displacement oil recovery.
Further, in another embodiment of the method, the well of handling up described in carries out water filling imbibition and recovers the oil,
Including:
It is filled the water into the well of handling up, when filling the water end of term pressure equal to original formation pressure, stops filling the water, described in closing
It handles up well, carries out bored well;
Judge whether the closed time of the bored well reaches preset time, if so, exploiting to the well of handling up;
Whether strata pressure in the corresponding control area of well of handling up described in judgement is less than or equal to preset pressure, if so, stopping
It only recovers the oil, the well of handling up is filled the water again, bored well, oil recovery.
Further, in another embodiment of the method, the method also includes:
Judge whether the water flood recovery number is greater than preset times, if so, to well and the producing well handled up
It re-starts volume fracturing reservoir reconstruction, and the position of handle up well and the producing well is interchangeable.
Further, in another embodiment of the method, the well of handling up described in carries out water filling imbibition and recovers the oil,
Including:
The time of the water flood recovery of well of handling up in the Horizontal Well row is different.
On the other hand, this application provides a kind of quarrying apparatus of low pressure densification oil reservoir, including:
Well arranges setup module, and for the geology pressure distribution situation according to oil reservoir location to be exploited, horizontal well is arranged
Well is arranged, and includes handle up well and producing well, handle up well and the producing well interval setting in the Horizontal Well row;
Module is transformed in volume, for well and the producing well progress volume fracturing reservoir reconstruction handled up;
Production module carries out water filling imbibition for well of handling up described in and recovers the oil, and acts on displacement institute using displacement between well
It states the adjacent producing well of well of handling up and carries out displacement oil recovery.
Further, in another embodiment of described device, the production module includes:
Bored well unit is filled the water, for being filled the water into the well of handling up, when filling the water end of term pressure equal to original formation pressure,
Stop water filling, closes well of handling up, carry out bored well;
Oil-producing unit, for judging whether the closed time of the bored well reaches preset time, if so, handling up described
Well is exploited;
Loop control unit, for judging that strata pressure is less than or equal to default pressure in the corresponding control area of well of handling up
When power, then stop recovering the oil, the well of handling up be filled the water again, bored well, oil recovery.
Further, in another embodiment of described device, the quarrying apparatus of the low pressure densification oil reservoir further includes:
Well arranges reset cell, for judging whether the water flood recovery number is greater than preset times, if so, gulping down to described
Tu Jing and the producing well re-start volume fracturing reservoir reconstruction, and the position of handle up well and the producing well is carried out
It exchanges.
Further, in another embodiment of described device, the production module is specifically used for:
The time that the water flood recovery of the well of handling up in the Horizontal Well row is arranged is different.In another aspect, the application also mentions
A kind of computer storage medium has been supplied, computer program is stored thereon with, the computer program is performed, and is realized above-mentioned low
Press the recovery method of compact oil reservoir.
In another aspect, present invention also provides a kind of quarrying apparatus of low pressure densification oil reservoir, including:It processor and is used for
The memory of storage processor executable instruction, the processor realize opening for above-mentioned low pressure densification oil reservoir when executing described instruction
Mining method.
The recovery method and device of low pressure densification oil reservoir provided by the present application, by the way that Horizontal Well row is suitably arranged, and
By Horizontal Well arrange in horizontal well be set to handle up well and producing well.Each handle up in Horizontal Well row and is adopted well
It after oil well carries out volume fracturing reservoir reconstruction, fills the water into well of handling up, is acted on using imbibition, adopted so that well of handling up carries out imbibition
Oil.Simultaneously because the interval setting of handle up well and producing well, handle up well water flood recovery when, pressure wave divergence can be relied on, to phase
Adjacent producing well plays the role of displacement, pushes difficult recover the oil between well to adjacent producing well, displacement producing well recovers the oil.Both it sent out
The advantage of imbibition oil recovery technique has been waved, while utmostly having accelerated hypotonic or Oil in Super-low Permeability oil reservoir exploitation using displacement between well,
It avoids to rely only on imbibition effect or rely only on displacement effect and is difficult to the fine and close oil of Efficient Development ultra-low penetration, is difficult to improve and finally adopts
The problem of yield, has ensured oil field stable high yield.Meanwhile handle up well and oil recovery are set for entire low pressure densification oil reservoir interval
Well realizes the variation of inter-well pressure wave, improves sweep efficiency, while carrying out displacement between well, finally when handling up well water filling
Both the oil of imbibition effect extraction near wellbore zone had been utilized, the oil between well has been produced further through displacement, has improved low pressure densification oil reservoir
Whole recovery percent of reserves and recovery ratio.
Detailed description of the invention
In order to illustrate the technical solutions in the embodiments of the present application or in the prior art more clearly, to embodiment or will show below
There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this
The some embodiments recorded in application, for those of ordinary skill in the art, in the premise of not making the creative labor property
Under, it is also possible to obtain other drawings based on these drawings.
Fig. 1 is a kind of method flow signal of recovery method one embodiment of low pressure densification oil reservoir provided by the present application
Figure;
Fig. 2 is the position setting schematic diagram that volume fracturing Horizontal Well is arranged in the embodiment of the present application;
Fig. 3 is typical water horizontal well well group imbibition in the embodiment of the present application+displacement cyclic water stimulation oil recovery schematic diagram;
Fig. 4 is the Production development curve synoptic diagram of well and producing well handled up in the embodiment of the present application;
Fig. 5 is the exploitation effect schematic diagram of the application one embodiment mesolow compact oil reservoir;
Fig. 6 is the development effectiveness contrast schematic diagram of different development plans in the application one implementation;
Fig. 7 is the modular structure schematic diagram of quarrying apparatus one embodiment of low pressure densification oil reservoir provided by the present application;
Fig. 8 is the structural schematic diagram of production module in the application one embodiment;
Fig. 9 is the modular structure schematic diagram of another embodiment of the quarrying apparatus of low pressure densification oil reservoir provided by the present application;
Figure 10 is the modular structure schematic diagram of the quarrying apparatus embodiment of another low pressure densification oil reservoir provided by the present application.
Specific embodiment
In order to make those skilled in the art better understand the technical solutions in the application, below in conjunction with the application reality
The attached drawing in example is applied, the technical scheme in the embodiment of the application is clearly and completely described, it is clear that described implementation
Example is merely a part but not all of the embodiments of the present application.Based on the embodiment in the application, this field is common
The application protection all should belong in technical staff's every other embodiment obtained without creative efforts
Range.
Compact oil reservoir reservoir has low hole, hypotonic, low pressure feature, and develops with natural microcrack, development difficulty is big,
Energy supplement is difficult, development degree is low etc., and exploitation difficulty is bigger.When exploiting low pressure densification oil reservoir, can be adopted using handling up
Oil tech.Huff and puff oil recovery technology is a kind of production method not only injected but also recovered the oil with oil reservoir in same well, and there are two types of important for tool
Oil recovery mechanism, first is that the stratum energy around producing well is promoted, second is that the displacement of reservoir oil characteristic using injectant reduces reservoir micro hole
Crude oil saturation degree in gap.Technology of handling up is applied to tentative extensively at present as a kind of effective raising recovery ratio method
Exploitation.The type of skill of handling up is varied, including CO2It handles up, microorganism huff and puff, steam soak and cyclic water stimulation etc., the application
It can be recovered the oil using cyclic water stimulation in embodiment.By injecting water into reservoir, the oil in reservoir is cemented out.
Cyclic water stimulation oil recovery may include that imbibition oil recovery and displacement are recovered the oil, and cyclic water stimulation imbibition oil recovery technique is for hypotonic
A kind of wetting phase fluid that saturating reservoir proposes is in porous media by another non-wetted phase fluid of capillary force effect displacement
Oil recovery technique.Compared to traditional water drive, its advantage lies in being able to generate biggish capillary pressure using tiny pore throat two-phase fluid
Power, and the power of water drive oil is become, displace the matrix oil that traditional water drive is difficult to produce.In addition, for crack water logging water
Horizontal well, being handled up using imbibition makes its oil-producing again using oil and water displacement, stratum energy supplement principle.But it is simple by infiltration
Suction effect, recovering the oil, time-consuming, and the cost recovery period is long, and sphere of action is limited;It is acted on by displacement merely, large fracture can only be produced
Or the oil in middle and high infiltration water stream channel, the oil in matrix can not be produced.
In the prior art, the research of oily whole development fine and close for ultra-low penetration is less, is generally only to study opening for individual well
Originating party case, the consideration imbibition or displacement effect that the exploitation of individual well usually only can be simple.When in the prior art, needed for imbibition oil recovery
Between it is long, the development cycle of oil gas is long.The ultra dense well spacing and horizontal well taken to realize displacement effect maximization
The oil production methods such as control are adopted in parity segment section construction, note, and construction is complicated, difficulty is big, and development cost is high, mining site bad adaptability.Shen
Please embodiment arranged by rationally setting Horizontal Well, and control the water injection time etc. of well handled up, while imbibition and displacement is utilized
Effect is recovered the oil, comprehensively consider it is common play imbibition and displacement effect, the development plan whole to the fine and close oil of ultra-low penetration into
Row research, to obtain the exploitation for being suitble to the fine and close oil of ultra-low penetration whole, embodiment is simple, and development cost is lower, applicability ratio
It is relatively wide, meanwhile, improve the recovery ratio of ultra-low penetration compact oil reservoir entirety.
Fig. 1 is a kind of method flow signal of recovery method one embodiment of low pressure densification oil reservoir provided by the present application
Figure, the recovery method of low pressure densification oil reservoir provided by the present application include:
S1, the geology pressure distribution situation according to oil reservoir location to be exploited, setting Horizontal Well are arranged, the horizontal well
It include handle up well and producing well, handle up well and the producing well interval setting in well row.
Specifically, usually when carrying out the exploitation of petroleum, multiple wells can be set in oil reservoir location to be exploited, carries out stone
The exploitation of oil.Oil reservoir to be analyzed in some embodiments of the application can be single layer oil reservoir or stratified reservoir, and the type of oil reservoir can
To include the unsaturated low pressure reservoirs of no edge-bottom water/pneumatic jack, determined with specific reference to actual needs.Such as:One example of the application
In oil reservoir to be analyzed can be the ultra-low penetration compact oil reservoir of intrinsic fracture development, reservoir matrix mean permeability can be lower than
0.3mD, average pore can be 9%-11%.It, can be in oil reservoir location to be analyzed by more mouthfuls in the embodiment of the present application
Well arrangement is in a row, and each well can be horizontal well.According to oil reservoir to be exploited, that is, low pressure densification oil reservoir location geology
The position of horizontal well is arranged in pressure distribution situation, and multiple horizontal wells are arranged in rows, and the well spacing between each horizontal well can root
According to needing to be configured, Horizontal Well row is obtained.Such as:In one example of the application, the well spacing of Horizontal Well row be can be set
For 500-600m, array pitch can be set to 200m, and horizontal well length can be set to 600-800 meters.Wherein, in Horizontal Well row
It may include handle up well and producing well, it can selected part horizontal well is as well of handling up, part of horizontal in Horizontal Well row
Well as producing well, Horizontal Well can be arranged in the embodiment of the present application in handle up well and the setting of producing well interval.
Fig. 2 is the position setting schematic diagram that volume fracturing Horizontal Well is arranged in the embodiment of the present application, as shown in Fig. 2, this Shen
In please implementing Horizontal Well row in may include multiple rows of horizontal well, may include handle up well and producing well in each draining horizontal well.
Same row handle up well and producing well interval setting, and adjacent well row well of handling up be staggered, adjacent well row producing well
It is to be staggered.It should be noted that is recovered the oil in Fig. 2 is that well a bite producing well of handling up is arranged alternately flatly, when practical application,
It can according to need the quantity at selection interval.Such as:The two mouthfuls of producing wells of well that can handle up flatly are arranged alternately or two mouthfuls of producing wells
Well of handling up flatly is arranged alternately, and the embodiment of the present application is not especially limited.It should be noted that Horizontal Well row is as needed
It can be a draining horizontal well.
In addition, can be arranged along the biggest principal stress direction of oil reservoir location to be exploited when Horizontal Well row is arranged
Horizontal Well row.Biggest principal stress direction can be the maximum direction of geologic body each point stress of oil reservoir location to be exploited,
It can be obtained by geological analysis or according to data such as seismic datas.General fracture azimuth and region biggest principal stress direction
Unanimously, well row is oriented parallel to fracture azimuth when well spacing, can be convenient volume fracturing, obtains better fracture network.
S2, volume fracturing reservoir reconstruction is carried out to well and the producing well handled up.
Specifically, volume fracturing reservoir reconstruction may include being transformed using volume fracturing technology to reservoir, so that well
Reservoir near cylinder has better fracture network.After arranging Horizontal Well row, it is to the horizontal well in Horizontal Well row
Handle up well and producing well carries out volume fracturing reservoir reconstruction, in some embodiments of the application, can use slippery water pressure break, multistage
Pressure break, synchronous pressure break equipressure split technology and split reservoir reconstruction to horizontal well progress volume fracturing.Such as:The application one embodiment
In, reservoir reconstruction can be carried out to horizontal well using more cluster volume fracturing modes are segmented, horizontal well can be divided into mono- section of 100m,
Each section can divide 2-4 local perforation, each perforated interval 1-1.5m, midfeather 20-30m, and such perforating modes are known as
Cluster, then volume fracturing reservoir reconstruction is carried out by these perforated intervals.In some examples of the application, when volume fracturing reservoir reconstruction
Can be using slippery water or guanidine gum fracturing fluid as fracturing fluid, number of segment, which is transformed, can be set to 8-12, and sand feeding amount can be set to
300m3-600m3, entering ground liquid measure can be 3000m3-6000m3, it can be 30%-50% that the row of returning, which leads,.Volume fracturing reservoir reconstruction
Relative to conventional fracturing reform, injection fracturing fluid liquid measure is increased, and can be produced using slippery water fracturing fluid more complicated
Stitch net.By volume fracturing reservoir reconstruction, be capable of increasing near wellbore permeability, the oil in matrix can first seepage flow to nearly well
In band pressure-break, then by pressure-break inflow well, be finally plucked out of, such seepage flow mode make the efficiency of oil exploitation with
And the yield of exploitation is far superior to petroleum in such a way that matrix flows into pit shaft.
S3, water filling imbibition oil recovery is carried out using the well of handling up, and utilize well phase of handling up described in displacement effect displacement between well
Adjacent producing well carries out displacement oil recovery.
Specifically, set Horizontal Well row and well of handling up, producing well position, by each well of handling up, producing well into
After row volume fracturing reservoir reconstruction, to handling up, well carries out water flood recovery.Water flood recovery can specifically include water filling, bored well, oil recovery
Three phases.When well of handling up carries out water flood recovery, well of handling up can use grease replacement process and pressure wave inside reservoir and expand
The process of dissipating makes difficult recover the oil in matrix enter hypertonic channel, realizes huff and puff oil recovery by imbibition metathesis.Simultaneously as handling up
Well and the setting of producing well interval, handle up well when carrying out water flood recovery, can rely on pressure wave divergence, rise to adjacent producing well
It is acted on to displacement, pushes difficult recover the oil between well to adjacent producing well, displacement producing well recovers the oil.
In the recovery process of low pressure densification oil reservoir, when well of handling up carries out water flood recovery, that is, well of handling up fill the water-and it is bored
It when well-oil recovery, the offset well of the well of handling up while driving a well, utilizes the displacement between well to act on and recover the oil.It should be noted that actually answering
Used time, if during well water filling of handling up, the producing well adjacent with the well of handling up it is aqueous more than 80%, can also be with when water logging occurs
The adjacent producing well closing well bored well regular hour is recovered the oil again.Such as:Well A adjacent producing well of handling up is B, C, when handling up
When carrying out water flood recovery, adjacent producing well B, C's well A can recover the oil always.If B, C's is aqueous more than 80%, water occurs
When flooding, B, C closing well bored well regular hour can also be recovered the oil again.
Using method provided by the embodiments of the present application, that is, the principle of imbibition displacement is utilized while displacement between well is utilized
Principle, displacement go out oil can be produced by producing well, the oil that the bored well of imbibition cements out can voluntarily be produced by well of handling up, " drive seep
In conjunction with " recover the oil, development rate and Exploitation Depth are had both, the recovery ratio and efficiency of oil-gas mining are improved.The embodiment of the present application utilizes
Compact oil reservoir pore throat itself is tiny, this big feature of capillary force, and the imbibition oil recovery effect for the well near wellbore zone that handle up solves
Compact oil reservoir pore throat itself is tiny, the normal exploitation of the big obstruction of capillary force, the problem of development contradiction occurs.In addition, the application one
In a embodiment, the well of handling up described in carries out water filling imbibition and recovers the oil, and may include:Handling up in the Horizontal Well row
The time of the water flood recovery of well is different.
Specifically, when the practical exploitation for carrying out low pressure densification oil reservoir, more mouthfuls of handle up well and more mouthfuls of producing wells be may include, respectively
The time that a well of handling up carries out huff and puff oil recovery can be inconsistent.Each well of handling up can be set according to the needs actually exploited
Water filling, bored well and oil recovery corresponding time.Such as:It, can if being provided with 3 mouthfuls of wells of handling up in low pressure densification oil reservoir to be exploited
To set moment a for the handle up water injection time of well of first, the water injection time of second mouthful of well of handling up is set as moment b, third
The handle up water injection time of well of mouth is set as moment c.It is of course also possible to carry out while filling the water each well of handling up, the application is implemented
Example is not especially limited.
The recovery method of low pressure densification oil reservoir provided by the present application, by the way that Horizontal Well row is suitably arranged, and will be horizontal
Horizontal well in Jing Jing row is set to handle up well and producing well.To each in Horizontal Well row handle up well and producing well into
It after row volume fracturing reservoir reconstruction, fills the water into well of handling up, is acted on using imbibition, so that well of handling up carries out imbibition oil recovery.Simultaneously
Due to handle up well and producing well interval be arranged, handle up well water flood recovery when, can rely on pressure wave divergence, to adjacent oil recovery
Well plays the role of displacement, pushes difficult recover the oil between well to adjacent producing well, displacement producing well recovers the oil.Both imbibition has been played
The advantage of oil recovery technique, while hypotonic or Oil in Super-low Permeability oil reservoir exploitation utmostly is accelerated using displacement between well, it avoids only
Displacement effect is acted on or relies only on by imbibition to be difficult to the fine and close oil of Efficient Development ultra-low penetration, be difficult to improve asking for ultimate recovery
Topic, has ensured oil field stable high yield.Meanwhile handle up well and producing well are set for entire low pressure densification oil reservoir interval, it is handling up
When well fills the water, the variation of inter-well pressure wave is realized, sweep efficiency is improved, while carrying out displacement between well, is finally both utilized
The oil of imbibition effect extraction near wellbore zone, the oil between well has been produced further through displacement, the entirety for improving low pressure densification oil reservoir is adopted
Degree and recovery ratio out.
On the basis of the above embodiments, the application also provides another embodiment of the method.Specifically, the side
In another embodiment of method, the well of handling up described in carries out water filling imbibition and recovers the oil, and may include:
It is filled the water into the well of handling up, when filling the water end of term pressure equal to original formation pressure, stops filling the water, described in closing
It handles up well, carries out bored well;
Judge whether the closed time of the bored well reaches preset time, if so, exploiting to the well of handling up;
Whether strata pressure in the corresponding control area of well of handling up described in judgement is less than or equal to preset pressure, if so, stopping
It only recovers the oil, the well of handling up is filled the water again, bored well, oil recovery.
Specifically, when carrying out water flood recovery using well of handling up, sand-flushing first can be carried out to well of handling up, it later can be with
It is filled the water with pre-set daily water-injection rate into well of handling up, well near wellbore zone strata pressure of improving the standard, while adjacent is adopted
Oil well carries out displacement, stops water filling when filling the water end of term pressure and being equal to original formation pressure, cumulative water injected at this time is about etc.
In the cumulative liquid production of failure mining phase.After water filling, will handle up well closing well, into the bored well stage, at this moment, start reservoir
Internal grease replacement process and pressure wave-diffusion process make difficult recover the oil in matrix enter hypertonic channel by imbibition metathesis,
Pressure wave divergence can be relied on simultaneously, plays the role of displacement to offset well, and difficulty between well is made to recover the oil to offset well push.If judging bored well
Closed time reaches preset time, then can drive a well to well of handling up, be exploited with pre-set daily fluid production rate.When gulping down
When spitting the strata pressure in the corresponding control area of well and dropping to preset pressure, to handling up, well carries out closing well, stops this round and gulps down
It spits, into the second wheel water filling, bored well, oil recovery process.Individual well fracture half-length × horizontal well length=area, the corresponding control of well of handling up
Strata pressure in area processed can refer to that, in this control range inner plane strata pressure, strata pressure can pass through pressure recovery
Well testing measures.
Wherein, pre-set daily water-injection rate can be obtained based on numerical simulation study and field test analysis, accumulation note
Water is approximately equal to the cumulative liquid production of failure mining phase, and accumulation water filling can be obtained according to material balance method reasoning and calculation
Amount.Daily water-injection rate × injection number of days can be equal to each cumulative water injected, and how much specific cumulative water injected can mention according to pressure
High 40% liquid measure needed calculates.According to the difference of near wellbore zone pressure to reset pressure, can be calculated according to material balance method
The cumulative water injected needed, cumulative water injected/design daily water-injection rate=injection number of days.Pre-set daily fluid production rate can also be with base
It is obtained in numerical simulation study and field test analysis, is usually no more than 15m3/ d prevents strata pressure decline too fast.Default pressure
Power can be the 60% of original formation pressure, and original formation pressure can be by obtaining in the data such as adress analysis or seismic data
, the strata pressure in the corresponding control area of well of handling up can be actually measured.The pre- of bored well can be set according to water injection time
If the time, preset time can generally be equal to water injection time, and water injection time can be by obtaining the injecting process timing.Namely
Say that usual closed time can be equal to water injection time and can drive a well to well of handling up when closed time reaches water injection time
It recovers the oil.
The recovery method of low pressure densification oil reservoir provided by the present application, by the way that Horizontal Well row is suitably arranged, and will be horizontal
Horizontal well in Jing Jing row is set to handle up well and producing well.By the water filling recycled to well of handling up, bored well is adopted
Oil is acted on using imbibition, so that well of handling up recovers the oil, simultaneously because the interval setting of handle up well and producing well, well of handling up note
When hydromining oil, pressure wave divergence can be relied on, plays the role of displacement to adjacent producing well, adopt difficult recover the oil between well to adjacent
Oil well push, displacement producing well recover the oil.Both the advantage of imbibition oil recovery technique had been played, while utmostly having been driven using between well
For hypotonic or Oil in Super-low Permeability oil reservoir exploitation is accelerated, avoid rely only on imbibition effect or rely only on displacement effect be difficult to efficiently open
The fine and close oil of hair ultra-low penetration is difficult to improve the problem of ultimate recovery, has ensured oil field stable high yield.
On the basis of the above embodiments, the application also provides another embodiment of the method.Specifically, the side
In another embodiment of method, the method also includes:
Judge whether the water flood recovery number is greater than preset times, if so, to well and the producing well handled up
It re-starts volume fracturing reservoir reconstruction, and the position of handle up well and the producing well is interchangeable.
Specifically, when carrying out water flood recovery to well of handling up, water filling-bored well-oil recovery can be used as primary complete water filling
It recovers the oil.When water flood recovery number is greater than preset times, well and producing well can be handled up again in Horizontal Well row again
Volume fracturing reservoir reconstruction is carried out, the method for volume fracturing reservoir reconstruction can refer to above-described embodiment, and details are not described herein again.Weight
After newly discharging into row volume fracturing reservoir reconstruction to Horizontal Well, it will handle up well and producing well be interchangeable, it can will be original
Well of handling up as producing well, carry out water flood recovery for original producing well as well of handling up.It can reach in this way to avoid individual well
The lower economic limit of exploitation, so that cost of oil production is excessively high.Lower economic limit can refer to needed for doing primary water filling-bored well-oil recovery
Water filling takes, the expenses such as operating cost, equal with the expense that oil increment after bored well is sold.Changed by volume fracturing reservoir again
It makes, and replaces the position of water injection well and producing well, so that each horizontal well can be carried out imbibition and displacement is recovered the oil, improve low
Press the recovery ratio of compact oil reservoir entirety.The size of preset times by numerical simulation or can test determination according to actual needs,
The application is not especially limited.
Such as:If including 6 horizontal wells in Horizontal Well row, wherein horizontal well A, B, C is well of handling up, and E, F, G are to recover the oil
The position of well, handle up well and producing well can be configured according to above-described embodiment.When the number for well A, B, C water flood recovery of handling up
When greater than 5 times, can will handle up well A, B, C, producing well E, F, G, re-start volume fracturing reservoir reconstruction, also, by A, B, C
As producing well, using E, F, G as well of handling up.Water flood recovery is carried out to E, F, G, and is acted on using displacement between well, displacement A, B, C
It recovers the oil.When the number of E, F, G water flood recovery is greater than 5 times, A, B, C, E, F, G are re-started into volume fracturing reservoir again and changed
It makes, and using A, B, C as well of handling up, E, F, G are as producing well.Volume fracturing reservoir reconstruction is successively carried out in this way, and is gulped down
The exchange of Tu Jing, producing well.
The embodiment that the application is introduced below with reference to specific example:
Changqing oilfields are newly appeased the border area 83 horizontal well nature failure formula development zones, and this area is Changqing oilfields densification oil test area
One of, fine and close oil reservoir is 7 layers, reservoir buried depth 2190-2570m long, reservoir average pore 7-9%, mean permeability 0.1-
0.2mD, original formation pressure 15.8MPa, the development of reservoir intrinsic fracture, average crack develop 0.29/m of density, in-place oil
Viscosity 1.23mPas, density 0.74g/cm3, gas-oil ratio 75.40m3/t, saturation pressure 7.04MPa.Fig. 3 is the application reality
Typical water horizontal well well group imbibition in example+displacement cyclic water stimulation oil recovery schematic diagram is applied, as shown in figure 3, AP83 conduct is handled up in Fig. 3
Well, adjacent two sides are respectively arranged with producing well AP48 and AP84.
It is arranged along biggest principal stress direction arrangement Horizontal Well, well spacing 500m, array pitch 200m, 600 meters of horizontal well length.For
Horizontal Well row is arranged well of handling up every well, adjacent level Jing Jing is arranged, and well of handling up is interlaced.Using the more cluster volumes of segmentation
Pressure break mode carries out reservoir reconstruction to horizontal well, and fracturing fluid uses slippery water fracturing fluid, and number of segment 12, sand feeding amount 600m is transformed3, enter
Ground liquid measure 6000m3, the row of returning leads 40%, average single hop operational discharge capacity 5m3/ min, average single hop sand feeding amount 50m3。
Handle up well AP83 imbibition oil recovery technique the specific steps are:
1) when reservoir pressure is down to 9.5MPa, sand-flushing is carried out to the well AP83 that handles up first, later with 120m3/ d note
Water is filled the water to reservoir, well near wellbore zone strata pressure of improving the standard, while being driven to adjacent producing well AP48 and AP84
It replaces, reaches 5100m when filling the water the 43rd day cumulative water injected3When stop water filling, cumulative water injected at this time is approximately equal to failure and opens
Adopt the cumulative liquid production in stage.
2) after filling the water, well AP83 closing well of handling up, bored well 45 days starts grease replacement process and pressure wave inside reservoir
Diffusion process.It is that difficult recover the oil enters hypertonic channel in matrix by imbibition metathesis;By pressure wave divergence, to adjacent
Producing well AP48 and AP84 play the role of displacement, and difficulty between well is made to recover the oil to offset well push.
3) the opening well and making production stage, with 12m3/ d daily fluid production rate is exploited, the stratum in well AP83 control area of handling up
Closing well stops this round and handles up when pressure drops to 9.5MPa, into the second wheel water filling, bored well, oil recovery process.
During the well AP83 that handles up is filled the water, adjacent producing well AP48 and AP84 close a well in.It handles up and the bored well of well AP83 and adopts
During oil, adjacent producing well AP48 is always maintained to be exploited with 6m3/d daily fluid production rate, and adjacent producing well AP84 is protected always
It holds and is exploited with 10m3/d daily fluid production rate.Fig. 4 is that handle up in the embodiment of the present application Production development curve of well and producing well shows
It is intended to, it can be seen that in the well AP83 water flood recovery stage of handling up, handle up well AP83 and adjacent producing well AP48 and AP84 pairs
The variation of daily fluid production rate, daily oil production and the water content answered.
Measure terminates initial stage, and AP83 days oil-producings of well of handling up rise to 5.17t from 0.83t, and handle up accumulative increasing oil 644.21t.Phase
Adjacent AP48 days oil-producings of producing well rise to 4.22t from 2.67t, and matrix water drive is accumulative to increase oil 428.51t.Adjacent producing well AP84
Day oil-producing rises to 9.1t from 2.33t, and matrix water drive is accumulative to increase oil 1157.84t.Measure effect is obvious, it can be seen that imbibition+displacement
Development mode can reasonable supplement stratum energy, the difficulty between well that can utmostly tap the latent power on well adopts fine and close oily potentiality, improves
Ultimate recovery.
Fig. 5 is the exploitation effect schematic diagram of the application one embodiment mesolow compact oil reservoir, as shown in figure 5, right in figure
The scale PRES at upper angle can indicate different oil saturations, and the horizontal well W2 of centre can indicate well of handling up in figure,
Horizontal well W1, W3 of the right and left can indicate producing well.As can be seen from the figure there are different journeys in oil saturation field between well
The variation of degree, the water energy infused in the well that illustrates to handle up are driven to all areas between well, allow the crude oil between well to flow to pit shaft extraction and come, so that
Crude oil between well is adequately employed, and the whole recovery ratio of low pressure densification oil reservoir is improved.
In addition, the application one recovery scheme also proposed to the embodiment of the present application in implementing has carried out numerical simulation reality
It tests, on the basis of volume fracturing increases reservoir reconstruction volume, implements the mode (handling up every well spacing) of " drive to seep and combine " to well group
It is developed.Fig. 6 be the application one implement in different development plans development effectiveness contrast schematic diagram, as shown in fig. 6, can be with
Find out that the recovery percent of reserves change rate of " imbibition+displacement " recovery method in the embodiment of the present application is apparently higher than original displacement in flooding
The superiority for combining mining method is seeped in curvilinear motion rate, that is, the drive for illustrating that the embodiment of the present application proposes.
On this basis, influence of the removal volume fracturing to recovery percent of reserves, to imbibition effect and displacement effect to total output
Contribution done quantization comparison, as shown in table 1, it can be seen that after changing waterflooding extraction mode, be still the contribution rate of displacement
In the highest flight, however as the increase for round of handling up and the growth of development time, imbibition effect improves the contribution of recovery percent of reserves
Rate is gradually increased.
As it can be seen that the measure of this transformation waterflooding extraction mode has utmostly played displacement effect and imbibition effect, solve
The development contradiction that compact oil reservoir waterflooding extraction easy water breakthrough, injection-production relation difficulty are established, while it is independent to substantially reduce compact oil reservoir
The time recovered the oil by imbibition effect.
The different withdrawal mechanism recovery percent of reserves contrast tables of table 1
Recovery method provided by the embodiments of the present application is bred in the valuable practical experience of the fine and close oil exploitation of Changqing oilfields
And go out, there is extremely strong mining site adaptability, can be applied directly among mining site development plan.
The recovery method of low pressure densification oil reservoir provided by the present application, by the way that Horizontal Well row is suitably arranged, and will be horizontal
Horizontal well in Jing Jing row is set to handle up well and producing well.To each in Horizontal Well row handle up well and producing well into
After row volume fracturing reservoir reconstruction, fills the water into well of handling up, acted on using imbibition, so that well of handling up recovers the oil, simultaneously because
Handle up the interval setting of well and producing well, handle up well water flood recovery when, pressure wave divergence can be relied on, adjacent producing well is risen
It is acted on to displacement, pushes difficult recover the oil between well to adjacent producing well, displacement producing well recovers the oil.Both imbibition oil recovery had been played
The advantage of technology, while hypotonic or Oil in Super-low Permeability oil reservoir exploitation utmostly is accelerated using displacement between well, it avoids and relies only on
Imbibition acts on or relies only on displacement effect and is difficult to the fine and close oil of Efficient Development ultra-low penetration, is difficult to improve the problem of ultimate recovery,
Oil field stable high yield is ensured.Meanwhile handle up well and producing well are set for entire low pressure densification oil reservoir interval, in well note of handling up
When water, the variation of inter-well pressure wave is realized, sweep efficiency is improved, while carrying out displacement between well, imbibition is finally both utilized
The oil of effect extraction near wellbore zone, the oil between well has been produced further through displacement, improves the whole extraction journey of low pressure densification oil reservoir
Degree and recovery ratio.It solves to rely only on imbibition effect or rely only on displacement effect and is difficult to the fine and close oil of Efficient Development ultra-low penetration, hardly possible
The problem of to improve ultimate recovery, provides and opens the entirety for the fine and close oil of ultra-low penetration that imbibition plays jointly with displacement effect
Forwarding method.
Based on the recovery method of low pressure densification oil reservoir described above, this specification one or more embodiment also provides one
The quarrying apparatus of kind low pressure densification oil reservoir.The device may include the system for having used this specification embodiment the method
(including distributed system), software (application), module, component, server, client etc. simultaneously combine the necessary dress for implementing hardware
It sets.Based on same innovation thinking, for example following implementation of the device in one or more embodiments that this specification embodiment provides
Described in example.Since the implementation that device solves the problems, such as is similar to method, the reality of the specific device of this specification embodiment
The implementation that may refer to preceding method is applied, overlaps will not be repeated.Used below, term " unit " or " module " can
To realize the combination of the software and/or hardware of predetermined function.Although device described in following embodiment is preferably come with software
It realizes, but the realization of the combination of hardware or software and hardware is also that may and be contemplated.
Specifically, Fig. 7 is that the modular structure of quarrying apparatus one embodiment of low pressure densification oil reservoir provided by the present application is shown
It is intended to, as shown in fig. 7, the quarrying apparatus of low pressure densification oil reservoir provided herein includes well row's setup module 61, volume changes
Modeling block 72, production module 73.
Well arranges setup module 71, can be used for the geology pressure distribution situation according to oil reservoir location to be exploited, setting
Horizontal Well is arranged, and includes handle up well and producing well, handle up well and the producing well interval setting in the Horizontal Well row;
Module 72 is transformed in volume, can be used for well and the producing well progress volume fracturing reservoir reconstruction handled up;
Production module 73, the well that can be used for handling up described in carries out water filling imbibition and recovers the oil, and is acted on using displacement between well
The adjacent producing well of well of handling up described in displacement carries out displacement oil recovery.
The quarrying apparatus of low pressure densification oil reservoir provided by the present application, by the way that Horizontal Well row is suitably arranged, and will be horizontal
Horizontal well in Jing Jing row is set to handle up well and producing well.To each in Horizontal Well row handle up well and producing well into
After row volume fracturing reservoir reconstruction, fills the water into well of handling up, acted on using imbibition, so that well of handling up recovers the oil, simultaneously because
Handle up the interval setting of well and producing well, handle up well water flood recovery when, pressure wave divergence can be relied on, adjacent producing well is risen
It is acted on to displacement, pushes difficult recover the oil between well to adjacent producing well, displacement producing well recovers the oil.Both imbibition oil recovery had been played
The advantage of technology, while hypotonic or Oil in Super-low Permeability oil reservoir exploitation utmostly is accelerated using displacement between well, it avoids and relies only on
Imbibition acts on or relies only on displacement effect and is difficult to the fine and close oil of Efficient Development ultra-low penetration, is difficult to improve the problem of ultimate recovery,
Oil field stable high yield is ensured.Meanwhile handle up well and producing well are set for entire low pressure densification oil reservoir interval, in well note of handling up
When water, the variation of inter-well pressure wave is realized, sweep efficiency is improved, while carrying out displacement between well, imbibition is finally both utilized
The oil of effect extraction near wellbore zone, the oil between well has been produced further through displacement, improves the whole extraction journey of low pressure densification oil reservoir
Degree and recovery ratio.
Fig. 8 is the structural schematic diagram of production module in the application one embodiment, as shown in figure 8, in above-described embodiment
On the basis of, the production module 73 includes:
Bored well unit 81 is filled the water, can be used for into the well of handling up filling the water, when water filling end of term pressure is equal to prime stratum
When pressure, stop water filling, closes well of handling up, carry out bored well;
Oil-producing unit 82, can be used for judging whether the closed time of the bored well reaches preset time, if so, to institute
Well of handling up is stated to be exploited;
Loop control unit 83 can be used for judging that strata pressure is less than or equal in the corresponding control area of well of handling up
When preset pressure, then stop recovering the oil, the well of handling up be filled the water again, bored well, oil recovery.
The quarrying apparatus of low pressure densification oil reservoir provided by the present application, by the way that Horizontal Well row is suitably arranged, and will be horizontal
Horizontal well in Jing Jing row is set to handle up well and producing well.By the water filling recycled to well of handling up, bored well is adopted
Oil is acted on using imbibition, so that well of handling up recovers the oil, simultaneously because the interval setting of handle up well and producing well, well of handling up note
When hydromining oil, pressure wave divergence can be relied on, plays the role of displacement to adjacent producing well, adopt difficult recover the oil between well to adjacent
Oil well push, displacement producing well recover the oil.Both the advantage of imbibition oil recovery technique had been played, while utmostly having been driven using between well
For hypotonic or Oil in Super-low Permeability oil reservoir exploitation is accelerated, avoid rely only on imbibition effect or rely only on displacement effect be difficult to efficiently open
The fine and close oil of hair ultra-low penetration is difficult to improve the problem of ultimate recovery, has ensured oil field stable high yield.
Fig. 9 is the modular structure schematic diagram of another embodiment of the quarrying apparatus of low pressure densification oil reservoir provided by the present application,
As shown in figure 9, on the basis of the above embodiments, the quarrying apparatus of the low pressure densification oil reservoir further includes:
Well arranges reset cell 91, can be used for judging whether the water flood recovery number is greater than preset times, if so, right
It is described to handle up well and the producing well re-starts volume fracturing reservoir reconstruction, and by the position of the handle up well and the producing well
It sets and is interchangeable.
The quarrying apparatus of low pressure densification oil reservoir provided by the present application, under the economy that exploitation can be reached to avoid individual well in this way
Limit, cost are excessively high.By volume fracturing reservoir reconstruction again, and the position of water injection well and producing well is replaced, so that each
Horizontal well can be carried out imbibition and displacement is recovered the oil, and improve the recovery ratio of low pressure densification oil reservoir entirety.
On the basis of the above embodiments, the production module is specifically used for:
The time that the water flood recovery of the well of handling up in the Horizontal Well row is arranged is different.
The quarrying apparatus of low pressure densification oil reservoir provided by the present application, when well of handling up carries out water flood recovery, adjacent oil recovery
Well drives a well carry out displacement oil recovery simultaneously.It is stewing the different note of each well of handling up can be set with development behavior according to each well geological condition
It adopts the time, has both played the advantage of imbibition oil recovery technique, while utmostly accelerating hypotonic or Oil in Super-low Permeability using displacement between well
The exploitation of oil reservoir, avoids to rely only on imbibition effect or rely only on displacement effect and is difficult to the fine and close oil of Efficient Development ultra-low penetration, difficult
The problem of to improve ultimate recovery, has ensured oil field stable high yield.
It should be noted that device described above can also include other embodiment party according to the description of embodiment of the method
Formula, concrete implementation mode are referred to the description of related method embodiment, do not repeat one by one herein.
It is above-mentioned that this specification specific embodiment is described.Other embodiments are in the scope of the appended claims
It is interior.In some cases, the movement recorded in detail in the claims or step can be come according to the sequence being different from embodiment
It executes and desired result still may be implemented.In addition, process depicted in the drawing not necessarily require show it is specific suitable
Sequence or consecutive order are just able to achieve desired result.In some embodiments, multitasking and parallel processing be also can
With or may be advantageous.
The embodiment of the present application also provides a kind of computer storage mediums, are stored thereon with computer program, the calculating
Machine program is performed, and realizes the recovery method of above-mentioned low pressure densification oil reservoir, is such as realized:According to oil reservoir location to be exploited
Geology pressure distribution situation, setting Horizontal Well are arranged, and include handle up well and producing well, the well of handling up in the Horizontal Well row
It is arranged with the producing well interval;To well and the producing well progress volume fracturing reservoir reconstruction handled up;It is gulped down using described
Tu Jing carries out water filling imbibition and recovers the oil, and carries out displacement using the adjacent producing well of well of handling up described in displacement effect displacement between well and adopt
Oil.
