CN106522113B - The overall continuous rear annealing method in mobile formwork beam face - Google Patents
The overall continuous rear annealing method in mobile formwork beam face Download PDFInfo
- Publication number
- CN106522113B CN106522113B CN201611017073.7A CN201611017073A CN106522113B CN 106522113 B CN106522113 B CN 106522113B CN 201611017073 A CN201611017073 A CN 201611017073A CN 106522113 B CN106522113 B CN 106522113B
- Authority
- CN
- China
- Prior art keywords
- traversing
- hanging beam
- retrogressing
- mobile formwork
- girder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
- E01D21/06—Methods or apparatus specially adapted for erecting or assembling bridges by translational movement of the bridge or bridge sections
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The present invention relates to a kind of overall continuous rear annealing method in mobile formwork beam face.Step is:A)Track is installed in Liang Mianshang and very heavy topmast stands position, and the retrogressing beam of lifting first is fallen within above jack;B)Installation second retreats beam, and its joint aligns with the first retrogressing beam;C)Traversing hanging beam and traversing jack system are installed;D)Girder is connected with retreating upper hanging beam;E)Upper hanging beam will be retreated at flange plate preformed hole to fix using suspension rod with traversing hanging beam anchor hole;F)Rear cross beam is completed to be connected with girder with reference to above-mentioned installation steps;G)Bracket is released to drawing fining twisted steel, bracket is traversing to portal;H)Whole lateral moving is molded to specified location, installs longitudinal stability bar;I)Suspension rod at all flange plate preformed holes is released, simultaneously operating retreats longitudinal thrustor on upper hanging beam and rear cross beam track, and mobile formwork carries out continuous retrogressing walking, constructed until completing to retreat.It shortens mobile formwork and retreats construction period, reduces plant equipment input, saves operating expenses, reduces construction safety risk.
Description
Technical field
The present invention relates to mobile formwork to retreat construction technology, particularly a kind of overall continuous retrogressing side in mobile formwork beam face
Method.
Background technology
Annealing process uses traditional method hole-specifically retreated using itself bracket mostly after self-propelled moveable formwork at present, this
Traditional handicraft, which there are, to be needed to have bad luck bracket repeatedly in work progress, consolidates bracket in high-altitude repeatedly, and process conversion is frequent, construction week
The shortcomings that phase is longer, and work high above the ground construction safety risk is big.
The content of the invention
It is an object of the invention to provide a kind of overall continuous rear annealing method in mobile formwork beam face, mainly solve above-mentioned existing
Technical problem present in technology, it shortens mobile formwork and retreats construction period, reduces plant equipment input, saves construction cost
With reduction construction safety risk.
To achieve the above object, the technical scheme is that:
A kind of overall continuous rear annealing method in mobile formwork beam face, it is characterised in that:
It is applicable the precondition of this technology:
(1)Mobile formwork structure type is voluntarily downlink movable mould frame, mobile formwork retreat scope should be multispan, it is long away from
From bridge;
(2)Mobile formwork is newly-increased to retreat upper hanging beam.
It comprises the following steps:
A)Track is installed in Liang Mianshang and very heavy topmast stands position, and the retrogressing beam of lifting first falls within correct above jack
Position;
B)Beam is retreated using crane auxiliary installation second, crane, which slings the second retrogressing beam, makes its joint and first retreat beam pair
Together, temporary consolidation is carried out with bolt and punch;
C)Normal construction high-strength bolt, and brushing antirust paint;Traversing hanging beam and traversing jack system are installed;
D)Corresponding position is welded to connect suspension centre and horizontal jack guide plate on girder, by girder with retreating upper hanging beam
Connect;
E)Upper hanging beam will be retreated at flange plate preformed hole to fix using suspension rod with traversing hanging beam anchor hole, strengthens lateral stability
Property;
F)Rear cross beam is completed to be connected with girder with reference to above-mentioned installation steps;
G)After end is hung in examination, bracket is released to drawing fining twisted steel, bracket is traversing to portal;
H)Mobile formwork stamping die, whole lateral moving are molded to specified location, install longitudinal stability bar;
I)Suspension rod at all flange plate preformed holes is released, simultaneously operating retreats longitudinal pushing tow on upper hanging beam and rear cross beam track
Device, mobile formwork carries out continuous retreat and walked, until completing to retreat construction.
The invention has the advantages that:
By the application of this construction technology, complete within 20 days in advance mobile formwork and retreat construction, realize and saving construction
Construction speed target is accelerated while machinery, material, substantially increases efficiency of construction, while reduce the danger of work high above the ground
Property.
Brief description of the drawings
Fig. 1 is horizontal General Arrangement in the present invention(Hanging beam in retrogressing).
Fig. 2 is the structural representation of traversing jack system in the present invention.
Fig. 3 is horizontal General Arrangement in the present invention(Rear cross beam).
Fig. 4 is that mobile formwork beam face integrally continuously retreats longitudinal general arrangement in the present invention.
Fig. 5 is the structural representation of longitudinal thrustor in the present invention.
Embodiment
This technology construction process is further described below in conjunction with the accompanying drawings:
A kind of overall continuous rear annealing method in mobile formwork beam face, such as Fig. 1-5, it comprises the following steps:
A)Such as Fig. 1,3 vertical positions of track 2 and jack are installed on the beam face 1 of pouring concrete beam 15, lifting the
One retrogressing beam 4 falls within the top correct position of jack 3.
B)Beam 5 is retreated using crane auxiliary installation second, crane, which slings the second retrogressing beam 5, makes its joint and first retreat beam
4 alignment, temporary consolidation is carried out with bolt and punch.
C)Normal construction high-strength bolt, and brushing antirust paint;Traversing hanging beam 6 and traversing jack system are installed(Such as Fig. 2).
The traversing jack system includes jack and horizontal jack guide plate 8.
D)Corresponding position is welded to connect suspension centre and horizontal jack guide plate 8 on girder 7, by girder 7 with retreating
Hanging beam 9 connects.
E)Upper hanging beam 9 will be retreated at the preformed hole of flange plate 10 to fix using suspension rod 11 with the traversing anchor hole of hanging beam 6, enhancing is horizontal
To stability.
F)Such as Fig. 3, rear cross beam 12 is completed to be connected with girder 7 with reference to above-mentioned installation steps, such as Fig. 4 after installation.
G)After end is hung in examination, bracket 13 is released to drawing fining twisted steel, bracket 13 is traversing to portal.
H)Mobile formwork stamping die, whole lateral moving are molded to specified location, installation longitudinal stability bar 14.
I)Suspension rod 11 at all preformed holes of flange plate 10 is released, simultaneously operating is retreated on upper hanging beam 9 and the track of rear cross beam 12
Longitudinal thrustor(Such as Fig. 5), mobile formwork carries out continuous retreat and walked, until completing to retreat construction.Longitudinal thrustor
Including jack 161, traversing oil cylinder 162.
It is only presently preferred embodiments of the present invention in summary, is not used for limiting the practical range of the present invention.It is i.e. all
The equivalent changes and modifications made according to the content of scope of the present invention patent, it all should be the technology category of the present invention.
Claims (1)
- A kind of 1. overall continuous rear annealing method in mobile formwork beam face, it is characterised in that:It comprises the following steps:A)Track is installed in Liang Mianshang and very heavy topmast stands position, and the retrogressing beam of lifting first falls within correct position above jack Put;B)Beam is retreated using crane auxiliary installation second, crane, which slings the second retrogressing beam, makes its joint be alignd with the first retrogressing beam, Temporary consolidation is carried out with bolt and punch, the upper hanging beam of retrogressing is formed with this;C)Normal construction high-strength bolt, and brushing antirust paint;Traversing hanging beam and traversing jack system are installed;D)Corresponding position is welded to connect suspension centre and horizontal jack guide plate on girder, and girder is connected with retreating upper hanging beam Get up;E)Upper hanging beam will be retreated at flange plate preformed hole to fix using suspension rod with traversing hanging beam anchor hole, strengthens lateral stability;F)Rear cross beam is completed to be connected with girder with reference to above-mentioned installation steps;G)After end is hung in examination, bracket is released to drawing fining twisted steel, bracket is traversing to portal;H)Mobile formwork stamping die, whole lateral moving are molded to specified location, install longitudinal stability bar;I)Suspension rod at all flange plate preformed holes is released, simultaneously operating retreats longitudinal pushing tow dress on upper hanging beam and rear cross beam track Put, mobile formwork carries out continuous retreat and walked, until completing to retreat construction.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611017073.7A CN106522113B (en) | 2016-11-19 | 2016-11-19 | The overall continuous rear annealing method in mobile formwork beam face |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611017073.7A CN106522113B (en) | 2016-11-19 | 2016-11-19 | The overall continuous rear annealing method in mobile formwork beam face |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106522113A CN106522113A (en) | 2017-03-22 |
CN106522113B true CN106522113B (en) | 2018-01-09 |
Family
ID=58352718
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611017073.7A Active CN106522113B (en) | 2016-11-19 | 2016-11-19 | The overall continuous rear annealing method in mobile formwork beam face |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106522113B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108677732B (en) * | 2018-06-20 | 2021-02-05 | 中铁三局集团有限公司 | Auxiliary movable formwork girder suspension retreating construction method suitable for variable cross-section girder section |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004107972A (en) * | 2002-09-18 | 2004-04-08 | Mitsubishi Heavy Ind Ltd | Launching method and launching machine for bridge |
CN201381482Y (en) * | 2009-03-12 | 2010-01-13 | 武汉众磊工程机械技术有限公司 | Downward movable frame bridge fabrication machine with overlap beam |
CN102720131A (en) * | 2011-03-31 | 2012-10-10 | 江苏恩纳斯重工机械有限公司 | Rear propulsion cradle |
CN102943443A (en) * | 2012-11-21 | 2013-02-27 | 山东省路桥集团有限公司 | Movable mould frame bridge fabrication machine C type beam system |
-
2016
- 2016-11-19 CN CN201611017073.7A patent/CN106522113B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004107972A (en) * | 2002-09-18 | 2004-04-08 | Mitsubishi Heavy Ind Ltd | Launching method and launching machine for bridge |
CN201381482Y (en) * | 2009-03-12 | 2010-01-13 | 武汉众磊工程机械技术有限公司 | Downward movable frame bridge fabrication machine with overlap beam |
CN102720131A (en) * | 2011-03-31 | 2012-10-10 | 江苏恩纳斯重工机械有限公司 | Rear propulsion cradle |
CN102943443A (en) * | 2012-11-21 | 2013-02-27 | 山东省路桥集团有限公司 | Movable mould frame bridge fabrication machine C type beam system |
Non-Patent Citations (1)
Title |
---|
完全自行式移动模架造桥机在苏通大桥连续梁中应用;胡安祥等;《施工技术》;20051231;第34卷(第12期) * |
Also Published As
Publication number | Publication date |
---|---|
CN106522113A (en) | 2017-03-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108330842B (en) | Bridge girder erection machine for erection construction of large-span reinforced concrete composite girder and construction method | |
CN204875552U (en) | Frame bridge crane vertical lift structure | |
CN104695337B (en) | Self-lifting sliding and turnover construction system and construction method | |
CN105155423A (en) | Upward moving type movable formwork for continuous box girder construction | |
KR20140084107A (en) | Self-Launching Movable Scaffolding System | |
CN104512844A (en) | Transverse sliding and vertical hydraulic jacking lifting method for super-huge type mill housing frame | |
CN109835826B (en) | Self-climbing type heavy elevator | |
CN204662952U (en) | A kind of self-propelled tool single side formwork formwork system | |
CN103912137A (en) | Lifting device for lifting construction for buildings | |
CN111749140A (en) | Truss integral lifting type bridge high pier creeping formwork device and construction method | |
CN207047691U (en) | A kind of cantilever type movable crosshead | |
CN104695335A (en) | Overall reinforcement binding and hoisting construction method and construction device adopting upstroke movable scaffolding | |
CN106758872A (en) | Wavelike steel webplate SCC engineering methods hang movable hanging basket and the method using its construction with car convolution | |
CN103982200A (en) | Full-face inner sliding rail moving steel mould trolley | |
CN103291084B (en) | Building jacking steel reinforced concrete support system construction method | |
CN106522113B (en) | The overall continuous rear annealing method in mobile formwork beam face | |
CN205576749U (en) | Pontic roof beam structure promotes and rackwork | |
CN110173281A (en) | A kind of sliding mode system for circular tunnel concreting | |
CN106150525A (en) | A kind of rock anchorage beam construction trolley and construction method thereof | |
CN104018680B (en) | Lifting method of large-span solid-web type arc beam | |
CN211547804U (en) | Cantilever type retaining wall rapid construction device | |
CN102225580B (en) | Method for longitudinally moving box girder internal mold | |
CN104179123A (en) | Bridge fabrication machine capable of building and assembling two bridge segments | |
CN209686254U (en) | A kind of folding retractable support leg device | |
CN203924755U (en) | The lifting appliance of building lifting construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |