CN106553664A - The method and apparatus of shunting route control is implemented in combination with using STP and CTC - Google Patents

The method and apparatus of shunting route control is implemented in combination with using STP and CTC Download PDF

Info

Publication number
CN106553664A
CN106553664A CN201611050309.7A CN201611050309A CN106553664A CN 106553664 A CN106553664 A CN 106553664A CN 201611050309 A CN201611050309 A CN 201611050309A CN 106553664 A CN106553664 A CN 106553664A
Authority
CN
China
Prior art keywords
shunting
route
shunting route
information
stp
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611050309.7A
Other languages
Chinese (zh)
Other versions
CN106553664B (en
Inventor
汤宝伟
崔虎
徐庆标
王刚
陈智新
田相坤
王如跃
梁前浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Casco Signal Ltd
Original Assignee
Casco Signal Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Casco Signal Ltd filed Critical Casco Signal Ltd
Priority to CN201611050309.7A priority Critical patent/CN106553664B/en
Publication of CN106553664A publication Critical patent/CN106553664A/en
Application granted granted Critical
Publication of CN106553664B publication Critical patent/CN106553664B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L27/00Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
    • B61L27/04Automatic systems, e.g. controlled by train; Change-over to manual control
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L27/00Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
    • B61L27/30Trackside multiple control systems, e.g. switch-over between different systems
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L27/00Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
    • B61L27/40Handling position reports or trackside vehicle data

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Train Traffic Observation, Control, And Security (AREA)

Abstract

The present invention relates to a kind of utilization STP and CTC is implemented in combination with the method and device of shunting route control, including:1) STP systems receive shunting operation sheet, according to current locomotive location information and the destination of shunting service, calculate shunting route, when route setting is needed, initiate shunting route application;2) CTC system real-time reception is set up shunting route application form or the shunting route application for newly receiving is inserted in shunting route application form from the shunting route application information of the STP systems of all locomotives;3) shunting operation sheet for all locomotives of the CTC system real-time reception from Shunting planning server;4) CTC system is operated to the shunting route application in shunting route application form.Compared with prior art, the labor intensity of personnel present invention reduces car is engaged in, improves the efficiency of shunting service, realizes the safe control to shunting route using equipment, fundamentally avoid the generation that shunting route mistake does problem.

Description

The method and apparatus of shunting route control is implemented in combination with using STP and CTC
Technical field
The present invention relates to the technology of shunting in a kind of railway transport course, utilizes STP (radio shuntings more particularly, to a kind of Cab signal and monitoring system) and CTC (Centralized Dispatching System) be implemented in combination with shunting route control method and apparatus.
Background technology
Shunting service is the important component part in railway transport course, and in the work of station organization of driving one it is important And complicated content.No matter large-scale station or intermediate station, the essence of its shunting service are basically identical, i.e. station controller (person on duty) according to scheduling scheduled in member assign train plan for adjustment, loading-unloading vehicle plan, the production plan that picks up and drop train, locomotive hand over Road plan etc. is foundation, with reference to current station practical situation, works out station control operation plan, and with shunting list Form is assigned to shunting command personnel and the relevant personnel, handles shunting route in good time, and commander shunting service personnel complete according to plan Shunting service.
Handling for shunting route is an important step in shunting service, the correct of shunting route, safety and shunt into The timely foundation on road is to ensure that the most important thing of Safety of Shunting Operation and efficiency.In order to realize the automatic row road of shunting route, carry High working performance and row shunting service is interfered problem carry out intelligence discongest, improve Safety of Shunting Operation, CTC system Devise a set of shunting plan list editor and route automatic control function.Specifically by shunting operation sheet editing interface, work out Shunting plan, it is possible to modify to shunting trip sequence, manual auxiliary generate shunting route sequence and are issued to station autonomous controlling Machine, in due course machine trigger shunting route manually or trigger automatically shunting route.But as shunting service is strictly dependent on Train operation plan, and train work interfered with shunting service, such as pass through main track shunting route, take hair line shunt into Road, be not take up hair line but affect shunting route etc. of sending and receiving car, while shunting service is more complicated, the time for fulfiling assignment with Machine is stronger, it is therefore desirable to which Jing often constantly changes shunting plan and shunting route according to live actual job situation.In order to This change at random is adapted to, Platform attendant just must constantly work out shunting plan, modification or redesign shunting route Sequence, workload are too big so that CTC cannot be applied to scene to shunting route management and control.
At present, shunting route is set up and controls or apply traditional method.I.e. signaling at stations person is shunting service made of paper Single pendulum is put on the table, tune machine one shunting operation sheet of correspondence.Signalman is adjusted according to papery shunting operation sheet, manual observation The red band position of machine simultaneously combines time and the Train operation plan of shunting service, discharges route in good time.After route discharge, in correspondence Shunting trip on draw and complete labelling.Shunting route emissions operation is on interlocking HMI (TDCS stations) or in CTC terminals Pressing top button and terminal button are carried out.In order to ensure shunting route it is correct, rationally, safety, signalman arrangement shunt into Lu Shi, performs " at a glance, two clicks, three confirmations, four call " system.Simultaneously Platform attendant also route operating process is stared at control, Check on.
Handle under flow process in existing shunting route, it is higher to signalman's requirement, machine is adjusted simultaneously especially for multiple stage The station of operation, the busy station of train work, signalman's high labor intensive.Meanwhile, the mode that this shunting route is handled, especially It is on interlocking HMI to handle shunting route, it is impossible to realize, to shunting route and the verification inspection of shunting plan, shunting by equipment The inspection that conflicts with train route of route, the equipment application condition inspection of shunting route, realizes the safe control of shunting route. This traditional work mode for relying solely on operating personnel's automatic control, cross complaint, cannot ensure the safety of high density shunting service And efficiency requirements, it is badly in need of being managed and control shunting route arrangement by new technique, new equipment, while reducing car business personnel Labor intensity, improve work efficiency.
The content of the invention
The purpose of the present invention is exactly to provide a kind of using STP and CTC to overcome the defect of above-mentioned prior art presence It is implemented in combination with the method and apparatus of shunting route control.
The purpose of the present invention can be achieved through the following technical solutions:
A kind of method that utilization STP and CTC is implemented in combination with shunting route control, comprises the following steps:
1) the STP systems installed on locomotive receive this locomotive shunting operation sheet, according to shunting service practical situation to shunting Job ticket enters edlin adjustment, and the content for editing adjustment is:The time started and end time of shunting service;
2) promoter of the STP systems installed on locomotive as arrangement shunting route, when forbidding shunting in locomotive/car team pressure The front section of signal, locomotive STP systems are led according to current locomotive location information, the destination of next shunting service, route Outlet and current yard orbit occupancy relation, automatic search computer car can arrive at it is all feasible shunt into Road, and by STP systems automatically or by manual confirmation transmission shunting route application information to CTC system;
3) CTC system real-time reception from all locomotives STP systems shunting route application information, foundation shunt into Road application form is inserted into the shunting route application for newly receiving according to the sequencing of job priority and activity duration In shunting route application form;
4) shunting service for all tune machines of the CTC system real-time reception from Shunting planning server It is single;
5) CTC system is operated to the shunting route application in shunting route application form.
Forbid the front section of shunting signal in described locomotive/car team pressure, i.e., according to locomotive or car team travel direction, Jing Last crossed is shunt allows signal and first, front running into shunt the track circuit section between disable signal.
Described shunting plan establishment server, installs SMIS2.6 (station IMIS) software, for compiling Shunting operation plan processed, and shunting operation sheet is issued to locomotive and shunting route control machine.
Described shunting route application information includes engine number, the position of current locomotive place track, the mesh for going to operation Position, the route shunting neck being related to, the time started for carrying out this subjob and with end time, the priority scheduling of shunting service Level and all of optional shunting route through calculating.
When step 2) after STP system-computeds during no optional shunting route, do not send shunting route application information.
Described CTC system is operated specially to the shunting route application in shunting route application form:
A, the shunting route application information to each locomotive transmission carry out word and graphic software platform, and basis source in tune The shunting route application information that the shunting service single pair of of every locomotive of the car planning server locomotive sends is planned Verification;
B, for by plan verification inspection shunting route application, according to current locomotive position, go to the target of operation Position, the shunting neck of auxiliary and current yard track occupation, calculate can with the shunting route of traveling, and with locomotive STP The optional shunting route for calculating in the same fashion that system is provided is checked, and is carried out two and is taken two operations, selects all identicals Shunting route alternately shunting route collection;
C, train conflict inspection and equipment availability inspection are carried out on time dimension to alternative shunting route, by inspection The all shunting routes looked into form executable shunting route collection, and carry out word and yard figure to each executable shunting route Change and show, list the optimum shunting route of the pluses and minuses and system recommendations of each executable shunting route;
D, manual key triggering mode arrangement shunting route is provided to executable shunting route or with automatic triggering mode Arrangement shunting route;
E, for conflicting with train route or the executable of condition not met the reason for conflict with other shunting routes The shunting route application of shunting route, CTC send route and wait feedback information to corresponding locomotive STP systems;For not passing through Plan verification detection or the shunting route application of route verification detection, CTC send route mistake application information to locomotive STP systems System;
F, the executable shunting route provided from system are concentrated and select a shunting route, are arranged shunting route, and are sent Route performs feedback.
G, CTC system continue step a, b, c, d, e, f until completing all of shunting route application.
Equipment availability inspection in described step c includes power supply interrupted district inspection and construction and blockade range check.
A kind of device of the method that shunting route control is implemented in combination with for described utilization STP and CTC, including:CTC systems System, STP systems, computer interlock system, outdoor signal equipment, shunting plan establishment server, shunting route control machine and tune The control of car route shows machine, is provided with station autonomous controlling machine in described CTC system;
Described STP systems are connected with shunting plan establishment server, for receiving the shunting operation sheet of all locomotives;Send out Shunting service is sent to feed back;
Described STP systems are connected with shunting route control machine module, for sending locomotive shunting route application information;Connect Receive shunting route and perform state feedback information;
Described shunting route control machine is connected with shunting plan establishment server, for receiving the tune of all locomotives of our station Car job ticket;
The aobvious machine of described shunting route control machine and shunting route control is connected, for sending shunting route application information, standby Shunting route information, executable shunting route information are selected, route is received and is performed feedback;
Described shunting route control machine is connected with station autonomous controlling machine, and for sending alternative shunting route information, reception can Perform shunting route information;
The aobvious machine of described shunting route control is connected with station autonomous controlling machine, performs order for sending shunting route, receive into Road performs feedback;
Described computer interlock system is connected with outdoor signal equipment, for output relay operational order, gather after Electrical appliance state signal;
Described computer interlock system is connected with station autonomous controlling machine, for receiving route sequence instruction;Send route to hold Row state.
Described CTC system includes the CTC centers being connected with each other and CTC train station subsystems, and described station autonomous controlling machine sets In CTC train station subsystems.
Described STP systems include STP on-vehicle hosts and STP ground host machines;
Described STP on-vehicle hosts are connected with STP ground host machines, for sending shunting route application to STP ground host machines Information, receives route application feedback, receives shunting plan job ticket;
Described STP ground host machines STP on-vehicle hosts multiple with our station are connected, for receiving locomotive shunting route letter of application Breath;Send route and perform feedback of status;
Described STP ground host machines with shunting plan establishment server be connected, for receiving the work of shunting of all locomotives Industry list;
Described STP ground host machines are connected with shunting route control machine, for sending locomotive shunting route application information, are connect Receive shunting route and perform state feedback information.
Described STP on-vehicle hosts include that first information communication module, shunting operation sheet editor module, shunting route are calculated Module, shunting route application module and shunting route configuration module;
Described first information communication module and STP ground host machine interfaces, for obtaining automatically, updating shunting plan establishment The shunting operation sheet of server establishment, sends shunting route application information, receives shunting route and performs feedback;
Described shunting operation sheet editor module is that the hooking plan to shunting service is refined, and is passed through including addition route Shunting neck information, addition or change hooking plan time started and the end time, form the refinement shunting operation sheet of this tune machine;
Described shunting route computing module be according to locomotive current position, the destination for going to operation, shunting neck, with reference to Yard track occupation, calculates the optional shunting route set that can be arrived at;
Described shunting route application module be according to route application way configuration send shunting route application information to First information communication module, is transmitted by first information communication module, and the information of transmission includes:Engine number, locomotive present bit Put, destination locations, route shunting neck, operation time started and end time, job priority grade;Under automatic sending mode, When the track before locomotive/car team press-in disable signal, the automatic trigger message of shunting route application module sends;Manually triggering Under pattern, driver selects a good opportunity transmission according to field condition;
Described shunting route configuration module is used to arrange the mode of shunting route application to be triggering automatically or manually touches Send out.
Described STP ground host machines include the second information communication module, data processing distribution module;
All of with the our station STP on-vehicle hosts of the second described information communication module are set up and are wirelessly connected, for receive into Road application information, sends route and performs feedback, send locomotive shunting operation sheet;The second described information communication module and meter of shunting Establishment server connection is drawn, for receiving the shunting operation sheet of all locomotives;The second described information communication module with shunt into An outpost of the tax office's control machine connection, for sending shunting route application information, receives route and performs feedback information;
Data from external interface are carried out protocol conversion, data check by described data processing distribution module, and Communication queue queuing is carried out according to data type and priority level, it is ensured that the promptness of data message interaction.
Described shunting route control machine includes the 3rd information communication module, plan verification module and route verification module;
The 3rd described information communication module is connected with STP ground host machines, for receiving shunting route application information, is sent Carry out execution state;The 3rd described information communication module is connected with shunting plan establishment server, for receiving all locomotives Shunting operation sheet;The 3rd described information communication module is connected with station autonomous controlling machine, for sending alternative shunting route information, Receive executable shunting route information;
Described plan verification module is the shunting service according to every locomotive that server is worked out from shunting plan The shunting route information that the single pair of locomotive sends is checked, including destination, operation start and end time, job priority Grade;
Described route verification module is the current location that sends according to locomotive and goes to involving for destination locations and auxiliary Line information, is calculated the shunting route set that can be reached, and is provided with locomotive STP systems according to current yard track occupation Optional shunting route set carry out two and take two verifications operation, form alternative shunting route set.
The aobvious machine of described shunting route control includes the 4th information communication module, information display module, information intelligent layout mould Block, access way control module;
The 4th described information communication module is connected with shunting route control machine, for receive shunting route application information, Alternative shunting route information, executable shunting route information, send route and perform feedback;Described the 4th information communication module with Station autonomous controlling machine connects, and performs order for sending shunting route, receives route and performs feedback;
Described information display module is that shunting route application information is shown, wherein shunting route application information includes machine License number, locomotive current location, destination locations, shunting neck, operation time started and end time, job priority grade, can recruit Car route;Word and yard graphic software platform are carried out to alternative shunting route;Word and yard are carried out to executable shunting route Graphic software platform;One key operation button of route is provided to executable shunting route;
Described information intelligent layout modules are when the displaying of the multiple locomotive route application examples of information display module process When, whether there are executable shunting route, excellent operation elder generation grade, activity duration sequencing to enter according to the shunting route of locomotive application Row shows queue order management;When with the optional shunting route of yard graphics mode preview, alternative shunting route or executable shunting During route, according to locus, the position that Word message does not block graphical interfaces is calculated automatically, window layout again is carried out, side Just route preview;
Described access way control module is to complete the configuration to route triggering mode, either automatically or manually, meanwhile, work as route During triggering, send shunting route sequence instruction to the 4th information communication module, by the forwarding of the 4th information communication module shunt into Road sequence instruction completes route triggering to station autonomous controlling machine.
Described station autonomous controlling machine includes that the 5th information communication module and row are transferred in road conflict and check that module and equipment are available Property check module composition, wherein:
The 5th described information communication module is connected with shunting route control machine, for receiving alternative shunting route, is sent Executable shunting route;The 5th described information communication module be connected with shunting route control aobvious machine, reception route performs order, Send route and perform feedback;
Described row are transferred in road conflict and check Train operation plan of the module according to our station, to passing through main track on time dimension Shunting route, take to hair line shunting route, be not take up hair line but impact sending and receiving car shunting route carry out collision detection;
Described equipment availability checks that module adjusts machine to proceed through power supply interrupted district detection to electric power;To locomotive through constructing Blockade zone is detected;
Collision detection and the shunting route of equipment availability detection is adjusted to form executable shunting route by arranging;Executable When shunting route is performed, shunting route is detected in terms of time dimension, Spatial Dimension and equipment availability again, only Can just be handled by the shunting route for detecting.