This specification embodiment provide above-mentioned low pressure densification oil reservoir recovery method or device can in a computer by
Processor executes corresponding program instruction to realize, such as using the c++ language of windows operating system in the realization of the end PC, linux
System is realized or other are for example realized using android, iOS system programming language in intelligent terminal, and is based on quantum
Processing logic realization of computer etc..A kind of another embodiment of the quarrying apparatus for low pressure densification oil reservoir that this specification provides
In, Figure 10 is the modular structure schematic diagram of the quarrying apparatus embodiment of another low pressure densification oil reservoir provided by the present application, is such as schemed
Shown in 10, the quarrying apparatus for the low pressure densification oil reservoir that another embodiment of the application provides may include processor 101 and be used for
The memory 102 of storage processor executable instruction,
Processor 101 and memory 102 pass through bus 103 and complete mutual communication;
The processor 101 is used to call the program instruction in the memory 102, to execute above-mentioned each low pressure densification oil
Method provided by the recovery method embodiment of hiding, for example including:It is distributed according to the geology pressure of oil reservoir location to be exploited
Situation, setting Horizontal Well are arranged, and include handle up well and producing well, well and the producing well handled up in the Horizontal Well row
Interval setting;To well and the producing well progress volume fracturing reservoir reconstruction handled up;It is filled the water using the well of handling up
Imbibition is recovered the oil, and carries out displacement oil recovery using the adjacent producing well of well of handling up described in displacement effect displacement between well.
It should be noted that specification device described above can also include it according to the description of related method embodiment
His embodiment, concrete implementation mode are referred to the description of embodiment of the method, do not repeat one by one herein.In the application
Various embodiments are described in a progressive manner, and the same or similar parts between the embodiments can be referred to each other, often
What a embodiment stressed is the difference from other embodiments.For hardware+program class embodiment,
Since it is substantially similar to the method embodiment, so being described relatively simple, related place is said referring to the part of embodiment of the method
It is bright.
This specification embodiment is not limited to meet industry communication standard, standard computer data processing sum number
According to situation described in storage rule or this specification one or more embodiment.The right way of conduct is made in certain professional standards or use by oneself
In formula or the practice processes of embodiment description embodiment modified slightly also may be implemented above-described embodiment it is identical, it is equivalent or
The implementation result being anticipated that after close or deformation.Using these modifications or deformed data acquisition, storage, judgement, processing side
The embodiment of the acquisitions such as formula still may belong within the scope of the optional embodiment of this specification embodiment.
In the 1990s, the improvement of a technology can be distinguished clearly be on hardware improvement (for example,
Improvement to circuit structures such as diode, transistor, switches) or software on improvement (improvement for method flow).So
And with the development of technology, the improvement of current many method flows can be considered as directly improving for hardware circuit.
Designer nearly all obtains corresponding hardware circuit by the way that improved method flow to be programmed into hardware circuit.Cause
This, it cannot be said that the improvement of a method flow cannot be realized with hardware entities module.For example, programmable logic device
(Programmable Logic Device, PLD) (such as field programmable gate array (Field Programmable Gate
Array, FPGA)) it is exactly such a integrated circuit, logic function determines device programming by user.By designer
Voluntarily programming comes a digital display circuit " integrated " on a piece of PLD, designs and makes without asking chip maker
Dedicated IC chip.Moreover, nowadays, substitution manually makes IC chip, this programming is also used instead mostly " is patrolled
Volume compiler (logic compiler) " software realizes that software compiler used is similar when it writes with program development,
And the source code before compiling also write by handy specific programming language, this is referred to as hardware description language
(Hardware Description Language, HDL), and HDL is also not only a kind of, but there are many kind, such as ABEL
(Advanced Boolean Expression Language)、AHDL(Altera Hardware Description
Language)、Confluence、CUPL(Cornell University Programming Language)、HDCal、JHDL
(Java Hardware Description Language)、Lava、Lola、MyHDL、PALASM、RHDL(Ruby
Hardware Description Language) etc., VHDL (Very-High-Speed is most generally used at present
Integrated Circuit Hardware Description Language) and Verilog.Those skilled in the art also answer
This understands, it is only necessary to method flow slightly programming in logic and is programmed into integrated circuit with above-mentioned several hardware description languages,
The hardware circuit for realizing the logical method process can be readily available.
Controller can be implemented in any suitable manner, for example, controller can take such as microprocessor or processing
The computer for the computer readable program code (such as software or firmware) that device and storage can be executed by (micro-) processor can
Read medium, logic gate, switch, specific integrated circuit (Application Specific Integrated Circuit,
ASIC), the form of programmable logic controller (PLC) and insertion microcontroller, the example of controller includes but is not limited to following microcontroller
Device:ARC 625D, Atmel AT91SAM, Microchip PIC18F26K20 and Silicone Labs C8051F320, are deposited
Memory controller is also implemented as a part of the control logic of memory.It is also known in the art that in addition to
Pure computer readable program code mode is realized other than controller, can be made completely by the way that method and step is carried out programming in logic
Controller is obtained to come in fact in the form of logic gate, switch, specific integrated circuit, programmable logic controller (PLC) and insertion microcontroller etc.
Existing identical function.Therefore this controller is considered a kind of hardware component, and to including for realizing various in it
The device of function can also be considered as the structure in hardware component.Or even, it can will be regarded for realizing the device of various functions
For either the software module of implementation method can be the structure in hardware component again.
System, device, module or the unit that above-described embodiment illustrates can specifically realize by computer chip or entity,
Or it is realized by the product with certain function.It is a kind of typically to realize that equipment is computer.Specifically, computer for example may be used
Think personal computer, laptop computer, vehicle-mounted human-computer interaction device, cellular phone, camera phone, smart phone, individual
Digital assistants, media player, navigation equipment, electronic mail equipment, game console, tablet computer, wearable device or
The combination of any equipment in these equipment of person.
Although this specification one or more embodiment provides the method operating procedure as described in embodiment or flow chart,
It but may include more or less operating procedure based on conventional or without creativeness means.The step of being enumerated in embodiment
Sequence is only one of numerous step execution sequence mode, does not represent and unique executes sequence.Device in practice or
When end product executes, can be executed according to embodiment or the execution of method shown in the drawings sequence or parallel (such as it is parallel
The environment of processor or multiple threads, even distributed data processing environment).The terms "include", "comprise" or its
Any other variant is intended to non-exclusive inclusion so that include the process, methods of a series of elements, product or
Equipment not only includes those elements, but also including other elements that are not explicitly listed, or further include for this process,
Method, product or the intrinsic element of equipment.In the absence of more restrictions, being not precluded is including the element
There is also other identical or equivalent elements in process, method, product or equipment.The first, the second equal words are used to indicate name
Claim, and does not indicate any particular order.
For convenience of description, it is divided into various modules when description apparatus above with function to describe respectively.Certainly, implementing this
The function of each module can be realized in the same or multiple software and or hardware when specification one or more, it can also be with
The module for realizing same function is realized by the combination of multiple submodule or subelement etc..Installation practice described above is only
It is only illustrative, for example, in addition the division of the unit, only a kind of logical function partition can have in actual implementation
Division mode, such as multiple units or components can be combined or can be integrated into another system or some features can be with
Ignore, or does not execute.Another point, shown or discussed mutual coupling, direct-coupling or communication connection can be logical
Some interfaces are crossed, the indirect coupling or communication connection of device or unit can be electrical property, mechanical or other forms.
The present invention be referring to according to the method for the embodiment of the present invention, the process of device (system) and computer program product
Figure and/or block diagram describe.It should be understood that every one stream in flowchart and/or the block diagram can be realized by computer program instructions
The combination of process and/or box in journey and/or box and flowchart and/or the block diagram.It can provide these computer programs
Instruct the processor of general purpose computer, special purpose computer, Embedded Processor or other programmable data processing devices to produce
A raw machine, so that being generated by the instruction that computer or the processor of other programmable data processing devices execute for real
The device for the function of being specified in present one or more flows of the flowchart and/or one or more blocks of the block diagram.
These computer program instructions, which may also be stored in, is able to guide computer or other programmable data processing devices with spy
Determine in the computer-readable memory that mode works, so that it includes referring to that instruction stored in the computer readable memory, which generates,
Enable the manufacture of device, the command device realize in one box of one or more flows of the flowchart and/or block diagram or
The function of being specified in multiple boxes.
These computer program instructions also can be loaded onto a computer or other programmable data processing device, so that counting
Series of operation steps are executed on calculation machine or other programmable devices to generate computer implemented processing, thus in computer or
The instruction executed on other programmable devices is provided for realizing in one or more flows of the flowchart and/or block diagram one
The step of function of being specified in a box or multiple boxes.
