CN106529788A - Project plan chart generation method and device - Google Patents

Project plan chart generation method and device Download PDF

Info

Publication number
CN106529788A
CN106529788A CN201610953031.8A CN201610953031A CN106529788A CN 106529788 A CN106529788 A CN 106529788A CN 201610953031 A CN201610953031 A CN 201610953031A CN 106529788 A CN106529788 A CN 106529788A
Authority
CN
China
Prior art keywords
project
time coordinate
coordinate axle
project plan
plan
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610953031.8A
Other languages
Chinese (zh)
Inventor
卢锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Leshi Zhixin Electronic Technology Tianjin Co Ltd
LeTV Holding Beijing Co Ltd
Original Assignee
Leshi Zhixin Electronic Technology Tianjin Co Ltd
LeTV Holding Beijing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Leshi Zhixin Electronic Technology Tianjin Co Ltd, LeTV Holding Beijing Co Ltd filed Critical Leshi Zhixin Electronic Technology Tianjin Co Ltd
Priority to CN201610953031.8A priority Critical patent/CN106529788A/en
Publication of CN106529788A publication Critical patent/CN106529788A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06316Sequencing of tasks or work
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T11/002D [Two Dimensional] image generation
    • G06T11/60Editing figures and text; Combining figures or text

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • General Physics & Mathematics (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention provides a project plan chart generation method and device and belongs to the computer technical field. The main object of the invention is to solve the problem of low efficiency of manual software plan drawing in the prior art. The method provided by the embodiments of the present invention includes the following steps that: the time node information and project data of a project plan are obtained; a time coordinate axis corresponding to the project data is configured according to the time node information; and a project plan chart is generated according to the project data and the time coordinate axis, and the project plan chart is displayed. The project plan chart generation method and device of the present invention are mainly used for project plan chart generation.

Description

A kind of project plan map generalization method and device
Technical field
The present embodiments relate to field of computer technology, more particularly to a kind of project plan map generalization method and dress Put.
Background technology
Software Project Planning is technical staff when software project is implemented, and activity, resource, task to software project, is entered The advance planning that degree etc. is made.For example, existed according to the time started of each node, end time, different task in software development The information such as the relation in the time cycle, project manager can draw portion can reflect these progress situation " Software Project Plannings Figure ".
At present, Software Project Planning figure can be carried out by Microsoft Project, Excel and all kinds of third party's instruments Draw, inventor is found that during invention is realized Software Project Planning figure is, by artificial hand drawn, to use During Excel software for drawing planning charts, when occurring, project is excessive, project is frequently changed, all kinds of burst branch events of project When, technical staff can use more time to draw planning chart, and everyone draws the style of planning chart and is difficult unification;Use When MicrosoftProject or third party's instrument draw planning chart, need single software and various plug-in units are installed, edit Draw complex, cause project plan map generalization efficiency poor.
The content of the invention
The embodiment of the present invention provides a kind of project plan map generalization method and device, artificial in prior art to solve The less efficient problem of hand drawn Software Project Planning figure.
The embodiment of the present invention provides a kind of project plan map generalization method, including:
Obtain the timing node information and project data of the project plan;
According to timing node information configuration time coordinate axle corresponding with project data;
Project planning chart is generated according to the project data and the time coordinate axle, is shown.
The embodiment of the present invention provides a kind of project plan map generalization device, including:
Acquiring unit, for obtaining the timing node information and project data of the project plan;
Dispensing unit, for according to timing node information configuration time coordinate axle corresponding with project data;
Signal generating unit, for generating project planning chart according to the project data and the time coordinate axle, is shown.
A kind of project plan map generalization method and device provided in an embodiment of the present invention, first obtain the project plan when Intermediate node information and project data, according to timing node information configuration time coordinate axle corresponding with project data, according to The project data and the time coordinate axle generate project planning chart, are shown.With current artificial hand drawn software item Mesh planning chart is compared, and the embodiment of the present invention is by project data is automatically configured in the time coordinate axle produced by timing node In, automatically generating for Software Project Planning figure being realized, the drafting operation of Software Project Planning figure is simplified, so as to increased item The formation efficiency of mesh planning chart.
Description of the drawings
In order to be illustrated more clearly that the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing Accompanying drawing to be used needed for having technology description is briefly described, it should be apparent that, drawings in the following description are these Some bright embodiments, for those of ordinary skill in the art, on the premise of not paying creative work, can be with root Other accompanying drawings are obtained according to these accompanying drawings.
Fig. 1 is a kind of flow chart of project plan map generalization method provided in an embodiment of the present invention;
Fig. 2 is a kind of schematic diagram of project plan figure provided in an embodiment of the present invention;
Fig. 3 is the flow chart of another kind of project plan map generalization method provided in an embodiment of the present invention;
Fig. 4 is a kind of schematic diagram of project plan data table provided in an embodiment of the present invention;
Fig. 5 is a kind of schematic diagram of project plan stacking figure provided in an embodiment of the present invention;
Fig. 6 is a kind of structural representation of project plan map generalization device provided in an embodiment of the present invention
Fig. 7 is the structural representation of another kind of project plan map generalization device provided in an embodiment of the present invention;
Fig. 8 is a kind of apparatus structure schematic diagram of server provided in an embodiment of the present invention.
Specific embodiment
To make purpose, technical scheme and the advantage of the embodiment of the present invention clearer, below in conjunction with the embodiment of the present invention In accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is The a part of embodiment of the present invention, rather than the embodiment of whole.Based on the embodiment in the present invention, those of ordinary skill in the art The every other embodiment obtained under the premise of creative work is not made, belongs to the scope of protection of the invention.
The embodiment of the present invention provides a kind of project plan map generalization method, as shown in figure 1, methods described includes:
101st, the timing node information and project data of the project plan are obtained.
Wherein, the timing node information of the project plan includes the time started and end time of the project plan, described Project data includes the title of the project plan, the title of the project plan can also include the important name of the project plan claim TaskName and Sub- title Sub-TaskName, for example, the important name of the project plan is referred to as project corporate plan, software project, hardware plan, project The sub- title of corporate plan includes Concept, Kickoff, EVT Build etc., and the sub- title of software project includes EVT Release, DVT Release etc., the sub- title of hardware plan include EVT HWRelease, PVT Release etc..
It should be noted that the timing node information and project data of the project plan are carried out being input into obtaining by user, During input data, user can change data at any time.
102nd, according to timing node information configuration time coordinate axle corresponding with project data.
Wherein, it is described to claim the corresponding time with the corresponding time coordinate axle of project data is project plan important name Reference axis, includes the timing node information that all items plan important name claims with sub- title in the time coordinate axle, i.e., when Between timing node information is marked in reference axis.For example, the important name of the project plan is referred to as project corporate plan, and son is entitled Concept, Kickoff, EVT Build, sets up with direction to the right as future time, and direction is sat for the time of time in the past to the left Parameter, contains the corresponding timing node information of sub- title of all items plan in time coordinate axle.
It should be noted that the configuration of time coordinate axle can generate coordinate with the direction of from left to right according to time sequencing Axle, the timing node information of the sub- title of each project plan in time coordinate axle can be shown with a mark, such as disconnected Line, circle etc., the embodiment of the present invention is not specifically limited.
103rd, project planning chart is generated according to the project data and the time coordinate axle, is shown.
Wherein, in the project plan figure comprising all items plan important name claim and the sub- title of the project plan all times Nodal information, and comprising the corresponding implementation progress mark per individual sub- title, implementation progress is identified based on identifying current project Draw the timing node for performing, implementation progress mark can be for arrow, rectangle, triangle etc., and the embodiment of the present invention does not do concrete limit It is fixed.
It should be noted that the project plan figure being currently generated is created in system with tool type, it is possible to use compiling Language is write, and the embodiment of the present invention is not specifically limited, such as VBA (Visual Basic forApplications) language Speech exploitation, then generation view, such as Excel forms are combined with other view softwares.
For the embodiment of the present invention, specific application scenarios can be with as follows, but not limited to this, including:Acquisition project Entitled project corporate plan based on data, sub entitled Concept, it is in May, 2016 time started that timing node information is No. 14, the end time be in June, 2016 No. 20, according to the time coordinate axle of timing node information configuration as shown in Fig. 2 generating Project plan figure is the project plan figure comprising time-labeling in time coordinate axle.
A kind of project plan map generalization method provided in an embodiment of the present invention, obtains the timing node of the project plan first Information and project data, according to timing node information configuration time coordinate axle corresponding with project data, according to the item Mesh number evidence and the time coordinate axle generate project planning chart, are shown.With current artificial hand drawn Software Project Planning Figure is compared, and the embodiment of the present invention is realized by project data is automatically configured in the time coordinate axle produced by timing node Automatically generating for Software Project Planning figure, simplifies the drafting operation of Software Project Planning figure, reduces manual steps.
Another kind of project plan map generalization method is embodiments provided, as shown in figure 3, methods described includes:
201st, judge the authorization code information of user input with the presence or absence of in preset white list.
Wherein, the authorization code information can be the identification information of user and login password, the preset white list In preserve allow generation project planning chart User Identity information.For example, in specific " History " pages of Excel One window Encypt Information that can make user input authorization message of middle presence, user is in UserName dialog boxes Middle input xiaoming, is input into feao@^* $ GR& in authorization code Encypt Code dialog boxes, in judging preset white list is It is no to there is xiaoming and feao@^* $ GR&.
It should be noted that exist can be protected by registration or mandate with the authorization code information in preset white list Deposit, the drawing instrument of view is currently generated for protection, only in the legal authorization code of user input, can just be carried out next Step.By judging the authorization code information of user input with the presence or absence of in preset white list, it is ensured that the software for drawing project plan The legitimacy of figure personnel, realizes the authenticity of generation project planning chart, improves the accuracy of project plan figure.
If the 202, judging, the authorization code information of user input is present in preset white list, the project of receiving user's input The timing node information of plan and project data, time coordinate axle attribute information, drawing attribute information.
Wherein it is possible to passing through a tables of data carries out the data of receiving user's input, inhomogeneity in tables of data, can be preserved The project plan of type, and the corresponding timing node information of items of different types plan and project data, time coordinate axle attribute Information, drawing attribute information.For example, the timing node information is time started Begin Date and end time End Date, the type of the project plan can be type of hardware, software type, integral type etc., and the embodiment of the present invention is not done to be had Body is limited, and the time coordinate axle attribute information can include that denotation coordination axle, from the beginning of current date, is automatically generated Current Date, the Start Date of denotation coordination axle time started, the Stop Date of denotation coordination axle end time, table When making the Picture Type of graph type in showing reference axis, representing Time Unit that time shaft type is calendar or Zhou Li, represent Countershaft makees Column Width of graph region col width etc., and the embodiment of the present invention is not specifically limited, and the drawing attribute information can With including sequence number Item, remark information Description, director Responsible, beginning and the percentage of end time Judgement Status, reserved field Reserved of Process, time started and end time state etc., the embodiment of the present invention is not It is specifically limited.
It should be noted that time coordinate axle attribute information, drawing attribute information can enter line program by compiler Write, such as VBA so that user is only input into corresponding symbol and can be obtained by corresponding result, can carry out as a form Input, it is also possible to generate 2 forms and be input into, and the information in tables of data can be programmed using VBA, reaches addition and uses The effect of family input data or reduction user input data.In addition, receive user input data in include make graph type, when The embodiment of the present invention such as countershaft type are not specifically limited.For example, make graph type in the denotation coordination axle for receiving user input Can be Picture Type, mapping type method for expressing can be arrow, rectangle, triangle, have numerical value to be identified respectively, The expression time shaft type for receiving user input can be calendar or Zhou Li, such as, in Time Unit, calendar is 1, Zhou Liwei 2, receive user input represent time shaft make graph region col width Colium Width can in units of millimeter, the present invention Embodiment is not specifically limited, and the remark information for receiving user input makees the special information of graph region for mark, if for example Remark information Description is started with " TextboxD ", then increase text box in graph region is made and be highlighted, The content of textboxD back is a mark content of this project.
For example, user by the drawing attribute data is input into by table is, as shown in figure 3, sequence number Item is 1 project meter The type drawn is project integral type, and entitled project corporate plan based on the project data of the project plan, son are entitled Concept, beginning and the percentage Process of end time are 100%, the automatic decision of time started and end time state Status is Closed, and time started BeginDate is 2016/4/2 with end time End Date for 2016/4/2, by table The time coordinate axle attribute data being input into is opened as shown in figure 4, automatically generating CurrentDate for 2016/6/16, reference axis Time beginning Start Date are that 2016/4/1, reference axis end time Stop Date are class of mapping in 2016/6/30, reference axis Type Picture Type be 4, time shaft type be calendar or go through in week Time Unit for 2, time shaft make graph region col width Colium Width is 8.Believed by the timing node information and project data of the project plan of receiving user's input, time coordinate axle attribute Breath, drawing attribute information, increase make rule map in detail, provide the user more mapping specifications so that user utilizes and works as previous existence It is more convenient into working.
203rd, according to the timing node information and the time coordinate axle attribute information, time seat is generated in preset regions Parameter.
Wherein, the preset regions are automatic Drafting region, by timing node information by being labeled in the time as graph type Region below the correspondence position of reference axis, generally time coordinate axle carries out mapping and shows, the concrete form embodiment of the present invention Do not limit.By according to the timing node information and the time coordinate axle attribute information, generating the time in preset regions Reference axis, be user generate specifically, be more easy to the time coordinate axle that is analyzed.
204th, according to the drawing attribute information, the project data is configured into the time coordinate axle in the preset regions In, obtain project plan figure.
Wherein, include the mapping class in preset regions in the project plan figure according to the generation of drawing attribute information The timing node information of type mark.
It should be noted that after user input data, generating preset regions, i.e. automatic Drafting area, from action Can carry out triggering generation project planning chart using computer compiler language configuration trigger event in figure area, for example, using VBA languages Speech is compiled " Update " button, for automatically generating project plan figure.
By according to the drawing attribute information, the project data being configured the time coordinate axle in the preset regions In, project plan figure is obtained, the content in the project plan figure of generation is more enriched, is easy to technical staff to enter the project plan The analysis of degree.
205th, when adjust instruction is received, project plan figure is adjusted according to the adjust instruction.
Wherein, regulating object and adjustment action are carried in the adjust instruction, the regulating object includes drawing attribute Information, time coordinate axle attribute information, timing node information, project data.The adjustment action is that user changes or again defeated Enter data, user can pass through to adjust drawing attribute information, time coordinate axle attribute information, timing node information, project data, The project plan figure that modification is generated.By when adjust instruction is received, being carried out to project plan figure according to the adjust instruction Adjustment, so that user makes project plan figure again automatically, so as to improve project plan map generalization efficiency.
206th, when scaling instruction is received, the project plan figure is shown according to the scaling instruction.
Wherein, it is comprising launching displaying instruction or being laminated to show instruction in the scaling instruction, described to be shown as Preset regions show the markup information of whole project datas, and stacking instruction is only to show the item on time coordinate axle in preset regions The markup information of mesh number evidence.
It should be noted that in the instrument that project plan figure is generated, utilizing program in machine code to write for scaling what is shown Event, is shown project plan figure will pass through trigger event.By when scaling instruction is received, being referred to according to the scaling Order shows the project plan figure, is easy to analysis of the user to project plan figure, improves the efficiency for showing project plan figure.
For the embodiment of the present invention, specific application scenarios can be with as follows, but not limited to this, including:It is special in Excel In fixed " History " page, user is input into xiaoming in UserName dialog boxes, in authorization code Encypt Code couple Feao@^* $ GR& are input in words frame, by checking, start preset project data table, as shown in figure 4, the item by user input Mesh corporate plan, software project, Concept, Kickoff, EVT Release, Begin Date are 2016/5/14,2016/5/ 16th, 2016/5/16, End Date2016/6/20,2016/6/22,2016/6/20, Process are that 100%, Status is Closed, generates project plan figure as shown in Figure 2.When stacking displaying instruction is received, show as shown in Figure 5.
Another kind of project plan map generalization method provided in an embodiment of the present invention, first determines whether the authorization code of user input Information with the presence or absence of in preset white list, the if so, then timing node information and project of the project plan of receiving user's input Data, time coordinate axle attribute information, drawing attribute information, then according to the timing node information and the time coordinate axle Attribute information, generates time coordinate axle in preset regions, according to the drawing attribute information, the project data is configured in institute State in the time coordinate axle of preset regions, obtain project plan figure, when adjust instruction is received, according to the adjust instruction pair Project plan figure is adjusted.Compared with current artificial hand drawn Software Project Planning figure, the embodiment of the present invention is by authorizing The input data of user, in the time coordinate axle that data are labeled in automatic Drafting region, and realizes by changing data weight It is new to map, it is to avoid the loaded down with trivial details artificial operation of repetition, simplify project plan map generalization step.
Further, implementing as Fig. 1 methods describeds, embodiments provides a kind of project plan figure Generating means, as shown in fig. 6, described device includes:Acquiring unit 31, dispensing unit 32, signal generating unit 33.
Acquiring unit 31, for obtaining the timing node information and project data of the project plan.
Wherein, the timing node information of the project plan includes the time started and end time of the project plan, described Project data includes the title of the project plan, the title of the project plan can also include the important name of the project plan claim TaskName and Sub- title Sub-TaskName.
Dispensing unit 32, for according to timing node information configuration time coordinate axle corresponding with project data.
Wherein, it is described to claim the corresponding time with the corresponding time coordinate axle of project data is project plan important name Reference axis, includes the timing node information that all items plan important name claims with sub- title in the time coordinate axle, i.e., when Between timing node information is marked in reference axis.
Signal generating unit 33, for generating project planning chart according to the project data and the time coordinate axle, is shown Show.
Wherein, in the project plan figure comprising all items plan important name claim and the sub- title of the project plan all times Nodal information, and comprising the corresponding implementation progress mark per individual sub- title, implementation progress is identified based on identifying current project Draw the timing node for performing, implementation progress mark can be for arrow, rectangle, triangle etc., and the embodiment of the present invention does not do concrete limit It is fixed.
It should be noted that each function list involved by a kind of project plan map generalization device provided in an embodiment of the present invention Other corresponding descriptions of unit, may be referred to the correspondence description of method shown in Fig. 1, will not be described here.
A kind of project plan map generalization device provided in an embodiment of the present invention, obtains the timing node of the project plan first Information and project data, according to timing node information configuration time coordinate axle corresponding with project data, according to the item Mesh number evidence and the time coordinate axle generate project planning chart, are shown.With current artificial hand drawn Software Project Planning Figure is compared, and the embodiment of the present invention is realized by project data is automatically configured in the time coordinate axle produced by timing node Automatically generating for Software Project Planning figure, simplifies the drafting operation of Software Project Planning figure, reduces manual steps.
Further, implementing as Fig. 3 methods describeds, embodiments provides another kind of project plan figure Generating means, as shown in fig. 7, described device includes:Acquiring unit 41, dispensing unit 42, signal generating unit 43, adjustment unit 44th, display unit 45.
Acquiring unit 41, for obtaining the timing node information and project data of the project plan;
Dispensing unit 42, for according to timing node information configuration time coordinate axle corresponding with project data;
Signal generating unit 43, for generating project planning chart according to the project data and the time coordinate axle, is shown Show.
Further, the acquiring unit 41 includes:
Judge module 4101, for judging the authorization code information of user input with the presence or absence of in preset white list;
Receiver module 4102, if judging that the authorization code information of user input is present in preset white name for judge module 4101 Dan Zhong, then the timing node information and project data of the project plan of receiving user's input, time coordinate axle attribute information, drawing Attribute information.
The dispensing unit 42, specifically for according to the timing node information and the time coordinate axle attribute information, Time coordinate axle is generated in preset regions.
The signal generating unit 43, specifically for according to the drawing attribute information, the project data being configured described In the time coordinate axle of preset regions, project plan figure is obtained.
Further, described device also includes:
Adjustment unit 44, for when adjust instruction is received, being adjusted to project plan figure according to the adjust instruction It is whole, regulating object and adjustment action are carried in the adjust instruction.
Wherein, regulating object and adjustment action are carried in the adjust instruction, the regulating object includes drawing attribute Information, time coordinate axle attribute information, timing node information, project data.The adjustment action is that user changes or again defeated Enter data, user can pass through to adjust drawing attribute information, time coordinate axle attribute information, timing node information, project data, The project plan figure that modification is generated.
Display unit 45, for when scaling instruction is received, showing the project plan figure according to the scaling instruction, Include in the scaling instruction and launch to show instruction or be laminated displaying instruction.
Wherein, it is comprising launching displaying instruction or being laminated to show instruction in the scaling instruction, described to be shown as Preset regions show the markup information of whole project datas, and stacking instruction is only to show the item on time coordinate axle in preset regions The markup information of mesh number evidence.
It should be noted that each function involved by another kind of project plan map generalization device provided in an embodiment of the present invention Other corresponding descriptions of unit, may be referred to the correspondence description of method shown in Fig. 3, will not be described here.
Another kind of project plan map generalization device provided in an embodiment of the present invention, first determines whether the authorization code of user input Information with the presence or absence of in preset white list, the if so, then timing node information and project of the project plan of receiving user's input Data, time coordinate axle attribute information, drawing attribute information, then obtain the timing node information of the project plan of user input And project data, time coordinate axle attribute information, drawing attribute information, according to the timing node information and the time coordinate Axle attribute information, generates time coordinate axle in preset regions, according to the drawing attribute information, the project data is configured In the time coordinate axle of the preset regions, project plan figure is obtained, when adjust instruction is received, according to the adjust instruction Project plan figure is adjusted.Compared with current artificial hand drawn Software Project Planning figure, the embodiment of the present invention is by awarding The input data of power user, in the time coordinate axle that data are labeled in automatic Drafting region, and realizes by changing data Again map, it is to avoid the loaded down with trivial details artificial operation of repetition, simplify project plan map generalization step.
It should be noted that above-mentioned service end is directed to, the unit module arrived used in every embodiment of the present invention Function can be realized by hardware processor (hardware processor).
Exemplary, as shown in figure 8, Fig. 8 shows that a kind of apparatus structure of server provided in an embodiment of the present invention shows It is intended to, the service end can include:At least one processor (processor) 51, communication interface (Communications Interface) 52, memory (memory) 83 and bus 54, wherein, processor 51, communication interface 52, memory 53 are by total Line 54 completes mutual communication.The information transfer that communication interface 52 can be used between server and client.Processor 51 The logical order in memory 53 can be called, to perform following method:Obtain the timing node information and project of the project plan Data;According to timing node information configuration time coordinate axle corresponding with project data;According to the project data and institute State time coordinate axle and generate project planning chart, shown.
Additionally, the logical order in above-mentioned memory 53 can be realized by the form of SFU software functional unit and is used as solely When vertical production marketing or use, can be stored in a computer read/write memory medium.Based on such understanding, this The part or the part of the technical scheme that bright technical scheme is substantially contributed to prior art in other words can be with soft The form of part product is embodied, and the computer software product is stored in a storage medium, including some instructions to make Obtain a computer equipment (can be personal computer, server, or network equipment etc.) and perform each embodiment of the invention The all or part of step of methods described.And aforesaid storage medium includes:USB flash disk, portable hard drive, read-only storage (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), magnetic disc or CD etc. it is various Can be with the medium of store program codes.
Through the above description of the embodiments, those skilled in the art can be understood that each embodiment can By software plus required general hardware platform mode realizing, naturally it is also possible to by hardware.Based on such understanding, on State the part that technical scheme substantially contributes prior art in other words to embody in the form of software product, should Computer software product can be stored in a computer-readable storage medium, such as ROM/RAM, magnetic disc, CD etc., including some fingers Order is used so that a computer installation (can be personal computer, server, or network equipment etc.) performs each enforcement Method described in some parts of example or embodiment.
Finally it should be noted that:Above example only to illustrate technical scheme, rather than a limitation;Although With reference to the foregoing embodiments the present invention has been described in detail, it will be understood by those within the art that:Which still may be used To modify to the technical scheme described in foregoing embodiments, or equivalent is carried out to which part technical characteristic; And these modification or replace, do not make appropriate technical solution essence depart from various embodiments of the present invention technical scheme spirit and Scope.

Claims (10)

1. a kind of project plan map generalization method, is applied to drawing instrument, it is characterised in that include:
Obtain the timing node information and project data of the project plan;
According to timing node information configuration time coordinate axle corresponding with project data;
Project planning chart is generated according to the project data and the time coordinate axle, is shown.
2. method according to claim 1, it is characterised in that the timing node information and project of the acquisition project plan Data include:
Judge the authorization code information of user input with the presence or absence of in preset white list;
If judging, the authorization code information of user input is present in preset white list, the project plan of receiving user's input when Intermediate node information and project data, time coordinate axle attribute information, drawing attribute information.
3. method according to claim 2, it is characterised in that described according to the timing node information configuration and item number Include according to corresponding time coordinate axle:
According to the timing node information and the time coordinate axle attribute information, time coordinate axle is generated in preset regions;
Described to generate project planning chart according to the project data and the time coordinate axle, carrying out display includes:
According to the drawing attribute information, the project data is configured in the time coordinate axle of the preset regions, is obtained Project plan figure.
4. the method according to any one of claim 1-3, it is characterised in that methods described also includes:
When adjust instruction is received, project plan figure is adjusted according to the adjust instruction, is taken in the adjust instruction With regulating object and adjustment action.
5. the method according to any one of claim 1-3, it is characterised in that methods described also includes:
When scaling instruction is received, the project plan figure is shown according to the scaling instruction, is included in the scaling instruction Launch to show instruction or be laminated displaying instruction.
6. a kind of project plan map generalization device, is applied to drawing instrument, it is characterised in that include:
Acquiring unit, for obtaining the timing node information and project data of the project plan;
Dispensing unit, for according to timing node information configuration time coordinate axle corresponding with project data;
Signal generating unit, for generating project planning chart according to the project data and the time coordinate axle, is shown.
7. device according to claim 6, it is characterised in that the acquiring unit includes,
Judge module, for judging the authorization code information of user input with the presence or absence of in preset white list;
Receiver module, if judging that the authorization code information of user input is present in preset white list for judge module, receives The timing node information of the project plan of user input and project data, time coordinate axle attribute information, drawing attribute information.
8. device according to claim 7, it is characterised in that
The dispensing unit, specifically for according to the timing node information and the time coordinate axle attribute information, preset Area generation time coordinate axle;
The signal generating unit, specifically for according to the drawing attribute information, the project data being configured in the preset area In the time coordinate axle in domain, project plan figure is obtained.
9. the device according to any one of claim 6-8, it is characterised in that described device also includes:
Adjustment unit, it is for when adjust instruction is received, being adjusted to project plan figure according to the adjust instruction, described Regulating object and adjustment action are carried in adjust instruction.
10. the device according to any one of claim 6-8, it is characterised in that described device also includes:
Display unit, for when scaling instruction is received, showing the project plan figure, the contracting according to the scaling instruction Include in putting instruction and launch to show instruction or be laminated displaying instruction.
CN201610953031.8A 2016-10-25 2016-10-25 Project plan chart generation method and device Pending CN106529788A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610953031.8A CN106529788A (en) 2016-10-25 2016-10-25 Project plan chart generation method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610953031.8A CN106529788A (en) 2016-10-25 2016-10-25 Project plan chart generation method and device

Publications (1)

Publication Number Publication Date
CN106529788A true CN106529788A (en) 2017-03-22

Family

ID=58326728

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610953031.8A Pending CN106529788A (en) 2016-10-25 2016-10-25 Project plan chart generation method and device

Country Status (1)

Country Link
CN (1) CN106529788A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107122188A (en) * 2017-04-26 2017-09-01 网易(杭州)网络有限公司 The method and device of project process bar image generation
CN108985647A (en) * 2018-07-27 2018-12-11 广船国际有限公司 A kind of execution method, apparatus, equipment and the storage medium of the project plan
CN111192342A (en) * 2020-01-08 2020-05-22 思创数码科技股份有限公司 Project group management topological graph generation method, device, equipment and storage medium

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020059182A1 (en) * 2000-09-29 2002-05-16 Yoshiro Oka Operation assistance method and system and recording medium for storing operation assistance method
CN102496081A (en) * 2011-11-15 2012-06-13 北京航空航天大学 Three-dimensional visualized and interaction method of project structured message
CN105512099A (en) * 2015-12-09 2016-04-20 金蝶软件(中国)有限公司 Gantt chart generation method and device

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020059182A1 (en) * 2000-09-29 2002-05-16 Yoshiro Oka Operation assistance method and system and recording medium for storing operation assistance method
CN102496081A (en) * 2011-11-15 2012-06-13 北京航空航天大学 Three-dimensional visualized and interaction method of project structured message
CN105512099A (en) * 2015-12-09 2016-04-20 金蝶软件(中国)有限公司 Gantt chart generation method and device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107122188A (en) * 2017-04-26 2017-09-01 网易(杭州)网络有限公司 The method and device of project process bar image generation
CN108985647A (en) * 2018-07-27 2018-12-11 广船国际有限公司 A kind of execution method, apparatus, equipment and the storage medium of the project plan
CN111192342A (en) * 2020-01-08 2020-05-22 思创数码科技股份有限公司 Project group management topological graph generation method, device, equipment and storage medium
CN111192342B (en) * 2020-01-08 2024-01-16 思创数码科技股份有限公司 Project group management topological graph generation method, device, equipment and storage medium

Similar Documents

Publication Publication Date Title
CN110310088B (en) Workflow configuration method and related products
CN109308357A (en) It is a kind of for obtaining the method, apparatus and equipment of answer information
CN110287479A (en) Name entity recognition method, electronic device and storage medium
El-Hajj et al. Solving the team orienteering problem with cutting planes
CN105095970B (en) The execution method and system of third-party application
CN106528613B (en) Intelligent answer method and device
Schneidewind et al. How personas support requirements engineering
US20060173908A1 (en) System and method for automated customization of a workflow management system
CN107833009A (en) Personalized checking method, device, storage medium and the terminal of Claims Resolution order
CN105723405A (en) Guided article authorship
CN109213486A (en) Method and apparatus for generating customized visualization component
CN106529788A (en) Project plan chart generation method and device
WO2012159657A1 (en) Data sharing agreements
CN103366249A (en) Procedure batch examining and approving tool based on workflow
CN110489198A (en) A kind of method and system of worksheet
CN110189220A (en) A kind of risk analysis decision-making technique, device, system and storage medium
CN109347866A (en) Login method, device, system and computer readable storage medium
CN106896937A (en) Method and apparatus for being input into information
CN106407377A (en) Search method and device based on artificial intelligence
CN109345379A (en) A kind of intelligence credit method and apparatus
CN116737910B (en) Intelligent dialogue processing method, device, equipment and storage medium
CN106529904A (en) Branching view generating method and branching view generating device
CN108536718A (en) A kind of method and system for the IT application in management realized based on input and output semantization
CN109472656A (en) A kind of methods of exhibiting of virtual objects, device and storage medium
CN114662126A (en) Method and system for controlling process approval information authority based on different roles

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170322

WD01 Invention patent application deemed withdrawn after publication