CN106566909A - 一种转炉用生铁块补炉工艺 - Google Patents

一种转炉用生铁块补炉工艺 Download PDF

Info

Publication number
CN106566909A
CN106566909A CN201610911619.7A CN201610911619A CN106566909A CN 106566909 A CN106566909 A CN 106566909A CN 201610911619 A CN201610911619 A CN 201610911619A CN 106566909 A CN106566909 A CN 106566909A
Authority
CN
China
Prior art keywords
fettling
pig
slag
converter
larger
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610911619.7A
Other languages
English (en)
Inventor
唐庆利
杨立民
朱劲峰
栾学军
孟润泽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tangshan Xin Baotai Iron And Steel Co Ltd
Original Assignee
Tangshan Xin Baotai Iron And Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tangshan Xin Baotai Iron And Steel Co Ltd filed Critical Tangshan Xin Baotai Iron And Steel Co Ltd
Priority to CN201610911619.7A priority Critical patent/CN106566909A/zh
Publication of CN106566909A publication Critical patent/CN106566909A/zh
Pending legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21CPROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
    • C21C5/00Manufacture of carbon-steel, e.g. plain mild steel, medium carbon steel or cast steel or stainless steel
    • C21C5/28Manufacture of steel in the converter
    • C21C5/42Constructional features of converters
    • C21C5/44Refractory linings
    • C21C5/441Equipment used for making or repairing linings
    • C21C5/443Hot fettling; Flame gunning

Abstract

本发明涉及一种转炉补炉工艺,属于冶金行业转炉炼钢技术领域。技术方案是:包含如下工艺步骤:(1)补炉用生铁块:成分质量百分比Si≤0.60%、P≤0.150%、S≤0.060%;(2)当补炉部位侵蚀深度达到50—70mm时进行补炉,(3)补炉炉次要求钢水终点质量百分比C≥0.07%,出钢温度≤1650℃,钢水出净后,炉渣中:MgO≥9%,碱度R≥3.0;(4)补炉时,将补炉用生铁块平铺在补炉部位,铺满为止;(5)铺满后,摇炉至92‑94°,保持3min以上至炉渣完全固化后,进行溅渣护炉操作,完成补炉工艺。与背景技术相比,缩短了补炉时间,提高了转炉作业。降低了喷补料和补炉转的消耗,达到降本增效的目的。

