A kind of shale gas pressure break ladder sand adding method
Technical field
The present invention relates to shale gas exploration and development fracturing engineering technical field, more particularly to a kind of shale gas pressure break ladder adds
Sand method.
Background technology
In shale gas reservoir fracturing improvement, add sand technique frequently with slug formula, that is, pump one plus sand slug, then pump
One liquid slug, and so on, sand ratio is stepped up, and is characterized in one plus the constant grit dosage of sand slug, it is impossible to
Anticipation adds sand critical point, easily causes sand plug, increases subsequent construction operation and engineering cost, affects reservoir reconstruction effect.
The content of the invention
In order to overcome the defect of above-mentioned prior art, it is an object of the invention to provide a kind of shale gas pressure break ladder adds sand
Method, using staged sand adding method, effectively prevents reservoir sand plug, reduces construction risk;Explore reservoir and add sand critical point, effectively
Realize building the pressure in seam, strengthen correctional effect;Crack effective support is at utmost completed, the high seepage channel of gas is set up;After guidance
Than design, continuous development well sand ensures that construction is smoothed out.
In order to achieve the above object, the technical scheme is that:
A kind of shale gas pressure break ladder sand adding method, comprises the following steps:
(1), infusion prepad fluid:Using ground high pressure pumping-in equipment, to the prepad fluid of pit shaft infusion 5-7 hole volume
Amount, liquid make seam into stratum.
(2), infusion first plus sand slug, prepad fluid enter after stratum makes seam, start proppant stone is added in fracturing fluid
To fill crack, using the sand liquid measure of 2-3 hole volume as one plus sand slug, first adds 60- before sand slug to sand
The sand liquid measure of 80% volume adds sand than A by sand, and than constant, sand is initially 1% than A to sand, 20-40% bodies after first plus sand slug
Long-pending sand liquid measure adds sand than B by sand, and than constant, sand has certain lifting than A compared with sand than B to sand, lifts 1-2%, so completes this section
Ladder adds sand;
(3), first liquid slug of infusion, using the pressure break liquid measure of 1-2 hole volume as a liquid slug, infusion
Into pit shaft, the sand slug that adds for replacing step (2) enters stratum, and by well head pressure data, that observes different sand ratios adds sand section
The pressure trend behind stratum is entered, if pressure shows as oblique line rising and shows that pressure change is gentle, sand ratio is improved sky
Between, into step (4);If pressure shows as closely ramping, pressure rises more than 0.5 MPa/second, shows to carry at this stage
Sand ratio is risen, needs further infusion fracturing fluid to make seam, into step (1);
(4), infusion second plus sand slug, using the sand liquid measure of 2-3 hole volume as one plus sand slug, this slug
The sand liquid measure of front 60-80% volumes adds sand than B by sand, and than constant, after this slug, the sand liquid measure of 20-40% volumes compares C by sand to sand
Plus sand, than constant, sand has certain lifting than B compared with sand than C to sand, lifts 1-2%, so completes this section of ladder and add sand;
(5), second liquid slug of infusion, using the pressure break liquid measure of 1-2 hole volume as a liquid slug, infusion
Into pit shaft, the sand slug that adds for replacing step (4) enters stratum, and by well head pressure data, that observes different sand ratios adds sand section
Enter the pressure trend behind stratum;
(6), repeat step (4) completes each to step (5) 15-20 time specifically to reach FRACTURING DESIGN sand feeding amount to require
Stage adds sand, last infusion displacement fluid to complete whole pressing crack construction task.
In any one liquid slug, plus after sand slug enters stratum, operation pressure is steady, is held essentially constant, shows
Stratum adds grittiness good, increases to 3 or more different sand ratios, progressively carry according to the increment of 1-2% in next plus sand slug
Rise, increase the sand amount and liquid sand-transport effeciency in fracturing reform.
Described preposition liquid measure and fracturing fluid are slippery water.
The present invention compares traditional slug and adds sand technique, and in same plus sand slug, staged increases one or two sand
Than, by observing well head pressure data variation, if pressure steadily if continue operation, if pressure rises obvious, show that reservoir adds sand
Difficulty, needs further to make seam, or has reached that reservoir is critical plus sand point.By ladder plus the process of sand, being capable of anticipation
Subsequently add sand space, lift liquid sand-transport effeciency, exploration stratum is critical to add sand point.Meanwhile, by controllable high sand ratio, it is capable of achieving
It is of short duration in crack to build the pressure, crack net pressure is improved, strengthens reservoir reconstruction effect.
Specific embodiment
The ladder that certain mouthful of shale gas well fracturing is presented herein below adds sand pump note program (general introduction), does furtherly as embodiment
It is bright.
Embodiment one
Table 1 adds sand pump note program (general introduction) to illustrate with the ladder of certain mouthful of shale gas well fracturing.
The present embodiment is comprised the following steps:
(1), infusion prepad fluid:Using ground high pressure pumping-in equipment, to before 120 side of pit shaft infusion (6 hole volumes)
Liquid measure is put, liquid makes seam into stratum.
(2), infusion first plus sand slug, prepad fluid enter after stratum makes seam, start proppant stone is added in fracturing fluid
Sand adds sand slug as one using the sand liquid measure of 40 sides (2 hole volumes), before first adds sand slug to fill crack
62.5% volume presses sand than 1% plus sand, and sand than constant, after first plus sand slug, press sand and add sand than 2% by 37.5% volume.
(3), first liquid slug of infusion, the pressure break liquid measure using 35 sides (1.7 hole volumes) is used as a liquid segment
Plug, infusion enter pit shaft, and the sand slug that adds for replacing step 2 enters stratum, and pressure slowly rises in oblique line, belongs to normal condition.
(4), infusion second plus sand slug, using the sand liquid measure of 40 sides (2 hole volumes) as second plus sand slug,
Before this slug, 62.5% volume presses sand than 2% plus sand, and sand than constant, after this slug, press sand and add sand, sand ratio than 4% by 37.5% volume
It is constant.
(5), second liquid slug of infusion, the pressure break liquid measure using 35 sides (1.7 hole volumes) is used as a liquid segment
Plug, infusion enter pit shaft, and the sand slug that adds for replacing step 2 enters stratum, and pressure slowly rises in oblique line, belongs to normal condition.
(6), repeat step (4) adds up plus sand slug 20, completes plus sand requirement, last pump to step (5) 18 times
Note displacement fluid, completes whole pressing crack construction task.The table 1 of above-described embodiment one represents that infusion program is as follows:
The well is the first prospect pit of the blank exploration area in Chongqing South East area, by the ladder SAND FRACTURING TECHNOLOGY, can
Effectively anticipation subsequently adds sand space, improves liquid sand-transport effeciency, and desk study stratum is critical plus sand point, is follow-up pressure break side
Case design is there is provided reliable basis.Meanwhile, by controllable high sand ratio, realize it is of short duration in crack build the pressure, improve crack fine pressure
Power, fracturing transformation effect are good.
Embodiment two
The present embodiment pressure break ladder sand adding method see the table below, and infusion program is as follows:
The well is Chongqing South East area shale gas horizontal well, by the ladder SAND FRACTURING TECHNOLOGY, being capable of effective anticipation well
Eye walks the follow-up plus sand space of Different Strata, improves liquid sand-transport effeciency, and the critical plus sand of desk study Different Strata
Point, provides reliable basis for the design of subsequent well well track, design of hydraulic fracturing scheme, meanwhile, in second plus sand slug, apply
Work pressure is steady, is held essentially constant, shows that stratum adds grittiness good, increases to 3 different sand ratios, according to 1% increment progressively
Lifted, increase fracturing reform in sand amount and liquid sand-transport effeciency, realize it is of short duration in crack build the pressure, improve crack net pressure,
Fracturing transformation effect is good.