Compared with prior art, the control method of shunting route of the invention first, when taking locomotive to need shunting route Route is carried out by equipment to calculate and apply arranging the strategy of shunting route, shunting service randomness is solved by force, shunting plan becomes Change soon, car business personnel constantly change a difficult problem for shunting route Sequence Program, reduce the intensity of car business staff.Specially: Locomotive STP systems receive this locomotive shunting operation sheet, when the front section of shunting signal is forbidden in locomotive/car team pressure, locomotive STP systems according to current locomotive location information and the destination of next shunting service, calculate locomotive can with traveling shunt into Road, and the shunting route application information up to next shunting service destination is sent to CTC system.Secondly, the method takes meter Draw dual verification, the software and hardware of the dual verification of shunting route to complete the two of isomery to take two tactful, it is ensured that shunting service is strictly pressed The safety with shunting route is performed according to plan.After specially CTC system receives the shunting route application of locomotive, basis source in The shunting operation sheet of shunting plan establishment server carries out shunting plan inspection to shunting route application information;According to shunting route The shunting route that application information is calculated shunting route and provided with STP systems carries out two and takes two dual tests checking to form alternative Shunting route.If plan or shunting route occur inconsistent situation, shunting route is performed all without arrangement.Further, should Method is entered ranks according to equipment and adjusts conflict to check to shunting route, and equipment availability inspection further ensures shunting route Safety, improves conevying efficiency.Specially CTC system alternative shunting route is carried out time dimension train route conflict check with And shunting route equipment safety protection (power failure, construction and blockade) is checked, is formed by the route for checking and is met the executable of condition Shunting route set, and be given every route strengths and weaknesses analysis and optimal choice suggestion.Finally, the method provides complete Intelligentized visualization interface and simple controlling interface, facilitate the grasp to Global Information of car business personnel, reduce maloperation Probability.Specially the method is shown with yard patterned way to each shunting route, shunting service application is labeled, And cause under the congested conditions of interface in many locomotive applications, sort according to shunting service priority, activity duration sequencing, interface Intelligent layout.The method provides the manual triggering mode arrangement shunting route of a key and automatic shunting to every shunting route simultaneously Route triggering mode.
Define the device of the present invention on the basis of the present invention, the device of the present invention be in CTC and STP apparatus and On the basis of shunting plan establishment server, increase on-vehicle host module in STP on-vehicle hosts, complete connecing for shunting operation sheet Refinement is received and edited, the application function of the search, calculating and shunting route of shunting route is completed, is realized according to current locomotive position Confidence cease and next shunting service destination, calculating locomotive with the shunting route of traveling, and can be sent to CTC system and reaches The shunting route application information of next shunting service destination;Increase ground host machine module in STP ground host machines, complete various numbers According to the conversion distribution of, information, info gateway is played between multiple stage locomotive, shunting plan establishment server and CTC system in station Effect.Increase shunting route control machine equipment device, while increasing shunting route control machine module, complete to shunting service meter The two of the shunting route of dual verification, the search calculating of shunting route and the two distinct device offers drawn take two verifications behaviour Make.Increase the aobvious machine equipment device of shunting route control, while increasing the aobvious machine module of shunting route control, complete to shunting route letter of application The intelligent layout of the graphic software platform and display information of breath, and the controlling interface of one key of route triggering is provided.In CTC self-regulating machines It is upper to increase the safe control inspection module of route, complete train route and shunting route collision detection and equipment on time dimension Condition safety detection.As the dress of the present invention centers these equipment and functional module, deposit in overcoming prior art completely Shunting route handle without workflow management and control, shunting route mistake proofing does and manually checks on, the safety of shunting route and The deficiency that efficiency varies with each individual, realize shunting route management and control from individual character to general character, it is ensured that shunting route it is timely, It is correct to set up, the safety and reliability of arrangement shunting route is improve, the labor intensity of car business personnel is reduced, it is prior It is to realize the fundamental change that the control of shunting route is controlled by people's steering equipment, fundamentally avoids shunting route mistake and do The generation of problem, with great economic benefit and social benefit.
Description of the drawings
Fig. 1 is the structural representation of the present invention.
Wherein 1 is CTC centers, and 2 is CTC train station subsystems, and 21 is station autonomous controlling machine, and 3 is STP on-vehicle hosts, and 4 is STP Ground host machine, 5 is that shunting plan works out server, and 6 is shunting route control machine, and 7 is the aobvious machine of shunting route control, and 8 is computer Interlock system, 9 is outdoor signal equipment.
Specific embodiment
The present invention is described in detail with specific embodiment below in conjunction with the accompanying drawings.The present embodiment is with technical solution of the present invention Premised on implemented, give detailed embodiment and specific operating process, but protection scope of the present invention be not limited to Following embodiments.
As shown in figure 1, a kind of utilization STP and CTC is implemented in combination with the device of shunting route control, including:CTC system, STP System, computer interlock system 8, outdoor signal equipment 9, shunting plan are worked out server 5, shunting route control machine 6 and are shunt Route control shows machine 7, and station autonomous controlling machine 21 is provided with described CTC system;
Described STP systems are connected with shunting plan establishment server, for receiving the shunting operation sheet of all locomotives, are sent out Shunting service is sent to feed back;Described STP systems are connected with shunting route control machine module, for sending locomotive shunting route application Information;Receive shunting route and perform state feedback information;Described shunting route control machine is connected with shunting plan establishment server Connect, for receiving the shunting operation sheet of all locomotives of our station;Described shunting route control machine is connected with the aobvious machine of shunting route control, For sending route application information, alternative shunting route information, executable shunting route information, receive route and perform feedback;Institute The shunting route control machine stated is connected with station autonomous controlling machine, for sending alternative shunting route information, receive it is executable shunt into Road information;The aobvious machine of described shunting route control is connected with station autonomous controlling machine, is performed order for sending shunting route, is received route Perform feedback;Described computer interlock system is connected with outdoor signal equipment, for output relay operational order, gather after Electrical appliance state signal;Described computer interlock system is connected with station autonomous controlling machine, for receiving route sequence instruction, send into Road performs state.
Described CTC system includes the CTC centers 1 being connected with each other and CTC train station subsystems 2, described station autonomous controlling machine 21 are located in CTC train station subsystems.
Described STP systems include STP on-vehicle hosts 3 and STP ground host machines 4;Described STP on-vehicle hosts and STP ground Face main frame connection, for sending shunting route application information to STP ground host machines, receives route application feedback, receives meter of shunting Draw job ticket;Described STP ground host machines STP on-vehicle hosts multiple with our station are connected, for receiving locomotive shunting route application Information;Send route and perform feedback of status;Described STP ground host machines with shunting plan establishment server be connected, for connecing Receive the shunting operation sheet of all locomotives;Described STP ground host machines are connected with shunting route control machine, for sending locomotive shunting Route application information, receives shunting route and performs state feedback information.
Described STP on-vehicle hosts include that first information communication module, shunting operation sheet editor module, shunting route are calculated Module, shunting route application module and shunting route configuration module;Described first information communication module is connect with STP ground host machines Mouthful, for obtaining automatically, updating the shunting operation sheet of shunting plan establishment server establishment, shunting route application information is sent, Receive shunting route and perform feedback;Described shunting operation sheet editor module is that the hooking plan to shunting service is refined, bag The time started and end time of the shunting neck information that addition route is passed through, addition or modification hooking plan are included, this tune machine is formed Refinement shunting operation sheet;Described shunting route computing module is according to locomotive current position, goes to the destination of operation, involves Line, with reference to yard track occupation, calculates the optional shunting route set that can be arrived at;Described shunting route Shen Please module be to send shunting route application information to first information communication module according to the configuration of route application way, believed by first Message communication module is transmitted, and the information of transmission includes:Engine number, locomotive current location, destination locations, route shunting neck, work Industry time started and end, job priority grade;Rail under automatic sending mode, before locomotive/car team press-in disable signal During road, the automatic trigger message of shunting route application module sends;Under artificial triggering pattern, driver selects a good opportunity according to field condition and sends out Send;It is triggering automatically or artificial triggering that described shunting route configuration module is used to arrange the mode of shunting route application.
Described STP ground host machines include the second information communication module, data processing distribution module;The second described information Communication module STP on-vehicle hosts all of with our station are set up and are wirelessly connected, and for receiving shunting route application information, send route Feedback is performed, locomotive shunting operation sheet is sent;The second described information communication module is connected with shunting plan establishment server, is used In the shunting operation sheet for receiving all locomotives;The second described information communication module is connected with shunting route control machine, for sending out Shunting route application information is sent, route is received and is performed feedback information;Described data processing distribution module, to connecing from outside The data of mouth carry out protocol conversion, data check, and carry out communication queue queuing according to data type and priority level, it is ensured that number According to the promptness of information exchange.
Described shunting route control machine includes the 3rd information communication module, plan verification module and route verification module; The 3rd described information communication module is connected with STP ground host machines, for receiving shunting route application information, is sent route and is performed State;The 3rd described information communication module is connected with shunting plan establishment server, for receiving the work of shunting of all locomotives Industry list;The 3rd described information communication module is connected with station autonomous controlling machine, and for sending alternative shunting route information, reception can be held Row shunting route information;Described plan verification module is the tune according to every locomotive that server is worked out from shunting plan Car job ticket is checked to the shunting route information that the locomotive sends, including destination, the operation time started and at the end of Between, job priority grade;Described route verification module is the current location that sends according to locomotive and goes to destination locations and auxiliary The shunting neck information for helping, calculates the shunting route set that can reach according to current yard track occupation, and with locomotive STP The optional route set that system is provided carries out two and takes two verifications operation, forms alternative shunting route set.
The aobvious machine of described shunting route control includes the 4th information communication module, information display module, information intelligent layout mould Block, access way control module;The 4th described information communication module is connected with shunting route control machine, for receiving shunting route Shen Please information, alternative shunting route information, executable shunting route information, send route and perform feedback;The 4th described information is led to Letter module is connected with station autonomous controlling machine, performs order for sending shunting route, is received route and is performed feedback;Described information shows Show that module is that shunting route application information is shown, wherein shunting route application information includes engine number, locomotive current location, mesh Position, shunting neck, operation time started and end time, job priority grade, optional shunting route;To alternative shunting route Carry out word and yard graphic software platform;Word and yard graphic software platform are carried out to executable shunting route;To executable tune Car route provides one key operation button of route;Described information intelligent layout modules are when the multiple locomotives of information display module process During the displaying of route application example, according to the shunting route of locomotive application whether have executable shunting route, job priority grade, Activity duration sequencing carries out showing queue order management;When with the optional shunting route of yard graphics mode preview, alternative tune When car route or executable shunting route, according to locus, the position that Word message does not block graphical interfaces is calculated automatically, is entered Row window layout again, facilitates route preview.Described access way control module is to complete the configuration to route triggering mode, automatically Or manually, meanwhile, when route is triggered, shunting route sequence instruction is sent to the 4th information communication module, by the 4th letter Message communication module forwards shunting route sequence instruction completes route triggering to station autonomous controlling machine.
Described station autonomous controlling machine includes that the 5th information communication module, row are transferred in road conflict and check module and equipment availability Module composition is checked, wherein:The 5th described information communication module is connected with shunting route control machine, is alternatively shunt for receiving Route, sends executable shunting route;The 5th described information communication module be connected with shunting route control aobvious machine, reception route Order is performed, route is sent and is performed feedback;Described row are transferred in road conflict and check Train operation plan of the module according to our station, in the time On the shunting route for passing through main track, the shunting route for taking hair line, the tune for being not take up hair line but affecting sending and receiving car in dimension Car route carries out collision detection;Described equipment availability checks that module adjusts machine to proceed through power supply interrupted district detection to electric power;It is right Locomotive is detected through construction and blockade region;Shunting route through detecting forms executable shunting route, executable When shunting route is performed, shunting route is detected in terms of time dimension, Spatial Dimension and equipment availability again, only Can just be handled by the shunting route for detecting.
The control method of shunting route of the present invention, comprises the following steps:
(1) the STP systems installed on locomotive receive this locomotive shunting operation sheet, according to shunting service practical situation to shunting Job ticket enters edlin adjustment.Editing the content for adjusting is:The time started and end time of shunting service.
(2) the STP systems installed on locomotive are to arrange the promoter of shunting route.When forbidding shunting in locomotive/car team pressure The front section of signal, locomotive STP systems are led according to current locomotive location information, the destination of next shunting service, route Outlet and current yard orbit occupancy relation, automatic search computer car can arrive at it is all feasible shunt into Road, and by STP systems automatically or by manual confirmation transmission shunting route application information to CTC system.Route application information Including:Shunting neck that engine number, the position of current locomotive place track, the destination locations for going to operation, route are related to, carry out All of optionally the shunting of the time started and end time, the priority level of shunting service and process calculating of this subjob Route.When no optional route, can not send.
(3) shunting route application information of the CTC system real-time reception from the STP systems of all locomotives, foundation are shunt Route application form inserts the shunting route application for newly receiving according to the sequencing of job priority and activity duration To in shunting route application form.
(4) shunt work for all tune machines of the CTC system real-time reception from Shunting planning server Industry list.
(5) CTC system is done as follows successively to the shunting route application in shunting route application form:
A, the shunting route application information to each locomotive transmission carry out word and graphic software platform, and according to from tune The shunting route application information that the shunting service single pair of of each locomotive of the car planning server locomotive sends is planned Verification, such as destination, operation time started and end time, job priority grade etc..
B, for by plan verification inspection shunting route application, according to current locomotive position, go to the target of operation Position, the shunting neck of auxiliary and current yard track occupation, calculate can with the shunting route of traveling, and with locomotive STP The optional shunting route for calculating in the same fashion that system is provided is checked, and is carried out 2 and is taken 2 operations, is selected all identicals and is adjusted Car route becomes alternative shunting route collection;
C, train conflict inspection and equipment availability inspection (power failure area are carried out on time dimension to alternative shunting route Domain inspection, construction and blockade range check), executable shunting route collection is formed by all shunting routes for checking, and to each Executable shunting route carries out word and yard graphical representation, and the pluses and minuses and system for listing each executable shunting route are built The optimum shunting route of view.
D, manual key triggering mode arrangement shunting route is provided to executable shunting route or with automatic triggering mode Arrangement shunting route;
E, for conflicting with train route or the reason such as conflict with other shunting routes does not meet the executable of condition The shunting route application of shunting route, CTC system send route and wait feedback information to corresponding locomotive STP systems;For not By plan verification detection or route verification detection shunting route application, CTC system send route mistake application information to Locomotive STP systems;
F, the executable shunting route provided from CTC system are concentrated and select a shunting route, arrange shunting route, concurrently It is sent into road and performs feedback.
G, CTC system continue step a, b, c, d, e, f until completing all of shunting route application.
The above, the only specific embodiment of the present invention, but protection scope of the present invention is not limited thereto, any Those familiar with the art the invention discloses technical scope in, various equivalent modifications can be readily occurred in or replaced Change, these modifications or replacement should all be included within the scope of the present invention.Therefore, protection scope of the present invention should be with right The protection domain of requirement is defined.

Claims (14)

1. a kind of method that utilization STP and CTC is implemented in combination with shunting route control, it is characterised in that comprise the following steps:
1) the STP systems installed on locomotive receive this locomotive shunting operation sheet, according to shunting service practical situation to shunting service Singly enter edlin adjustment, the content for editing adjustment is:The time started and end time of shunting service;
2) promoter of the STP systems installed on locomotive as arrangement shunting route, when forbidding shunting signal in locomotive/car team pressure Front section, locomotive STP systems are according to current locomotive location information, the destination of next shunting service, route shunting neck And current yard orbit occupancy relation, all feasible shunting route that automatic search computer car can be arrived at, and By STP systems automatically or by manual confirmation transmission shunting route application information to CTC system;
3) CTC system real-time reception sets up shunting route Shen from the shunting route application information of the STP systems of all locomotives Please the table or shunting route application for newly receiving is inserted into according to the sequencing of job priority and activity duration shunt In route application form;
4) shunting operation sheet for all tune machines of the CTC system real-time reception from Shunting planning server;
5) CTC system is operated to the shunting route application in shunting route application form.
2. the method that a kind of utilization STP and CTC according to claim 1 is implemented in combination with shunting route control, its feature exist In, the front section of disable signal of shunting in described locomotive/car team pressure, i.e., according to locomotive or car team travel direction, process Last is shunt allows signal and first, front running into shunt the track circuit section between disable signal.
3. the method that a kind of utilization STP and CTC according to claim 1 is implemented in combination with shunting route control, its feature exist In described shunting route application information includes engine number, the position of current locomotive place track, the purpose status for going to operation Put, the shunting neck that route is related to, the time started and end time that carry out this subjob, the priority level of shunting service and Jing Cross all of optional shunting route for calculating.
4. the method that a kind of utilization STP and CTC according to claim 1 is implemented in combination with shunting route control, its feature exist In when step 2) after STP system-computeds during no optional shunting route, do not send shunting route application information.
5. the method that a kind of utilization STP and CTC according to claim 1 is implemented in combination with shunting route control, its feature exist In described CTC system is operated specially to the shunting route application in shunting route application form:
A, the shunting route application information to each locomotive transmission carry out word and graphic software platform, and according to from meter of shunting Drawing the shunting route application information that the shunting service single pair of locomotive of each locomotive of establishment server sends carries out plan verification;
B, for by plan verification inspection shunting route application, according to current locomotive position, go to the target location of operation, The shunting neck of auxiliary and current yard track occupation, calculating with the shunting route of traveling, and can be carried with locomotive STP systems For the optional shunting route for calculating in the same fashion checked, carry out two and take two operations, select all identicals shunt into Road becomes alternative shunting route collection;
C, train conflict inspection and equipment availability inspection are carried out on time dimension to alternative shunting route, by what is checked All shunting routes form executable shunting route collection, and carry out word to each executable shunting route and yard is graphically opened up Show, list the optimum shunting route of the pluses and minuses and system recommendations of each executable shunting route;
D, manual key triggering mode arrangement shunting route is provided to executable shunting route or is arranged with automatic triggering mode Shunting route;
E, shunt for conflicting with train route or not meeting the executable of condition the reason for conflict with other shunting routes The shunting route application of route, CTC send route and wait feedback information to corresponding locomotive STP systems;For not by plan Verification detection or the shunting route application of route verification detection, CTC send route mistake application information to locomotive STP systems;
F, the executable shunting route provided from CTC system are concentrated and select a shunting route, are arranged shunting route, are concurrently sent into Road performs feedback.
G, CTC system continue step a, b, c, d, e, f until completing all of shunting route application.
6. the method that a kind of utilization STP and CTC according to claim 5 is implemented in combination with shunting route control, its feature exist In the equipment availability inspection in described step c includes power supply interrupted district inspection and construction and blockade range check.
7. a kind of utilization STP and CTC for described in claim 1 is implemented in combination with the device of the method for shunting route control, its It is characterised by, including:CTC system, STP systems, computer interlock system, outdoor signal equipment, shunting plan establishment server, Shunting route control machine and the aobvious machine of shunting route control, are provided with station autonomous controlling machine in described CTC system;
Described STP systems are connected with shunting plan establishment server, for receiving the shunting operation sheet of all locomotives;Send and adjust Car operation feedback;
Described STP systems are connected with shunting route control machine module, for sending locomotive shunting route application information;Receive and adjust Car route performs state feedback information;
Described shunting route control machine is connected with shunting plan establishment server, for receiving the work of shunting of all locomotives of our station Industry list;
Described shunting route control machine is connected with the aobvious machine of shunting route control, for sending shunting route application information, alternative tune Car route information, executable shunting route information, receive route and perform feedback;
Described shunting route control machine is connected with station autonomous controlling machine, for sending alternative shunting route information, receives executable Shunting route information;
The aobvious machine of described shunting route control is connected with station autonomous controlling machine, performs order for sending shunting route, is received route and is held Row feedback;
Described computer interlock system is connected with outdoor signal equipment, for output relay operational order, gathers relay Status signal;
Described computer interlock system is connected with station autonomous controlling machine, for receiving route sequence instruction;Send route and perform shape State.
8. device according to claim 7, it is characterised in that described CTC system include the CTC centers being connected with each other and CTC train station subsystems, described station autonomous controlling machine are located in CTC train station subsystems.
9. device according to claim 7, it is characterised in that described STP systems include STP on-vehicle hosts and STP ground Face main frame;
Described STP on-vehicle hosts are connected with STP ground host machines, for sending shunting route application information to STP ground host machines, Route application feedback is received, shunting plan job ticket is received;
Described STP ground host machines STP on-vehicle hosts multiple with our station are connected, for receiving locomotive shunting route application information; Send route and perform feedback of status;
Described STP ground host machines with shunting plan establishment server be connected, for receiving the shunting operation sheet of all locomotives;
Described STP ground host machines are connected with shunting route control machine, for sending locomotive shunting route application information, are received and are adjusted Car route performs state feedback information.
10. device according to claim 9, it is characterised in that described STP on-vehicle hosts include first information communication mould Block, shunting operation sheet editor module, shunting route computing module, shunting route application module and shunting route configuration module;
Described first information communication module and STP ground host machine interfaces, for obtaining automatically, updating shunting plan establishment service The shunting operation sheet of device establishment, sends shunting route application information, receives shunting route and performs feedback;
Described shunting operation sheet editor module is that the hooking plan to shunting service is refined, including leading that addition route is passed through The time started and end time of outlet information, addition or modification hooking plan, form the refinement shunting operation sheet of this tune machine;
Described shunting route computing module is according to locomotive current position, the destination for going to operation, shunting neck, with reference to yard Track occupation, calculates the optional shunting route set that can be arrived at;
Described shunting route application module is to send shunting route application information to first according to the configuration of route application way Information communication module, is transmitted by first information communication module, and the information of transmission includes:Engine number, locomotive current location, mesh Position, route shunting neck, operation time started and end time, job priority grade;Under automatic sending mode, work as machine During track before car/car team press-in disable signal, the automatic trigger message of shunting route application module sends;In artificial triggering pattern Under, driver selects a good opportunity transmission according to field condition;
It is triggering automatically or artificial triggering that described shunting route configuration module is used to arrange the mode of shunting route application.
11. devices according to claim 9, it is characterised in that described STP ground host machines include the second information communication mould Block, data processing distribution module;
All of with the our station STP on-vehicle hosts of the second described information communication module are set up and wirelessly are connected, for reception shunt into Road application information, sends route and performs feedback, send locomotive shunting operation sheet;The second described information communication module and meter of shunting Establishment server connection is drawn, for receiving the shunting operation sheet of all locomotives;The second described information communication module with shunt into An outpost of the tax office's control machine connection, for sending shunting route application information, receives route and performs feedback information;
Data from external interface are carried out protocol conversion, data check by described data processing distribution module, and according to Data type and priority level carry out communication queue queuing, it is ensured that the promptness of data message interaction.
12. devices according to claim 7, it is characterised in that described shunting route control machine includes that the 3rd information is led to Letter module, plan verification module and route verification module;
The 3rd described information communication module is connected with STP ground host machines, for receiving shunting route application information, sends route Execution state;The 3rd described information communication module is connected with shunting plan establishment server, for receiving the tune of all locomotives Car job ticket;The 3rd described information communication module is connected with station autonomous controlling machine, for sending alternative shunting route information, is received Executable shunting route information;
Described plan verification module is the shunting service single pair of of every locomotive that basis source works out server in shunting plan The shunting route information that the locomotive sends is checked, including destination, operation time started and end time, job priority Grade;
Described route verification module is the current location of the locomotive sent according to locomotive and goes to leading for destination locations and auxiliary Outlet information, calculates the shunting route set that can reach according to current yard track occupation, and with locomotive provide can Select shunting route set to carry out two and take two verifications operation, form alternative shunting route set.
13. devices according to claim 7, it is characterised in that the aobvious machine of described shunting route control includes that the 4th information is led to Letter module, information display module, information intelligent layout modules, access way control module;
The 4th described information communication module is connected with shunting route control machine, for receiving shunting route application information, alternative Shunting route information, executable shunting route information, send route and perform feedback;The 4th described information communication module and station Self-regulating machine connects, and performs order for sending shunting route, receives route and performs feedback;
Described information display module is that shunting route application information is shown, wherein shunting route application information includes locomotive Number, locomotive current location, destination locations, shunting neck, operation time started and end time, job priority grade, optional shunt Route;Word and yard graphic software platform are carried out to alternative shunting route;Word and yards design are carried out to executable shunting route Shapeization shows;One key operation button of route is provided to executable shunting route;
Described information intelligent layout modules are the roots when the displaying of information display module process multiple locomotive route application examples Whether there are executable shunting route, job priority grade, activity duration sequencing to be shown according to the shunting route of locomotive application Show that queue order is managed;When with the optional shunting route of yard graphics mode preview, alternative shunting route or executable shunting route When, according to locus, the position that Word message does not block graphical interfaces is calculated automatically, window layout again is carried out, is conveniently entered Road preview;
Described access way control module is to complete the configuration to route triggering mode, either automatically or manually, meanwhile, when route is triggered When, shunting route sequence instruction is sent to the 4th information communication module, shunting route sequence is forwarded by the 4th information communication module Row instruction completes route triggering to station autonomous controlling machine.
14. devices according to claim 7, it is characterised in that described station autonomous controlling machine includes the 5th information communication mould Block and row are transferred in road conflict and check that module and equipment availability check module composition, wherein:
The 5th described information communication module is connected with shunting route control machine, and for receiving alternative shunting route, transmission can be held Row shunting route;The 5th described information communication module be connected with shunting route control aobvious machine, receive route and perform order, transmission Route performs feedback;
Described row are transferred in road conflict and check Train operation plan of the module according to our station, shunt to passing through main track on time dimension Route, take to hair line shunting route, be not take up hair line but impact sending and receiving car shunting route carry out collision detection;
Described equipment availability checks that module adjusts machine to proceed through power supply interrupted district detection to electric power;To locomotive through construction and blockade Detected in region;
Collision detection and the shunting route of equipment availability detection is adjusted to form executable shunting route by arranging;Shunt executable When route is performed, shunting route is detected in terms of time dimension, Spatial Dimension and equipment availability again, only passed through The shunting route of detection can just be handled.
CN201611050309.7A 2016-11-24 2016-11-24 The method and apparatus of shunting route control is implemented in combination with using STP and CTC Active CN106553664B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611050309.7A CN106553664B (en) 2016-11-24 2016-11-24 The method and apparatus of shunting route control is implemented in combination with using STP and CTC

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611050309.7A CN106553664B (en) 2016-11-24 2016-11-24 The method and apparatus of shunting route control is implemented in combination with using STP and CTC

Publications (2)

Publication Number Publication Date
CN106553664A true CN106553664A (en) 2017-04-05
CN106553664B CN106553664B (en) 2018-08-28

Family

ID=58443700

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611050309.7A Active CN106553664B (en) 2016-11-24 2016-11-24 The method and apparatus of shunting route control is implemented in combination with using STP and CTC

Country Status (1)

Country Link
CN (1) CN106553664B (en)

Cited By (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109591858A (en) * 2018-12-12 2019-04-09 卡斯柯信号有限公司 Locomotive based on CTC3.0 system, which changes, to be hung operation and handles method and device
CN109606432A (en) * 2018-12-12 2019-04-12 卡斯柯信号有限公司 A kind of method and apparatus for realizing the linkage of station operation post using CTC3.0
CN109677451A (en) * 2018-12-28 2019-04-26 卡斯柯信号有限公司 The control system and method that shunting monitoring function is combined with Train Detection and Identification
CN110104029A (en) * 2019-03-27 2019-08-09 卡斯柯信号有限公司 A kind of CTC route automatic trigger method suitable for inter-city passenger rail
CN110203256A (en) * 2019-04-26 2019-09-06 昆明聚讯科技有限公司 Wireless shunting light-display system and method with without interlocking shunting route guiding function
CN110406569A (en) * 2019-08-07 2019-11-05 通号万全信号设备有限公司 A method of road is arranged manually applied to rail traffic
CN110901701A (en) * 2019-12-06 2020-03-24 上海富欣智能交通控制有限公司 Rail train route handling method and system
CN111516729A (en) * 2020-05-08 2020-08-11 卡斯柯信号有限公司 Centralized processing method for locomotive shunting operation list
CN112572549A (en) * 2020-12-22 2021-03-30 卡斯柯信号有限公司 Method for automatically handling shunting route
CN112693503A (en) * 2021-03-25 2021-04-23 上海富欣智能交通控制有限公司 Shunting route method and device, train control system and readable storage medium
CN113619653A (en) * 2021-06-29 2021-11-09 卡斯柯信号有限公司 Automatic generation method of shunting operation plan, electronic equipment and medium
CN113715881A (en) * 2021-09-17 2021-11-30 交控科技股份有限公司 Train shunting and marshalling method and device, electronic equipment and storage medium
CN113715879A (en) * 2021-11-04 2021-11-30 北京全路通信信号研究设计院集团有限公司 Shunting operation management and control method and system
CN114296422A (en) * 2021-11-23 2022-04-08 卡斯柯信号有限公司 Centralized station yard display and control method, equipment and medium based on CTC3.0
CN114312915A (en) * 2021-12-15 2022-04-12 中国铁路南宁局集团有限公司 Shunting construction safety protection method for railway special line
CN114394132A (en) * 2021-12-30 2022-04-26 卡斯柯信号有限公司 Improved method, equipment and medium for handling shunting route of dispatching centralized system
US20220266884A1 (en) * 2020-02-18 2022-08-25 Casco Signal Ltd. Ctc3.0-based implementation method for route handling of regional centralized control station
CN115973235A (en) * 2023-03-21 2023-04-18 卡斯柯信号(北京)有限公司 Train screening control method and device
CN116080721A (en) * 2022-12-30 2023-05-09 中国铁道科学研究院集团有限公司通信信号研究所 Efficient shunting control module and intelligent shunting method
CN116620356A (en) * 2023-05-29 2023-08-22 北京泰恒众信科技有限公司 Railway shunting access safety control system and method
CN118004250A (en) * 2024-04-08 2024-05-10 中国铁道科学研究院集团有限公司通信信号研究所 Railway cross-station safety protection method and system supporting inter-station cooperation

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2005007483A1 (en) * 2003-07-18 2005-01-27 Hitachi, Ltd. Device for supporting vehicle replacement schedule generation
CN102700574A (en) * 2012-05-04 2012-10-03 北京康吉森交通技术有限公司 Intelligent tracking system for enterprise railway plane shunting and working method of intelligent tracking system
CN104943712A (en) * 2015-06-25 2015-09-30 卡斯柯信号有限公司 Automatic management method for shunting operation notice sheet in shunting monitoring system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2005007483A1 (en) * 2003-07-18 2005-01-27 Hitachi, Ltd. Device for supporting vehicle replacement schedule generation
CN102700574A (en) * 2012-05-04 2012-10-03 北京康吉森交通技术有限公司 Intelligent tracking system for enterprise railway plane shunting and working method of intelligent tracking system
CN104943712A (en) * 2015-06-25 2015-09-30 卡斯柯信号有限公司 Automatic management method for shunting operation notice sheet in shunting monitoring system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
陈煜: ""浅谈无线调车机车信号和监控系统控制方案"", 《铁道通信信号》 *

Cited By (35)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109606432A (en) * 2018-12-12 2019-04-12 卡斯柯信号有限公司 A kind of method and apparatus for realizing the linkage of station operation post using CTC3.0
CN109591858A (en) * 2018-12-12 2019-04-09 卡斯柯信号有限公司 Locomotive based on CTC3.0 system, which changes, to be hung operation and handles method and device
CN109677451A (en) * 2018-12-28 2019-04-26 卡斯柯信号有限公司 The control system and method that shunting monitoring function is combined with Train Detection and Identification
CN109677451B (en) * 2018-12-28 2023-08-29 卡斯柯信号有限公司 Control system and method combining shunting monitoring function and train operation control
CN110104029A (en) * 2019-03-27 2019-08-09 卡斯柯信号有限公司 A kind of CTC route automatic trigger method suitable for inter-city passenger rail
CN110203256A (en) * 2019-04-26 2019-09-06 昆明聚讯科技有限公司 Wireless shunting light-display system and method with without interlocking shunting route guiding function
CN110203256B (en) * 2019-04-26 2020-12-11 昆明聚讯科技有限公司 Wireless shunting light display system and method with non-interlocking shunting route guidance function
CN110406569A (en) * 2019-08-07 2019-11-05 通号万全信号设备有限公司 A method of road is arranged manually applied to rail traffic
CN110901701B (en) * 2019-12-06 2021-08-03 上海富欣智能交通控制有限公司 Rail train route handling method and system
CN110901701A (en) * 2019-12-06 2020-03-24 上海富欣智能交通控制有限公司 Rail train route handling method and system
US11952023B2 (en) * 2020-02-18 2024-04-09 Casco Signal Ltd. CTC3.0-based implementation method for route handling of regional centralized control station
US20220266884A1 (en) * 2020-02-18 2022-08-25 Casco Signal Ltd. Ctc3.0-based implementation method for route handling of regional centralized control station
CN111516729B (en) * 2020-05-08 2022-03-29 卡斯柯信号有限公司 Centralized processing method for locomotive shunting operation list
CN111516729A (en) * 2020-05-08 2020-08-11 卡斯柯信号有限公司 Centralized processing method for locomotive shunting operation list
CN112572549B (en) * 2020-12-22 2022-07-15 卡斯柯信号有限公司 Method for automatically handling shunting route
CN112572549A (en) * 2020-12-22 2021-03-30 卡斯柯信号有限公司 Method for automatically handling shunting route
CN112693503B (en) * 2021-03-25 2021-06-18 上海富欣智能交通控制有限公司 Shunting route execution method and device, train control system and readable storage medium
CN112693503A (en) * 2021-03-25 2021-04-23 上海富欣智能交通控制有限公司 Shunting route method and device, train control system and readable storage medium
CN113619653A (en) * 2021-06-29 2021-11-09 卡斯柯信号有限公司 Automatic generation method of shunting operation plan, electronic equipment and medium
CN113715881A (en) * 2021-09-17 2021-11-30 交控科技股份有限公司 Train shunting and marshalling method and device, electronic equipment and storage medium
CN113715879A (en) * 2021-11-04 2021-11-30 北京全路通信信号研究设计院集团有限公司 Shunting operation management and control method and system
WO2023077892A1 (en) * 2021-11-04 2023-05-11 北京全路通信信号研究设计院集团有限公司 Shunting operation management and control method and system
CN114296422A (en) * 2021-11-23 2022-04-08 卡斯柯信号有限公司 Centralized station yard display and control method, equipment and medium based on CTC3.0
CN114296422B (en) * 2021-11-23 2024-03-29 卡斯柯信号有限公司 CTC 3.0-based station yard centralized display and control method, equipment and medium
CN114312915A (en) * 2021-12-15 2022-04-12 中国铁路南宁局集团有限公司 Shunting construction safety protection method for railway special line
CN114394132B (en) * 2021-12-30 2023-08-25 卡斯柯信号有限公司 Improved method, equipment and medium for handling shunting route of dispatching centralized system
WO2023124705A1 (en) * 2021-12-30 2023-07-06 卡斯柯信号有限公司 Method for improving shunting route handling performed by centralized traffic control system, and device and medium
CN114394132A (en) * 2021-12-30 2022-04-26 卡斯柯信号有限公司 Improved method, equipment and medium for handling shunting route of dispatching centralized system
CN116080721A (en) * 2022-12-30 2023-05-09 中国铁道科学研究院集团有限公司通信信号研究所 Efficient shunting control module and intelligent shunting method
CN115973235B (en) * 2023-03-21 2023-08-01 卡斯柯信号(北京)有限公司 Train screening control method and device
CN115973235A (en) * 2023-03-21 2023-04-18 卡斯柯信号(北京)有限公司 Train screening control method and device
CN116620356A (en) * 2023-05-29 2023-08-22 北京泰恒众信科技有限公司 Railway shunting access safety control system and method
CN116620356B (en) * 2023-05-29 2024-04-05 北京泰恒众信科技有限公司 Railway shunting access safety control system and method
CN118004250A (en) * 2024-04-08 2024-05-10 中国铁道科学研究院集团有限公司通信信号研究所 Railway cross-station safety protection method and system supporting inter-station cooperation
CN118004250B (en) * 2024-04-08 2024-06-28 中国铁道科学研究院集团有限公司通信信号研究所 Railway cross-station safety protection method and system supporting inter-station cooperation

Also Published As

Publication number Publication date
CN106553664B (en) 2018-08-28

Similar Documents

Publication Publication Date Title
CN106553664B (en) The method and apparatus of shunting route control is implemented in combination with using STP and CTC
CN104773191B (en) Automatic centralized enterprise railway control method and system thereof
CN108528477B (en) A kind of metro depot/parking lot complex automatic system
CN109664923B (en) Urban rail transit train control system based on vehicle-vehicle communication
CN111353645B (en) Automatic handling method and system for urban rail transit vehicle base driving plan
CN105278379B (en) A kind of MTU depot centralized control system
CN113415322B (en) High-speed train operation adjusting method and system based on Q learning
CN112883640B (en) Digital twin station system, job scheduling method based on system and application
CN108819990A (en) Yard integrated control system
CN109649453A (en) A kind of train route handles method automatically
CN109591858B (en) Method and device for handling locomotive hanging change operation based on CTC3.0 system
CN109178041A (en) A kind of city rail vehicle section yard route automatic control system
WO2019228394A1 (en) Centralized train dispatch control system and control method
CN101544233A (en) Marshalling station comprehensive automatic system
CN112164272A (en) Signal simulation system and simulation method of tramcar signal system
CN112550384A (en) CTC 3.0-based method for handling shunting of motor train station
CN112644519B (en) Forward vehicle aggregation combination system and method for railway marshalling station
CN109677456A (en) A kind of train route control method and system suitable for low-density railway
CN206358166U (en) The device of shunting route control is implemented in combination with using STP and CTC
CN108791368A (en) Rail traffic crewing management system
CN113788054B (en) Automatic straight-through access management method for train on-line connection and hanging
SK500272011A3 (en) System for controlled transmission of train numbers for support of railway traffic control and manner in which this system operates
JP2014019182A (en) Train operation command device
CN116395003B (en) Train section and train station crossing receiving and dispatching train control method suitable for one station and multiple stations
CN112590876B (en) Urban rail transit dispatching command system and processing method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant