CN106553664B - The method and apparatus of shunting route control is implemented in combination with using STP and CTC - Google Patents

The method and apparatus of shunting route control is implemented in combination with using STP and CTC Download PDF

Info

Publication number
CN106553664B
CN106553664B CN201611050309.7A CN201611050309A CN106553664B CN 106553664 B CN106553664 B CN 106553664B CN 201611050309 A CN201611050309 A CN 201611050309A CN 106553664 B CN106553664 B CN 106553664B
Authority
CN
China
Prior art keywords
shunting
route
information
shunting route
stp
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611050309.7A
Other languages
Chinese (zh)
Other versions
CN106553664A (en
Inventor
汤宝伟
崔虎
徐庆标
王刚
陈智新
田相坤
王如跃
梁前浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Casco Signal Ltd
Original Assignee
Casco Signal Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Casco Signal Ltd filed Critical Casco Signal Ltd
Priority to CN201611050309.7A priority Critical patent/CN106553664B/en
Publication of CN106553664A publication Critical patent/CN106553664A/en
Application granted granted Critical
Publication of CN106553664B publication Critical patent/CN106553664B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L27/00Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
    • B61L27/04Automatic systems, e.g. controlled by train; Change-over to manual control
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L27/00Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
    • B61L27/30Trackside multiple control systems, e.g. switch-over between different systems
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L27/00Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
    • B61L27/40Handling position reports or trackside vehicle data

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Train Traffic Observation, Control, And Security (AREA)

Abstract

The present invention relates to a kind of method and devices being implemented in combination with shunting route control using STP and CTC, including:1) STP systems receive shunting operation sheet, according to the destination of current locomotive location information and shunting service, calculate shunting route, when needing route setting, initiate shunting route application;2) CTC system real-time reception establishes shunting route application form or the shunting route application newly received is inserted into shunting route application form from the shunting route application information of the STP systems of all locomotives;3) CTC system real-time reception derives from the shunting operation sheet for all locomotives of Shunting planning server;4) CTC system operates the shunting route application in shunting route application form.Compared with prior art, present invention reduces the labor intensity of vehicle business personnel, the efficiency of shunting service is improved, the safe control to shunting route is realized using equipment, fundamentally avoids the generation that shunting route mistake does problem.

Description

The method and apparatus of shunting route control is implemented in combination with using STP and CTC
Technical field
The present invention relates to the technologies of shunting in a kind of railway transport course, and STP (radio shuntings are utilized more particularly, to a kind of Cab signal and monitoring system) and CTC (Centralized Dispatching System) be implemented in combination with shunting route control method and apparatus.
Background technology
Shunting service be in important component in railway transport course and the work of station organization of driving one it is important And complicated content.No matter large-scale station or intermediate station, the essence of shunting service is almost the same, i.e. station controller Train plan for adjustment that (person on duty) assigns according to member scheduled in scheduling, loading-unloading vehicle plan, the production plan that picks up and drop train, locomotive are handed over Road plan etc. is foundation, in conjunction with current station actual conditions, works out station control operation plan, and with shunting list Form is assigned to shunting command personnel and the relevant personnel, handles shunting route in due course, and commander shunting service personnel complete according to plan Shunting service.
Handling for shunting route is an important link in shunting service, the correct of shunting route, safety and shunt into The most important thing for being to ensure that Safety of Shunting Operation and efficiency is established in the timely of road.In order to realize the automatic row road of shunting route, carry High operating efficiency and to row shunting service interfere with each other problem carry out intelligence discongest, improve Safety of Shunting Operation, CTC system Devise a set of shunting plan list editor and route automatic control function.Specifically by shunting operation sheet editing interface, establishment Shunting plan, and can modify to shunting trip sequence, auxiliary generates shunting route sequence and is issued to station autonomous controlling by hand Machine, in due course machine trigger shunting route or automatic trigger shunting route manually.But since shunting service is strictly dependent on Train operation plan, and train work is interfered with each other with shunting service, such as pass through the shunting route of main track, occupy to hair line shunt into Road is not take up hair line but influences the shunting route etc. of sending and receiving vehicle, while shunting service is more complicated, the time to fulfil assignment with Machine is stronger, it is therefore desirable to change shunting plan and shunting route according to live actual job situation constantly.In order to This random variation is adapted to, Platform attendant just must constantly work out shunting plan, modification or redesign shunting route Sequence, workload are too big so that CTC can not be applied to scene to shunting route management and control.
Currently, shunting route is established and traditional method is still applied in control.I.e. signaling at stations person is shunting service made of paper Single pendulum is put on the table, and a tune machine corresponds to a shunting operation sheet.Signalman adjusts according to papery shunting operation sheet, artificial observation The red band position of machine and time and the Train operation plan for combining shunting service, discharge route in due course.After route discharge, in correspondence Shunting trip on draw completion label.Shunting route emissions operation is on interlocking HMI (stations TDCS) or in CTC terminals It presses beginning button and terminal button carries out.In order to ensure shunting route it is correct, rationally, safety, signalman arrangement shunt into Lu Shi executes " at a glance, two clicks, three confirmations, four call " system.Simultaneously Platform attendant also to route operating process stare at control, It checks on.
In the case where existing shunting route handles flow, signalman is required it is relatively high, simultaneously especially for more tune machines The station of operation, the busy station of train work, signalman's labor intensity are big.Meanwhile the mode that this shunting route is handled, especially It is to handle shunting route on interlocking HMI, the verification inspection to shunting route and shunting plan can not be realized by equipment, is shunt The inspection that conflicts with train route of route, the equipment application condition inspection of shunting route, realizes the safe control of shunting route. It is this rely solely on operating personnel's automatic control, cross complaint traditional work mode, can not ensure the safety of high density shunting service And efficiency requirements, it is badly in need of being managed and control shunting route arrangement by new technology, new equipment, while reducing vehicle business personnel Labor intensity, improve working efficiency.
Invention content
STP and CTC is utilized it is an object of the present invention to overcome the above-mentioned drawbacks of the prior art and provide a kind of It is implemented in combination with the method and apparatus of shunting route control.
The purpose of the present invention can be achieved through the following technical solutions:
A method of it being implemented in combination with shunting route using STP and CTC and controls, include the following steps:
1) the STP systems installed on locomotive receive this locomotive shunting operation sheet, according to shunting service actual conditions to shunting Job ticket is adjusted into edlin, and the content for editing adjustment is:At the beginning of shunting service and the end time;
2) promoter of the STP systems installed on locomotive as arrangement shunting route, forbids shunting when in locomotive/car team pressure The front section of signal, locomotive STP systems are led according to current locomotive location information, the destination of next shunting service, route Outlet and current yard orbit occupancy relationship, automatic search computer vehicle can arrive at it is all it is feasible shunt into Road, and manual confirmation transmission shunting route application information automatically or is passed through to CTC system by STP systems;
3) CTC system real-time reception from all locomotives STP systems shunting route application information, foundation shunt into Road application form is inserted into the shunting route application newly received according to the sequencing of job priority and activity duration In shunting route application form;
4) CTC system real-time reception derives from the shunting service for all tune machines of Shunting planning server It is single;
5) CTC system operates the shunting route application in shunting route application form.
Forbid the front section of shunting signal in the locomotive/car team pressure, i.e., according to locomotive or car team travel direction, warp The track circuit section that the last one crossed is shunt between permission signal and first, the front disable signal of shunting encountered.
The shunting plan works out server, SMIS2.6 (station Integrated Management Information System) software is installed, for compiling Shunting operation plan processed, and issue shunting operation sheet to locomotive and shunting route control machine.
The shunting route application information includes the position of track where engine number, current locomotive, goes to the mesh of operation Position, route be related to shunting neck, carry out this subjob at the beginning of and with end time, the priority scheduling of shunting service Grade and all optional shunting routes by calculating.
When not having optional shunting route after step 2) STP system-computeds, shunting route application information is not sent.
The CTC system operates specially the shunting route application in shunting route application form:
A, word and graphic software platform are carried out to the shunting route application information that each locomotive is sent, and basis source is in tune The shunting route application information that the shunting service single pair of every locomotive of the vehicle planning server locomotive is sent is planned Verification;
B, for going to the target of operation according to current locomotive position by planning the shunting route application that verification is examined Position, the shunting neck of auxiliary and current yard track occupation, calculate can with the shunting route of traveling, and with locomotive STP The optional shunting route calculated in the same fashion that system provides is checked, and is carried out two and is taken two operations, selects all identical Shunting route alternately shunting route collection;
C, train conflict inspection and equipment availability inspection are carried out to alternative shunting route on time dimension, passes through inspection All shunting routes looked into form executable shunting route collection, and carry out word and yard figure to each executable shunting route Change displaying, lists the advantage and disadvantage of each executable shunting route and the optimal shunting route of system recommendations;
D, it provides manual key triggering mode to executable shunting route and arranges shunting route or in a manner of automatic trigger Arrange shunting route;
E, for conflicting with train route or conflicting with other shunting routes the reason of, does not meet the executable of condition The shunting route application of shunting route, CTC send route and wait for feedback information to corresponding locomotive STP systems;For not passing through The shunting route application of plan verification detection or route verification detection, CTC send route mistake application information to locomotive STP systems System;
F, the executable shunting route provided from system concentrates one shunting route of selection, arranges shunting route, and send Route executes feedback.
G, CTC system continues step a, b, c, d, e, f until completing all shunting route applications.
Equipment availability inspection in the step c includes power supply interrupted district inspection and construction and blockade range check.
A kind of device for the method for being implemented in combination with shunting route control using STP and CTC, including:CTC systems System, STP systems, computer interlock system, outdoor signal equipment, shunting plan establishment server, shunting route control machine and tune Vehicle route control shows machine, and station autonomous controlling machine is equipped in the CTC system;
The STP systems are connect with shunting plan establishment server, the shunting operation sheet for receiving all locomotives;Hair Shunting service is sent to feed back;
The STP systems are connect with shunting route control machine module, for sending locomotive shunting route application information;It connects It receives shunting route and executes status feedback information;
The shunting route control machine is connect with shunting plan establishment server, the tune for receiving all locomotives of our station Vehicle job ticket;
The shunting route control machine and shunting route control show machine and connect, for sending shunting route application information, standby Shunting route information, executable shunting route information are selected, route is received and executes feedback;
The shunting route control machine is connect with station autonomous controlling machine, and for sending alternative shunting route information, reception can Execute shunting route information;
The shunting route control shows machine and is connect with station autonomous controlling machine, and order is executed for sending shunting route, receive into Road executes feedback;
The computer interlock system is connect with outdoor signal equipment, be used for output relay operational order, acquisition after Electrical appliance state signal;
The computer interlock system is connect with station autonomous controlling machine, for receiving route sequence instruction;Route is sent to hold Row state.
The CTC system includes that the centers CTC being connected with each other and CTC train station subsystems, the station autonomous controlling machine are set In CTC train station subsystems.
The STP systems include STP on-vehicle hosts and STP ground host machines;
The STP on-vehicle hosts are connect with STP ground host machines, for sending shunting route application to STP ground host machines Information receives route application feedback, receives shunting plan job ticket;
The STP ground host machines are connect with the multiple STP on-vehicle hosts of our station, for receiving locomotive shunting route letter of application Breath;It sends route and executes feedback of status;
The STP ground host machines are connect with shunting plan establishment server, the work of shunting for receiving all locomotives Industry list;
The STP ground host machines are connect with shunting route control machine, for sending locomotive shunting route application information, are connect It receives shunting route and executes status feedback information.
The STP on-vehicle hosts include first information communication module, shunting operation sheet editor module, shunting route calculating Module, shunting route application module and shunting route configuration module;
The first information communication module and STP ground host machine interfaces, for obtaining automatically, updating shunting plan establishment The shunting operation sheet of server establishment, sends shunting route application information, receives shunting route and executes feedback;
The shunting operation sheet editor module is to be refined to the hooking plan of shunting service, including addition route passes through Shunting neck information, addition or modification hooking plan at the beginning of and the end time, form the refinement shunting operation sheet of this tune machine;
The shunting route computing module be according to locomotive current position, the destination for going to operation, shunting neck, in conjunction with Yard track occupation calculates the optional shunting route set that can be arrived at;
The shunting route application module be according to route application way configuration send shunting route application information to First information communication module is sent by first information communication module, and the information of transmission includes:Engine number, locomotive present bit Set, destination locations, route shunting neck, operation starting and end time, job priority grade;Under automatic sending mode, When track before locomotive/car team indentation disable signal, shunting route application module automatic trigger information is sent;Manually triggering Under pattern, driver selects a good opportunity transmission according to field condition;
The mode that the shunting route configuration module is used to be arranged shunting route application is automatic trigger or manually touches Hair.
The STP ground host machines include the second information communication module, data processing distribution module;
Second information communication module is established with all STP on-vehicle hosts of our station and is wirelessly connected, for receive into Road application information sends route and executes feedback, sends locomotive shunting operation sheet;Second information communication module and meter of shunting Draw establishment server connection, the shunting operation sheet for receiving all locomotives;Second information communication module and shunt into Machine connection is controlled in an outpost of the tax office, for sending shunting route application information, receives route and executes feedback information;
The data processing distribution module, to carrying out protocol conversion, data check from the data of external interface, and Communication queue queuing is carried out according to data type and priority level, ensures the promptness of data information interaction.
The shunting route control machine includes third information communication module, plan verification module and route verification module;
The third information communication module is connect with STP ground host machines, for receiving shunting route application information, is sent Carry out execution state;The third information communication module is connect with shunting plan establishment server, for receiving all locomotives Shunting operation sheet;The third information communication module is connect with station autonomous controlling machine, for sending alternative shunting route information, It receives and can perform shunting route information;
The plan verification module is the shunting service according to every locomotive from shunting plan establishment server The shunting route information that single pair this locomotive is sent is checked, including destination, operation start and end time, job priority Grade;
The described route verification module is the current location sent according to locomotive and goes to involving for destination locations and auxiliary Line information calculates the shunting route set that can be reached according to current yard track occupation, and is provided with locomotive STP systems Optional shunting route set carry out two take two verifications operate, form alternative shunting route set.
It includes the 4th information communication module, information display module, information intelligent layout mould that the shunting route control, which shows machine, Block, access way control module;
4th information communication module is connect with shunting route control machine, for receive shunting route application information, Alternative shunting route information, executable shunting route information, send route and execute feedback;4th information communication module with Station autonomous controlling machine connects, and executes order for sending shunting route, receives route and execute feedback;
The information display module is shown to shunting route application information, and wherein shunting route application information includes machine License number, destination locations, shunting neck, operation starting and end time, job priority grade, can recruit at locomotive current location Vehicle route;Word and yard graphic software platform are carried out to alternative shunting route;Word and yard are carried out to executable shunting route Graphic software platform;One key operation button of route is provided to executable shunting route;
The information intelligent layout modules are when information display module handles the displaying of multiple locomotive route application examples When, according to the shunting route of locomotive application whether have executable shunting route, excellent operation elder generation grade, activity duration sequencing into Row shows queue order management;When with the optional shunting route of yard graphics mode preview, alternative shunting route or executable shunting When route, according to spatial position, the automatic position for calculating text information and not blocking graphical interfaces carries out window and is laid out again, side Just route preview;
The access way control module is the configuration completed to route triggering mode, either automatically or manually, meanwhile, work as route When triggering, send shunting route sequence instruction to the 4th information communication module, by the forwarding of the 4th information communication module shunt into Road sequence instruction completes route triggering to station autonomous controlling machine.
The station autonomous controlling machine includes that the 5th information communication module and row transfer in road conflict and check that module and equipment are available Property check module composition, wherein:
5th information communication module is connect with shunting route control machine, for receiving alternative shunting route, is sent Executable shunting route;5th information communication module is connect with the aobvious machine of shunting route control, is received route and is executed order, It sends route and executes feedback;
The row transfer in road conflict and check Train operation plan of the module according to our station, to passing through main track on time dimension Shunting route, the shunting route for occupying the shunting route to hair line, being not take up hair line but influencing sending and receiving vehicle carry out collision detection;
The equipment availability checks that module proceeds through power supply interrupted district detection to electric power tune machine;To locomotive by constructing Blockade zone is detected;
Collision detection and the shunting route of equipment availability detection is adjusted to form executable shunting route by row;Executable When shunting route executes, shunting route is detected in terms of time dimension, Spatial Dimension and equipment availability again, only It can just be handled by the shunting route of detection.
Compared with prior art, the control method of shunting route of the invention first, when locomotive being taken to need shunting route Route calculating is carried out by equipment and applies for arranging the strategy of shunting route, it is strong to solve shunting service randomness, and shunting plan becomes Change soon, vehicle business personnel constantly change the problem of shunting route Sequence Program, reduce the intensity of vehicle business staff.Specially: Locomotive STP systems receive this locomotive shunting operation sheet, when forbidding the front section of shunting signal in locomotive/car team pressure, locomotive Destination of the STP systems according to current locomotive location information and next shunting service, calculate locomotive can with traveling shunt into Road, and the shunting route application information for reaching next shunting service destination is sent to CTC system.Secondly, this method takes meter Draw dual verification, the dual verification of shunting route software and hardware complete isomery two take two strategy, ensure that shunting service strictly by The safety with shunting route is executed according to plan.After specially CTC system receives the shunting route application of locomotive, basis source in The shunting operation sheet that shunting plan works out server carries out shunting plan inspection to shunting route application information;According to shunting route Application information calculates shunting route and the shunting route progress two provided with STP systems takes two dual tests to check to be formed alternatively Shunting route.If plan or shunting route are there is a situation where inconsistent, shunting route will not all arrange execution.Further more, should For method foundation equipment to shunting route into ranks tune conflict inspection, equipment availability inspection further ensures shunting route Safety improves conevying efficiency.Specially CTC system to alternative shunting route carry out time dimension train route conflict inspection with And shunting route equipment safety protection (having a power failure, construction and blockade) checks, the executable of the condition that meets is formed by the route of inspection Shunting route set, and provide strengths and weaknesses analysis and the optimal selection suggestion of every route.Finally, this method provides complete Intelligentized visualization interface and simple control interface facilitate the grasp to Global Information of vehicle business personnel, reduce maloperation Possibility.Specially this method is labeled each shunting route with the displaying of yard patterned way, shunting service application, And in the case where multimachine vehicle application causes interface congested conditions, sort according to shunting service priority, activity duration sequencing, interface Intelligence layout.This method provides the manual triggering mode arrangement shunting route of a key and automatic shunting to every shunting route simultaneously Route triggering mode.
Form the device of the invention on the basis of the present invention, the device of the invention be in CTC and STP apparatus and On the basis of shunting plan works out server, increases on-vehicle host module in STP on-vehicle hosts, complete connecing for shunting operation sheet It receives and editor's refinement, completes the application function of the search of shunting route, calculating and shunting route, realize according to current locomotive position Confidence ceases and the destination of next shunting service, and calculating locomotive can be with the shunting route of traveling, and sends and reach to CTC system The shunting route application information of next shunting service destination;Increase ground host machine module in STP ground host machines, completes various numbers According to the conversion distribution of, information, info gateway is played between more locomotives, shunting plan establishment server and CTC system in station Effect.Increase shunting route control machine equipment device, while increasing shunting route control machine module, completes to shunting service meter The two of the shunting route that the search of the dual verification, shunting route drawn calculates and two distinct devices provide take two verifications to grasp Make.Increase shunting route control and show machine equipment device, while increasing shunting route control and showing machine module, completes to shunting route letter of application The graphic software platform of breath and the intelligent layout of display information, and the control interface of one key of route triggering is provided.In CTC self-regulating machines The upper safe control of increase route checks module, completes the collision detection and equipment of train route and shunting route on time dimension Condition safety detection.Since these equipment and function module being arranged in the device of the invention, overcomes deposit in the prior art completely Shunting route handle no workflow management with control, shunting route mistake proofing, which is done, manually checks on, the safety of shunting route with The deficiency that efficiency varies with each individual, realize shunting route management and control from individual character to general character, it is ensured that shunting route it is timely, It is correct to establish, the safety and reliability of arrangement shunting route is improved, the labor intensity of vehicle business personnel is reduced, it is prior It is the fundamental change for realizing the control of shunting route and being controlled by people's steering equipment, fundamentally avoids shunting route mistake and do The generation of problem has great economic benefit and social benefit.
Description of the drawings
Fig. 1 is the structural diagram of the present invention.
Wherein 1 is the centers CTC, and 2 be CTC train station subsystems, and 21 be station autonomous controlling machine, and 3 be STP on-vehicle hosts, and 4 be STP Ground host machine, 5 work out server for shunting plan, and 6 be shunting route control machine, and 7 show machine for shunting route control, and 8 be computer Interlock system, 9 be outdoor signal equipment.
Specific implementation mode
The present invention is described in detail with specific embodiment below in conjunction with the accompanying drawings.The present embodiment is with technical solution of the present invention Premised on implemented, give detailed embodiment and specific operating process, but protection scope of the present invention is not limited to Following embodiments.
As shown in Figure 1, a kind of device being implemented in combination with shunting route control using STP and CTC, including:CTC system, STP System, computer interlock system 8, outdoor signal equipment 9, shunting plan work out server 5, shunting route control machine 6 and shunt Route control shows machine 7, and station autonomous controlling machine 21 is equipped in the CTC system;
The STP systems are connect with shunting plan establishment server, the shunting operation sheet for receiving all locomotives, hair Shunting service is sent to feed back;The STP systems are connect with shunting route control machine module, for sending locomotive shunting route application Information;It receives shunting route and executes status feedback information;The shunting route control machine connects with shunting plan establishment server It connects, the shunting operation sheet for receiving all locomotives of our station;The shunting route control machine shows machine with shunting route control and connect, For sending route application information, alternative shunting route information, executable shunting route information, receives route and execute feedback;Institute The shunting route control machine stated is connect with station autonomous controlling machine, for sending alternative shunting route information, receive it is executable shunt into Road information;The shunting route control shows machine and is connect with station autonomous controlling machine, executes order for sending shunting route, receives route Execute feedback;The computer interlock system is connect with outdoor signal equipment, be used for output relay operational order, acquisition after Electrical appliance state signal;The computer interlock system is connect with station autonomous controlling machine, for receiving route sequence instruction, send into Road executes state.
The CTC system includes the centers CTC 1 being connected with each other and CTC train station subsystems 2, the station autonomous controlling machine 21 are located in CTC train station subsystems.
The STP systems include STP on-vehicle hosts 3 and STP ground host machines 4;The STP on-vehicle hosts are with STP Face host connects, and for sending shunting route application information to STP ground host machines, receives route application feedback, receives meter of shunting Draw job ticket;The STP ground host machines are connect with the multiple STP on-vehicle hosts of our station, for receiving locomotive shunting route application Information;It sends route and executes feedback of status;The STP ground host machines are connect with shunting plan establishment server, for connecing Receive the shunting operation sheet of all locomotives;The STP ground host machines are connect with shunting route control machine, for sending locomotive shunting Route application information receives shunting route and executes status feedback information.
The STP on-vehicle hosts include first information communication module, shunting operation sheet editor module, shunting route calculating Module, shunting route application module and shunting route configuration module;The first information communication module connects with STP ground host machines Mouthful, the shunting operation sheet for obtaining, updating shunting plan establishment server establishment automatically sends shunting route application information, It receives shunting route and executes feedback;The shunting operation sheet editor module is refined to the hooking plan of shunting service, packet Include addition route pass through shunting neck information, addition or modification hooking plan at the beginning of and the end time, form this tune machine Refine shunting operation sheet;The shunting route computing module is according to locomotive current position, the destination of going to operation, involves Line calculates the optional shunting route set that can be arrived in conjunction with yard track occupation;The shunting route Shen Please module be according to route application way configuration send shunting route application information arrive first information communication module, by first believe Message communication module is sent, and the information of transmission includes:Engine number, destination locations, route shunting neck, is made locomotive current location Industry time started and end, job priority grade;Under automatic sending mode, the rail before locomotive/car team indentation disable signal When road, shunting route application module automatic trigger information is sent;Under artificial triggering pattern, driver selects a good opportunity hair according to field condition It send;The mode that the shunting route configuration module is used to be arranged shunting route application is automatic trigger or artificial triggering.
The STP ground host machines include the second information communication module, data processing distribution module;Second information Communication module is established with all STP on-vehicle hosts of our station and is wirelessly connected, and for receiving shunting route application information, sends route Feedback is executed, locomotive shunting operation sheet is sent;Second information communication module is connect with shunting plan establishment server, is used In the shunting operation sheet for receiving all locomotives;Second information communication module is connect with shunting route control machine, for sending out Shunting route application information is sent, route is received and executes feedback information;The data processing distribution module, connects to deriving from outside The data of mouth carry out protocol conversion, data check, and carry out communication queue queuing according to data type and priority level, ensure number According to the promptness of information exchange.
The shunting route control machine includes third information communication module, plan verification module and route verification module; The third information communication module is connect with STP ground host machines, for receiving shunting route application information, is sent route and is executed State;The third information communication module is connect with shunting plan establishment server, the work of shunting for receiving all locomotives Industry list;The third information communication module is connect with station autonomous controlling machine, and for sending alternative shunting route information, reception can be held Row shunting route information;The plan verification module is the tune according to every locomotive from shunting plan establishment server Vehicle job ticket checks the shunting route information that this locomotive is sent, including destination, the operation time started and at the end of Between, job priority grade;The described route verification module is the current location sent according to locomotive and goes to destination locations and auxiliary The shunting neck information helped calculates the shunting route set that can reach according to current yard track occupation, and with locomotive STP The optional route set that system provides carries out two and two verifications is taken to operate, and forms alternative shunting route set.
It includes the 4th information communication module, information display module, information intelligent layout mould that the shunting route control, which shows machine, Block, access way control module;4th information communication module is connect with shunting route control machine, for receiving shunting route Shen Please information, alternative shunting route information, executable shunting route information, send route and execute feedback;4th information is logical Letter module is connect with station autonomous controlling machine, is executed order for sending shunting route, is received route and execute feedback;The information is aobvious Show that module is shown to shunting route application information, wherein shunting route application information includes engine number, locomotive current location, mesh Position, shunting neck, operation starting and end time, job priority grade, optional shunting route;To alternative shunting route Carry out word and yard graphic software platform;Word and yard graphic software platform are carried out to executable shunting route;It is adjusted to executable Vehicle route provides one key operation button of route;The information intelligent layout modules are when information display module handles multiple locomotives When the displaying of route application example, according to the shunting route of locomotive application whether have executable shunting route, job priority grade, Activity duration sequencing carries out display queue order management;When with the optional shunting route of yard graphics mode preview, alternative tune When vehicle route or executable shunting route, according to spatial position, the automatic position for calculating text information and not blocking graphical interfaces, into Row window is laid out again, facilitates route preview.The access way control module is the configuration completed to route triggering mode, automatically Or manually, meanwhile, when route triggers, shunting route sequence instruction is sent to the 4th information communication module, passes through the 4th letter Message communication module forwards shunting route sequence instruction completes route triggering to station autonomous controlling machine.
The station autonomous controlling machine includes the 5th information communication module, arranges and transfer in road conflict inspection module and equipment availability Check module composition, wherein:5th information communication module is connect with shunting route control machine, is alternatively shunt for receiving Route sends and can perform shunting route;5th information communication module is connect with the aobvious machine of shunting route control, receives route Order is executed, route is sent and executes feedback;The row transfer in road conflict and check Train operation plan of the module according to our station, in the time Tune in dimension on passing through the shunting route of main track, occupying the shunting route to hair line, be not take up hair line but influence sending and receiving vehicle Vehicle route carries out collision detection;The equipment availability checks that module proceeds through power supply interrupted district detection to electric power tune machine;It is right Locomotive is detected by construction and blockade region;Executable shunting route is formed by the shunting route detected, executable When shunting route executes, shunting route is detected in terms of time dimension, Spatial Dimension and equipment availability again, only It can just be handled by the shunting route of detection.
The control method of shunting route of the present invention, includes the following steps:
(1) the STP systems installed on locomotive receive this locomotive shunting operation sheet, according to shunting service actual conditions to shunting Job ticket is adjusted into edlin.Editing the content adjusted is:At the beginning of shunting service and the end time.
(2) the STP systems installed on locomotive are to arrange the promoter of shunting route.Forbid shunting when in locomotive/car team pressure The front section of signal, locomotive STP systems are led according to current locomotive location information, the destination of next shunting service, route Outlet and current yard orbit occupancy relationship, automatic search computer vehicle can arrive at it is all it is feasible shunt into Road, and manual confirmation transmission shunting route application information automatically or is passed through to CTC system by STP systems.Route application information Including:Shunting neck that engine number, the position of track, the destination locations for going to operation, route where current locomotive are related to carries out It optionally shunts with end time, the priority level of shunting service and by all of calculating at the beginning of this subjob Route.When no optional route, can not send.
(3) CTC system real-time reception derives from the shunting route application information of the STP systems of all locomotives, and foundation is shunt Route application form is inserted into the shunting route application newly received according to job priority and the sequencing of activity duration Into shunting route application form.
(4) CTC system real-time reception derives from the work of shunting for all tune machines of Shunting planning server Industry list.
(5) CTC system is done as follows the shunting route application in shunting route application form successively:
A, word and graphic software platform are carried out to the shunting route application information that each locomotive is sent, and according to from tune The shunting route application information that the shunting service single pair of each locomotive of the vehicle planning server locomotive is sent is planned Verification, such as destination, operation starting and end time, job priority grade etc..
B, for going to the target of operation according to current locomotive position by planning the shunting route application that verification is examined Position, the shunting neck of auxiliary and current yard track occupation, calculate can with the shunting route of traveling, and with locomotive STP The optional shunting route calculated in the same fashion that system provides is checked, and is carried out 2 and is taken 2 operations, selects all identical tune Vehicle route becomes alternative shunting route collection;
C, train conflict inspection and equipment availability inspection (power failure area are carried out to alternative shunting route on time dimension Domain inspection, construction and blockade range check), executable shunting route collection is formed by all shunting routes of inspection, and to each Executable shunting route carries out word and yard graphical representation, the advantage and disadvantage and system for listing each executable shunting route are built The optimal shunting route of view.
D, it provides manual key triggering mode to executable shunting route and arranges shunting route or in a manner of automatic trigger Arrange shunting route;
E, the executable of condition is not met for the reasons such as conflict with train route or conflict with other shunting routes The shunting route application of shunting route, CTC system send route and wait for feedback information to corresponding locomotive STP systems;For not By plan verification detection or route verification detection shunting route application, CTC system send route mistake application information to Locomotive STP systems;
F, the executable shunting route provided from CTC system concentrates one shunting route of selection, arranges shunting route, concurrently It is sent into road and executes feedback.
G, CTC system continues step a, b, c, d, e, f until completing all shunting route applications.
The above description is merely a specific embodiment, but scope of protection of the present invention is not limited thereto, any Those familiar with the art in the technical scope disclosed by the present invention, can readily occur in various equivalent modifications or replace It changes, these modifications or substitutions should be covered by the protection scope of the present invention.Therefore, protection scope of the present invention should be with right It is required that protection domain subject to.

Claims (14)

1. a kind of method being implemented in combination with shunting route control using STP and CTC, which is characterized in that include the following steps:
1) the STP systems installed on locomotive receive this locomotive shunting operation sheet, according to shunting service actual conditions to shunting service Single to be adjusted into edlin, the content for editing adjustment is:At the beginning of shunting service and the end time;
2) promoter of the STP systems installed on locomotive as arrangement shunting route, when forbidding shunting signal in locomotive/car team pressure Front section, locomotive STP systems are according to current locomotive location information, the destination of next shunting service, route shunting neck And current yard orbit occupancy relationship, all feasible shunting routes that automatic search computer vehicle can arrive at, and It is automatic or pass through manual confirmation and send shunting route application information to CTC system by STP systems;
3) CTC system real-time reception establishes shunting route Shen from the shunting route application information of the STP systems of all locomotives Please the table or shunting route application newly received is inserted into according to the sequencing of job priority and activity duration shunt In route application form;
4) CTC system real-time reception derives from the shunting operation sheet for all tune machines of Shunting planning server;
5) CTC system operates the shunting route application in shunting route application form.
2. a kind of method being implemented in combination with shunting route control using STP and CTC according to claim 1, feature exist In, the front section for disable signal of shunting in the locomotive/car team pressure, i.e., according to locomotive or car team travel direction, process The last one track circuit section allowed between signal and first, the front disable signal of shunting encountered of shunting.
3. a kind of method being implemented in combination with shunting route control using STP and CTC according to claim 1, feature exist In the shunting route application information includes the position of track where engine number, current locomotive, goes to the purpose status of operation Set, the shunting neck that route is related to, carry out this subjob at the beginning of and end time, the priority level of shunting service and warp Cross all optional shunting routes calculated.
4. a kind of method being implemented in combination with shunting route control using STP and CTC according to claim 1, feature exist In when there is no optional shunting route after step 2) STP system-computeds, not sending shunting route application information.
5. a kind of method being implemented in combination with shunting route control using STP and CTC according to claim 1, feature exist In the CTC system operates specially the shunting route application in shunting route application form:
A, word and graphic software platform are carried out to the shunting route application information that each locomotive is sent, and according to from meter of shunting The shunting route application information for drawing the locomotive transmission of the shunting service single pair of each locomotive of establishment server carries out plan verification;
B, for going to the target location of operation according to current locomotive position by planning the shunting route application that verification is examined, Route shunting neck and current yard track occupation, calculating can be with the shunting route of traveling, and is provided with locomotive STP systems The optional shunting route calculated in the same fashion checked, carry out two taking two operations, select all identical shunting routes As alternative shunting route collection;
C, train conflict inspection and equipment availability inspection are carried out to alternative shunting route on time dimension, passes through inspection All shunting routes form executable shunting route collection, and are graphically opened up to each executable shunting route progress word and yard Show, lists the advantage and disadvantage of each executable shunting route and the optimal shunting route of system recommendations;
D, it provides manual key triggering mode arrangement shunting route to executable shunting route or is arranged in a manner of automatic trigger Shunting route;
E, for conflicting with train route or conflicting with other shunting routes the reason of, does not meet the executable of condition and shunts The shunting route application of route, CTC send route and wait for feedback information to corresponding locomotive STP systems;For not passing through plan The shunting route application of verification detection or route verification detection, CTC send route mistake application information to locomotive STP systems;
F, the executable shunting route provided from CTC system concentrates one shunting route of selection, arranges shunting route, is concurrently sent into Road executes feedback;
G, CTC system continues step a, b, c, d, e, f until completing all shunting route applications.
6. a kind of method being implemented in combination with shunting route control using STP and CTC according to claim 5, feature exist In the equipment availability inspection in the step c includes power supply interrupted district inspection and construction and blockade range check.
7. a kind of device for the method described in claim 1 for being implemented in combination with shunting route control using STP and CTC, It is characterized in that, including:CTC system, STP systems, computer interlock system, outdoor signal equipment, shunting plan establishment server, Shunting route control machine and shunting route control show machine, and station autonomous controlling machine is equipped in the CTC system;
The STP systems are connect with shunting plan establishment server, the shunting operation sheet for receiving all locomotives;It sends and adjusts Vehicle operation feedback;
The STP systems are connect with shunting route control machine module, for sending locomotive shunting route application information;It receives and adjusts Vehicle route executes status feedback information;
The shunting route control machine is connect with shunting plan establishment server, the work of shunting for receiving all locomotives of our station Industry list;
The shunting route control machine shows machine with shunting route control and connect, for sending shunting route application information, alternative tune Vehicle route information, executable shunting route information, receive route and execute feedback;
The shunting route control machine is connect with station autonomous controlling machine, for sending alternative shunting route information, is received executable Shunting route information;
The shunting route control shows machine and is connect with station autonomous controlling machine, executes order for sending shunting route, receives route and hold Row feedback;
The computer interlock system is connect with outdoor signal equipment, is used for output relay operational order, acquires relay Status signal;
The computer interlock system is connect with station autonomous controlling machine, for receiving route sequence instruction;It sends route and executes shape State.
8. device according to claim 7, which is characterized in that the CTC system include be connected with each other the centers CTC and CTC train station subsystems, the station autonomous controlling machine are located in CTC train station subsystems.
9. device according to claim 7, which is characterized in that the STP systems include STP on-vehicle hosts and STP Face host;
The STP on-vehicle hosts are connect with STP ground host machines, for sending shunting route application information to STP ground host machines, Route application feedback is received, shunting plan job ticket is received;
The STP ground host machines are connect with the multiple STP on-vehicle hosts of our station, for receiving locomotive shunting route application information; It sends route and executes feedback of status;
The STP ground host machines are connect with shunting plan establishment server, the shunting operation sheet for receiving all locomotives;
The STP ground host machines are connect with shunting route control machine, for sending locomotive shunting route application information, are received and are adjusted Vehicle route executes status feedback information.
10. device according to claim 9, which is characterized in that the STP on-vehicle hosts include first information communication mould Block, shunting operation sheet editor module, shunting route computing module, shunting route application module and shunting route configuration module;
The first information communication module and STP ground host machine interfaces, for obtaining, updating shunting plan establishment service automatically The shunting operation sheet of device establishment, sends shunting route application information, receives shunting route and executes feedback;
The shunting operation sheet editor module is to be refined to the hooking plan of shunting service, including add leading for route process Outlet information, addition or modification hooking plan at the beginning of and the end time, form the refinement shunting operation sheet of this tune machine;
The shunting route computing module is according to locomotive current position, the destination for going to operation, shunting neck, in conjunction with yard Track occupation calculates the optional shunting route set that can be arrived at;
The shunting route application module is that the configuration of foundation route application way sends shunting route application information to first Information communication module is sent by first information communication module, and the information of transmission includes:Engine number, locomotive current location, mesh Position, route shunting neck, operation starting and end time, job priority grade;Under automatic sending mode, work as machine When track before vehicle/car team indentation disable signal, shunting route application module automatic trigger information is sent;In manually triggering pattern Under, driver selects a good opportunity transmission according to field condition;
The mode that the shunting route configuration module is used to be arranged shunting route application is automatic trigger or artificial triggering.
11. device according to claim 9, which is characterized in that the STP ground host machines include that the second information communicates mould Block, data processing distribution module;
Second information communication module is established with all STP on-vehicle hosts of our station and is wirelessly connected, for receive shunt into Road application information sends route and executes feedback, sends locomotive shunting operation sheet;Second information communication module and meter of shunting Draw establishment server connection, the shunting operation sheet for receiving all locomotives;Second information communication module and shunt into Machine connection is controlled in an outpost of the tax office, for sending shunting route application information, receives route and executes feedback information;
The data processing distribution module, to the data progress protocol conversion from external interface, data check, and according to Data type and priority level carry out communication queue queuing, ensure the promptness of data information interaction.
12. device according to claim 7, which is characterized in that the shunting route control machine includes that third information is logical Believe that module, plan verification module and route check module;
The third information communication module is connect with STP ground host machines, for receiving shunting route application information, sends route Execution state;The third information communication module is connect with shunting plan establishment server, the tune for receiving all locomotives Vehicle job ticket;The third information communication module is connect with station autonomous controlling machine, for sending alternative shunting route information, is received Executable shunting route information;
The plan verification module is the shunting service single pair for every locomotive that basis source works out server in shunting plan The shunting route information that this locomotive is sent is checked, including destination, operation starting and end time, job priority Grade;
The described route verification module is the current location of the locomotive sent according to locomotive and goes to leading for destination locations and auxiliary Outlet information calculates the shunting route set that can reach according to current yard track occupation, and with locomotive provide can Selecting shunting route set to carry out two takes two verifications to operate, and forms alternative shunting route set.
13. device according to claim 7, which is characterized in that it is logical including the 4th information that the shunting route control shows machine Believe module, information display module, information intelligent layout modules, access way control module;
4th information communication module is connect with shunting route control machine, for receiving shunting route application information, alternative Shunting route information, executable shunting route information, send route and execute feedback;4th information communication module and station Self-regulating machine connects, and executes order for sending shunting route, receives route and execute feedback;
The information display module is shown to shunting route application information, and wherein shunting route application information includes locomotive Number, locomotive current location, destination locations, shunting neck, operation starting and end time, job priority grade, optional shunt Route;Word and yard graphic software platform are carried out to alternative shunting route;Word and yards design are carried out to executable shunting route Shapeization is shown;One key operation button of route is provided to executable shunting route;
The information intelligent layout modules are the roots when information display module handles the displaying of multiple locomotive route application examples Whether there are executable shunting route, job priority grade, activity duration sequencing to be shown according to the shunting route of locomotive application Show queue order management;When with the optional shunting route of yard graphics mode preview, alternative shunting route or executable shunting route When, according to spatial position, the automatic position for calculating text information and not blocking graphical interfaces carries out window and is laid out again, it is convenient into Road preview;
The access way control module is the configuration completed to route triggering mode, either automatically or manually, meanwhile, when route triggers When, shunting route sequence instruction is sent to the 4th information communication module, and shunting route sequence is forwarded by the 4th information communication module Station autonomous controlling machine is arrived in row instruction, completes route triggering.
14. device according to claim 7, which is characterized in that the station autonomous controlling machine includes that the 5th information communicates mould Block and row transfer in road conflict and check that module and equipment availability check module composition, wherein:
5th information communication module is connect with shunting route control machine, and for receiving alternative shunting route, transmission can be held Row shunting route;5th information communication module is connect with the aobvious machine of shunting route control, is received route and is executed order, sends Route executes feedback;
The row transfer in road conflict and check Train operation plan of the module according to our station, are shunt on time dimension to passing through main track Route, the shunting route for occupying the shunting route to hair line, being not take up hair line but influencing sending and receiving vehicle carry out collision detection;
The equipment availability checks that module proceeds through power supply interrupted district detection to electric power tune machine;Construction and blockade is passed through to locomotive Region is detected;
Collision detection and the shunting route of equipment availability detection is adjusted to form executable shunting route by row;It shunts executable When route executes, shunting route is detected in terms of time dimension, Spatial Dimension and equipment availability again, is only passed through The shunting route of detection can just be handled.
CN201611050309.7A 2016-11-24 2016-11-24 The method and apparatus of shunting route control is implemented in combination with using STP and CTC Active CN106553664B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611050309.7A CN106553664B (en) 2016-11-24 2016-11-24 The method and apparatus of shunting route control is implemented in combination with using STP and CTC

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611050309.7A CN106553664B (en) 2016-11-24 2016-11-24 The method and apparatus of shunting route control is implemented in combination with using STP and CTC

Publications (2)

Publication Number Publication Date
CN106553664A CN106553664A (en) 2017-04-05
CN106553664B true CN106553664B (en) 2018-08-28

Family

ID=58443700

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611050309.7A Active CN106553664B (en) 2016-11-24 2016-11-24 The method and apparatus of shunting route control is implemented in combination with using STP and CTC

Country Status (1)

Country Link
CN (1) CN106553664B (en)

Families Citing this family (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109591858B (en) * 2018-12-12 2020-11-06 卡斯柯信号有限公司 Method and device for handling locomotive hanging change operation based on CTC3.0 system
CN109606432B (en) * 2018-12-12 2023-06-09 卡斯柯信号有限公司 Method and device for realizing station operation post linkage by using CTC3.0
CN109677451B (en) * 2018-12-28 2023-08-29 卡斯柯信号有限公司 Control system and method combining shunting monitoring function and train operation control
CN110104029A (en) * 2019-03-27 2019-08-09 卡斯柯信号有限公司 A kind of CTC route automatic trigger method suitable for inter-city passenger rail
CN110203256B (en) * 2019-04-26 2020-12-11 昆明聚讯科技有限公司 Wireless shunting light display system and method with non-interlocking shunting route guidance function
CN110406569A (en) * 2019-08-07 2019-11-05 通号万全信号设备有限公司 A method of road is arranged manually applied to rail traffic
CN110901701B (en) * 2019-12-06 2021-08-03 上海富欣智能交通控制有限公司 Rail train route handling method and system
CN111332341B (en) * 2020-02-18 2022-07-15 卡斯柯信号有限公司 Realization method for entering route handling of centralized control station based on CTC3.0
CN111516729B (en) * 2020-05-08 2022-03-29 卡斯柯信号有限公司 Centralized processing method for locomotive shunting operation list
CN112572549B (en) * 2020-12-22 2022-07-15 卡斯柯信号有限公司 Method for automatically handling shunting route
CN112693503B (en) * 2021-03-25 2021-06-18 上海富欣智能交通控制有限公司 Shunting route execution method and device, train control system and readable storage medium
CN113619653B (en) * 2021-06-29 2023-05-09 卡斯柯信号有限公司 Automatic generation method of shunting operation plan, electronic equipment and medium
CN113715881B (en) * 2021-09-17 2022-09-02 交控科技股份有限公司 Train shunting and marshalling method and device, electronic equipment and storage medium
CN113715879A (en) * 2021-11-04 2021-11-30 北京全路通信信号研究设计院集团有限公司 Shunting operation management and control method and system
CN114296422B (en) * 2021-11-23 2024-03-29 卡斯柯信号有限公司 CTC 3.0-based station yard centralized display and control method, equipment and medium
CN114312915A (en) * 2021-12-15 2022-04-12 中国铁路南宁局集团有限公司 Shunting construction safety protection method for railway special line
CN114394132B (en) * 2021-12-30 2023-08-25 卡斯柯信号有限公司 Improved method, equipment and medium for handling shunting route of dispatching centralized system
CN116080721B (en) * 2022-12-30 2024-11-08 中国铁道科学研究院集团有限公司通信信号研究所 Efficient shunting control module and intelligent shunting method
CN115973235B (en) * 2023-03-21 2023-08-01 卡斯柯信号(北京)有限公司 Train screening control method and device
CN116620356B (en) * 2023-05-29 2024-04-05 北京泰恒众信科技有限公司 Railway shunting access safety control system and method
CN118004250B (en) * 2024-04-08 2024-06-28 中国铁道科学研究院集团有限公司通信信号研究所 Railway cross-station safety protection method and system supporting inter-station cooperation

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102700574A (en) * 2012-05-04 2012-10-03 北京康吉森交通技术有限公司 Intelligent tracking system for enterprise railway plane shunting and working method of intelligent tracking system
CN104943712A (en) * 2015-06-25 2015-09-30 卡斯柯信号有限公司 Automatic management method for shunting operation notice sheet in shunting monitoring system

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2005007483A1 (en) * 2003-07-18 2005-01-27 Hitachi, Ltd. Device for supporting vehicle replacement schedule generation

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102700574A (en) * 2012-05-04 2012-10-03 北京康吉森交通技术有限公司 Intelligent tracking system for enterprise railway plane shunting and working method of intelligent tracking system
CN104943712A (en) * 2015-06-25 2015-09-30 卡斯柯信号有限公司 Automatic management method for shunting operation notice sheet in shunting monitoring system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
"浅谈无线调车机车信号和监控系统控制方案";陈煜;《铁道通信信号》;20150531;第51卷(第5期);全文 *

Also Published As

Publication number Publication date
CN106553664A (en) 2017-04-05

Similar Documents

Publication Publication Date Title
CN106553664B (en) The method and apparatus of shunting route control is implemented in combination with using STP and CTC
CN104773191B (en) Automatic centralized enterprise railway control method and system thereof
US20190359238A1 (en) Railway yard integrated control system
CN111353645B (en) Automatic handling method and system for urban rail transit vehicle base driving plan
CN109664923B (en) Urban rail transit train control system based on vehicle-vehicle communication
US3944986A (en) Vehicle movement control system for railroad terminals
CN101544233B (en) Marshalling station comprehensive automatic system
CN109178041B (en) Automatic control system for urban rail vehicle station yard access
CN109591858B (en) Method and device for handling locomotive hanging change operation based on CTC3.0 system
CN105278379A (en) Multiple-unit train maintenance base (station) centralized control system
WO2019228394A1 (en) Centralized train dispatch control system and control method
CN102700574A (en) Intelligent tracking system for enterprise railway plane shunting and working method of intelligent tracking system
WO2016017740A1 (en) Interlocking device
CN109625039B (en) Autonomous dispatching system and method for transportation of mine transport locomotive
CN104309652A (en) Intelligent tramcar signal system
WO2005007483A1 (en) Device for supporting vehicle replacement schedule generation
CN107808564A (en) A kind of track traffic sand table and interlock system, electric power system
CN112644519B (en) Forward vehicle aggregation combination system and method for railway marshalling station
CN113715879A (en) Shunting operation management and control method and system
CN206358166U (en) The device of shunting route control is implemented in combination with using STP and CTC
SK288449B6 (en) System for controlled transmission of train numbers for support of railway traffic control and manner in which this system operates
JP2014019182A (en) Train operation command device
CN112381277A (en) Arrival and departure line distribution method for direction-different high-speed railway junction station connected with multiple lines
CN108791368A (en) Rail traffic crewing management system
CN116395003B (en) Train section and train station crossing receiving and dispatching train control method suitable for one station and multiple stations

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant