CN102943443A - Movable mould frame bridge fabrication machine C type beam system - Google Patents

Movable mould frame bridge fabrication machine C type beam system Download PDF

Info

Publication number
CN102943443A
CN102943443A CN2012104734679A CN201210473467A CN102943443A CN 102943443 A CN102943443 A CN 102943443A CN 2012104734679 A CN2012104734679 A CN 2012104734679A CN 201210473467 A CN201210473467 A CN 201210473467A CN 102943443 A CN102943443 A CN 102943443A
Authority
CN
China
Prior art keywords
hydraulic cylinder
traversing
vertical shift
mobile formwork
girder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012104734679A
Other languages
Chinese (zh)
Inventor
王小山
周玉坤
刘德建
韩军霞
王殿学
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Luqiao Group Co Ltd
Original Assignee
Shandong Luqiao Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Luqiao Group Co Ltd filed Critical Shandong Luqiao Group Co Ltd
Priority to CN2012104734679A priority Critical patent/CN102943443A/en
Publication of CN102943443A publication Critical patent/CN102943443A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a movable mould frame bridge fabrication machine C type beam system. The system comprises an upper box beam, a suspension device, an electrohydraulic control system, a support frame, a longitudinal moving mechanism, a transverse moving mechanism and a track, the upper box beam is fixed on the track through the support frame and fixedly connected with a movable mould frame main beam through the suspension device, a jacking hydraulic cylinder is disposed on the support frame, the electrohydraulic control system drives the jacking hydraulic cylinder to ascend and descend to achieve suspension of the rear end of the movable mould frame main beam, a transverse moving hydraulic cylinder is disposed on the transverse moving mechanism, a longitudinal moving hydraulic cylinder is disposed on the longitudinal moving mechanism, and in a suspension state, the electrohydraulic control system respectively drives the transverse moving hydraulic cylinder and the longitudinal moving hydraulic cylinder to stretch and retract so as to control transverse moving opening and closing and longitudinal moving walking of the rear end of the movable mould frame main beam. Self weight load of the movable mould frame rear end is converted from a lower bracket to an upper C type beam system through the suspension device and the jacking hydraulic cylinder, and transverse moving opening and closing and longitudinal moving walking of the movable mould frame bridge fabrication machine are achieved by the hydraulic control in an assisted mode.

Description

A kind of mobile formwork bridge fabrication machine C type girder system system
Technical field
The present invention relates to a kind of C type girder system system, belong to and be specifically designed to bracket self-propelled moveable formwork bridge fabrication machine ancillary facility in the bridge construction.
Background technology
In recent years, continuous growth along with highway in China, high speed railway construction scale, demand to advanced construction equipment and technology is more and more higher, downstriker, the non-self-propelled moveable formwork bridge fabrication machine of upstriker since last century the nineties be widely used in the bridge construction construction at home, this technique is applicable to beach, valley, urban viaduct, stride the construction of the place continuous beam such as river, bridge spanning the sea or simply supported beam cast-in-place concrete bridge.It is many to have the number of turnover, short construction period, and construction safety is reliable, and on-the-spot civilization is succinct, uses the mobile formwork bridge fabrication machine construction not need under the middle bridge cut-off characteristics such as traffic, has both guaranteed workmanship, again can accelerating construction progress, have good economic benefit.But in construction, all need the crane gear of assisting, especially the non-automatic moving mould bases of downstriker bracket bridging, the crane gear that needs to assist in construction is had bad luck the members such as bracket, when auxiliary crane gear can't arrive, execution conditions are restricted or at the large beach of difficulty of construction, valley, urban viaduct, when striding the construction of river, bridge spanning the sea place continuous beam, the advantage of himself and high efficiency just have no way of bringing into play.
Summary of the invention
Technical problem to be solved by this invention is the problem that bridging needs to assist in construction for the non-automatic moving mould bases of downstriker bracket crane gear is had bad luck the members such as bracket, bracket is possessed in the situation of stand under load not shift out and system in place.
For solving this technical problem, the invention provides a kind of mobile formwork bridge fabrication machine C type girder system system, by upper tank beam, erecting by overhang, electrohydraulic control system, bracing frame and vertical shift mechanism, transverse-moving mechanism be laid on the track of having built on the concrete box girder and form, the upper tank beam fixedly mounts in orbit by bracing frame, and is fixedly connected with the mobile formwork girder by erecting by overhang; Support frame as described above is provided with the jacking hydraulic cylinder, and electrohydraulic control system drives the lifting realization of this jacking hydraulic cylinder to the suspention of mobile formwork main beam rear end; Described transverse-moving mechanism is provided with traversing hydraulic cylinder, vertical shift mechanism is provided with the vertical shift hydraulic cylinder, drives respectively the flexible realization of traversing hydraulic cylinder and vertical shift hydraulic cylinder to the control of the traversing folding of mobile formwork main beam rear end and vertical shift walking by electrichydraulic control system under suspended state.
Described erecting by overhang is comprised of hanging beam, suspension rod, traversing drop in beam, and traversing drop in beam is connected with the upper tank beam with suspension rod by hanging beam, and the mobile formwork erection of main beam is below traversing drop in beam; Be provided with traversing promotion frame and traversing hydraulic cylinder on the described traversing drop in beam, control the flexible of traversing hydraulic cylinder and realize the traversing folding of mobile formwork girder by traversing promotion frame.
Support frame as described above is comprised of supporting frame, base, jacking hydraulic cylinder, supporting frame is enclosed within on jacking hydraulic cylinder and the base and plays position-limiting action, its top is fixed together by bolt and upper tank beam, base support in orbit, the lifting of jacking hydraulic cylinder realizes the suspention that upper tank beam and mobile formwork girder make up; Described vertical shift mechanism comprises the vertical shift hydraulic cylinder and the vertical shift of installing in orbit promotes frame, the two ends of vertical shift hydraulic cylinder connect respectively on the base of vertical shift hydraulic cylinder and bracing frame, and the flexible realization upper tank beam of control vertical shift hydraulic cylinder and the combination of mobile formwork girder are walked along the track vertical shift under suspended state.
Described electrohydraulic control system comprises hydraulic power unit and operating platform, and this hydraulic power unit and operating platform are arranged on the upper tank beam, for jacking hydraulic cylinder, vertical shift hydraulic cylinder and traversing hydraulic cylinder flexible provides electrichydraulic control.
The AC 380V of described electrohydraulic control system; 50HZ, system works pressure 32Mpa.
Beneficial effect: the present invention has adopted by Driven by Hydraulic Cylinder jacking suspention mobile formwork system, it is mobile formwork vertical shift walking, the auxiliary body of horizontal folding, by acting on the concrete box girder, erecting by overhang and jacking hydraulic cylinder by self are transformed into top C type girder system system with the gravity load of mobile formwork rear end by the bottom bracket, it is by auxiliary traversing folding and the vertical shift walking that realizes mobile formwork bridge fabrication machine of hydraulic control under the state of suspention, so that the realization of downstriker bracket automatic moving formwork bridge fabrication machine becomes possibility, the present invention operates succinctly, safe and reliable, suspention mobile formwork system in the time of can realizing the mobile formwork vertical shift.
Description of drawings
Fig. 1 is structural representation front view of the present invention;
Fig. 2 is bracing frame of the present invention and vertical shift mechanism structure schematic diagram;
Fig. 3 is support frame structure schematic diagram of the present invention;
Fig. 4 is traversing promotion shelf structure schematic diagram of the present invention.
Among the figure: 1 upper tank beam, 2 erectings by overhang, 3 electrohydraulic control systems, 4 bracing frames, 5 tracks, 6 hanging beams, 7 suspension rods, 8 traversing drop in beams, 9 vertical shift mechanisms, 10 traversing promotion framves, 11 traversing hydraulic cylinders, 12 vertical shift oil cylinders, 13 vertical shifts promote frame, 14 jacking hydraulic cylinders, 15 supporting frames, 16 bases, 20 mobile formwork girders.
The specific embodiment
The invention will be further described below in conjunction with the drawings and specific embodiments.
Figure 1 shows that structural representation front view of the present invention.
The present invention is comprised of with vertical shift mechanism 9, transverse-moving mechanism 5 and track 6 upper tank beam 1, erecting by overhang 2, electrohydraulic control system 3, bracing frame 4.
Track 6 is laid on has built on the concrete box girder, is C type girder system system vertical shift walking track.
Upper tank beam 1 main carrying mobile formwork bridge fabrication machine rear end self load.
Upper tank beam 1 is fixedly mounted on the track 6 by bracing frame 4, and is fixedly connected with mobile formwork girder 20 by erecting by overhang 2; Support frame as described above 4 is provided with jacking hydraulic cylinder 14, and electrohydraulic control system 3 drives the lifting realization of this jacking hydraulic cylinder 14 to the suspention of mobile formwork girder 20 rear ends; Described transverse-moving mechanism 5 is provided with traversing hydraulic cylinder 11 and traversing promotion frame 10, vertical shift mechanism 9 is provided with vertical shift hydraulic cylinder 12 and vertical shift and promotes frame 13, is 3 to drive respectively the flexible realization of traversing hydraulic cylinder 11 and vertical shift hydraulic cylinder 12 to the control of the traversing folding in mobile formwork girder 20 rear ends and vertical shift walking by electrichydraulic control under suspended state.
Described erecting by overhang 2 is comprised of hanging beam 6, suspension rod 7, traversing drop in beam 8, traversing drop in beam 8 is connected with suspension rod by hanging beam 6 and is connected with upper tank beam 1, mobile formwork girder 20 is installed in the below of traversing drop in beam 8, and hanging beam 6, suspension rod 7 and traversing drop in beam 8 participate in stressed together.
Erecting by overhang 2 is the link of upper tank beam 1 and mobile formwork girder 20, carries mobile formwork bridge fabrication machine rear end self load with upper tank beam 1.
Figure 4 shows that traversing promotion shelf structure schematic diagram of the present invention.
Be provided with traversing promotion frame 10 and traversing hydraulic cylinder 11 on the described traversing drop in beam 8, control the flexible of traversing hydraulic cylinder 11 and realize the 20 traversing foldings of mobile formwork girder by traversing promotion frame 10.
Figure 3 shows that support frame structure schematic diagram of the present invention.
Support frame as described above 4 is comprised of supporting frame 15, base 16, jacking hydraulic cylinder 14, supporting frame 15 is enclosed within on jacking hydraulic cylinder 14 and the base 16 and plays position-limiting action, its top is fixed together by bolt and upper tank beam 1, base 16 is supported on the track 5, and the lifting of jacking hydraulic cylinder 14 realizes the suspention that upper tank beam 1 and mobile formwork girder 20 make up.
Figure 2 shows that bracing frame of the present invention and vertical shift mechanism structure schematic diagram.
Described vertical shift mechanism 9 comprises vertical shift hydraulic cylinder 12 and the vertical shift that is installed on the track 5 promotes frame 13, the two ends of vertical shift hydraulic cylinder 12 connect respectively on the base of vertical shift hydraulic cylinder 12 and bracing frame 4, and the flexible realization upper tank beam 1 of control vertical shift hydraulic cylinder 12 is walked along track 5 vertical shifts with 20 combinations of mobile formwork girder under suspended state.
Described electrohydraulic control system 3 comprises hydraulic power unit and operating platform, and this hydraulic power unit and operating platform are arranged on the upper tank beam 1, for jacking hydraulic cylinder 14, vertical shift hydraulic cylinder 12 and traversing hydraulic cylinder 11 flexible provides electrichydraulic control; The AC 380V of described electrohydraulic control system 3; 50HZ, system works pressure 32Mpa.
The present invention has following features:
A: simple in structure, stressed clear and definite: mobile formwork girder 20 is suspended to upper tank beam 1 on the bridge floor by erecting by overhang 2, and mobile formwork girder 20 is all born by erecting by overhang 2 at the support reaction of suspension point, and is stressed clear and definite;
B: adopt machinery, hydraulic pressure electrical control, operate succinct, safe and reliable: after the hanging beam 6 that is connected with upper tank beam 1, suspension rod 7 and traversing drop in beam 8 are affixed, make hanging beam 6, suspension rod 7 and traversing drop in beam 8 stressed by jack-up hydraulic ram 14, jack-up hydraulic ram 14 mechanical locks lock subsequently, be responsible for the support top work in the work progress, avoid jack-up hydraulic ram 14 oil return and having an accident in work progress;
C: installation rate is fast, conversion is fast: after C type girder system system installs, finish the conversion of the carrying system of mobile formwork bridge fabrication machine rear end deadweight by the lifting of control jacking hydraulic cylinder 14;
D: under the state that suspends in midair, walked by traversing folding and the vertical shift of the auxiliary realization of electrichydraulic control mobile formwork bridge fabrication machine: by the traversing hydraulic cylinder 11 of electrichydraulic control, the 12 flexible horizontal foldings of realization of vertical shift hydraulic cylinder and vertical shift walking.
The present invention has adopted by Driven by Hydraulic Cylinder jacking suspention mobile formwork system, it is mobile formwork vertical shift walking, the auxiliary body of horizontal folding, by acting on the concrete box girder, erecting by overhang and jacking hydraulic cylinder by self are transformed into top C type girder system system with the gravity load of mobile formwork rear end by the bottom bracket, it is by auxiliary traversing folding and the vertical shift walking that realizes mobile formwork bridge fabrication machine of hydraulic control under the state of suspention, so that the realization of downstriker bracket automatic moving formwork bridge fabrication machine becomes possibility, the present invention operates succinctly, safe and reliable, suspention mobile formwork system in the time of can realizing the mobile formwork vertical shift.
The above-mentioned embodiment of the present invention just illustrates, and is not only, all within the scope of the present invention or the change that is equal in the scope of the present invention all surrounded by the present invention.

Claims (4)

1. a mobile formwork bridge fabrication machine C type girder system is united, it is characterized in that: by upper tank beam (1), erecting by overhang (2), electrohydraulic control system (3), bracing frame (4) with vertical shift mechanism (9), transverse-moving mechanism (5) be laid on the track (6) of having built on the concrete box girder and form, upper tank beam (1) is fixedly mounted on the track (6) by bracing frame (4), and is fixedly connected with mobile formwork girder (20) by erecting by overhang (2); Support frame as described above (4) is provided with jacking hydraulic cylinder (14), and electrohydraulic control system (3) drives the lifting realization of this jacking hydraulic cylinder (14) to the suspention of mobile formwork girder (20) rear end; Described transverse-moving mechanism (5) is provided with traversing hydraulic cylinder (11), vertical shift mechanism (9) is provided with vertical shift hydraulic cylinder (12), drives respectively the flexible realization of traversing hydraulic cylinder (11) and vertical shift hydraulic cylinder (12) to the control of the traversing folding in mobile formwork girder (20) rear end and vertical shift walking by electrichydraulic control system (3) under suspended state.
2. mobile formwork bridge fabrication machine C type girder system according to claim 1 is united, it is characterized in that: described erecting by overhang (2) is comprised of hanging beam (6), suspension rod (7), traversing drop in beam (8), traversing drop in beam (8) is connected 7 by hanging beam (6) with suspension rod) be connected with upper tank beam (1), mobile formwork girder (20) is installed in the below of traversing drop in beam (8); Be provided with traversing promotion frame (10) and traversing hydraulic cylinder (11) on the described traversing drop in beam (8), control the flexible of traversing hydraulic cylinder (11) and realize the traversing folding of mobile formwork girder (20) by traversing promotion frame (10).
3. mobile formwork bridge fabrication machine C type girder system according to claim 1 is united, it is characterized in that: support frame as described above (4) is comprised of supporting frame (15), base (16), jacking hydraulic cylinder (14), supporting frame (15) is enclosed within jacking hydraulic cylinder (14) and has gone up position-limiting action with base (16), its top is fixed together by bolt and upper tank beam (1), base (16) is supported on the track (5), and the lifting of jacking hydraulic cylinder (14) realizes the suspention that upper tank beam (1) and mobile formwork girder (20) make up; Described vertical shift mechanism (9) comprises vertical shift hydraulic cylinder (12) and the vertical shift that is installed on the track (5) promotes frame (13), the two ends of vertical shift hydraulic cylinder (12) connect respectively on the base of vertical shift hydraulic cylinder (12) and bracing frame (4), and the flexible realization upper tank beam (1) of control vertical shift hydraulic cylinder (12) is walked along track (5) vertical shift with mobile formwork girder (20) combination under suspended state.
4. according to claim 1,2 or 3 described mobile formwork bridge fabrication machine C type girder system systems, it is characterized in that: described electrohydraulic control system (3) comprises hydraulic power unit and operating platform, this hydraulic power unit and operating platform are arranged on the upper tank beam (1), for jacking hydraulic cylinder (14), vertical shift hydraulic cylinder (12) and traversing hydraulic cylinder (11) flexible provides electrichydraulic control; The AC 380V of described electrohydraulic control system (3); 50HZ, system works pressure 32Mpa.
CN2012104734679A 2012-11-21 2012-11-21 Movable mould frame bridge fabrication machine C type beam system Pending CN102943443A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012104734679A CN102943443A (en) 2012-11-21 2012-11-21 Movable mould frame bridge fabrication machine C type beam system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012104734679A CN102943443A (en) 2012-11-21 2012-11-21 Movable mould frame bridge fabrication machine C type beam system

Publications (1)

Publication Number Publication Date
CN102943443A true CN102943443A (en) 2013-02-27

Family

ID=47726423

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012104734679A Pending CN102943443A (en) 2012-11-21 2012-11-21 Movable mould frame bridge fabrication machine C type beam system

Country Status (1)

Country Link
CN (1) CN102943443A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106522113A (en) * 2016-11-19 2017-03-22 中交路桥建设有限公司 Integrally continuous backing method for moving formwork on girder face
CN106976799A (en) * 2017-05-19 2017-07-25 山东恒堃机械有限公司 Hanging beam before a kind of mobile formwork
CN109338894A (en) * 2018-11-22 2019-02-15 中铁十二局集团第工程有限公司 Mobile formwork pours width box girder construction method
CN109610340A (en) * 2019-01-09 2019-04-12 山东恒堃机械有限公司 A kind of novel cross-beam structure
CN109914246A (en) * 2019-03-05 2019-06-21 中交二航局第四工程有限公司 A kind of construction method of the cast-in-place super across footpath continuous box girder of 55m mobile formwork
CN110374015A (en) * 2019-08-05 2019-10-25 山东恒堃机械有限公司 It is a kind of cross concrete continuous beam exempt from dismount mobile formwork

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004107972A (en) * 2002-09-18 2004-04-08 Mitsubishi Heavy Ind Ltd Launching method and launching machine for bridge
CN101806038A (en) * 2010-03-29 2010-08-18 山东省路桥集团有限公司 Curved box girder sliding mold frame and construction method
CN101892633A (en) * 2010-07-22 2010-11-24 中交第二航务工程局有限公司 Self-propelled small radius movable mould frame
CN202899042U (en) * 2012-11-21 2013-04-24 山东省路桥集团有限公司 Moving formwork bridge fabrication machine C-shaped girder system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004107972A (en) * 2002-09-18 2004-04-08 Mitsubishi Heavy Ind Ltd Launching method and launching machine for bridge
CN101806038A (en) * 2010-03-29 2010-08-18 山东省路桥集团有限公司 Curved box girder sliding mold frame and construction method
CN101892633A (en) * 2010-07-22 2010-11-24 中交第二航务工程局有限公司 Self-propelled small radius movable mould frame
CN202899042U (en) * 2012-11-21 2013-04-24 山东省路桥集团有限公司 Moving formwork bridge fabrication machine C-shaped girder system

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
刘尊宝: "0采用下行式移动模架现浇铁路客运专线32m箱梁施工关键技术", 《石家庄铁路职业技术学院学报》, no. 2, 30 June 2007 (2007-06-30) *
李海等: "DZ40/1000型移动模架设计与施工", 《华东公路》, 20 August 2006 (2006-08-20) *
王冠波等: "DXZ32/900下承自行式移动模架的设计", 《2012年全国地方机械工程学会学术年会论文集(河南分册)》, 11 October 2012 (2012-10-11) *
黄建刚: "移动模架造桥机在武广客运专线中的应用", 《黑龙江科技信息》, no. 20, 31 July 2008 (2008-07-31), pages 210 - 211 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106522113A (en) * 2016-11-19 2017-03-22 中交路桥建设有限公司 Integrally continuous backing method for moving formwork on girder face
CN106522113B (en) * 2016-11-19 2018-01-09 中交路桥建设有限公司 The overall continuous rear annealing method in mobile formwork beam face
CN106976799A (en) * 2017-05-19 2017-07-25 山东恒堃机械有限公司 Hanging beam before a kind of mobile formwork
CN106976799B (en) * 2017-05-19 2018-03-16 山东恒堃机械有限公司 Hanging beam before a kind of mobile formwork
CN109338894A (en) * 2018-11-22 2019-02-15 中铁十二局集团第工程有限公司 Mobile formwork pours width box girder construction method
CN109338894B (en) * 2018-11-22 2020-05-12 中铁十二局集团第一工程有限公司 Construction method for pouring wide and narrow box girder by movable formwork
CN109610340A (en) * 2019-01-09 2019-04-12 山东恒堃机械有限公司 A kind of novel cross-beam structure
CN109914246A (en) * 2019-03-05 2019-06-21 中交二航局第四工程有限公司 A kind of construction method of the cast-in-place super across footpath continuous box girder of 55m mobile formwork
CN110374015A (en) * 2019-08-05 2019-10-25 山东恒堃机械有限公司 It is a kind of cross concrete continuous beam exempt from dismount mobile formwork

Similar Documents

Publication Publication Date Title
CN102661039B (en) Drum frame supporting power built-in integrated jacking steel platform formwork system and construction method
CN102943443A (en) Movable mould frame bridge fabrication machine C type beam system
CN203049466U (en) Downward bracket self-moving formwork bridge fabrication machine
CN102953343A (en) Descending bracket self-mobile model framework bridge fabrication machine
CN103669211B (en) Hydraulic multifunctional suspension-assembly girder lifting machine and steel box girder assembling method
CN104631335A (en) Novel large-tonnage bridge girder erection machine and construction method thereof
CN102140779B (en) Movable cast-in-situ support and movable construction method of box girder cast-in-situ support
CN201151881Y (en) Wheeltrack type hoisting girder machine
CN206553961U (en) The short light-duty expanded letter combined type Hanging Basket of tower cable-stayed bridge
CN101210419A (en) Inside and outside beam system bridge fabrication machine for small radius curve concrete box girder construction and construction method thereof
CN201801818U (en) Bridge erecting machine capable of erecting double-track twin beams at tunnel entrance by zero distance
CN105540446A (en) Interior-climbing type lifting platform
CN103526697B (en) Self-propelled movable formwork for construction of double-rectangle water conservancy aqueduct
CN103498421A (en) Movable formwork used for U-type water-conservancy flume construction
CN103437302A (en) Hanging basket construction method for suspension pouring section of single cable plane cable-stayed bridge
CN202899042U (en) Moving formwork bridge fabrication machine C-shaped girder system
CN101570959B (en) Cross-over bridge fabrication machine with up mobile formwork and cross-over construction method thereof
CN110820602A (en) Single-segment box girder bridge girder erection machine and operation method thereof
CN202755313U (en) Tunnel portal short-distance girder-erecting and tunnel-passing bridge-erecting machine
CN201943004U (en) Double-girder transporting and erecting integrated bridge girder erecting machine capable of realizing girder erecting at zero distance from tunnel portal
CN102286931B (en) Deck moving support system (MSS) bridge fabrication machine specially for construction of double-T-shaped bridge
CN110130203B (en) Upper-bearing arch-rigid frame continuous beam combined bridge and construction method
CN114808747A (en) Multifunctional bridge girder erection machine and bridge girder erection construction method
CN101575907B (en) Lateral mobile mould base with multi-supports for bridge construction
CN206902548U (en) Bridge Erector

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Wang Xiaoshan

Inventor after: Liu Dejian

Inventor after: Han Junxia

Inventor after: Wang Dianxue

Inventor before: Wang Xiaoshan

Inventor before: Zhou Yukun

Inventor before: Liu Dejian

Inventor before: Han Junxia

Inventor before: Wang Dianxue

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: WANG XIAOSHAN ZHOU YUKUN LIU DEJIAN HAN JUNXIA WANG DIANXUE TO: WANG XIAOSHAN LIU DEJIAN HAN JUNXIA WANG DIANXUE

C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130227