Description

一种转炉用生铁块补炉工艺
技术领域
本发明涉及一种转炉用生铁块补炉工艺,尤其是转炉兑铁侧铁水对炉衬的冲刷部位的补炉工艺,属于冶金行业转炉炼钢技术领域。
背景技术
冶金行业炼钢生产中,转炉钢产量占80%以上,转炉炉龄是转炉炼钢的一个重要指标,因此加强炉体维护是延长炉衬寿命的重要措施。
根据炉衬损坏的程度和部位,可采用不同的护炉、补炉方法,如溅渣护炉、湿法喷补、干法喷补及贴砖渣补等。各种不同方法有不同的特点和适用范围,如溅渣护炉溅渣层均匀,时间短一般为4分钟左右,但无法解决兑铁侧铁水对炉衬的冲刷。湿法喷补和干法喷补可以均匀喷补,但烧结固化时间较长,一般为1小时左右。贴砖渣补一般用来补兑铁面和出钢面,且烧结固化时间也较长,为1小时左右。
现代炼钢厂生产组织一般为单炉对单机,连铸中包的使用时间较长,在40小时左右,转炉补炉1小时的烧结固化使转炉炼钢生产中断,只能在连铸拉下时进行补炉,如果连铸热换就无法补炉,特别是炉役后期,这种情况更加突出。
发明内容
本发明目的是提供一种转炉用生铁块补炉工艺,利用生铁块将炉渣快速冻结在补炉部位并与炉衬粘接,使补炉部位在摇炉过程中多次挂渣,在炉衬表面形成一种高熔点的矿物质,使炉渣与炉衬成为一个整体,达到补炉的效果,解决背景技术中存在的问题。
本实用发明的技术方案是:
一种转炉用生铁块补炉工艺,包含如下工艺步骤:
(1)补炉用生铁块:成分质量百分比Si≤0.60%、P≤0.150%、S≤0.060%,且干燥、无杂质,防止补炉引起安全事故和影响补炉效果,生铁块用量可根据转炉容量大小而定,以满足平铺兑铁侧炉衬冲刷部位即可;
(2)当补炉部位侵蚀深度达到50—70mm时进行补炉,所述补炉部位是指转炉兑铁侧炉衬冲刷部位,也就是转炉装铁侧铁水对炉衬的冲刷部位;
(3)补炉炉次要求钢水终点质量百分比C≥0.07%,出钢温度≤1650℃,钢水出净后,液态的炉渣中:MgO≥9%,碱度R≥3.0;
(4)补炉时,将补炉用生铁块平铺在补炉部位,铺满为止,补炉部位控制在渣线上方,所述渣线是指兑铁后转炉摇直漂浮在铁水上的炉渣与炉衬侵蚀的痕迹;
(5)铺满后,摇炉至92-94°,使补炉部位的生铁块完全浸泡在液态的炉渣中,使补炉部位的生铁块完全浸泡在液态的炉渣中,保持3min以上至炉渣完全固化并与炉衬粘接后,进行溅渣护炉操作,完成补炉工艺,然后进行下炉冶炼。补炉后的第一炉冶炼要化好渣,不返干,过程温度控制合适。
所述溅渣护炉操作是转炉维护常规的技术手段,溅渣护炉是指转炉出钢后摇到吹炼位,加入改质剂使炉渣的熔点和粘度升高,通过高压氮气使炉渣喷溅到炉衬上,降低下次转炉冶炼时对炉衬的侵蚀,一般每一炉溅渣一次。
上述转炉用生铁块补炉工艺,所述步骤(5)铺满后,摇炉至92-94°,保持3-5min后,进行溅渣护炉操作,完成补炉工艺,然后进行下炉冶炼。
采用本发明,充分利用生铁块与炉渣的温度差,使炉渣快速降温充分固化并与炉衬粘接,并停留3-5min。由于生铁块与炉渣的粘合性,使补炉部位在摇炉过程中多次挂渣,在炉衬表面形成一种高熔点的矿物质,使炉渣与炉衬成为一个整体,达到补炉的效果,减缓炉衬砖的侵蚀速度,从而提高转炉的炉龄,由于停留时间短,对转炉炼钢生产节奏影响小。
采用生铁块补炉工艺,由于存在终点增碳的可能性,因此不适宜冶炼超低碳钢。
本发明的有益效果是:比背景技术补炉时间减少50多分钟,缩短了补炉时间,提高了转炉作业。降低了喷补料和补炉转的消耗,为中间包的使用提供了有力的保证。稳定生产节奏,提高劳动生产率,进而达到降本增效的目的。
具体实施方式
以下通过实例对本发明作进一步说明。
一种转炉用生铁块补炉工艺,包含如下工艺步骤:
(1)补炉用生铁块:成分质量百分比Si≤0.60%、P≤0.150%、S≤0.060%,且干燥、无杂质,防止补炉引起安全事故和影响补炉效果,生铁块用量可根据转炉容量大小而定,以满足平铺兑铁侧炉衬冲刷部位即可;
(2)当补炉部位侵蚀深度达到50—70mm时进行补炉,所述补炉部位是指转炉兑铁侧炉衬冲刷部位,也就是转炉装铁侧铁水对炉衬的冲刷部位;
(3)补炉炉次要求钢水终点质量百分比C≥0.07%,出钢温度≤1650℃,钢水出净后,炉渣中:MgO≥9%,碱度R≥3.0;
(4)补炉时,将补炉用生铁块平铺在补炉部位,铺满为止,补炉部位控制在渣线上方,所述渣线是指兑铁后转炉摇直漂浮在铁水上的炉渣与炉衬侵蚀的痕迹;
(5)铺满后,摇炉至92-94°,使补炉部位的生铁块完全浸泡在液态的炉渣中,保持3min以上至炉渣完全固化并与炉衬粘接后,进行溅渣护炉操作,完成补炉工艺,然后进行下炉冶炼。补炉后的第一炉冶炼要化好渣,不返干,过程温度控制合适。
生铁块补炉炉次,在安全方面与贴砖补炉、喷补兑铁侧补炉等一样,执行相关安全规定。

Claims (3)

1.一种转炉用生铁块补炉工艺,其特征在于包含如下工艺步骤:
(1)补炉用生铁块:成分质量百分比Si≤0.60%、P≤0.150%、S≤0.060%;
(2)当补炉部位侵蚀深度达到50—70mm时进行补炉,所述补炉部位是指转炉兑铁侧炉衬冲刷部位;
(3)补炉炉次要求钢水终点质量百分比C≥0.07%,出钢温度≤1650℃,钢水出净后,液态的炉渣中:MgO≥9%,碱度R≥3.0;
(4)补炉时,将补炉用生铁块平铺在补炉部位,铺满为止;
(5)铺满后,摇炉至92-94°,使补炉部位的生铁块完全浸泡在液态的炉渣中,保持3min以上至炉渣完全固化并与炉衬粘接后,进行溅渣护炉操作,完成补炉工艺。
2.根据权利要求1所述的一种转炉用生铁块补炉工艺,其特征在于所述补炉部位控制在渣线上方。
3.根据权利要求1所述的一种转炉用生铁块补炉工艺,其特征在于所述步骤(5)摇炉至92-94°,保持3-5min后,进行溅渣护炉操作。
CN201610911619.7A 2016-10-20 2016-10-20 一种转炉用生铁块补炉工艺 Pending CN106566909A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610911619.7A CN106566909A (zh) 2016-10-20 2016-10-20 一种转炉用生铁块补炉工艺

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610911619.7A CN106566909A (zh) 2016-10-20 2016-10-20 一种转炉用生铁块补炉工艺

Publications (1)

Publication Number Publication Date
CN106566909A true CN106566909A (zh) 2017-04-19

Family

ID=58533387

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610911619.7A Pending CN106566909A (zh) 2016-10-20 2016-10-20 一种转炉用生铁块补炉工艺

Country Status (1)

Country Link
CN (1) CN106566909A (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108034787A (zh) * 2017-11-17 2018-05-15 河钢股份有限公司承德分公司 一种利用磁选渣铁对半钢炼钢转炉护炉的方法
CN108396099A (zh) * 2018-04-19 2018-08-14 天津钢铁集团有限公司 一种快速修补转炉炉衬的方法
CN108517386A (zh) * 2018-04-10 2018-09-11 唐山新宝泰钢铁有限公司 用于炼钢转炉的补炉方法
CN111349748A (zh) * 2018-12-24 2020-06-30 新疆八一钢铁股份有限公司 一种炉前生铁渣补与贴补结合护炉的炉衬维护工艺
CN111621614A (zh) * 2020-07-23 2020-09-04 攀钢集团攀枝花钢钒有限公司 炼钢转炉补炉方法
CN112877494A (zh) * 2021-01-13 2021-06-01 广东韶钢松山股份有限公司 一种转炉的护炉方法
CN114107596A (zh) * 2020-08-26 2022-03-01 山西建龙实业有限公司 一种用生铁块垫补转炉兑铁面的方法

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105925752A (zh) * 2016-05-30 2016-09-07 本钢板材股份有限公司 一种利用生铁块+炉渣对转炉炉衬进行修补的方法

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105925752A (zh) * 2016-05-30 2016-09-07 本钢板材股份有限公司 一种利用生铁块+炉渣对转炉炉衬进行修补的方法

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108034787A (zh) * 2017-11-17 2018-05-15 河钢股份有限公司承德分公司 一种利用磁选渣铁对半钢炼钢转炉护炉的方法
CN108517386A (zh) * 2018-04-10 2018-09-11 唐山新宝泰钢铁有限公司 用于炼钢转炉的补炉方法
CN108517386B (zh) * 2018-04-10 2020-06-16 乌海市包钢万腾钢铁有限责任公司 用于炼钢转炉的补炉方法
CN108396099A (zh) * 2018-04-19 2018-08-14 天津钢铁集团有限公司 一种快速修补转炉炉衬的方法
CN111349748A (zh) * 2018-12-24 2020-06-30 新疆八一钢铁股份有限公司 一种炉前生铁渣补与贴补结合护炉的炉衬维护工艺
CN111621614A (zh) * 2020-07-23 2020-09-04 攀钢集团攀枝花钢钒有限公司 炼钢转炉补炉方法
CN114107596A (zh) * 2020-08-26 2022-03-01 山西建龙实业有限公司 一种用生铁块垫补转炉兑铁面的方法
CN112877494A (zh) * 2021-01-13 2021-06-01 广东韶钢松山股份有限公司 一种转炉的护炉方法

Similar Documents

Publication Publication Date Title
CN106566909A (zh) 一种转炉用生铁块补炉工艺
CN102660658B (zh) 一种转炉炉渣固化的方法
CN105925752A (zh) 一种利用生铁块+炉渣对转炉炉衬进行修补的方法
CN108728603A (zh) 一种快速补炉的方法
CN100569959C (zh) 一种熔融钢渣热闷处理方法
CN104480382A (zh) 一种离心球墨铸铁管的制备方法
CN104894327A (zh) 转炉渣面炉衬补炉法
CN102965465A (zh) 一种转炉渣固化的方法
CN110042197A (zh) 一种利用废弃镁碳砖补炉的方法
CN109266807A (zh) 一种大流量底吹溅渣与顶吹溅渣相结合的护炉工艺
CN107570660B (zh) 脱模剂及其制备方法
CN113930577A (zh) 一种炉龄后期转炉炉衬的维护方法
CN104060025A (zh) 一种炼钢用转炉综合护炉方法
CN111748670B (zh) 一种底吹氧气-石灰粉提高铬矿还原的方法
CN106995866A (zh) 一种低成本高效转炉补炉工艺
CN103343290A (zh) 一种高锰钢及其制造方法
CN204381354U (zh) 一种炉外精炼铁水包
CN108517386B (zh) 用于炼钢转炉的补炉方法
CN106735033A (zh) 一种连铸中间包二次开浇工艺
CN106244898A (zh) 一种低磷钢的生产方法
CN105624361B (zh) 一种碱性转炉炉衬修补方法及使用该方法修补的转炉
CN106544463A (zh) 一种转炉护炉方法
CN105177400A (zh) 一种合金板锤的智能制备系统及方法
JPH0382705A (ja) 転炉の熱間補修方法
CN102534092A (zh) 一种顶底复吹转炉护炉方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170419

WD01 Invention patent application deemed withdrawn after publication