In a typical configuration, calculating equipment includes one or more processors (CPU), input/output interface, net
Network interface and memory.
Memory may include the non-volatile memory in computer-readable medium, random access memory (RAM) and/or
The forms such as Nonvolatile memory, such as read-only memory (ROM) or flash memory (flash RAM).Memory is computer-readable medium
Example.
Computer-readable medium includes permanent and non-permanent, removable and non-removable media can be by any method
Or technology come realize information store.Information can be computer readable instructions, data structure, the module of program or other data.
The example of the storage medium of computer includes, but are not limited to phase change memory (PRAM), static random access memory (SRAM), moves
State random access memory (DRAM), other kinds of random access memory (RAM), read-only memory (ROM), electric erasable
Programmable read only memory (EEPROM), flash memory or other memory techniques, read-only disc read only memory (CD-ROM) (CD-ROM),
Digital versatile disc (DVD) or other optical storage, magnetic cassettes, tape magnetic disk storage, graphene stores or other
Magnetic storage device or any other non-transmission medium, can be used for storage can be accessed by a computing device information.According to herein
In define, computer-readable medium does not include temporary computer readable media (transitory media), such as the data of modulation
Signal and carrier wave.
It will be understood by those skilled in the art that this specification one or more embodiment can provide as method, system or calculating
Machine program product.Therefore, this specification one or more embodiment can be used complete hardware embodiment, complete software embodiment or
The form of embodiment combining software and hardware aspects.Moreover, this specification one or more embodiment can be used at one or
It is multiple wherein include computer usable program code computer-usable storage medium (including but not limited to magnetic disk storage,
CD-ROM, optical memory etc.) on the form of computer program product implemented.
This specification one or more embodiment can computer executable instructions it is general on
It hereinafter describes, such as program module.Generally, program module includes executing particular task or realization particular abstract data type
Routine, programs, objects, component, data structure etc..This this specification one can also be practiced in a distributed computing environment
Or multiple embodiments, in these distributed computing environments, by being held by the connected remote processing devices of communication network
Row task.In a distributed computing environment, program module can be located at the local and remote computer including storage equipment
In storage medium.
All the embodiments in this specification are described in a progressive manner, same and similar portion between each embodiment
Dividing may refer to each other, and each embodiment focuses on the differences from other embodiments.Especially for system reality
For applying example, since it is substantially similar to the method embodiment, so being described relatively simple, related place is referring to embodiment of the method
Part explanation.In the description of this specification, reference term " one embodiment ", " some embodiments ", " example ",
The description of " specific example " or " some examples " etc. means specific features described in conjunction with this embodiment or example, structure, material
Or feature is contained at least one embodiment or example of this specification.In the present specification, to the signal of above-mentioned term
Property statement be necessarily directed to identical embodiment or example.Moreover, particular features, structures, materials, or characteristics described
It may be combined in any suitable manner in any one or more of the embodiments or examples.In addition, without conflicting with each other, this
The technical staff in field can be by the spy of different embodiments or examples described in this specification and different embodiments or examples
Sign is combined.
The foregoing is merely the embodiments of this specification one or more embodiment, are not limited to book explanation
Book one or more embodiment.To those skilled in the art, this specification one or more embodiment can have various
Change and variation.All any modification, equivalent replacement, improvement and so within the spirit and principles of the present application should all include
Within scope of the claims.
Claims (10)
1. a kind of recovery method of low pressure densification oil reservoir, which is characterized in that
According to the geology pressure distribution situation of oil reservoir location to be exploited, Horizontal Well is set and is arranged, in the Horizontal Well row
Including well and the producing well handled up, handle up well and the producing well interval setting;
To well and the producing well progress volume fracturing reservoir reconstruction handled up;
Water filling imbibition is carried out using the well of handling up to recover the oil, and utilizes the adjacent oil recovery of well of handling up described in displacement effect displacement between well
Well carries out displacement oil recovery.
2. a kind of recovery method of low pressure densification oil reservoir as described in claim 1, which is characterized in that handle up described in the utilization
Well carries out water filling imbibition and recovers the oil, including:
It is filled the water into the well of handling up, when filling the water end of term pressure equal to original formation pressure, stops water filling, handle up described in closing
Well carries out bored well;
Judge whether the closed time of the bored well reaches preset time, if so, exploiting to the well of handling up;
Whether strata pressure in the corresponding control area of well of handling up described in judgement is less than or equal to preset pressure, if so, stopping adopting
Oil again fills the water the well of handling up, bored well, oil recovery.
3. a kind of recovery method of low pressure densification oil reservoir as described in claim 1, which is characterized in that the method also includes:
Judge whether the water flood recovery number is greater than preset times, if so, handling up well and the producing well again to described
Volume fracturing reservoir reconstruction is carried out, and the position of handle up well and the producing well is interchangeable.
4. a kind of recovery method of low pressure densification oil reservoir as described in claim 1, which is characterized in that handle up described in the utilization
Well carries out water filling imbibition and recovers the oil, including:
The time of the water flood recovery of well of handling up in the Horizontal Well row is different.
5. a kind of quarrying apparatus of low pressure densification oil reservoir, which is characterized in that including:
Well arranges setup module, and for the geology pressure distribution situation according to oil reservoir location to be exploited, setting Horizontal Well is arranged,
It include handle up well and producing well, handle up well and the producing well interval setting in the Horizontal Well row;
Module is transformed in volume, for well and the producing well progress volume fracturing reservoir reconstruction handled up;
Production module carries out water filling imbibition for well of handling up described in and recovers the oil, and gulps down using described in displacement effect displacement between well
It spits the adjacent producing well of well and carries out displacement oil recovery.
6. a kind of quarrying apparatus of low pressure densification oil reservoir as claimed in claim 5, which is characterized in that the production module packet
It includes:
Bored well unit is filled the water, for being filled the water into the well of handling up, when filling the water end of term pressure equal to original formation pressure, is stopped
Water filling closes well of handling up, carries out bored well;
Oil-producing unit, for judging whether the closed time of the bored well reaches preset time, if so, to it is described handle up well into
Row exploitation;
Loop control unit, for judging that strata pressure is less than or equal to preset pressure in the corresponding control area of well of handling up
When, then stop recovering the oil, the well of handling up be filled the water again, bored well, oil recovery.
7. a kind of quarrying apparatus of low pressure densification oil reservoir as claimed in claim 5, which is characterized in that the low pressure densification oil reservoir
Quarrying apparatus further include:
Well arranges reset cell, for judging whether the water flood recovery number is greater than preset times, if so, to the well of handling up
Volume fracturing reservoir reconstruction is re-started with the producing well, and the position of handle up well and the producing well is carried out mutual
It changes.
8. a kind of quarrying apparatus of low pressure densification oil reservoir as claimed in claim 6, which is characterized in that the production module is specific
For:
The time that the water flood recovery of the well of handling up in the Horizontal Well row is arranged is different.
9. a kind of computer storage medium, is stored thereon with computer program, which is characterized in that the computer program is performed
When, realize the described in any item methods of claim 1-4.
10. a kind of quarrying apparatus of low pressure densification oil reservoir, which is characterized in that can be held including processor and for storage processor
The memory of row instruction, the processor are realized when executing described instruction such as any one of Claims 1-4 the method
Step.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2017112143048 | 2017-11-28 | ||
CN201711214304 | 2017-11-28 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108843291A true CN108843291A (en) | 2018-11-20 |
CN108843291B CN108843291B (en) | 2021-11-30 |
Family
ID=64213284
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810506716.7A Active CN108843291B (en) | 2017-11-28 | 2018-05-24 | Exploitation method and device of low-pressure tight oil reservoir |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108843291B (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110469309A (en) * | 2019-08-16 | 2019-11-19 | 中国石油天然气股份有限公司 | A kind of low pressure densification oil reservoir supplement energy fracturing process |
CN111119832A (en) * | 2019-11-18 | 2020-05-08 | 中国石油天然气股份有限公司 | Unstable alternate mining method and device for facing horizontal well pattern |
CN112049624A (en) * | 2019-06-06 | 2020-12-08 | 中国石油天然气股份有限公司 | Method, device, equipment and storage medium for predicting dynamic reserves of oil well |
CN112832726A (en) * | 2021-01-14 | 2021-05-25 | 长江大学 | Tertiary oil recovery method for oil displacement between single-well huff-puff sections of compact oil shale oil horizontal well |
CN113250662A (en) * | 2021-06-17 | 2021-08-13 | 长江大学 | Imbibition oil production method suitable for low-permeability reservoir and laboratory simulation method |
CN113356821A (en) * | 2020-03-06 | 2021-09-07 | 中国石油化工股份有限公司 | Well group development method |
CN114165205A (en) * | 2021-12-06 | 2022-03-11 | 西安石油大学 | Method for calculating cross-well flux of fracturing fluid considering imbibition |
CN115288644A (en) * | 2022-08-22 | 2022-11-04 | 大庆信辰油田技术服务有限公司 | Method for improving crude oil recovery ratio by combining hypotonic reservoir with carbon dioxide huff and puff |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2009014586A1 (en) * | 2007-07-24 | 2009-01-29 | Exxonmobil Upstream Research Company | Use of a heavy petroleum fraction as drive fluid in the recovery of hydrocarbons from a subterranean formation |
CN105756654A (en) * | 2015-12-30 | 2016-07-13 | 中国石油大学(华东) | Water-drive reservoir well network optimization design method |
CN105888630A (en) * | 2016-04-29 | 2016-08-24 | 中国石油天然气股份有限公司 | Method for improving recovery efficiency by huff-puff oil recovery of tight oil fracturing horizontal well |
CN106246150A (en) * | 2016-09-18 | 2016-12-21 | 中国石油天然气股份有限公司 | Oil field fracturing transformation method |
CN106437642A (en) * | 2016-05-06 | 2017-02-22 | 中国石油天然气股份有限公司 | Injection-production asynchronous mining method for horizontal well of fractured reservoir |
CN106593400A (en) * | 2016-12-29 | 2017-04-26 | 中国石油天然气股份有限公司 | Directional well spacing method for volume fracturing of ultra-low permeability tight oil reservoir |
CN107390268A (en) * | 2017-07-05 | 2017-11-24 | 中国石油天然气股份有限公司 | Identification method and device for low-permeability conglomerate diagenetic trap |
-
2018
- 2018-05-24 CN CN201810506716.7A patent/CN108843291B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2009014586A1 (en) * | 2007-07-24 | 2009-01-29 | Exxonmobil Upstream Research Company | Use of a heavy petroleum fraction as drive fluid in the recovery of hydrocarbons from a subterranean formation |
CN105756654A (en) * | 2015-12-30 | 2016-07-13 | 中国石油大学(华东) | Water-drive reservoir well network optimization design method |
CN105888630A (en) * | 2016-04-29 | 2016-08-24 | 中国石油天然气股份有限公司 | Method for improving recovery efficiency by huff-puff oil recovery of tight oil fracturing horizontal well |
CN106437642A (en) * | 2016-05-06 | 2017-02-22 | 中国石油天然气股份有限公司 | Injection-production asynchronous mining method for horizontal well of fractured reservoir |
CN106246150A (en) * | 2016-09-18 | 2016-12-21 | 中国石油天然气股份有限公司 | Oil field fracturing transformation method |
CN106593400A (en) * | 2016-12-29 | 2017-04-26 | 中国石油天然气股份有限公司 | Directional well spacing method for volume fracturing of ultra-low permeability tight oil reservoir |
CN107390268A (en) * | 2017-07-05 | 2017-11-24 | 中国石油天然气股份有限公司 | Identification method and device for low-permeability conglomerate diagenetic trap |
Non-Patent Citations (1)
Title |
---|
李龙龙 等: ""胡尖山油田AP区块长7致密油吞吐效果评价"", 《石油化工应用》 * |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112049624A (en) * | 2019-06-06 | 2020-12-08 | 中国石油天然气股份有限公司 | Method, device, equipment and storage medium for predicting dynamic reserves of oil well |
CN112049624B (en) * | 2019-06-06 | 2024-04-30 | 中国石油天然气股份有限公司 | Method, device, equipment and storage medium for predicting dynamic reserve of oil well |
CN110469309A (en) * | 2019-08-16 | 2019-11-19 | 中国石油天然气股份有限公司 | A kind of low pressure densification oil reservoir supplement energy fracturing process |
CN110469309B (en) * | 2019-08-16 | 2021-08-27 | 中国石油天然气股份有限公司 | Low-pressure tight oil reservoir energy-supplementing fracturing method |
CN111119832A (en) * | 2019-11-18 | 2020-05-08 | 中国石油天然气股份有限公司 | Unstable alternate mining method and device for facing horizontal well pattern |
CN113356821A (en) * | 2020-03-06 | 2021-09-07 | 中国石油化工股份有限公司 | Well group development method |
CN112832726A (en) * | 2021-01-14 | 2021-05-25 | 长江大学 | Tertiary oil recovery method for oil displacement between single-well huff-puff sections of compact oil shale oil horizontal well |
US11352866B1 (en) * | 2021-01-14 | 2022-06-07 | Yangtze University | Enhanced oil recovery method with single well huff and puff and inter-segment oil displacement after horizontal well fracturing |
CN113250662A (en) * | 2021-06-17 | 2021-08-13 | 长江大学 | Imbibition oil production method suitable for low-permeability reservoir and laboratory simulation method |
CN114165205A (en) * | 2021-12-06 | 2022-03-11 | 西安石油大学 | Method for calculating cross-well flux of fracturing fluid considering imbibition |
CN115288644A (en) * | 2022-08-22 | 2022-11-04 | 大庆信辰油田技术服务有限公司 | Method for improving crude oil recovery ratio by combining hypotonic reservoir with carbon dioxide huff and puff |
CN115288644B (en) * | 2022-08-22 | 2023-03-10 | 大庆信辰油田技术服务有限公司 | Method for improving crude oil recovery ratio by combining hypotonic reservoir with carbon dioxide huff and puff |
Also Published As
Publication number | Publication date |
---|---|
CN108843291B (en) | 2021-11-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108843291A (en) | Exploitation method and device of low-pressure tight oil reservoir | |
Zhongxing et al. | Development modes of Triassic Yanchang formation Chang 7 member tight oil in Ordos Basin, NW China | |
CN105888630B (en) | Method for improving recovery efficiency by huff-puff oil recovery of tight oil fracturing horizontal well | |
Agrawal et al. | Impact of liquid loading in hydraulic fractures on well productivity | |
Qun et al. | The “fracture-controlled reserves” based stimulation technology for unconventional oil and gas reservoirs | |
Sanchez | Management of water alternating gas (WAG) injection projects | |
CN101952544B (en) | Method of hydraulic fracturing of horizontal wells, resulting in increased production | |
CN106246150B (en) | Oil field fracturing transformation method | |
US3402768A (en) | Oil recovery method using a nine-spot well pattern | |
CA2523474C (en) | Method for improved vertical sweep of oil reservoirs | |
Fragoso et al. | Improving recovery of liquids from shales through gas recycling and dry gas injection | |
CN103670350B (en) | A kind of variable intensity water injection exploitation method for carbonate fracture-cavity oil reservoir | |
CN105696997A (en) | Method for achieving interval waterflood swallowing-spitting oil exploitation among multi-stage fracturing horizontal well fractures | |
CN106437642A (en) | Injection-production asynchronous mining method for horizontal well of fractured reservoir | |
US11274538B2 (en) | Methods and systems for ballooned hydraulic fractures and complex toe-to-heel flooding | |
CN105756634A (en) | Method for achieving interval waterflood swallowing-spitting oil exploitation among multi-stage fractured horizontal well cracks | |
CN104481473B (en) | Gas drive reservoir injection and production method and device | |
CN110259421A (en) | Fractured compact oil reservoir water injection energy supplementing method | |
CN105863581A (en) | Oil extraction method for controlling water and increasing oil of high-water-content oil well of buried hill oil reservoir | |
CN112302608B (en) | Horizontal well before-pressure injection fluid development method based on three-dimensional fracturing well pattern | |
CN113743037A (en) | Low-permeability reservoir water injection induced dynamic fracture variable flow conductivity calculation method | |
Mahmoud et al. | Range of operability of gas-assisted gravity drainage process | |
Nakashima et al. | Development of a Giant Carbonate Oil Field, Part 2: Migration from Pressure Maintenance Development to Sweep Oriented IOR Development | |
CN105804710A (en) | Method for improving gas injection driving effect of low-permeability fractured reservoir | |
Doctor et al. | Use of Channel Fracturing Technology Increases Production and Reduces Risks in Horizontal Wellbore Completions-First Experience in Russia, South-Priobskoe Oil Field |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |